Acor Residency

ACOR INFRA · Medchal-Malkajgiri · RERA P02200008308

ACOR RESIDENCY is a residential apartment project in Suraram, Qutballapur mandal, Medchal-Malkajgiri district. The registered promoter is ACOR INFRA, identified as a proprietorship. The project has a site extent of 397.07 sq m and one residential building with 1 Stilt + 5 upper floors, comprising 10 2BHK apartments with a filed saleable area of 108.33 sq m per unit. Its TG-RERA registration is P02200008308, and the promoter’s Form B states completion before 24 March 2025.

01What we found

Period endedTG-RERA registration ran to 24 Mar 2025 - check its extension on TG-RERA
12documents on file - each fact links to its page
3court cases on this project's land (survey 326, Suraram) or naming the project
10items to check - 4 high

Read from TG-RERA filings, approvals, land and registration records and court records. A court case is counted only when the court record states this project's survey number with its village, or names the project.

02Check before you pay

10 items to check before you pay, 4 high - from the title chain, court records and approvals, each with what to ask the builder or your advocate. An item may not be a problem with the project: records can be incomplete.

Sign in to see each item and what to do

1. Project at a glance

Project identity

ItemProject record
Registered project nameACOR RESIDENCY
Project type / useResidential apartment project RERA record RERA filing
Phase / registered portionPhase not separately identified in the supplied record; registration is for ACOR RESIDENCY
TG-RERA registrationP02200008308
Registration validity30/05/2024 to 24/03/2025; this is the registration-validity period, not evidence of an extension
Registered promoterACOR INFRA, identified as a proprietorship; Anil Thapa is named as proprietor/promoter in the filed Form B RERA filing
Status in supplied recordRegistration dates have elapsed; no extension order is supplied. The registration certificate records the registration and its validity dates

Land and geographic identity

ItemProject record
Locality / revenue villageSuraram is the project locality and village in the RERA record. The registration certificate separately states Qutballapur as the village; the supplied records do not resolve this naming difference RERA record RERA filing
Mandal / district / PINQutballapur mandal; Medchal-Malkajgiri district; PIN 500055 RERA record RERA filing
Survey numbers322, 323 and 326; no subdivisions are disclosed RERA filing
Site extentRERA record: total area 397.07 sq m, area affected by road widening/FTL/nala widening 54.44 sq m, and net area 342.63 sq m RERA filing
Boundaries (RERA filing)East: Plot No. 39; West: 40 feet wide road; North: Plot Nos. 51 and 51A; South: 40 feet wide road RERA filing

Development identity

ItemProject record
Sanctioning authorityGreater Hyderabad Municipal Corporation (GHMC) Approvals record
Principal building permit2369/GHMC/KPL/2022-BP, dated 24 March 2022 Approvals record
Approved building / floorsOne residential building, 1 Stilt + 5 upper floors; approved building height is recorded as 14.95 m excluding stilt
Approved built-up area944.65 sq m net residential BUA is stated in the plan record; the same extraction also separately records 958.05 sq m built-up area and 1146.95 sq m total built-up area. These are distinct labels in the supplied plan data
Unit countsApproval record: 1 sanctioned building unit. RERA filing: 10 apartments (2BHK) RERA filing RERA unit table
ParkingPlan record states 10 total parking and 8 proposed number of parkings; parking area is recorded as 188.9 sq m in the building-permit extraction

Offering and status

ItemProject record
RERA-filed configuration2BHK; 10 units RERA unit table
RERA-filed saleable area108.33 sq m per unit RERA unit table
Booked / available0 booked / 10 available, as last read from the TG-RERA portal; no as-of date is supplied, so counts are indicative RERA unit table
Construction stageNot established by the supplied project evidence. No independently verified site-progress record is provided Document index RERA amenities
Completion deadlinePromoter’s Form B states completion before 24 March 2025; the GHMC permit record also gives a sanctioned completion deadline of 24 March 2025
Occupancy / completion certificateNo project-specific occupancy or completion certificate is supplied. The architect’s Form 1A is blank and does not certify completion

2. The project story

ACOR RESIDENCY is registered as a residential apartment project on land identified in the RERA filing as Survey Nos. 322, 323 and 326, in Suraram, Qutballapur mandal, Medchal-Malkajgiri district. The registration certificate describes the project location as Qutballapur, while the RERA project record identifies Suraram; both location references are retained here because the supplied documents do not reconcile them RERA record RERA filing.

The GHMC building-permit record describes one residential building with a stilt level and five upper floors. The RERA filing lists ten 2BHK apartments. The project’s stated completion deadline was 24 March 2025, but the supplied materials do not establish construction completion or occupancy certification. The portal’s unit availability figures are indicative only because their as-of date is not recorded RERA unit table.

3. Master plan, architecture & building design

The supplied GHMC plan records one building named “BLDG (NARENDER GAURI)” for residential use, comprising 1 Stilt + 5 upper floors, with a recorded building height of 14.95 m excluding the stilt floor. The plan record identifies 342.63 sq m as net plot area and 944.65 sq m as net residential built-up area. It separately lists built-up area as 958.05 sq m and total built-up area as 1146.95 sq m; these labels are kept distinct as recorded.

The plan extraction records 397.07 sq m plot area, 48.90 sq m road-affected area, 5.54 sq m splay area, and 54.44 sq m total deduction. It also records 153.70 sq m vacant plot area and proposed coverage of 188.93 sq m (54.26%). The supplied data does not establish a basement, podium, floor-by-floor apartment arrangement, lifts/stairs configuration, landscaping extent, or a phase-wise layout.

The building-permit record specifies surrender of the road-affected portion to GHMC and includes a condition for a tot-lot to be fenced and maintained as greenery before an occupancy certificate is issued. The plan extraction lists a separate underground water-storage tank, terrace tank, lift, septic tank and STP, but does not provide sufficient evidence to establish their completed or operational status.

4. Homes, configurations & floor plans

ConfigurationUnitsBookedAvailableRERA saleable areaMeasured carpet areaLoading (if supplied)
2BHK10010108.33 sq mSoftware-measured: median 69.3 sq m; range 56.0–70.0 sq m36%

RERA records ten 2BHK apartments, each with a filed saleable area of 108.33 sq m. Booked and available counts are portal figures without an as-of date RERA unit table RERA unit details.

The carpet-area figures are software measurements from the approved floor-plan drawings, not RERA-filed carpet-area disclosures; the measurement record says four 2BHK designs were measured and one requires review. The measured sample plan shows two bedrooms, a kitchen, living/dining area, two toilets and a balcony labelled 1.25 m wide. One measured balcony is listed as 3.75 sq m and excluded from the carpet measurement RERA unit details Floor plans. Carpet area, balcony area and saleable area are different measures; the supplied drawing measurements should be checked against the plan. The RERA filing does not identify a filed carpet-area figure RERA unit table Floor plans.

5. Parking & vehicle circulation

The plan extraction records 10 total parking spaces, 8 proposed number of parkings, and a parking area of 188.9 sq m in the building-permit material. The permit conditions state that approved stilt parking is to be used exclusively for vehicle parking and not partitioned or converted to another use.

The supplied record does not establish the number or allocation of resident, visitor or accessible spaces, the parking arrangements for particular apartments, or a separate basement/podium parking level. No exclusive ownership or unit-specific parking allocation is established by the supplied documents.

6. Amenities, recreation & open spaces

The RERA amenities record lists proposed infrastructure items and shows 0% progress for the listed items; it does not establish that any facility is complete or independently verified RERA amenities.

Green strip / tot-lot / park
Description / sizePermit condition requires a fenced tot-lot maintained as greenery before OC; no size supplied
Evidence sourceRERA amenities
Declared progress / verified statusRERA amenities record: 0%; completion not verified
Community buildings
Description / sizeListed in RERA amenities record; no size or facility details supplied
Evidence sourceRERA amenities
Declared progress / verified status0%; completion not verified
Aggregate recreational open space
Description / sizeListed in RERA amenities record; area not supplied
Evidence sourceRERA amenities
Declared progress / verified status0%; completion not verified
Kids’ play area, yoga/meditation, jogging/cycle track, indoor games, swimming pool, gym, clubhouse and park
Description / sizeThird-party vendor listings only; no project-filed sizes or capacities supplied
Evidence sourcePromoter website
Declared progress / verified statusMarketing/vendor claims; not established as sanctioned or delivered

7. Utilities, building services & safety

The RERA amenities record marks Water Supply, Sewerage (Chamber, Lines, Septic Tank, STP) and Water Conservation, Rain water Harvesting as available, while recording 0% progress for those entries. This is a filed amenity status, not independent confirmation of installation or operation RERA amenities.

The plan extraction lists a 25,000-litre underground static water-storage tank and a 25,000-litre terrace tank, along with a sump, septic tank, STP, rainwater harvesting and percolation pit. The building-permit record specifies three rainwater-harvesting pits, a transformer space and a garbage house. The supplied evidence does not establish water source, STP capacity or commissioning, reuse arrangements, power backup, EV charging, lift count/capacity, CCTV, security systems, or accessibility provisions.

The permit requires the owner/developer and technical professionals to provide structural safety and means-of-escape safety measures, and states that an occupancy fire NOC is to be obtained before the occupancy certificate. These are approval conditions; the supplied materials do not establish that the required systems or clearances have been completed or issued.

8. Location, access & connectivity

The project is recorded in Suraram, Qutballapur mandal, Medchal-Malkajgiri district, PIN 500055, with Survey Nos. 322, 323 and 326 RERA record RERA filing. The registration certificate separately states Qutballapur as the village.

The GHMC plan material refers to a south road and records road widths including 12.00 m and 18.00 m, and a 2.50 m wide passage; the building-permit material also refers to a 40-feet-wide road in the RERA land-boundary fields RERA filing. A supplied location record gives the Financial District (Nanakramguda) as 1.2 km away Location record. No public-transport routes, travel times, or other measured landmark distances are established in the supplied location data.

9. Developer & development status

The registered promoter is ACOR INFRA, recorded as a proprietorship; Anil Thapa is identified as proprietor/promoter in the RERA-filed Form B RERA filing. The registration certificate gives the promoter’s registered-office location as Khairtabad, Hyderabad, PIN 500034. No official contact details or promoter website are supplied.

The promoter’s Form B declares that the landowner, M/s. EPE Process Filters and Accumulators Private Limited, holds legal title under the Development Agreement-cum-GPA and that the project land is free from encumbrances. It also states a completion undertaking of before 24 March 2025. The supplied evidence does not provide independently verified construction progress, an extension order, or an occupancy certificate.

10. Approvals, official records & documents

TG-RERA registration certificate
Identifier / dateP02200008308; valid 30/05/2024–24/03/2025
What the supplied record establishesRegistration of ACOR RESIDENCY and stated registration conditions
GHMC building permit
Identifier / date2369/GHMC/KPL/2022-BP; 24 March 2022
What the supplied record establishesBuilding permit for a residential building; the filed extraction describes 1 Stilt + 5 upper floors
GHMC plan / building-permit material
Identifier / dateTS/059325/2021; 29-11-2021
What the supplied record establishesPlan extraction for one residential building, with site, floor and services parameters
Form B promoter declaration
Identifier / date2024
What the supplied record establishesPromoter declarations concerning title basis, encumbrances, separate-account obligations and completion undertaking
Architect’s overall-completion Form 1A
Identifier / dateProject and certificate details blank
What the supplied record establishesA blank completion-certificate form; it does not establish completion or an issued occupancy certificate

Frequently asked questions

Is ACOR RESIDENCY registered with Telangana RERA?

Yes. ACOR RESIDENCY is registered with the Telangana Real Estate Regulatory Authority as P02200008308; the registration status is New Project.

Who is the developer of ACOR RESIDENCY?

The promoter named in the RERA registration is ACOR INFRA.

Where is ACOR RESIDENCY located?

ACOR RESIDENCY is in Suraram, Qutballapur, Medchal-Malkajgiri, Telangana (500055).

When will ACOR RESIDENCY be completed?

The promoter's proposed date of completion filed with RERA is 24/03/2025. This is the promoter's declaration, not a guarantee.