Nile Valley Project - Block - 8B
JANAPRIYA TOWNSHIPS PRIVATE LIMITED · Sangareddy · RERA P01100007344
NILE VALLEY PROJECT - BLOCK - 8B is a residential apartment project at Madhavapuri Town Ship, North Avenue, Ameenapur, Ameenpur, Sangareddy, developed by JANAPRIYA TOWNSHIPS PRIVATE LIMITED. The RERA land details state a total area of 99,633 sq m; the wider plan describes 13 residential blocks and an amenities block, and Block 8B’s later plan details show Stilt + 12 floors and 48 tenements. The RERA-filed schedule records 192 3BHK units with saleable area 48.19 sq m. It is registered with TG-RERA as P01100007344, and the project identity record lists proposed completion as 30/04/2028.
More from Janapriya Townships Pvt Ltd · 6 projects →
01What we found
Read from TG-RERA filings, approvals, land and registration records and court records. A court case is counted only when the court record states this project's survey number with its village, or names the project.
02Check before you pay
8 items to check before you pay, 2 high - from the title chain, court records and approvals, each with what to ask the builder or your advocate. An item may not be a problem with the project: records can be incomplete.
1. Project at a glance
Project identity
| Item | Record |
|---|---|
| Registered project name | NILE VALLEY PROJECT - BLOCK - 8B RERA record |
| Project type and registered portion | Residential apartment project; Block 8B is the registered portion. RERA record |
| TG-RERA registration | P01100007344; issued 08/12/2023, valid through 30/12/2027. Registration validity is separate from the completion undertaking. |
| Registered promoter | JANAPRIYA TOWNSHIPS PRIVATE LIMITED, a private limited company. RERA record Corporate record |
| RERA status | Registration certificate is on file; it states registration has not been extended. |
Land and geographic identity
| Item | Record |
|---|---|
| Locality / revenue village | Madhavapuri Town Ship, North Avenue / Ameenapur (also rendered “Ameenpur” in approval documents). RERA record RERA filing |
| Mandal / district / PIN | Ameenpur / Sangareddy / 500050. RERA record RERA filing |
| Project survey numbers as registered | 341, 342 PART, 334 & 335. RERA record |
| Survey numbers/subdivisions in filed approvals | 334/P, 335/P, 341 & 342 in the HMDA technical approval; 334/Part, 335/Part & 342 in the Ameenpur Municipality permission; the later building-permit record lists 341, 342 PART, 334 & 335. |
| Site area | RERA land details state total area 99,633 sq m, affected area 1,336.53 sq m, and net area 98,296.47 sq m. RERA filing |
| Boundaries | East: OWNERS LAND; west and north: NEIGHBOURS LAND; south: 18 M WIDE ROAD. RERA filing |
Development identity
| Item | Record |
|---|---|
| Sanctioning authority / principal approval | HMDA technical approval 10843/P4/Plg/H/2007, dated 31-12-2021, forwarded to Ameenpur Municipality for sanction and release. The municipal building-permission record is dated 11/04/2022. Approvals record |
| Later plan/permit records | HMDA plan record TS/053539/2024; building-permit order 007518/BP/HMDA/1815/SKP/2024, dated 11 November, 2024. Approvals record |
| Approved built-up area | The HMDA technical approval records residential BUA of 279700.60 Sq.mts and amenities BUA of 7732.91 Sq.mts. The later municipal order records total built-up area 306,230.07 Sq.mts. These are approval-document figures for the wider multi-block development, not a Block 8B-only total. |
| Block 8B plan figures | The filed building-plan details state Block 8B total BUA 8,858.18, comprising existing BUA 6,931.46 and proposed BUA 1,926.72; total tenements 48. |
| Buildings and floors | The wider approval records 13 residential blocks—4A, 4B, 4C, 5, 6, 8A, 8B, 8C, 8D, 9A, 9B, 10A and 10B—and an amenities block. The 2021 approval describes Block 8B as 1 Cellar + Stilt + 10 floors; later plan details show Stilt + 12 floors for Block 8B. |
| Parking / approved versus RERA-declared units | The revised plan details record No of Cars Proposed 1694 for the wider plan; Block 8B’s plan details state net parking 502.79. The RERA-filed unit schedule records 192 Block 8B units. RERA unit table |
Offering and status
| Item | Record |
|---|---|
| RERA-filed configuration | 3BHK, saleable area 48.19 sq m, 192 units. RERA unit table |
| Booking / availability | Portal-derived record shows 0 booked and 192 available; the booking record has no as-of date and should be treated as indicative. RERA unit table |
| Completion undertaking | The RERA Form B declaration undertakes completion by 30.12.2027; the project identity record separately lists proposed completion as 30/04/2028. RERA filing |
| Construction stage | The supplied records include proposed and existing plan areas, but no independently verified current site-progress report. Construction status is therefore not established from this evidence. |
| Occupancy certificate | No occupancy/completion certificate is supplied for Block 8B; the municipal permission states an Occupancy Certificate is compulsory before occupation. |
2. The project story
This is a residential apartment development registered with TG-RERA as NILE VALLEY PROJECT - BLOCK - 8B, at Madhavapuri Town Ship, North Avenue, in revenue village Ameenapur, Ameenpur Mandal, Sangareddy District. The registered land schedule names survey numbers 341, 342 PART, 334 and 335. RERA record RERA filing
Block 8B forms part of a larger multi-block residential plan. The filed drawings and approval records describe 13 residential blocks and a separate amenities block, while Block 8B’s later plan details identify 48 tenements in that block. The RERA-filed unit schedule, however, records 192 units for the registered Block 8B project. RERA unit table
The approval records describe existing and proposed built-up area, including additional floors in the later plan materials. Those figures describe the plans, not independently confirmed construction progress. The available evidence does not establish which construction work is complete on site, and no occupancy certificate for Block 8B is included.
3. Master plan, architecture & building design
The site is recorded in the RERA land details as 99,633 sq m total and 98,296.47 sq m net, with 1,336.53 sq m affected area. The later HMDA plan record gives plot area 99632.99 sq.mt., net area 98296.46 sq.mt., and road-affected area 1336.53. RERA filing
The wider technical approval describes a high-rise residential development, including Blocks 4A–4C, 5, 6, 8A–8D, 9A–9B and 10A–10B, together with an amenities block described as a clubhouse and commercial shopping. The 2021 approval identifies Block 8B as 1 Cellar + Stilt + 10 floors. Later plan materials describe Block 8B as Stilt + 12 floors, with total height 45.05mt. and height excluding stilt 35.99 mt. The later municipal order also describes existing lower levels and 10 upper floors with two proposed upper floors for Block 8B.
Block 8B’s plan details state total BUA 8,858.18, existing BUA 6,931.46, proposed BUA 1,926.72, and 48 tenements. The wider plan record separately states total proposed built-up area excluding parking 35202.69 and including parking 104380.30; those are plan figures for the wider development, not saleable or carpet-area measurements.
The filed plan records also identify internal driveways/passages and a proposed road network, including an 18.00 MT WIDE EXISTING road and an 18.00 MT WIDE PROPOSED ROAD. A landscaped/open-space component is not described in sufficient detail here to quantify its design or delivery.
4. Homes, configurations & floor plans
The RERA-filed schedule lists 192 3BHK units, each with saleable area 48.19 sq m. The portal-derived booking figures indicate 0 booked and 192 available, but the record has no as-of date. No measured carpet-area figure for the RERA-listed 3BHK configuration is available in the supplied floor-plan measurement data. RERA unit table RERA unit details Floor plans
| Configuration | Units | Booked | Available | RERA saleable area | Measured carpet area | Loading (if supplied) |
|---|---|---|---|---|---|---|
| 3BHK | 192 | 0 | 192 | 48.19 sq m | Not measured in supplied drawing data | Not supplied |
The supplied drawing-measurement record contains software-measured carpet-area ranges for 1BHK and 2BHK designs, but marks both as not matched to a TG-RERA configuration. Those measurements are from drawing geometry, are not RERA disclosures, and need review; they are not presented as the registered Block 8B offering. Six of eight drawings remain pending scan review. RERA unit details Floor plans
Saleable area and carpet area are different measures: the RERA filing supplies the saleable figure, while a drawing-based carpet measurement would describe measured internal floor area and would not include the home’s share of common areas. No balcony/utility or loading figure for the RERA-filed 3BHK is supplied here. RERA unit details Floor plans
5. Parking & vehicle circulation
The wider revised plan records No of Cars Proposed 1694 and a Visitor Parking Percentage 10 %. The Block 8B plan details state net parking 502.79; the supplied extract does not specify the unit of that figure.
The municipal permission says cellar and stilt areas approved for parking are to be used exclusively for vehicle parking, without partition walls or rolling shutters. The later plan materials identify stack car parking and require Electric Vehicle Charging Infrastructure in parking places. The evidence does not specify an individual flat’s allocated bay, visitor-space count, accessible-space provision, or the final delivered parking arrangement.
6. Amenities, recreation & open spaces
The RERA amenity record marks the following 14 categories as “YES” and shows 0% progress for each. These are declared availability categories, not evidence of completion. RERA amenities
| Facility | Description / size | Evidence source | Declared progress / verified status |
|---|---|---|---|
| Internal roads and footpaths | No size supplied | RERA amenities | Listed “YES”; 0%; completion not independently verified |
| Water supply | No capacity supplied | RERA amenities | Listed “YES”; 0%; completion not independently verified |
| Sewerage, treatment and disposal | Chambers, lines, septic tank and STP listed; no capacity supplied | RERA amenities | Listed “YES”; 0%; completion not independently verified |
| Storm-water drains | No size supplied | RERA amenities | Listed “YES”; 0%; completion not independently verified |
| Green strip / tot-lot / park | No area supplied | RERA amenities | Listed “YES”; 0%; completion not independently verified |
| Street lighting | No quantity supplied | RERA amenities | Listed “YES”; 0%; completion not independently verified |
| Community buildings | Approval describes an amenities block with clubhouse and commercial shopping | RERA amenities | Listed “YES”; 0%; completion not independently verified |
| Solid-waste management and disposal | No facility size or capacity supplied | RERA amenities | Listed “YES”; 0%; completion not independently verified |
| Water conservation / rainwater harvesting | Rainwater-harvesting structures are named in approval records | RERA amenities | Listed “YES”; 0%; completion not independently verified |
| Energy management | No specific facility or capacity supplied | RERA amenities | Listed “YES”; 0%; completion not independently verified |
| Fire protection and life safety | Approval records list fire-safety provisions; see Utilities and safety below | RERA amenities | Listed “YES”; 0%; completion not independently verified |
| Electrical meter room / substation / receiving station | Plan and approval records identify transformer and electrical facilities | RERA amenities | Listed “YES”; 0%; completion not independently verified |
| Aggregate recreational open space | Listed, but no area supplied | RERA amenities | Listed “YES”; 0%; completion not independently verified |
7. Utilities, building services & safety
Water and drainage: The approval records require water-storage tanks and identify a bore, sump, septic tank, underground drainage, STP and rainwater-harvesting structures. One municipal record specifies separate underground and terrace tanks of 25,000 litres each for residential buildings. Approval conditions also refer to treated-sewage connections and disposal arrangements; capacities and current operating status are not supplied.
Electrical and building services: Approval materials identify transformer space, generator provision, meter rooms and electrical installations. The later plan conditions require Electric Vehicle Charging Infrastructure in parking places and dual piping for the specified larger residential development. These are plan conditions/provisions; the evidence does not establish installation or commissioning.
Lifts and circulation: The plan records identify lifts, a fire-escape lift, fire-escape stairs and a fire-command-centre lobby. Lift quantities and capacities are not supplied.
Fire and safety: Approval conditions refer to fire-fighting installations, emergency lighting, hose reels, down-comers, fire extinguishers, fire-resistant transformer construction and automatic sprinklers where basement area exceeds 200 Sq.mts. A fire NOC number 003940/RPROV/ Sangareddy / 2018 is listed in the municipal-permission record. These records do not establish current completion or operational compliance.
Waste and access: The approval records identify a garbage house and refuse-chute provision; a later building-permit record also requires CCTV. No security-system configuration, staffing, accessibility design or measured accessible-circulation details are supplied.
8. Location, access & connectivity
The registered location is Madhavapuri Town Ship, North Avenue, revenue village Ameenapur, Ameenpur Mandal, Sangareddy District, PIN 500050. The project’s southern boundary is recorded as an 18 M WIDE ROAD. RERA record RERA filing RERA filing
The location record gives the nearest sampled Outer Ring Road interchange at approximately 8.4 km. This is a supplied distance estimate; no public-transport routes, travel times or additional verified landmark distances are provided. Location record
9. Developer & development status
The registered promoter is JANAPRIYA TOWNSHIPS PRIVATE LIMITED, a company with GSTIN 36AABCJ9016B1ZX. The RERA party record lists Ravinder Reddy Kondakindi as authorized signatory and Kranti Kiran Reddy Kondakindi as Managing Director. The Form B declaration was made by N Nandanandhan Reddy as an authorized person for the promoter. Corporate record Parties record
The RERA Form B declaration, dated 28 October 2023, states that the promoter has legal title to the land and that the land is free from encumbrances, and undertakes project completion by 30.12.2027. Those statements are promoter declarations. The project identity record separately gives proposed completion as 30/04/2028. RERA filing
The RERA portal record identifies 192 units in Block 8B, while the plan details state 48 tenements for Block 8B. The supplied evidence does not include a current, independently verified construction-progress report or an occupancy certificate for this block. RERA unit table
10. Approvals, official records & documents
| Record | Available evidence |
|---|---|
| TG-RERA registration | Form C certificate for NILE VALLEY PROJECT - BLOCK - 8B, registration P01100007344, issued 08/12/2023, valid through 30/12/2027. |
| HMDA technical approval | Revised multi-storied building permission, file 10843/P4/Plg/H/2007, dated 31-12-2021, for the wider development; forwarded to Ameenpur Municipality for sanction and release. |
| Municipal building permission | Ameenpur Municipality building permission dated 11/04/2022; it states an Occupancy Certificate is compulsory before occupation. |
| Later revised-plan record | HMDA plan record TS/053539/2024, covering multiple residential blocks, including Block 8B; the supplied extract identifies it as revised plan material. |
| Later building-permit order | Order 007518/BP/HMDA/1815/SKP/2024, dated 11 November, 2024, for the multi-block site; the supplied record states an Occupancy Certificate is required before occupation. |
| Promoter declaration | Form B affidavit dated 28 October 2023, including the promoter’s stated title/encumbrance declarations and completion undertaking. |
| Layout/floor-plan evidence | Plan sheets and drawing extracts are filed, but the separate layout/plan records with unreadable or incomplete OCR do not establish additional approval details. |
| Occupancy/completion record | No occupancy or completion certificate for Block 8B is included in the supplied documents. |
1. Project at a glance
Project identity
Registered project name: NILE VALLEY PROJECT - BLOCK - 8B
Project type and registered portion: Residential apartment project; Block 8B is the registered portion.
TG-RERA registration: P01100007344; issued 08/12/2023, valid through 30/12/2027. Registration validity is separate from the completion undertaking.
Registered promoter: JANAPRIYA TOWNSHIPS PRIVATE LIMITED, a private limited company.
RERA status: Registration certificate is on file; it states registration has not been extended.
Land and geographic identity
Locality / revenue village: Madhavapuri Town Ship, North Avenue / Ameenapur (also rendered “Ameenpur” in approval documents).
Mandal / district / PIN: Ameenpur / Sangareddy / 500050.
Project survey numbers as registered: 341, 342 PART, 334 & 335.
Survey numbers/subdivisions in filed approvals: 334/P, 335/P, 341 & 342 in the HMDA technical approval; 334/Part, 335/Part & 342 in the Ameenpur Municipality permission; the later building-permit record lists 341, 342 PART, 334 & 335.
Site area: RERA land details state total area 99,633 sq m, affected area 1,336.53 sq m, and net area 98,296.47 sq m.
Boundaries: East: OWNERS LAND; west and north: NEIGHBOURS LAND; south: 18 M WIDE ROAD.
Development identity
Sanctioning authority / principal approval: HMDA technical approval 10843/P4/Plg/H/2007, dated 31-12-2021, forwarded to Ameenpur Municipality for sanction and release. The municipal building-permission record is dated 11/04/2022.
Later plan/permit records: HMDA plan record TS/053539/2024; building-permit order 007518/BP/HMDA/1815/SKP/2024, dated 11 November, 2024.
Approved built-up area: The HMDA technical approval records residential BUA of 279700.60 Sq.mts and amenities BUA of 7732.91 Sq.mts. The later municipal order records total built-up area 306,230.07 Sq.mts. These are approval-document figures for the wider multi-block development, not a Block 8B-only total.
Block 8B plan figures: The filed building-plan details state Block 8B total BUA 8,858.18, comprising existing BUA 6,931.46 and proposed BUA 1,926.72; total tenements 48.
Buildings and floors: The wider approval records 13 residential blocks—4A, 4B, 4C, 5, 6, 8A, 8B, 8C, 8D, 9A, 9B, 10A and 10B—and an amenities block. The 2021 approval describes Block 8B as 1 Cellar + Stilt + 10 floors; later plan details show Stilt + 12 floors for Block 8B.
Parking / approved versus RERA-declared units: The revised plan details record No of Cars Proposed 1694 for the wider plan; Block 8B’s plan details state net parking 502.79. The RERA-filed unit schedule records 192 Block 8B units.
Offering and status
RERA-filed configuration: 3BHK, saleable area 48.19 sq m, 192 units.
Booking / availability: Portal-derived record shows 0 booked and 192 available; the booking record has no as-of date and should be treated as indicative.
Completion undertaking: The RERA Form B declaration undertakes completion by 30.12.2027; the project identity record separately lists proposed completion as 30/04/2028.
Construction stage: The supplied records include proposed and existing plan areas, but no independently verified current site-progress report. Construction status is therefore not established from this evidence.
Occupancy certificate: No occupancy/completion certificate is supplied for Block 8B; the municipal permission states an Occupancy Certificate is compulsory before occupation.
2. The project story
This is a residential apartment development registered with TG-RERA as NILE VALLEY PROJECT - BLOCK - 8B, at Madhavapuri Town Ship, North Avenue, in revenue village Ameenapur, Ameenpur Mandal, Sangareddy District. The registered land schedule names survey numbers 341, 342 PART, 334 and 335.
Block 8B forms part of a larger multi-block residential plan. The filed drawings and approval records describe 13 residential blocks and a separate amenities block, while Block 8B’s later plan details identify 48 tenements in that block. The RERA-filed unit schedule, however, records 192 units for the registered Block 8B project.
The approval records describe existing and proposed built-up area, including additional floors in the later plan materials. Those figures describe the plans, not independently confirmed construction progress. The available evidence does not establish which construction work is complete on site, and no occupancy certificate for Block 8B is included.
3. Master plan, architecture & building design
The site is recorded in the RERA land details as 99,633 sq m total and 98,296.47 sq m net, with 1,336.53 sq m affected area. The later HMDA plan record gives plot area 99632.99 sq.mt., net area 98296.46 sq.mt., and road-affected area 1336.53.
The wider technical approval describes a high-rise residential development, including Blocks 4A–4C, 5, 6, 8A–8D, 9A–9B and 10A–10B, together with an amenities block described as a clubhouse and commercial shopping. The 2021 approval identifies Block 8B as 1 Cellar + Stilt + 10 floors. Later plan materials describe Block 8B as Stilt + 12 floors, with total height 45.05mt. and height excluding stilt 35.99 mt. The later municipal order also describes existing lower levels and 10 upper floors with two proposed upper floors for Block 8B.
Block 8B’s plan details state total BUA 8,858.18, existing BUA 6,931.46, proposed BUA 1,926.72, and 48 tenements. The wider plan record separately states total proposed built-up area excluding parking 35202.69 and including parking 104380.30; those are plan figures for the wider development, not saleable or carpet-area measurements.
The filed plan records also identify internal driveways/passages and a proposed road network, including an 18.00 MT WIDE EXISTING road and an 18.00 MT WIDE PROPOSED ROAD. A landscaped/open-space component is not described in sufficient detail here to quantify its design or delivery.
4. Homes, configurations & floor plans
The RERA-filed schedule lists 192 3BHK units, each with saleable area 48.19 sq m. The portal-derived booking figures indicate 0 booked and 192 available, but the record has no as-of date. No measured carpet-area figure for the RERA-listed 3BHK configuration is available in the supplied floor-plan measurement data.
| Configuration | Units | Booked | Available | RERA saleable area | Measured carpet area | Loading (if supplied) |
|---|---|---|---|---|---|---|
| 3BHK | 192 | 0 | 192 | 48.19 sq m | Not measured in supplied drawing data | Not supplied |
The supplied drawing-measurement record contains software-measured carpet-area ranges for 1BHK and 2BHK designs, but marks both as not matched to a TG-RERA configuration. Those measurements are from drawing geometry, are not RERA disclosures, and need review; they are not presented as the registered Block 8B offering. Six of eight drawings remain pending scan review.
Saleable area and carpet area are different measures: the RERA filing supplies the saleable figure, while a drawing-based carpet measurement would describe measured internal floor area and would not include the home’s share of common areas. No balcony/utility or loading figure for the RERA-filed 3BHK is supplied here.
5. Parking & vehicle circulation
The wider revised plan records No of Cars Proposed 1694 and a Visitor Parking Percentage 10 %. The Block 8B plan details state net parking 502.79; the supplied extract does not specify the unit of that figure.
The municipal permission says cellar and stilt areas approved for parking are to be used exclusively for vehicle parking, without partition walls or rolling shutters. The later plan materials identify stack car parking and require Electric Vehicle Charging Infrastructure in parking places. The evidence does not specify an individual flat’s allocated bay, visitor-space count, accessible-space provision, or the final delivered parking arrangement.
6. Amenities, recreation & open spaces
The RERA amenity record marks the following 14 categories as “YES” and shows 0% progress for each. These are declared availability categories, not evidence of completion.
| Facility | Description / size | Evidence source | Declared progress / verified status |
|---|---|---|---|
| Internal roads and footpaths | No size supplied | Listed “YES”; 0%; completion not independently verified | |
| Water supply | No capacity supplied | Listed “YES”; 0%; completion not independently verified | |
| Sewerage, treatment and disposal | Chambers, lines, septic tank and STP listed; no capacity supplied | Listed “YES”; 0%; completion not independently verified | |
| Storm-water drains | No size supplied | Listed “YES”; 0%; completion not independently verified | |
| Green strip / tot-lot / park | No area supplied | Listed “YES”; 0%; completion not independently verified | |
| Street lighting | No quantity supplied | Listed “YES”; 0%; completion not independently verified | |
| Community buildings | Approval describes an amenities block with clubhouse and commercial shopping | Listed “YES”; 0%; completion not independently verified | |
| Solid-waste management and disposal | No facility size or capacity supplied | Listed “YES”; 0%; completion not independently verified | |
| Water conservation / rainwater harvesting | Rainwater-harvesting structures are named in approval records | Listed “YES”; 0%; completion not independently verified | |
| Energy management | No specific facility or capacity supplied | Listed “YES”; 0%; completion not independently verified | |
| Fire protection and life safety | Approval records list fire-safety provisions; see Utilities and safety below | Listed “YES”; 0%; completion not independently verified | |
| Electrical meter room / substation / receiving station | Plan and approval records identify transformer and electrical facilities | Listed “YES”; 0%; completion not independently verified | |
| Aggregate recreational open space | Listed, but no area supplied | Listed “YES”; 0%; completion not independently verified |
7. Utilities, building services & safety
Water and drainage: The approval records require water-storage tanks and identify a bore, sump, septic tank, underground drainage, STP and rainwater-harvesting structures. One municipal record specifies separate underground and terrace tanks of 25,000 litres each for residential buildings. Approval conditions also refer to treated-sewage connections and disposal arrangements; capacities and current operating status are not supplied.
Electrical and building services: Approval materials identify transformer space, generator provision, meter rooms and electrical installations. The later plan conditions require Electric Vehicle Charging Infrastructure in parking places and dual piping for the specified larger residential development. These are plan conditions/provisions; the evidence does not establish installation or commissioning.
Lifts and circulation: The plan records identify lifts, a fire-escape lift, fire-escape stairs and a fire-command-centre lobby. Lift quantities and capacities are not supplied.
Fire and safety: Approval conditions refer to fire-fighting installations, emergency lighting, hose reels, down-comers, fire extinguishers, fire-resistant transformer construction and automatic sprinklers where basement area exceeds 200 Sq.mts. A fire NOC number 003940/RPROV/ Sangareddy / 2018 is listed in the municipal-permission record. These records do not establish current completion or operational compliance.
Waste and access: The approval records identify a garbage house and refuse-chute provision; a later building-permit record also requires CCTV. No security-system configuration, staffing, accessibility design or measured accessible-circulation details are supplied.
8. Location, access & connectivity
The registered location is Madhavapuri Town Ship, North Avenue, revenue village Ameenapur, Ameenpur Mandal, Sangareddy District, PIN 500050. The project’s southern boundary is recorded as an 18 M WIDE ROAD.
The location record gives the nearest sampled Outer Ring Road interchange at approximately 8.4 km. This is a supplied distance estimate; no public-transport routes, travel times or additional verified landmark distances are provided.
9. Developer & development status
The registered promoter is JANAPRIYA TOWNSHIPS PRIVATE LIMITED, a company with GSTIN 36AABCJ9016B1ZX. The RERA party record lists Ravinder Reddy Kondakindi as authorized signatory and Kranti Kiran Reddy Kondakindi as Managing Director. The Form B declaration was made by N Nandanandhan Reddy as an authorized person for the promoter.
The RERA Form B declaration, dated 28 October 2023, states that the promoter has legal title to the land and that the land is free from encumbrances, and undertakes project completion by 30.12.2027. Those statements are promoter declarations. The project identity record separately gives proposed completion as 30/04/2028.
The RERA portal record identifies 192 units in Block 8B, while the plan details state 48 tenements for Block 8B. The supplied evidence does not include a current, independently verified construction-progress report or an occupancy certificate for this block.
10. Approvals, official records & documents
TG-RERA registration: Form C certificate for NILE VALLEY PROJECT - BLOCK - 8B, registration P01100007344, issued 08/12/2023, valid through 30/12/2027.
HMDA technical approval: Revised multi-storied building permission, file 10843/P4/Plg/H/2007, dated 31-12-2021, for the wider development; forwarded to Ameenpur Municipality for sanction and release.
Municipal building permission: Ameenpur Municipality building permission dated 11/04/2022; it states an Occupancy Certificate is compulsory before occupation.
Later revised-plan record: HMDA plan record TS/053539/2024, covering multiple residential blocks, including Block 8B; the supplied extract identifies it as revised plan material.
Later building-permit order: Order 007518/BP/HMDA/1815/SKP/2024, dated 11 November, 2024, for the multi-block site; the supplied record states an Occupancy Certificate is required before occupation.
Promoter declaration: Form B affidavit dated 28 October 2023, including the promoter’s stated title/encumbrance declarations and completion undertaking.
Layout/floor-plan evidence: Plan sheets and drawing extracts are filed, but the separate layout/plan records with unreadable or incomplete OCR do not establish additional approval details.
Occupancy/completion record: No occupancy or completion certificate for Block 8B is included in the supplied documents.
Other registrations of Nile Valley Project
Frequently asked questions
Is NILE VALLEY PROJECT - BLOCK - 8B registered with Telangana RERA?
Yes. NILE VALLEY PROJECT - BLOCK - 8B is registered with the Telangana Real Estate Regulatory Authority as P01100007344; the registration status is New Project.
Who is the developer of NILE VALLEY PROJECT - BLOCK - 8B?
The promoter named in the RERA registration is JANAPRIYA TOWNSHIPS PRIVATE LIMITED.
Where is NILE VALLEY PROJECT - BLOCK - 8B located?
NILE VALLEY PROJECT - BLOCK - 8B is in MADHAVAPURI TOWN SHIP, AMEENAPUR, AMEENPUR, Sangareddy, Telangana (500050).
When will NILE VALLEY PROJECT - BLOCK - 8B be completed?
The promoter's proposed date of completion filed with RERA is 30/04/2028. This is the promoter's declaration, not a guarantee.
More projects in Ameenapur







