Sri Tirumala Millennium Phase-II ,block-C
ENGINEERS ASSOCIATES PRIVATE LIMITED · Medchal-Malkajgiri · RERA P02200001536
SRI TIRUMALA MILLENNIUM PHASE-II ,BLOCK-C is a residential apartment project in Mallapur, Uppal, Medchal-Malkajgiri, developed by the registered promoter ENGINEERS ASSOCIATES PRIVATE LIMITED. The registered site area is 3968.15 sq. m, and the project comprises one block with 1 Cellar + Stilt + 5 upper floors and 80 apartments: 20 2BHK and 60 3BHK. The project is registered with TG-RERA under P02200001536, and the GHMC permit states that construction is to be completed before 29 October, 2025.
More from Engineers Associates Pvt Ltd · 5 projects →
01What we found
Read from TG-RERA filings, approvals, land and registration records and court records. A court case is counted only when the court record states this project's survey number with its village, or names the project.
02Check before you pay
10 items to check before you pay, 4 high - from the title chain, court records and approvals, each with what to ask the builder or your advocate. An item may not be a problem with the project: records can be incomplete.
1. Project at a glance
Project identity
| Field | Project record |
|---|---|
| Exact registered name | SRI TIRUMALA MILLENNIUM PHASE-II,BLOCK-C RERA record |
| Project type | Residential apartment project RERA record |
| Phase / registered portion | Phase-II, Block-C; registration is for this named project portion |
| TG-RERA registration | P02200001536; certificate issued 27/12/2019, valid from 27/12/2019 through 29/10/2025. The certificate record says no extension is recorded. |
| Registered promoter | ENGINEERS ASSOCIATES PRIVATE LIMITED (also shown in filed documents as M/s. Engineers Associates Pvt. Ltd.) RERA record Corporate record |
| RERA status in supplied record | New Project; the registration period stated on the certificate has ended, and no extension is recorded in the supplied certificate data. This is separate from the completion deadline and from occupancy-certificate status. RERA record |
Land and geographic identity
| Field | Project record |
|---|---|
| Locality / revenue village | Mallapur (also stated as Mallapur Village / MALLAPUR); locality field otherwise records NA. RERA record RERA filing |
| Mandal / district / PIN | Uppal / Medchal-Malkajgiri / 500076 RERA record |
| Project survey reference | Survey No. 161 P, also recorded in the building permit as Sy. No. 161(PART). RERA record RERA filing |
| Registered site extent | Total/site area 3968.15 sq. m; road-affected area 404.09 sq. m; net area 3564.06 sq. m. RERA filing |
| Boundary descriptions | East: Owner Land; West: Nighber land; North: Road; South: Nighber land (as recorded). RERA filing |
| Building-permit land-use figures | Tot-lot 179.2 sq. m; nala-affected area 0. |
Development identity
| Field | Project record |
|---|---|
| Sanctioning authority | Greater Hyderabad Municipal Corporation (GHMC) Approvals record |
| Principal building permit | Approval No. 1/C1/15640/2019; File No. 1/C1/13232/2019; approved 29 October, 2019. Approvals record |
| Sanctioned building | BLOCK C-1 (ST MILLENNIUM), residential; 1 Cellar + Stilt + 5 upper floors. |
| Height | 14.95 m, as stated in the sanctioned parameters. |
| Approved built-up area | Project record states approved built-up area 14621.14 sq. m; the building-permit extraction separately lists “Proposed Covered builtup area 744,080.00” without a unit in that extracted item. These are reported as recorded, not treated as interchangeable measures. RERA filing |
| Parking areas shown in permit | Cellar parking 2,001.10 and stilt parking 1,990.13 (areas as extracted; no parking-space count supplied). |
| RERA-declared homes | 80 units in one block/tower: 60 3BHK and 20 2BHK. RERA unit table |
| Sanctioned unit count | The building-permit conditions state that the sanctioned number of units must not be increased without prior GHMC approval; the number itself is not provided in the supplied permit extraction. |
Offering and status
| Field | Project record |
|---|---|
| RERA-filed configurations | 2BHK and 3BHK apartments RERA unit table |
| RERA-filed saleable area | 2BHK: 106.19–110.37 sq. m; 3BHK: 116.22–167.23 sq. m RERA unit table |
| Booked / available | 2BHK: 8 booked / 12 available; 3BHK: 39 booked / 21 available. Counts are from the TG-RERA portal record, which has no as-of date; treat them as indicative. RERA unit table |
| Completion dates in supplied records | Form B declaration: completion by 30/10/2021. TG-RERA registration certificate: validity ends 29/10/2025. GHMC building-permit parameters: construction to be completed before 29 October, 2025. |
| Construction stage | No independent site-progress verification or current construction-stage evidence is supplied. The RERA amenity record reports some infrastructure entries at 100%; that is a filed status, not an independent site inspection. RERA amenities |
| Occupancy / completion certificate | No occupancy or completion certificate is present in the supplied project documents. The GHMC permit states that an occupancy certificate is compulsory before occupation. Document index |
2. The project story
This is a single-block residential apartment development registered with TG-RERA as SRI TIRUMALA MILLENNIUM PHASE-II,BLOCK-C, on Survey No. 161 P in Mallapur, Uppal Mandal, Medchal-Malkajgiri District. The GHMC building permit identifies the building as Block C-1 (ST MILLENNIUM), with a cellar, stilt and five upper floors, and records a residential use. RERA record
The RERA filing lists 80 apartments—2BHK and 3BHK—and records 47 booked and 33 available in total. These inventory figures have no stated portal “as of” date. The supplied material does not establish the present construction stage through an independent site inspection, or establish that the building has received an occupancy or completion certificate. RERA unit table RERA amenities Document index
The project’s completion dates appear in separate project records: the promoter’s Form B declaration gives 30/10/2021, while the RERA certificate and GHMC permit give 29/10/2025 as the end of the registration validity and the permit completion deadline, respectively. These dates describe different recorded matters; the available documents do not establish a current completion or occupancy status.
3. Master plan, architecture & building design
The GHMC permit identifies one residential building, Block C-1 (ST MILLENNIUM), with 1 Cellar + Stilt + 5 upper floors and a stated height of 14.95 m. It records a site area of 3968.15 sq. m, road-affected area of 404.09 sq. m, net area of 3564.06 sq. m, tot-lot of 179.2 sq. m, and nala-affected area of 0.
The permit extraction gives cellar parking area as 2,001.10 and stilt parking area as 1,990.13; units for these extracted area entries and parking-space counts are not supplied. The RERA project record gives approved built-up area as 14621.14 sq. m. The building-permit extraction separately lists “Proposed Covered builtup area 744,080.00” without a unit in that field, so it is not used here as a comparable area measure. RERA filing
The supplied drawing record comprises one floor-plan document; it includes a typical plan labelled “TYPICAL -1,3,4,5 FLOOR PLAN” and a “SECOND FLOOR PLAN.” Drawing-derived measurements of apartment interiors are described in Section 4. No supplied evidence establishes a detailed building footprint, flats per floor, lift or stair quantities, internal road layout, or residential/commercial floor-area split. Floor plans
4. Homes, configurations & floor plans
The TG-RERA record lists 80 apartments: 20 2BHK and 60 3BHK. The saleable-area ranges below are RERA-filed. “Carpet area” figures are software measurements from the floor-plan drawing geometry, not RERA disclosures; the supplied measurement notes say these require review. Saleable area and carpet area are distinct measures: the drawing-based carpet measurement excludes balcony areas and does not represent the saleable area, which includes the home’s share of common areas. RERA unit table RERA unit details Floor plans
| Configuration | Units | Booked | Available | RERA saleable area | Measured carpet area | Loading (if supplied) |
|---|---|---|---|---|---|---|
| 2BHK | 20 | 8 | 12 | 106.19–110.37 sq. m | Software-measured: 62.1–75.3 sq. m; median 65.5 sq. m (7 flat designs measured) | 39% (supplied drawing-measurement record) |
| 3BHK | 60 | 39 | 21 | 116.22–167.23 sq. m | Software-measured: 79.7–100.3 sq. m; median 92.9 sq. m (21 flat designs measured) | Not supplied |
The drawing record shows, for one illustrated 2BHK, a hall, two bedrooms, kitchen, two toilets and two balconies. For one illustrated 3BHK, it shows living/dining, three bedrooms, kitchen, three toilets and two balconies. These are examples from the cited plan panels, not a statement that every unit has the same arrangement. The 2BHK drawing measurement record supplies a 39% loading figure; no equivalent 3BHK loading figure is supplied. RERA unit details
A 4BHK measurement is also present in the drawing analysis (one measured design; carpet area 88.8 sq. m), but 4BHK is not listed in the supplied TG-RERA unit configurations; it is therefore not presented as a RERA-filed offering. RERA unit details Floor plans
5. Parking & vehicle circulation
The GHMC permit identifies cellar and stilt parking areas of 2,001.10 and 1,990.13, respectively, and requires those areas to be used exclusively for vehicle parking without partition walls or rolling shutters. The extraction does not provide the units for these area figures or the number of parking spaces, and the supplied records do not establish resident/visitor allocations, accessible parking, mechanical parking, EV charging, parking ownership or unit-specific allotments.
The permit also records 18 mt. road widths and requires the applicant to form a BT road before release of the occupancy certificate. The supplied material does not describe parking ramps, the number or arrangement of vehicle entrances and exits, or pedestrian separation.
6. Amenities, recreation & open spaces
| Description / size | 179.2 sq. m tot-lot in the GHMC permit; permit requires it to be fenced and maintained as greenery before issue of occupancy certificate. |
|---|---|
| Evidence source | GHMC building permit; RERA amenity record RERA amenities |
| Declared progress / verified status | RERA amenity record marks “Green Strip/TOT LOT/Park” at 100%; this is a filed declaration, not independently verified completion. |
| Description / size | No dimensions or description supplied. |
|---|---|
| Evidence source | RERA amenity record RERA amenities |
| Declared progress / verified status | Filed at 0%. |
| Description / size | No facility or size specified. |
|---|---|
| Evidence source | RERA amenity record RERA amenities |
| Declared progress / verified status | Filed at 0%. |
| Description / size | No area supplied. |
|---|---|
| Evidence source | RERA amenity record RERA amenities |
| Declared progress / verified status | Filed at 0%. |
No project-specific TG-RERA evidence supplied here establishes a clubhouse, gym, swimming pool, indoor play area or children’s activity zone. These are not included as verified project facilities.
7. Utilities, building services & safety
| Evidence in the project record | RERA amenity record marks Water Supply and Water Conservation/Rain Water Harvesting as available at 100%. GHMC permit specifies 8 rain-water-harvesting pits. |
|---|---|
| Status / limitation | Filed availability is not independent verification of operation or capacity. No water source, storage capacity or treatment capacity is supplied. RERA amenities |
| Evidence in the project record | RERA amenity record marks Sewerage (chamber, lines, septic tank, STP) and Storm Water Drains at 100%. The permit requires an ETP as per standard specification. |
|---|---|
| Status / limitation | These are filed/permit requirements; no capacity, test results or independent operational verification is supplied. RERA amenities |
| Evidence in the project record | RERA amenity record marks Electrical Meter Room, Sub-Station, Receiving Station at 100%. GHMC permit requires transformer space on site. |
|---|---|
| Status / limitation | No transformer capacity, utility connection evidence or backup-power details supplied. RERA amenities |
| Evidence in the project record | GHMC permit requires a garbage house within the premises. |
|---|---|
| Status / limitation | RERA amenity record marks Solid Waste Management and Disposal at 0%; no collection or disposal arrangements are otherwise documented. RERA amenities |
| Evidence in the project record | RERA amenity record lists Fire Protection and Fire Safety Requirements at 0%. |
|---|---|
| Status / limitation | No project-specific fire clearance or detailed fire-system specifications are supplied in this Overview evidence. RERA amenities |
| Evidence in the project record | No lift count, service lift, capacities, accessible circulation, CCTV or access-control details are supplied. |
|---|---|
| Status / limitation | Not established by the available project record. |
The GHMC permit states that an occupancy certificate is compulsory before occupation and requires a completion notice after construction. It also requires the applicant to follow the sanctioned plan. These are permit conditions, not proof that the specified works or approvals have been completed.
8. Location, access & connectivity
The registered project location is Mallapur, Uppal Mandal, Medchal-Malkajgiri District, Telangana, PIN 500076, on Survey No. 161 P. The GHMC permit also identifies Mallapur and records an 18 mt. road width. RERA record
The supplied location dataset reports the nearest sampled Outer Ring Road interchange at approximately 48.2 km. No measured distances or travel times to other public-transport facilities or landmarks are supplied from the project-location record. Location record
9. Developer & development status
The registered promoter is ENGINEERS ASSOCIATES PRIVATE LIMITED, a company, with GSTIN 36AAACE7931K1ZG. The registered project address is recorded as Mallapur, Uppal Mandal, Medchal-Malkajgiri District, PIN 500076. The supplied record does not provide a project-specific official contact telephone number, email address or promoter website. RERA record Corporate record
The GHMC permit names Engineers Associates Pvt. Ltd. as the development-agreement-cum-GPA holder acting for A. Ramesh Goud & Others and identifies A. Praveen as its representative. The RERA Form B affidavit, dated 1st day of NOVEMBER 2019, is made by Mr. Adhikam Praveen for the promoter and declares a project-completion period ending 30/10/2021. The RERA registration certificate and GHMC permit separately state 29/10/2025 as the registration end date and building-permit completion deadline.
The supplied evidence does not establish current construction progress or a completed/occupancy-certified status by independent inspection. The permit extraction includes a “Floor handed over SECOND FLOOR Area (m2) 951.75” entry; that recorded item alone does not establish current overall completion or occupancy status. Document index
10. Approvals, official records & documents
| Reference and scope | Form C; registration P02200001536 for SRI TIRUMALA MILLENNIUM PHASE-II, BLOCK-C; issued 27/12/2019, valid through 29/10/2025; no extension recorded in supplied certificate data. |
|---|
| Reference and scope | Approval No. 1/C1/15640/2019, File No. 1/C1/13232/2019, dated 29 October, 2019; Block C-1 (ST MILLENNIUM), Survey No. 161(PART), Mallapur. |
|---|
| Reference and scope | Promoter declaration by Mr. Adhikam Praveen, dated 1st day of NOVEMBER 2019, including stated title basis, encumbrance declaration and completion undertaking. |
|---|
| Reference and scope | TG-RERA document 82804, listed as building floor-plan material; floor-plan analysis provides software-measured interior areas. |
|---|---|
| Source | Floor plans |
| Reference and scope | No such certificate is included in the supplied documents. |
|---|---|
| Source | Document index |
| Reference and scope | The supplied environmental clearance and pollution-board entries are matched at promoter level and identify another project name or do not establish coverage of this project’s survey and extent; they are not treated here as project-specific clearances. |
|---|---|
| Source | Regulatory record |
1. Project at a glance
Project identity
Exact registered name: SRI TIRUMALA MILLENNIUM PHASE-II,BLOCK-C
Project type: Residential apartment project
Phase / registered portion: Phase-II, Block-C; registration is for this named project portion
TG-RERA registration: P02200001536; certificate issued 27/12/2019, valid from 27/12/2019 through 29/10/2025. The certificate record says no extension is recorded.
Registered promoter: ENGINEERS ASSOCIATES PRIVATE LIMITED (also shown in filed documents as M/s. Engineers Associates Pvt. Ltd.)
RERA status in supplied record: New Project; the registration period stated on the certificate has ended, and no extension is recorded in the supplied certificate data. This is separate from the completion deadline and from occupancy-certificate status.
Land and geographic identity
Locality / revenue village: Mallapur (also stated as Mallapur Village / MALLAPUR); locality field otherwise records NA.
Mandal / district / PIN: Uppal / Medchal-Malkajgiri / 500076
Project survey reference: Survey No. 161 P, also recorded in the building permit as Sy. No. 161(PART).
Registered site extent: Total/site area 3968.15 sq. m; road-affected area 404.09 sq. m; net area 3564.06 sq. m.
Boundary descriptions: East: Owner Land; West: Nighber land; North: Road; South: Nighber land (as recorded).
Building-permit land-use figures: Tot-lot 179.2 sq. m; nala-affected area 0.
Development identity
Sanctioning authority: Greater Hyderabad Municipal Corporation (GHMC)
Principal building permit: Approval No. 1/C1/15640/2019; File No. 1/C1/13232/2019; approved 29 October, 2019.
Sanctioned building: BLOCK C-1 (ST MILLENNIUM), residential; 1 Cellar + Stilt + 5 upper floors.
Height: 14.95 m, as stated in the sanctioned parameters.
Approved built-up area: Project record states approved built-up area 14621.14 sq. m; the building-permit extraction separately lists “Proposed Covered builtup area 744,080.00” without a unit in that extracted item. These are reported as recorded, not treated as interchangeable measures.
Parking areas shown in permit: Cellar parking 2,001.10 and stilt parking 1,990.13 (areas as extracted; no parking-space count supplied).
RERA-declared homes: 80 units in one block/tower: 60 3BHK and 20 2BHK.
Sanctioned unit count: The building-permit conditions state that the sanctioned number of units must not be increased without prior GHMC approval; the number itself is not provided in the supplied permit extraction.
Offering and status
RERA-filed configurations: 2BHK and 3BHK apartments
RERA-filed saleable area: 2BHK: 106.19–110.37 sq. m; 3BHK: 116.22–167.23 sq. m
Booked / available: 2BHK: 8 booked / 12 available; 3BHK: 39 booked / 21 available. Counts are from the TG-RERA portal record, which has no as-of date; treat them as indicative.
Completion dates in supplied records: Form B declaration: completion by 30/10/2021. TG-RERA registration certificate: validity ends 29/10/2025. GHMC building-permit parameters: construction to be completed before 29 October, 2025.
Construction stage: No independent site-progress verification or current construction-stage evidence is supplied. The RERA amenity record reports some infrastructure entries at 100%; that is a filed status, not an independent site inspection.
Occupancy / completion certificate: No occupancy or completion certificate is present in the supplied project documents. The GHMC permit states that an occupancy certificate is compulsory before occupation.
2. The project story
This is a single-block residential apartment development registered with TG-RERA as SRI TIRUMALA MILLENNIUM PHASE-II,BLOCK-C, on Survey No. 161 P in Mallapur, Uppal Mandal, Medchal-Malkajgiri District. The GHMC building permit identifies the building as Block C-1 (ST MILLENNIUM), with a cellar, stilt and five upper floors, and records a residential use.
The RERA filing lists 80 apartments—2BHK and 3BHK—and records 47 booked and 33 available in total. These inventory figures have no stated portal “as of” date. The supplied material does not establish the present construction stage through an independent site inspection, or establish that the building has received an occupancy or completion certificate.
The project’s completion dates appear in separate project records: the promoter’s Form B declaration gives 30/10/2021, while the RERA certificate and GHMC permit give 29/10/2025 as the end of the registration validity and the permit completion deadline, respectively. These dates describe different recorded matters; the available documents do not establish a current completion or occupancy status.
3. Master plan, architecture & building design
The GHMC permit identifies one residential building, Block C-1 (ST MILLENNIUM), with 1 Cellar + Stilt + 5 upper floors and a stated height of 14.95 m. It records a site area of 3968.15 sq. m, road-affected area of 404.09 sq. m, net area of 3564.06 sq. m, tot-lot of 179.2 sq. m, and nala-affected area of 0.
The permit extraction gives cellar parking area as 2,001.10 and stilt parking area as 1,990.13; units for these extracted area entries and parking-space counts are not supplied. The RERA project record gives approved built-up area as 14621.14 sq. m. The building-permit extraction separately lists “Proposed Covered builtup area 744,080.00” without a unit in that field, so it is not used here as a comparable area measure.
The supplied drawing record comprises one floor-plan document; it includes a typical plan labelled “TYPICAL -1,3,4,5 FLOOR PLAN” and a “SECOND FLOOR PLAN.” Drawing-derived measurements of apartment interiors are described in Section 4. No supplied evidence establishes a detailed building footprint, flats per floor, lift or stair quantities, internal road layout, or residential/commercial floor-area split.
4. Homes, configurations & floor plans
The TG-RERA record lists 80 apartments: 20 2BHK and 60 3BHK. The saleable-area ranges below are RERA-filed. “Carpet area” figures are software measurements from the floor-plan drawing geometry, not RERA disclosures; the supplied measurement notes say these require review. Saleable area and carpet area are distinct measures: the drawing-based carpet measurement excludes balcony areas and does not represent the saleable area, which includes the home’s share of common areas.
| Configuration | Units | Booked | Available | RERA saleable area | Measured carpet area | Loading (if supplied) |
|---|---|---|---|---|---|---|
| 2BHK | 20 | 8 | 12 | 106.19–110.37 sq. m | Software-measured: 62.1–75.3 sq. m; median 65.5 sq. m (7 flat designs measured) | 39% (supplied drawing-measurement record) |
| 3BHK | 60 | 39 | 21 | 116.22–167.23 sq. m | Software-measured: 79.7–100.3 sq. m; median 92.9 sq. m (21 flat designs measured) | Not supplied |
The drawing record shows, for one illustrated 2BHK, a hall, two bedrooms, kitchen, two toilets and two balconies. For one illustrated 3BHK, it shows living/dining, three bedrooms, kitchen, three toilets and two balconies. These are examples from the cited plan panels, not a statement that every unit has the same arrangement. The 2BHK drawing measurement record supplies a 39% loading figure; no equivalent 3BHK loading figure is supplied.
A 4BHK measurement is also present in the drawing analysis (one measured design; carpet area 88.8 sq. m), but 4BHK is not listed in the supplied TG-RERA unit configurations; it is therefore not presented as a RERA-filed offering.
5. Parking & vehicle circulation
The GHMC permit identifies cellar and stilt parking areas of 2,001.10 and 1,990.13, respectively, and requires those areas to be used exclusively for vehicle parking without partition walls or rolling shutters. The extraction does not provide the units for these area figures or the number of parking spaces, and the supplied records do not establish resident/visitor allocations, accessible parking, mechanical parking, EV charging, parking ownership or unit-specific allotments.
The permit also records 18 mt. road widths and requires the applicant to form a BT road before release of the occupancy certificate. The supplied material does not describe parking ramps, the number or arrangement of vehicle entrances and exits, or pedestrian separation.
6. Amenities, recreation & open spaces
| Facility | Description / size | Evidence source | Declared progress / verified status |
|---|---|---|---|
| Tot-lot / green strip | 179.2 sq. m tot-lot in the GHMC permit; permit requires it to be fenced and maintained as greenery before issue of occupancy certificate. | GHMC building permit; RERA amenity record | RERA amenity record marks “Green Strip/TOT LOT/Park” at 100%; this is a filed declaration, not independently verified completion. |
| Internal roads & footpaths | No dimensions or description supplied. | RERA amenity record | Filed at 0%. |
| Community buildings | No facility or size specified. | RERA amenity record | Filed at 0%. |
| Aggregate recreational open space | No area supplied. | RERA amenity record | Filed at 0%. |
No project-specific TG-RERA evidence supplied here establishes a clubhouse, gym, swimming pool, indoor play area or children’s activity zone. These are not included as verified project facilities.
7. Utilities, building services & safety
| Evidence in the project record | RERA amenity record marks Water Supply and Water Conservation/Rain Water Harvesting as available at 100%. GHMC permit specifies 8 rain-water-harvesting pits. |
|---|---|
| Status / limitation | Filed availability is not independent verification of operation or capacity. No water source, storage capacity or treatment capacity is supplied. |
| Evidence in the project record | RERA amenity record marks Sewerage (chamber, lines, septic tank, STP) and Storm Water Drains at 100%. The permit requires an ETP as per standard specification. |
|---|---|
| Status / limitation | These are filed/permit requirements; no capacity, test results or independent operational verification is supplied. |
| Evidence in the project record | RERA amenity record marks Electrical Meter Room, Sub-Station, Receiving Station at 100%. GHMC permit requires transformer space on site. |
|---|---|
| Status / limitation | No transformer capacity, utility connection evidence or backup-power details supplied. |
| Evidence in the project record | GHMC permit requires a garbage house within the premises. |
|---|---|
| Status / limitation | RERA amenity record marks Solid Waste Management and Disposal at 0%; no collection or disposal arrangements are otherwise documented. |
| Evidence in the project record | RERA amenity record lists Fire Protection and Fire Safety Requirements at 0%. |
|---|---|
| Status / limitation | No project-specific fire clearance or detailed fire-system specifications are supplied in this Overview evidence. |
| Evidence in the project record | No lift count, service lift, capacities, accessible circulation, CCTV or access-control details are supplied. |
|---|---|
| Status / limitation | Not established by the available project record. |
The GHMC permit states that an occupancy certificate is compulsory before occupation and requires a completion notice after construction. It also requires the applicant to follow the sanctioned plan. These are permit conditions, not proof that the specified works or approvals have been completed.
8. Location, access & connectivity
The registered project location is Mallapur, Uppal Mandal, Medchal-Malkajgiri District, Telangana, PIN 500076, on Survey No. 161 P. The GHMC permit also identifies Mallapur and records an 18 mt. road width.
The supplied location dataset reports the nearest sampled Outer Ring Road interchange at approximately 48.2 km. No measured distances or travel times to other public-transport facilities or landmarks are supplied from the project-location record.
9. Developer & development status
The registered promoter is ENGINEERS ASSOCIATES PRIVATE LIMITED, a company, with GSTIN 36AAACE7931K1ZG. The registered project address is recorded as Mallapur, Uppal Mandal, Medchal-Malkajgiri District, PIN 500076. The supplied record does not provide a project-specific official contact telephone number, email address or promoter website.
The GHMC permit names Engineers Associates Pvt. Ltd. as the development-agreement-cum-GPA holder acting for A. Ramesh Goud & Others and identifies A. Praveen as its representative. The RERA Form B affidavit, dated 1st day of NOVEMBER 2019, is made by Mr. Adhikam Praveen for the promoter and declares a project-completion period ending 30/10/2021. The RERA registration certificate and GHMC permit separately state 29/10/2025 as the registration end date and building-permit completion deadline.
The supplied evidence does not establish current construction progress or a completed/occupancy-certified status by independent inspection. The permit extraction includes a “Floor handed over SECOND FLOOR Area (m2) 951.75” entry; that recorded item alone does not establish current overall completion or occupancy status.
10. Approvals, official records & documents
| Reference and scope | Form C; registration P02200001536 for SRI TIRUMALA MILLENNIUM PHASE-II, BLOCK-C; issued 27/12/2019, valid through 29/10/2025; no extension recorded in supplied certificate data. |
|---|
| Reference and scope | Approval No. 1/C1/15640/2019, File No. 1/C1/13232/2019, dated 29 October, 2019; Block C-1 (ST MILLENNIUM), Survey No. 161(PART), Mallapur. |
|---|
| Reference and scope | Promoter declaration by Mr. Adhikam Praveen, dated 1st day of NOVEMBER 2019, including stated title basis, encumbrance declaration and completion undertaking. |
|---|
| Reference and scope | TG-RERA document 82804, listed as building floor-plan material; floor-plan analysis provides software-measured interior areas. |
|---|
| Reference and scope | No such certificate is included in the supplied documents. |
|---|
| Reference and scope | The supplied environmental clearance and pollution-board entries are matched at promoter level and identify another project name or do not establish coverage of this project’s survey and extent; they are not treated here as project-specific clearances. |
|---|
Other registrations of Sri Tirumala Millennium
Frequently asked questions
Is SRI TIRUMALA MILLENNIUM PHASE-II ,BLOCK-C registered with Telangana RERA?
Yes. SRI TIRUMALA MILLENNIUM PHASE-II ,BLOCK-C is registered with the Telangana Real Estate Regulatory Authority as P02200001536; the registration status is New Project.
Who is the developer of SRI TIRUMALA MILLENNIUM PHASE-II ,BLOCK-C?
The promoter named in the RERA registration is ENGINEERS ASSOCIATES PRIVATE LIMITED.
Where is SRI TIRUMALA MILLENNIUM PHASE-II ,BLOCK-C located?
SRI TIRUMALA MILLENNIUM PHASE-II ,BLOCK-C is in Mallapur, Uppal, Medchal-Malkajgiri, Telangana (500076).
When will SRI TIRUMALA MILLENNIUM PHASE-II ,BLOCK-C be completed?
The promoter's proposed date of completion filed with RERA is 29/10/2025. This is the promoter's declaration, not a guarantee.
More projects in Mallapur