Sri Tirumala Millennium Phase-Ii,block-B
ENGINEERS ASSOCIATES PRIVATE LIMITED · Medchal-Malkajgiri · RERA P02200001780
SRI TIRUMALA MILLENNIUM PHASE-II,BLOCK-B is a residential apartment project in Uppal, Mallapur, Uppal mandal, Medchal-Malkajgiri district. The registered promoter is ENGINEERS ASSOCIATES PRIVATE LIMITED. The project covers a site area of 3974.41 m² and comprises one building with 1 Cellar + Stilt + 5 upper floors and 83 apartments: 40 2BHK and 43 3BHK. It is registered under TG-RERA number P02200001780, with proposed completion on 21/05/2027.
More from Engineers Associates Pvt Ltd · 5 projects →
01What we found
Read from TG-RERA filings, approvals, land and registration records and court records. A court case is counted only when the court record states this project's survey number with its village, or names the project.
02Check before you pay
7 items to check before you pay, 3 high - from the title chain, court records and approvals, each with what to ask the builder or your advocate. An item may not be a problem with the project: records can be incomplete.
1. Project at a glance
Project identity
| Item | Record |
|---|---|
| Registered project name | SRI TIRUMALA MILLENNIUM PHASE-II,BLOCK-B |
| Project type | Residential apartment project |
| Phase / registered portion | Phase-II, Block-B |
| TG-RERA registration | P02200001780 |
| Registration validity | 20 March 2020 to 21 January 2027; the certificate states six years. Registration validity is separate from the completion deadline. |
| Registered promoter | ENGINEERS ASSOCIATES PRIVATE LIMITED |
| RERA status | The supplied TG-RERA certificate records registration under section 5. The project evidence labels its status “New Project.” RERA record |
Land and geographic identity
| Item | Record |
|---|---|
| Revenue village | Mallapur in the building permit and title records; the project header and land fields do not disclose a village. |
| Locality | The RERA certificate records Uppal; the building permit identifies Mallapur. |
| Mandal / district / PIN | Uppal / Medchal-Malkajgiri / 505331 (RERA certificate). |
| Survey identity | 161 PART; the permit specifies 161 (PART) and the title records refer to Sy.No. 161/Part, Mallapur. |
| Site area | 3974.41 m²; net area 3430.16 m². The RERA land fields record 544.25 m² affected by road widening/FTL of tanks/nala widening. |
| Boundaries (RERA filing) | North: ROAD; West: C - BLOCK; East: OTHERS LAND; South: OTHERS LAND. |
| Cadastral location reference | Cadastral parcel centroid 17.41528, 78.35459; this is a software-provided parcel-centroid reference. |
RERA record RERA filing Land records Location record
Development identity
| Item | Record |
|---|---|
| Sanctioning authority | Greater Hyderabad Municipal Corporation (GHMC) |
| Principal building approval | Approval No. 1/C1/00797/2020, approved 22 January 2020; the permit also records File No. 1/C1/17528/2019. |
| Approved building | BLOCK B-1 (ST MILLEINUM), residential use; 1 Cellar + Stilt + 5 upper floors. |
| Height | 14.95 m, as recorded in the permit. |
| Approved built-up area | The supplied RERA filing gives 12638 m² as approved built-up area. The permit extraction also contains a “Proposed Covered builtup area” figure of 705,197.00 and “TOTAL: 7,505,945.00”; the extracted figures’ units/format are unclear, so they are not used as built-up-area measurements here. |
| Building / tower count | One building/block in the RERA unit record; the permit identifies one block. |
| Units | RERA record: 83 units total, comprising 40 2BHK and 43 3BHK apartments. The permit extraction lists residential and commercial entries, but the supplied material does not establish a separate RERA-declared commercial offering. |
| Parking provision | The permit extraction does not provide a usable parking-space count or parking allocation schedule. |
| Layout approval | RERA filing lists the layout-plan document requirement, but the supplied layout document is not extracted as an approved layout plan. |
RERA record RERA filing RERA filing Approvals record RERA unit table Document index
Offering and status
| Item | Record |
|---|---|
| RERA-filed configurations | 2BHK and 3BHK; filed saleable area ranges are shown in section 4 below. |
| Bookings / availability | 2BHK: 20 booked, 20 available. 3BHK: 24 booked, 19 available. These are portal counts with no supplied as-of date and should be treated as indicative. |
| Construction stage | The vendor description calls the project under construction, but the supplied record does not provide a dated construction-progress assessment or independent site verification. |
| Completion dates | Form B declares completion by 31/03/2022. The project header lists proposed completion 21/05/2027. These are declarations/recorded dates; they do not establish construction progress or completion. |
| Occupancy / completion certificate | No occupancy or completion certificate is supplied. The building permit states an occupancy certificate is compulsory before occupation. |
| Registration expiry | 21/01/2027 as stated on the registration certificate; this is not an occupancy certificate or a completion date. |
RERA unit table RERA record
2. The project story
This is a single-block residential apartment project registered as Phase-II, Block-B, on Survey No. 161 PART at Mallapur, Uppal mandal, Medchal-Malkajgiri district. The GHMC permit identifies the building as BLOCK B-1 (ST MILLEINUM), with a cellar, stilt and five upper floors. The RERA unit register lists 83 apartments: 40 two-bedroom and 43 three-bedroom units. RERA record Land records RERA unit table
The registration certificate is valid through 21 January 2027. Form B contains a promoter undertaking to complete by 31 March 2022, while the project header records a proposed completion date of 21 May 2027. The available evidence does not explain the project’s construction stage or establish completion: no dated, independently verified progress report or occupancy/completion certificate is supplied. The vendor’s “under-construction” description is a third-party description, not an independently verified site assessment. RERA record Promoter website Document index
3. Master plan, architecture & building design
The building permit is for one residential block, BLOCK B-1 (ST MILLEINUM), on a site area of 3974.41 m² and net area of 3430.16 m². It authorizes 1 Cellar + Stilt + 5 upper floors and states a height of 14.95 m. The project filing separately records approved built-up area as 12638 m². No building-footprint measurement, floor-by-floor flat schedule, lift/stair details, or approved whole-site layout is available in the supplied extracted material. RERA filing RERA filing Document index
The permit records a 174.53 m² tot-lot, 9 rainwater-harvesting pits, 195 trees, space for a transformer, a garbage house and an ETP. These are permit-recorded provisions, not evidence that the facilities have been completed. The permit refers to 18 mt. road widths and lists setbacks of 4.15, 6.47, 5.03 and 6.1; the supplied extraction does not identify the units for the setback figures.
The filed unit areas are saleable areas, while the drawing-based figures in section 4 are software-measured carpet-area estimates. No FSI-counted area or independently measured completed area is supplied. RERA unit table Floor plans
4. Homes, configurations & floor plans
The TG-RERA record lists 40 2BHK and 43 3BHK apartments. Bookings and availability below are portal counts without a supplied as-of date. RERA saleable areas are kept distinct from carpet areas measured by software from the submitted floor-plan drawing; the measurement source cautions that these drawing measurements need review and are not RERA disclosures. RERA unit table RERA unit details Floor plans
| Configuration | Units | Booked | Available | RERA saleable area | Measured carpet area | Loading (if supplied) |
|---|---|---|---|---|---|---|
| 2BHK | 40 | 20 | 20 | 101.17–109.53 m² | 55.8–70.9 m²; median 57.9 m² (software-measured) | 45% (drawing-measurement record) |
| 3BHK | 43 | 24 | 19 | 122.91–142.14 m² | 72.0–93.2 m²; median 85.9 m² (software-measured) | Not supplied |
The supplied drawing measurements include examples of 2BHK layouts with hall, living/kitchen, bedrooms, toilets and balconies, and a 3BHK layout with living/dining, kitchen, bedrooms, toilets, wash area and balcony. Room dimensions vary by drawing; these measurements are not RERA-filed unit specifications. Carpet area is not the same as saleable area: the measurement record notes that saleable area includes a share of common areas, while balconies are identified separately from carpet area in the drawing extraction. Confirm the specific unit’s approved plan and registered agreement before relying on a measured drawing area. RERA unit details Floor plans
The floor-plan software also measured 1BHK and 4BHK drawings, but neither configuration appears in the RERA unit register. Those drawing-only measurements are not presented as project offerings. RERA unit details Floor plans
5. Parking & vehicle circulation
The supplied building-permit extraction and RERA unit record do not establish a usable count of car or two-wheeler parking spaces, visitor or accessible parking, parking allocation by apartment, or a parking schedule by level. The permit identifies a cellar and stilt, but that alone does not establish the number or legal allocation of parking bays. No ramp, driveway, EV-charging or vehicle-entry/exit details are supplied. RERA unit table Document index
6. Amenities, recreation & open spaces
The permit records a tot-lot and trees; the RERA project update fields record several site services and facilities at 100%, but the supplied evidence does not independently verify their completion. Facilities not shown as complete in those fields are marked accordingly below. RERA amenities
| Facility | Description / size | Evidence source | Declared progress / verified status |
|---|---|---|---|
| Tot-lot | 174.53 m² | GHMC building permit | Permit provision; completion not verified. |
| Green strip / tot-lot / park | RERA update field; no size supplied | TG-RERA project update | 100% declared; independent completion not verified. |
| Internal roads and footpaths | No size supplied | TG-RERA project update | 0% recorded. |
| Community buildings | No size supplied | TG-RERA project update | 0% recorded. |
| Aggregate recreational open space | No size supplied | TG-RERA project update | 0% recorded. |
No clubhouse, indoor recreation or sports facility is established in the supplied project records. The vendor lists “Green Strip And TOT,” “LOT And Park” and other amenities, but those third-party descriptions do not establish sanction or delivery. RERA amenities Promoter website
7. Utilities, building services & safety
The GHMC permit records 9 rainwater-harvesting pits, 195 trees, transformer space, a garbage house and an ETP. It also states that an occupancy certificate is compulsory before occupation and that the applicant should provide the ETP as per standard specification. These are permit conditions/provisions; the supplied record does not verify installation or operation.
| Supplied record | RERA update records Water Supply as YES, 100%; the vendor describes 24X7 water supply. No source, storage capacity or treatment capacity is supplied. |
|---|---|
| Status shown in evidence | RERA-declared; no independent verification supplied. Vendor claim is not independently confirmed. |
| Supplied record | RERA update records Sewerage (including chamber, lines, septic tank, STP) and Storm Water Drains as YES, 100%. Permit records an ETP requirement. |
|---|---|
| Status shown in evidence | RERA-declared progress; installation and operating status not independently verified. |
| Supplied record | Permit records 9 RWHPs; RERA update records water conservation/rainwater harvesting as YES, 100%. |
|---|---|
| Status shown in evidence | Permit provision and RERA declaration; completion not independently verified. |
| Supplied record | RERA update records electrical meter room/sub-station/receiving station as YES, 100%; permit requires space for a transformer. |
|---|---|
| Status shown in evidence | RERA-declared / permit provision; no capacity or commissioning evidence supplied. |
| Supplied record | RERA update records Fire Protection and Fire Safety Requirements at 0%. No fire-system details or clearance are supplied here. |
|---|---|
| Status shown in evidence | RERA update field; no completed status established. |
| Supplied record | Permit requires a garbage house within the premises. RERA update records Solid Waste Management and Disposal at 0%. |
|---|---|
| Status shown in evidence | Permit requirement; completion not verified. |
| Supplied record | No lift count/capacity, accessible-circulation details, CCTV or access-control system is supplied. |
|---|---|
| Status shown in evidence | Not disclosed in the supplied evidence. |
RERA amenities Promoter website Regulatory record
8. Location, access & connectivity
The registered project record identifies Survey No. 161 PART, Mallapur, Uppal mandal, Medchal-Malkajgiri district; the RERA certificate gives PIN 505331. The building permit also identifies Mallapur. The RERA project fields do not disclose a more specific locality or approach-road description. RERA record Land records
The location data provides a cadastral parcel-centroid coordinate of 17.41528, 78.35459 and lists the Financial District (Nanakramguda) at 1.2 km. No public-transport, approach-road, or additional landmark distances are supplied in the project-location record. Location record
9. Developer & development status
The registered legal promoter is ENGINEERS ASSOCIATES PRIVATE LIMITED, a company. The supplied corporate identifier is GSTIN 36AAACE7931K1ZG. The RERA filing lists the promoter address as Flat No.507, Sri Thirumala Milleenium, Road no 12, Manikchand road, Uppal, Medchal-Malkajgiri, PIN 505331. The registration certificate gives the promoter office as Mallapur village, Uppal mandal, Medchal-Malkajgiri, PIN 500076. No official promoter website or project contact details are supplied in the evidence summarized here. Corporate record RERA filing
The project is registered as Phase-II, Block-B, and the supplied plan evidence describes one building. The promoter’s Form B declaration, signed by MR. ADHIKAM PRAVEEN, undertakes completion by 31/03/2022; the project header records proposed completion 21/05/2027. The evidence supplied does not include a dated progress certificate or independently verified construction status. RERA record
10. Approvals, official records & documents
| Record | Supplied evidence |
|---|---|
| TG-RERA registration | Form C for SRI TIRUMALA MILLENNIUM PHASE-II,BLOCK-B, registration P02200001780, issued 20/03/2020, valid to 21/01/2027. |
| GHMC building permit | Building Permit Order, approval 1/C1/00797/2020, File No. 1/C1/17528/2019, approved 22 January 2020; identifies Survey No. 161 (PART), Mallapur, and BLOCK B-1 (ST MILLEINUM). |
| Title-related filing | Advocate title opinions and development-agreement materials are listed in the RERA-filed documents: document IDs 92614, 105433 and 106765. Document index |
| Promoter declaration | Form B affidavit-cum-declaration dated 23 January 2020, including the promoter’s title-basis and completion undertaking. |
| Layout plan | RERA file lists document 105434 as a layout-plan/document requirement; the supplied record does not provide an extracted approved layout plan. Floor-plan measurements attributed to this drawing are software-measured and require review. Document index |
| Occupancy/completion certificate | None supplied; the permit says an occupancy certificate is compulsory before occupation. Document index |
| Other approval records | No project-specific fire clearance, water/sewerage clearance, or other separate clearance document is established by the supplied project evidence in this Overview. Document index |
1. Project at a glance
Project identity
Registered project name: SRI TIRUMALA MILLENNIUM PHASE-II,BLOCK-B
Project type: Residential apartment project
Phase / registered portion: Phase-II, Block-B
TG-RERA registration: P02200001780
Registration validity: 20 March 2020 to 21 January 2027; the certificate states six years. Registration validity is separate from the completion deadline.
Registered promoter: ENGINEERS ASSOCIATES PRIVATE LIMITED
RERA status: The supplied TG-RERA certificate records registration under section 5. The project evidence labels its status “New Project.”
Land and geographic identity
Revenue village: Mallapur in the building permit and title records; the project header and land fields do not disclose a village.
Locality: The RERA certificate records Uppal; the building permit identifies Mallapur.
Mandal / district / PIN: Uppal / Medchal-Malkajgiri / 505331 (RERA certificate).
Survey identity: 161 PART; the permit specifies 161 (PART) and the title records refer to Sy.No. 161/Part, Mallapur.
Site area: 3974.41 m²; net area 3430.16 m². The RERA land fields record 544.25 m² affected by road widening/FTL of tanks/nala widening.
Boundaries (RERA filing): North: ROAD; West: C - BLOCK; East: OTHERS LAND; South: OTHERS LAND.
Cadastral location reference: Cadastral parcel centroid 17.41528, 78.35459; this is a software-provided parcel-centroid reference.
Development identity
Sanctioning authority: Greater Hyderabad Municipal Corporation (GHMC)
Principal building approval: Approval No. 1/C1/00797/2020, approved 22 January 2020; the permit also records File No. 1/C1/17528/2019.
Approved building: BLOCK B-1 (ST MILLEINUM), residential use; 1 Cellar + Stilt + 5 upper floors.
Height: 14.95 m, as recorded in the permit.
Approved built-up area: The supplied RERA filing gives 12638 m² as approved built-up area. The permit extraction also contains a “Proposed Covered builtup area” figure of 705,197.00 and “TOTAL: 7,505,945.00”; the extracted figures’ units/format are unclear, so they are not used as built-up-area measurements here.
Building / tower count: One building/block in the RERA unit record; the permit identifies one block.
Units: RERA record: 83 units total, comprising 40 2BHK and 43 3BHK apartments. The permit extraction lists residential and commercial entries, but the supplied material does not establish a separate RERA-declared commercial offering.
Parking provision: The permit extraction does not provide a usable parking-space count or parking allocation schedule.
Layout approval: RERA filing lists the layout-plan document requirement, but the supplied layout document is not extracted as an approved layout plan.
Offering and status
RERA-filed configurations: 2BHK and 3BHK; filed saleable area ranges are shown in section 4 below.
Bookings / availability: 2BHK: 20 booked, 20 available. 3BHK: 24 booked, 19 available. These are portal counts with no supplied as-of date and should be treated as indicative.
Construction stage: The vendor description calls the project under construction, but the supplied record does not provide a dated construction-progress assessment or independent site verification.
Completion dates: Form B declares completion by 31/03/2022. The project header lists proposed completion 21/05/2027. These are declarations/recorded dates; they do not establish construction progress or completion.
Occupancy / completion certificate: No occupancy or completion certificate is supplied. The building permit states an occupancy certificate is compulsory before occupation.
Registration expiry: 21/01/2027 as stated on the registration certificate; this is not an occupancy certificate or a completion date.
2. The project story
This is a single-block residential apartment project registered as Phase-II, Block-B, on Survey No. 161 PART at Mallapur, Uppal mandal, Medchal-Malkajgiri district. The GHMC permit identifies the building as BLOCK B-1 (ST MILLEINUM), with a cellar, stilt and five upper floors. The RERA unit register lists 83 apartments: 40 two-bedroom and 43 three-bedroom units.
The registration certificate is valid through 21 January 2027. Form B contains a promoter undertaking to complete by 31 March 2022, while the project header records a proposed completion date of 21 May 2027. The available evidence does not explain the project’s construction stage or establish completion: no dated, independently verified progress report or occupancy/completion certificate is supplied. The vendor’s “under-construction” description is a third-party description, not an independently verified site assessment.
3. Master plan, architecture & building design
The building permit is for one residential block, BLOCK B-1 (ST MILLEINUM), on a site area of 3974.41 m² and net area of 3430.16 m². It authorizes 1 Cellar + Stilt + 5 upper floors and states a height of 14.95 m. The project filing separately records approved built-up area as 12638 m². No building-footprint measurement, floor-by-floor flat schedule, lift/stair details, or approved whole-site layout is available in the supplied extracted material.
The permit records a 174.53 m² tot-lot, 9 rainwater-harvesting pits, 195 trees, space for a transformer, a garbage house and an ETP. These are permit-recorded provisions, not evidence that the facilities have been completed. The permit refers to 18 mt. road widths and lists setbacks of 4.15, 6.47, 5.03 and 6.1; the supplied extraction does not identify the units for the setback figures.
The filed unit areas are saleable areas, while the drawing-based figures in section 4 are software-measured carpet-area estimates. No FSI-counted area or independently measured completed area is supplied.
4. Homes, configurations & floor plans
The TG-RERA record lists 40 2BHK and 43 3BHK apartments. Bookings and availability below are portal counts without a supplied as-of date. RERA saleable areas are kept distinct from carpet areas measured by software from the submitted floor-plan drawing; the measurement source cautions that these drawing measurements need review and are not RERA disclosures.
| Configuration | Units | Booked | Available | RERA saleable area | Measured carpet area | Loading (if supplied) |
|---|---|---|---|---|---|---|
| 2BHK | 40 | 20 | 20 | 101.17–109.53 m² | 55.8–70.9 m²; median 57.9 m² (software-measured) | 45% (drawing-measurement record) |
| 3BHK | 43 | 24 | 19 | 122.91–142.14 m² | 72.0–93.2 m²; median 85.9 m² (software-measured) | Not supplied |
The supplied drawing measurements include examples of 2BHK layouts with hall, living/kitchen, bedrooms, toilets and balconies, and a 3BHK layout with living/dining, kitchen, bedrooms, toilets, wash area and balcony. Room dimensions vary by drawing; these measurements are not RERA-filed unit specifications. Carpet area is not the same as saleable area: the measurement record notes that saleable area includes a share of common areas, while balconies are identified separately from carpet area in the drawing extraction. Confirm the specific unit’s approved plan and registered agreement before relying on a measured drawing area.
The floor-plan software also measured 1BHK and 4BHK drawings, but neither configuration appears in the RERA unit register. Those drawing-only measurements are not presented as project offerings.
5. Parking & vehicle circulation
The supplied building-permit extraction and RERA unit record do not establish a usable count of car or two-wheeler parking spaces, visitor or accessible parking, parking allocation by apartment, or a parking schedule by level. The permit identifies a cellar and stilt, but that alone does not establish the number or legal allocation of parking bays. No ramp, driveway, EV-charging or vehicle-entry/exit details are supplied.
6. Amenities, recreation & open spaces
The permit records a tot-lot and trees; the RERA project update fields record several site services and facilities at 100%, but the supplied evidence does not independently verify their completion. Facilities not shown as complete in those fields are marked accordingly below.
| Facility | Description / size | Evidence source | Declared progress / verified status |
|---|---|---|---|
| Tot-lot | 174.53 m² | GHMC building permit | Permit provision; completion not verified. |
| Green strip / tot-lot / park | RERA update field; no size supplied | TG-RERA project update | 100% declared; independent completion not verified. |
| Internal roads and footpaths | No size supplied | TG-RERA project update | 0% recorded. |
| Community buildings | No size supplied | TG-RERA project update | 0% recorded. |
| Aggregate recreational open space | No size supplied | TG-RERA project update | 0% recorded. |
No clubhouse, indoor recreation or sports facility is established in the supplied project records. The vendor lists “Green Strip And TOT,” “LOT And Park” and other amenities, but those third-party descriptions do not establish sanction or delivery.
7. Utilities, building services & safety
The GHMC permit records 9 rainwater-harvesting pits, 195 trees, transformer space, a garbage house and an ETP. It also states that an occupancy certificate is compulsory before occupation and that the applicant should provide the ETP as per standard specification. These are permit conditions/provisions; the supplied record does not verify installation or operation.
| Supplied record | RERA update records Water Supply as YES, 100%; the vendor describes 24X7 water supply. No source, storage capacity or treatment capacity is supplied. |
|---|---|
| Status shown in evidence | RERA-declared; no independent verification supplied. Vendor claim is not independently confirmed. |
| Supplied record | RERA update records Sewerage (including chamber, lines, septic tank, STP) and Storm Water Drains as YES, 100%. Permit records an ETP requirement. |
|---|---|
| Status shown in evidence | RERA-declared progress; installation and operating status not independently verified. |
| Supplied record | Permit records 9 RWHPs; RERA update records water conservation/rainwater harvesting as YES, 100%. |
|---|---|
| Status shown in evidence | Permit provision and RERA declaration; completion not independently verified. |
| Supplied record | RERA update records electrical meter room/sub-station/receiving station as YES, 100%; permit requires space for a transformer. |
|---|---|
| Status shown in evidence | RERA-declared / permit provision; no capacity or commissioning evidence supplied. |
| Supplied record | RERA update records Fire Protection and Fire Safety Requirements at 0%. No fire-system details or clearance are supplied here. |
|---|---|
| Status shown in evidence | RERA update field; no completed status established. |
| Supplied record | Permit requires a garbage house within the premises. RERA update records Solid Waste Management and Disposal at 0%. |
|---|---|
| Status shown in evidence | Permit requirement; completion not verified. |
| Supplied record | No lift count/capacity, accessible-circulation details, CCTV or access-control system is supplied. |
|---|---|
| Status shown in evidence | Not disclosed in the supplied evidence. |
8. Location, access & connectivity
The registered project record identifies Survey No. 161 PART, Mallapur, Uppal mandal, Medchal-Malkajgiri district; the RERA certificate gives PIN 505331. The building permit also identifies Mallapur. The RERA project fields do not disclose a more specific locality or approach-road description.
The location data provides a cadastral parcel-centroid coordinate of 17.41528, 78.35459 and lists the Financial District (Nanakramguda) at 1.2 km. No public-transport, approach-road, or additional landmark distances are supplied in the project-location record.
9. Developer & development status
The registered legal promoter is ENGINEERS ASSOCIATES PRIVATE LIMITED, a company. The supplied corporate identifier is GSTIN 36AAACE7931K1ZG. The RERA filing lists the promoter address as Flat No.507, Sri Thirumala Milleenium, Road no 12, Manikchand road, Uppal, Medchal-Malkajgiri, PIN 505331. The registration certificate gives the promoter office as Mallapur village, Uppal mandal, Medchal-Malkajgiri, PIN 500076. No official promoter website or project contact details are supplied in the evidence summarized here.
The project is registered as Phase-II, Block-B, and the supplied plan evidence describes one building. The promoter’s Form B declaration, signed by MR. ADHIKAM PRAVEEN, undertakes completion by 31/03/2022; the project header records proposed completion 21/05/2027. The evidence supplied does not include a dated progress certificate or independently verified construction status.
10. Approvals, official records & documents
TG-RERA registration: Form C for SRI TIRUMALA MILLENNIUM PHASE-II,BLOCK-B, registration P02200001780, issued 20/03/2020, valid to 21/01/2027.
GHMC building permit: Building Permit Order, approval 1/C1/00797/2020, File No. 1/C1/17528/2019, approved 22 January 2020; identifies Survey No. 161 (PART), Mallapur, and BLOCK B-1 (ST MILLEINUM).
Title-related filing: Advocate title opinions and development-agreement materials are listed in the RERA-filed documents: document IDs 92614, 105433 and 106765.
Promoter declaration: Form B affidavit-cum-declaration dated 23 January 2020, including the promoter’s title-basis and completion undertaking.
Layout plan: RERA file lists document 105434 as a layout-plan/document requirement; the supplied record does not provide an extracted approved layout plan. Floor-plan measurements attributed to this drawing are software-measured and require review.
Occupancy/completion certificate: None supplied; the permit says an occupancy certificate is compulsory before occupation.
Other approval records: No project-specific fire clearance, water/sewerage clearance, or other separate clearance document is established by the supplied project evidence in this Overview.
Other registrations of Sri Tirumala Millennium
Frequently asked questions
Is SRI TIRUMALA MILLENNIUM PHASE-II,BLOCK-B registered with Telangana RERA?
Yes. SRI TIRUMALA MILLENNIUM PHASE-II,BLOCK-B is registered with the Telangana Real Estate Regulatory Authority as P02200001780; the registration status is New Project.
Who is the developer of SRI TIRUMALA MILLENNIUM PHASE-II,BLOCK-B?
The promoter named in the RERA registration is ENGINEERS ASSOCIATES PRIVATE LIMITED.
Where is SRI TIRUMALA MILLENNIUM PHASE-II,BLOCK-B located?
SRI TIRUMALA MILLENNIUM PHASE-II,BLOCK-B is in Uppal, Medchal-Malkajgiri, Telangana (505331).
When will SRI TIRUMALA MILLENNIUM PHASE-II,BLOCK-B be completed?
The promoter's proposed date of completion filed with RERA is 21/05/2027. This is the promoter's declaration, not a guarantee.