Tulasi Lake Front,block 9

TULASI CONSTRUCTIONS · Medchal-Malkajgiri · RERA P02200002519

TULASI LAKE FRONT,BLOCK 9 is a residential apartment project in SURARAM VILLAGE-1, Qutballapur mandal, Medchal-Malkajgiri district, developed by registered promoter TULASI CONSTRUCTIONS. The project covers 668.9 sq m and comprises 1 building, identified as A-1, with 1 Stilt + 5 upper floors and 15 homes: 5 2BHK and 10 3BHK units. Its TG-RERA registration number is P02200002519, and its proposed completion date is 30/07/2026.

More from Tulasi Constructions · 7 projects →

01What we found

Period endedTG-RERA registration ran to 30 Jul 2026 - check its extension on TG-RERA
14documents on file - each fact links to its page
0court cases on this project's land in the court records searched
9items to check - 5 high

Read from TG-RERA filings, approvals, land and registration records and court records. A court case is counted only when the court record states this project's survey number with its village, or names the project.

02Check before you pay

9 items to check before you pay, 5 high - from the title chain, court records and approvals, each with what to ask the builder or your advocate. An item may not be a problem with the project: records can be incomplete.

Sign in to see each item and what to do

Project at a glance

Project identity

ItemProject record
Registered project nameTULASI LAKE FRONT,BLOCK 9 RERA record
Project type / intended useResidential apartment project RERA record RERA filing
Phase / registered portion“BLOCK 9”; the registration certificate identifies the project and plots 71, 72, 79 and 80. A broader phase description is not disclosed. RERA record
TG-RERA registrationP02200002519, granted under section 5; valid from 01/02/2021 to 30/07/2026. The registration record says five years and does not show an extension.
Registered promoterTULASI CONSTRUCTIONS; entity type recorded as Partnership. RERA record RERA filing
RERA project status“New Project” in the project information record. Registration validity is separate from the completion deadline and does not establish completion or occupancy. RERA filing

Land and geographic identity

ItemProject record
Locality / revenue villageSURARAM VILLAGE-1; revenue village recorded as Suraram. RERA record RERA filing
Mandal / district / PINQutballapur / Medchal-Malkajgiri / 500015. RERA record
Project survey numbers and subdivisions96/A, 97 & 98. RERA record Land records
Registered site extent668.9 sq m (also stated as 668.90 m2 in the completion-certificate extract). RERA filing
Total / net areaTotal area 668.9 sq m; net area 668.90 sq m. RERA filing
Boundaries as filedEast: PLOT NO 9; west: ROAD WIDTH-12; north and south: VACANT LAND. RERA filing

Development identity

ItemProject record
Sanctioning authorityGreater Hyderabad Municipal Corporation (GHMC). Approvals record
Principal building-permit approval2/C26/08255/2020, dated 30 July, 2020; the filed permit describes Building A-1, 1 Stilt + 5 upper floors. Approvals record
Additional permit number shown in OC record2/C26/00080/2021, dated 02 January, 2021.
Approved built-up areaProject filing records 1966.11 sq m. The building-permit extract separately lists residential upper-floor area 1,792.50 m2 and stilt parking area 359.50 m2. RERA filing
Building count1 building / block; identified in the permit as Building - A-1. RERA filing
Sanctioned floor configuration1 Stilt + 5 upper floors in the building permit. The later occupancy certificate extract describes a Cellar + Stilt Ground + Upper Floors configuration; its particulars are set out in the evidence index below.
ParkingBuilding-permit conditions say the sanctioned cellar and stilt are to be used exclusively for parking. The extract lists 359.50 m2 of stilt parking area.

Offering and status

ItemProject record
RERA-filed configurations2BHK: 5 units; 3BHK: 10 units. RERA unit table RERA unit details
RERA-filed saleable area2BHK: 1149.0 sq m; 3BHK: 1365.0 sq m, as recorded in the unit filing. These figures are presented as filed, not as carpet area. RERA unit table RERA unit details
Booked / availablePortal figures read as 0 booked, 15 available (5 2BHK and 10 3BHK). The portal data supplied has no as-of date, so counts are indicative. RERA unit table RERA unit details
Completion deadlineThe filed proposed completion date is 30/07/2026. The building-permit extract also states completion before 30 July, 2026. RERA record RERA filing
Occupancy certificateA GHMC occupancy certificate extract is available for a residential building at the same recorded survey numbers and plot numbers; its project/phase scope and particulars are described under “Approvals, official records & documents.”
Construction stageNo independently verified current site-progress measurement is supplied. Document index RERA amenities

The project story

The RERA record describes a single-building residential apartment project named TULASI LAKE FRONT,BLOCK 9, on a 668.9 sq m site in Suraram village, Qutballapur mandal, Medchal-Malkajgiri district. The registered land identity is survey numbers 96/A, 97 and 98, and the filed site boundaries identify a 12-wide road on the west. RERA record RERA filing

The GHMC building-permit extract describes one residential building, A-1, with 1 stilt + 5 upper floors. The project filing lists 15 apartments: five 2BHK and ten 3BHK. Those unit counts and the portal’s booked/available figures are RERA-record data; the supplied portal snapshot does not state when the booking counts were checked. RERA unit table

The project record gives a completion deadline of 30/07/2026. Separately, a GHMC occupancy-certificate document extract dated 07 February, 2022 says the identified residential building was fit for occupation and records completion date 13 December, 2021. The available evidence does not independently establish current construction progress or clarify whether that certificate covers the registered “BLOCK 9” project as a whole. RERA record

Master plan, architecture & building design

The registered site extent is 668.9 sq m, with net area 668.90 sq m. The GHMC building-permit extract records one residential building, A-1, with 1 stilt + 5 upper floors and height 14.85 m. It lists 1,792.50 m2 as residential upper-floor area and 359.50 m2 as stilt parking area. The RERA filing separately reports approved built-up area of 1966.11 sq m; these are distinct recorded area fields and are not treated as interchangeable. RERA filing RERA filing

The available evidence does not provide a usable architectural drawing extraction for apartment layouts, building footprint, flats per floor, lift or stair details, entry/exit arrangement, internal circulation, landscaping plan, or a floor-by-floor area schedule. The floor-plan record says one drawing is present but has no flats measured; no drawing-based carpet-area figure is available. Floor plans

The building permit lists a tot-lot area of 0 m2, 13 RWHPs, 30 Trees, a space for a transformer, a garbage house within the premises, and an ETP. These are permit-record items; the supplied information does not verify their installation or present completion status.

Homes, configurations & floor plans

The following configuration counts, booking figures and saleable areas are from the RERA filing. The record provides no measured carpet-area figures: the drawing dataset contains one drawing but no flats measured. RERA unit table RERA unit details Floor plans

ConfigurationUnitsBookedAvailableRERA saleable areaMeasured carpet areaLoading (if supplied)
2BHK5051149.0 sq mNot measured in supplied drawing dataNot supplied
3BHK100101365.0 sq mNot measured in supplied drawing dataNot supplied

The filing’s saleable area is not a measured carpet-area disclosure. Carpet area, exclusive balcony or verandah area, open terrace area and a home’s share of common areas are distinct concepts; the supplied evidence does not provide apartment-level balcony, utility, room-dimension or common-area loading measurements. Booking and availability counts are indicative because no portal as-of date is supplied. RERA unit details RERA unit table Floor plans

Parking & vehicle circulation

The GHMC building-permit extract states that the cellar and stilt approved for parking must be used exclusively for vehicle parking, without partition walls or rolling shutters; it also lists 359.50 m2 of stilt parking area. The building-permit document identifies one stilt level, while the occupancy-certificate extract refers to a cellar and stilt.

A sanctioned parking-space count, resident-versus-visitor allocation, accessible-space provision, two-wheeler count, parking allocation by apartment, ramp or driveway details, pedestrian separation and EV-charging provision are not established by the supplied evidence. A parking area shown or stated in a permit does not, on its own, establish exclusive parking rights for a particular apartment.

Amenities, recreation & open spaces

FacilityDescription / sizeEvidence sourceDeclared progress / verified status
Tot-lot0 m2 in the building-permit extractPermit-record figure; delivery status not independently verified
Rainwater harvesting13 RWHPs listed in permit; the occupancy-certificate extract also lists rainwater harvestingRecorded in project documents; installation status not independently verified
Trees30 Trees listedPermit-record item; planting/completion not verified
Community buildings / recreational open spaceNo completed facility or area is evidenced in the supplied amenity recordRERA amenitiesProgress fields show 0; independent completion not verified

The RERA amenity record includes categories such as internal roads and footpaths, water supply, sewerage, storm-water drains, green strip/tot-lot/park, street lighting, community buildings, sewage treatment/disposal, solid-waste management, water conservation, energy management, fire protection, electrical meter/substation facilities and recreational open space. Except for entries marked “YES” (water supply, water conservation/rainwater harvesting, energy management, fire protection and electrical meter/substation facilities), the supplied record does not state a separate availability value; the recorded progress fields are 0. These entries do not independently confirm that facilities are complete or operational. RERA amenities

Utilities, building services & safety

The RERA amenity record marks Water Supply, Water Conservation, Rain water Harvesting, Energy management, Fire Protection And Fire Safety Requirements, and Electrical Meter Room, Sub-Station, Receiving Station as “YES.” It does not specify water source, storage or treatment capacity; sewage-treatment capacity or reuse arrangements; electrical supply or backup capacity; or detailed fire-system equipment. RERA amenities

The building-permit extract lists an ETP, a space for a transformer, a garbage house within the premises, and 13 RWHPs. Its conditions require a Rain Water Harvesting Structure (percolation pit), an ETP as per standard specification, and a fire NOC from the Director (EV&DM) before issue of an occupancy certificate. These are document-record requirements or listed provisions; the supplied evidence does not establish their current operational status.

No lift or service-lift details, lift capacity, backup-power specification, waste-segregation arrangements, CCTV/access-control details, accessibility features or accessible circulation plan are supplied. RERA amenities Document index

Location, access & connectivity

The registered location is SURARAM VILLAGE-1, revenue village Suraram, Qutballapur mandal, Medchal-Malkajgiri district, PIN 500015. The filed site boundaries identify ROAD WIDTH-12 on the west; other recorded boundaries are PLOT NO 9 on the east and vacant land to the north and south. RERA record RERA filing RERA filing

A vendor record describes the project location as “Suraram, North Hyderabad, Hyderabad” and gives distances to nearby places, but those are third-party details rather than the primary RERA location record. The supplied independent location dataset lists Financial District (Nanakramguda) at 1.2 km; the record provides no further basis or route detail for that distance. Promoter website Location record

Developer & development status

The registered promoter is TULASI CONSTRUCTIONS, recorded as a Partnership, with GSTIN 36AAOFT0091L1ZQ. The RERA filing lists its address as GANESH PLAZA, GANESH NAGAR, SURARAM VILLAGE, SURARAM VILLAGE-1, Qutballapur, Medchal-Malkajgiri, 500015. The registration certificate separately states the promoter office as Village: Quthbullapur-1, Mandal: Qutballapur, District: Medchal-Malkajgiri, Pin: 500054. RERA filing Corporate record Parties record

The registration record names BODDU ASHOK as authorized signatory. The Form B document extract records his declaration on behalf of Tulasi Constructions, including a stated completion date of 30/07/2026 and declarations concerning title, encumbrances, fund deposits, audits and pending approvals. These are promoter declarations. Parties record

The supplied evidence does not give an independently verified current construction-progress percentage. The project completion date and the registration’s validity end date are both 30/07/2026, but they are different records with different meanings. RERA record

Approvals, official records & documents

TG-RERA registration certificate
Identifier / dateP02200002519; issued 01/02/2021; stated valid through 30/07/2026
What the supplied record establishesForm C registration for TULASI LAKE FRONT,BLOCK 9, granted under section 5; certificate conditions include a separate-account requirement.
GHMC building permit order
Identifier / dateApproval 2/C26/08255/2020; dated 30 July, 2020
What the supplied record establishesPermit extract identifies site survey numbers 96/A, 97 and 98, site extent 668.9 m2, and Building A-1 with 1 Stilt + 5 upper floors.
Additional building permit number recorded with OC material
Identifier / date2/C26/00080/2021; dated 02 January, 2021
What the supplied record establishesListed as the building permit number in the GHMC occupancy-certificate extract.
GHMC occupancy certificate
Identifier / dateApproval/proceedings 0100/GHMC/KPL/2022-OC; application 000462/GHMC/0233/KPL2/2022-OC; dated 07 February, 2022
What the supplied record establishesExtract identifies plots 71, 72, 79 and 80 in survey numbers 96/A, 97 and 98, states completion date 13 December, 2021, and says the building was fit for occupation. It describes Cellar + Stilt Ground + Upper Floors and records floor area as 1,634.45 m2 sanctioned and 1,660.67 m2 as per site building plan, with a stated deviation of 7.14%. The extract requests release of the mortgaged area.
Form B promoter declaration
Identifier / dateDocument 146660; declaration date shown as “0 / 01. /2021”
What the supplied record establishesPromoter declaration by Boddu Ashok on title basis, encumbrances, project completion, funds, approvals and audits.
TG-RERA agreement-for-sale template
Identifier / dateDocument 139379
What the supplied record establishesSupplied as a partly completed template; project/allottee/unit/execution particulars are not completed in the document summary.

The evidence also identifies a GHMC layout/subdivision reference LRS/4625/C-15/NZ/GHMC/2008 in the building-permit extract. A separate layout-approval document is listed in the RERA documents but was not extracted. Document index

The permit’s document extract states conditional building-permit requirements including commencement and completion notices, use of sanctioned plans, parking use of the cellar/stilt, an occupancy certificate before occupation, a fire NOC before the occupancy certificate, and provision for an ETP and rainwater harvesting. This overview records the supplied document evidence; it does not independently establish compliance or current site conditions.

Other registrations of Tulasi Lake Front

Frequently asked questions

Is TULASI LAKE FRONT,BLOCK 9 registered with Telangana RERA?

Yes. TULASI LAKE FRONT,BLOCK 9 is registered with the Telangana Real Estate Regulatory Authority as P02200002519; the registration status is New Project.

Who is the developer of TULASI LAKE FRONT,BLOCK 9?

The promoter named in the RERA registration is TULASI CONSTRUCTIONS.

Where is TULASI LAKE FRONT,BLOCK 9 located?

TULASI LAKE FRONT,BLOCK 9 is in SURARAM VILLAGE-1, Qutballapur, Medchal-Malkajgiri, Telangana (500015).

When will TULASI LAKE FRONT,BLOCK 9 be completed?

The promoter's proposed date of completion filed with RERA is 30/07/2026. This is the promoter's declaration, not a guarantee.

More projects in Suraram