Sign in

Abode Aahwanam

ABODE DEVELOPERS · Sangareddy · RERA P01100004789

ABODE AAHWANAM is a residential apartment project in Ameenpur locality, Ameenpur mandal, Sangareddy district. It is being developed by registered promoter Abode Developers. The project covers 8650.08 sq. m and comprises four blocks—three residential blocks, each with 1 stilt + 5 upper floors, and one amenities block with 1 ground + 3 upper floors—with 130 2BHK and 20 3BHK homes. Its TG-RERA registration number is P01100004789, and the promoter’s filed completion undertaking is 10 May 2028.

More from Abode Developers · 5 projects →

01What we found

RegisteredTG-RERA - valid till 6 Jul 2028
49documents on file - each fact links to its page
0court cases on this project's land in the court records searched
5items to check - 2 high

Read from TG-RERA filings, approvals, land and registration records and court records. A court case is counted only when the court record states this project's survey number with its village, or names the project.

02Check before you pay

5 items to check before you pay, 2 high - from the title chain, court records and approvals, each with what to ask the builder or your advocate. An item may not be a problem with the project: records can be incomplete.

Sign in to see each item and what to do

1. Project at a glance

Project identity

ItemProject record
Registered project nameABODE AAHWANAM RERA record
Project typeResidential apartment project RERA record
Phase / registered portionPhase or separately registered portion not identified in the supplied records. The registration covers the project associated with the survey numbers listed below.
TG-RERA registrationP01100004789
Registration validity1 August 2022 to 6 July 2028; the registration certificate states five years and is not marked as extended. This is registration validity, not an occupancy certificate or a statement of construction stage.
Registered promoterAbode Developers (also styled M/s ABODE DEVELOPERS); partnership firm RERA record Corporate record RERA filing
RERA status in supplied recordRegistered; the certificate is Form C.

Land and geographic identity

ItemProject record
Locality / revenue villageLocality: Ameenpur. Revenue village: AMEENAPUR (also written Ameenpur in the occupancy-certificate extraction). RERA record
Mandal / district / PINAmeenpur mandal; Sangareddy district; 502032. RERA record
Project survey numbers and subdivisions, as filed402/EE/1/2, 402/EE/1/1/1/2, 402/EE/1/1/2, 402/EE/2, 404/A, 404/AA, 410/AA1, AA2, AA3/2, E5/1/2, A1/1/2, A1/2/1/2, E5/2, E6/2.
Registered site extent8650.08 sq. m total area; the filed land details state 455.26 sq. m affected by road widening/FTL/nala widening and 8194.82 sq. m net area. RERA filing Land records
Boundaries, as filedNorth: 40 feet wide road; South: Sy. No. 410 part; East: Sy. No. 402 P, Sy. No. 399, 396; West: Sy. Nos. 406, 407, 405 and Sai Villas. RERA filing

Development identity

ItemProject record
Sanctioning authorityHyderabad Metropolitan Development Authority (HMDA). Approvals record
Principal building approvalBuilding Permit 060498/SKP/PLG/2021, dated 07/05/2022.
RERA-filed approved built-up area8194.82 sq. m is the approved built-up area recorded in the RERA filing. The occupancy-certificate extraction separately lists block-wise built-up areas. RERA filing
Buildings / blocksFour blocks: three residential blocks and one amenities block. RERA filing
Floor configuration in the occupancy-certificate recordBlocks 1, 2 and 3: 1 stilt + 5 upper floors each. Amenities block: 1 ground + 3 upper floors.
Parking levels / countParking counts and a distinct parking-level schedule are not established in the supplied extracts. The residential blocks are described as having a stilt level; its parking use and capacity are not specified here.
Unit countRERA filing: 153 total units, comprising 150 residential units and 3 “Multipurpose” units recorded as not for sale. The supplied approved-plan unit count is 4 building units, not an apartment count. RERA unit table RERA unit table RERA filing

Offering and status

ItemProject record
Homes filed with TG-RERA2BHK: 130; 3BHK: 20. RERA unit table RERA unit details
RERA-filed saleable area2BHK: 52.76 sq. m; 3BHK: 142.6 sq. m. RERA unit table RERA unit details
Booked / availablePortal snapshot reports 0 booked and 130 available 2BHK units, and 0 booked and 20 available 3BHK units. The portal data has no supplied as-of date; treat these counts as indicative, not live availability. RERA unit table RERA unit details
Construction / completion evidenceHMDA’s occupancy-certificate record states completion on 15/11/2025 and records an Occupancy Certificate dated 15/12/2025. An architect’s certificate dated 08/04/2026 states the project is completed in all aspects.
Occupancy certificate scopeThe supplied HMDA certificate is for the completed development in the stated site, identifies Blocks 1–3 and the amenities block, and records survey numbers 402/P, 404/P and 410/P.
Promoter-declared completion undertakingForm B, verified on 10 May 2022, states a completion undertaking of 10 May 2028. This is the promoter’s filed undertaking; it is distinct from the later completion and OC records above.

2. The project story

ABODE AAHWANAM is registered with TG-RERA as a residential apartment project in Ameenpur, Sangareddy district. The RERA filing describes a site of 8650.08 sq. m and four building units. HMDA’s supplied occupancy-certificate record describes three residential apartment blocks and a separate amenities block, with the residential blocks configured as one stilt level plus five upper floors and the amenities block as one ground floor plus three upper floors. RERA record RERA filing

The RERA unit schedule identifies 130 2BHK and 20 3BHK homes; it also has three “Multipurpose” entries that the filing data classifies as not for sale, so they are not counted as homes available for purchase. The supplied HMDA certificate records completion of the four blocks, and the architect’s Form 1A states that the project is complete in all aspects. Those records establish documentary completion and occupancy certification; they are not an independent site inspection for this report. RERA unit table RERA unit table

3. Master plan, architecture & building design

The project’s filed site area is 8650.08 sq. m, with a stated net area of 8194.82 sq. m. The RERA filing records approved built-up area of 8194.82 sq. m. HMDA’s occupancy-certificate extraction gives block-level built-up areas: 5845.0 sq. m for ABODE BLOCK-1, 5812.85 sq. m for ABODE BLOCK-2, 4551.2 sq. m for ABODE BLOCK-3 and 926.96 sq. m for ABODE AMINITIES BLOCK. These are presented as the figures in their respective records, not as interchangeable area measures. RERA filing RERA filing

The HMDA record describes three residential blocks, each with 1 stilt + 5 upper floors, and an amenities block with 1 ground + 3 upper floors. It lists building heights of 14.85 metres for each residential block and 11.96 metres for the amenities block. The supplied extracts do not specify apartment counts per floor, lifts, stairs, internal-road geometry, landscape/open-space dimensions or a phase-wise arrangement.

The RERA record lists 150 homes across two configurations and three multipurpose entries classified as not for sale. No carpet-area measurements are available: the eight drawing records identified for floor-plan review are scans pending measurement, with zero drawings measured. The RERA-filed saleable areas therefore remain the only supplied unit-area figures. RERA unit table RERA unit details Floor plans

4. Homes, configurations & floor plans

ConfigurationUnitsBookedAvailable*RERA saleable areaMeasured carpet areaLoading
2BHK130013052.76 sq. mNot measured from drawingsNot supplied
3BHK20020142.6 sq. mNot measured from drawingsNot supplied

\*Portal counts are reported without an as-of date and are indicative. RERA unit table RERA unit details

The RERA filing records saleable area, not carpet area. Carpet area measured from a floor plan would be a different measure; it is not available here because all eight supplied drawing records are scans pending measurement. Accordingly, no room dimensions, typical flat arrangement, balcony or utility measurements, or common-area loading can be reported from this evidence. RERA unit details Floor plans

5. Parking & vehicle circulation

The supplied records establish a stilt level in each of the three residential blocks, but do not identify its use or give sanctioned parking counts, resident or visitor allocation, accessible spaces, parking layouts, ramps, vehicle entries/exits, pedestrian separation, EV charging or unit-specific parking allocations. A stilt level alone does not establish the number or legal allocation of parking spaces. Document index

6. Amenities, recreation & open spaces

The RERA filing marks the following development works and facilities as available in its project schedule. The supplied extract reports 0% progress for the listed items; it does not establish that they were delivered or independently verified. HMDA’s certificate identifies a separate amenities block, but the supplied record does not set out its room-by-room facilities or capacities. RERA amenities

FacilityDescription / sizeEvidence sourceDeclared progress / verified status
Internal roads & footpathsSize not suppliedRERA filing RERA amenities0% recorded; not independently verified
Green strip / tot lot / parkSize not suppliedRERA filing RERA amenitiesMarked available; 0% recorded; not independently verified
Community buildingsSize and capacity not suppliedRERA filing RERA amenities; amenities block identified in HMDA recordMarked available; 0% recorded; not independently verified
Aggregate recreational open spaceArea not suppliedRERA filing RERA amenitiesMarked available; 0% recorded; not independently verified

No project-specific, verified inventory of clubhouse or indoor facilities, sports facilities, or recreational capacities is supplied for this overview.

7. Utilities, building services & safety

The RERA filing marks water supply, sewerage (including chambers, lines, septic tank and STP), storm-water drains, sewage and sullage treatment/disposal, solid-waste management, rainwater harvesting, energy management, fire protection and fire-safety requirements, and an electrical meter room/sub-station/receiving station in the project schedule. The same schedule reports 0% progress for its listed items. It does not provide system capacities, water sources or storage details, STP capacity, treated-water reuse arrangements, electrical supply or backup capacity, lift details, fire-system specifications, CCTV/access-control provisions, or accessibility arrangements. These are filing entries, not independent confirmation of installation or operation. RERA amenities

8. Location, access & connectivity

The registered project location is Ameenpur locality, revenue village AMEENAPUR, Ameenpur mandal, Sangareddy district, PIN 502032. The filed northern boundary is a 40 feet wide road. The supplied location data gives the nearest sampled Outer Ring Road interchange at approximately 8.4 km; no travel time is supplied. RERA record RERA filing Location record

9. Developer & development status

The registered promoter is Abode Developers, identified in the project record as a partnership firm. Its supplied GSTIN is 36ABKFA8944Q1ZJ. The registration certificate gives the promoter office as Village Nallagandla, Serilingampally mandal, Ranga Reddy district, PIN 500019; the project filing also gives an Ameenpur address. The supplied promoter website is https://abodegroups.com/. Corporate record RERA filing Parties record

Form B, verified at Hyderabad on 10 May 2022, records the promoter’s undertaking to complete by 10 May 2028. HMDA’s occupancy-certificate record later records completion on 15 November 2025 and an Occupancy Certificate dated 15 December 2025; the architect’s certificate dated 8 April 2026 states that the project is complete in all aspects. These are, respectively, a promoter undertaking and later completion/occupancy documents. The RERA portal’s unit-booking counts have no supplied as-of date. RERA unit table

10. Approvals, official records & documents

TG-RERA registration certificate
Identifier / dateP01100004789, issued 01/08/2022
What the supplied record establishesForm C registration for ABODE AAHWANAM; validity stated through 06/07/2028.
HMDA building permit
Identifier / date060498/SKP/PLG/2021, dated 07/05/2022
What the supplied record establishesBuilding permit number recorded in the occupancy-certificate extraction.
HMDA Occupancy Certificate
Identifier / date010875/HMDA/03187/SWOC/SKP2/2025, dated 15/12/2025
What the supplied record establishesCertificate records the completed buildings and identifies survey numbers 402/P, 404/P and 410/P.
Architect’s completion certificate (Form 1A)
Identifier / dateDated 08/04/2026
What the supplied record establishesArchitect certifies completion of the registered project and cites the HMDA Occupancy Certificate.
Form B affidavit-cum-declaration
Identifier / dateVerified 10 May 2022
What the supplied record establishesPromoter declaration and completion undertaking; not itself a land conveyance or authority approval.
RERA-filed title and encumbrance documents
Identifier / dateTitle-report documents
What the supplied record establishesFiled records include title-report material and development agreements, sale deeds and related instruments. The detailed instrument review belongs in the Land & Title section.
RERA-filed encumbrance statement
Identifier / dateStatement 92728332, search period 01-01-1993 to 17-07-2022
What the supplied record establishesStatement lists registered transactions, including three HMDA mortgage-without-possession entries.

The supplied records do not include a readable sanctioned drawing set or a public approved-layout lookup result. The building configuration above is therefore limited to the available RERA filing and HMDA certificate extracts; the full plans and conditions are not reproduced here. Document index HMDA

Frequently asked questions

Is ABODE AAHWANAM registered with Telangana RERA?

Yes. ABODE AAHWANAM is registered with the Telangana Real Estate Regulatory Authority as P01100004789; the registration status is New Project.

Who is the developer of ABODE AAHWANAM?

The promoter named in the RERA registration is ABODE DEVELOPERS.

Where is ABODE AAHWANAM located?

ABODE AAHWANAM is in Ameenpur, AMEENAPUR, Sangareddy, Telangana (502032).

When will ABODE AAHWANAM be completed?

The promoter's proposed date of completion filed with RERA is 06/07/2028. This is the promoter's declaration, not a guarantee.

More projects in Ameenapur