Aarohi
NEON INFRA · Sangareddy · RERA P01100009579
AAROHI is a residential apartment project at Plots 45 and 46 in Ameenpur, AMEENPUR mandal, Sangareddy district, developed by registered promoter NEON INFRA, a partnership. The registered portion has a land area of 446.49 sq. m and one residential block with 1 Stilt + 5 upper floors and 15 2BHK units, each with a saleable area of 104.36 sq. m. Its TG-RERA registration is P01100009579, and the RERA filing lists proposed completion as 27/01/2028.
More from Neon Infra · 8 projects →
01What we found
Read from TG-RERA filings, approvals, land and registration records and court records. A court case is counted only when the court record states this project's survey number with its village, or names the project.
02Check before you pay
6 items to check before you pay, 3 high - from the title chain, court records and approvals, each with what to ask the builder or your advocate. An item may not be a problem with the project: records can be incomplete.
1. Project at a glance
Project identity
| Item | Project record |
|---|---|
| Registered project name | AAROHI RERA record |
| Project type / phase | Residential apartment project; registered portion is identified as one building on Plots 45 and 46. A separate phase name is not disclosed. RERA record RERA filing |
| TG-RERA registration | P01100009579; registration began 28/09/2024 and the certificate states validity through 27/09/2027, unless extended by the Authority. Approvals record |
| Registered promoter | NEON INFRA, a partnership. RERA filing Corporate record |
| RERA status | Registered; the portal record was captured on 10 September 2026. Approvals record |
Land and geographic identity
| Item | Project record |
|---|---|
| Locality / site | Ameenpur; Plot Nos. 45 and 46. RERA filing |
| Revenue village | AMEENAPUR (also rendered “Ameenpur Village” in the building-permit documents). RERA record RERA filing |
| Mandal / district / PIN | AMEENPUR mandal; Sangareddy district; 502032. RERA record RERA filing |
| Project survey number and subdivision | 136/PART. RERA record |
| RERA-filed site area | 446.49 sq. m net and total area; road-widening/FTL/nala-affected area is recorded as 0. RERA filing |
| Boundaries in the RERA filing | North: Plot No. 44; South: Plot No. 47; East: 10 MT wide existing road; West: Plot Nos. 59 and 60. RERA filing |
Development identity
| Item | Project record |
|---|---|
| Sanctioning authority / principal approval | HMDA building permission 000914/BP/HMDA/0210/SKP/2024, approved 28 September 2024. Approvals record |
| Approved building form | One residential block: 1 Stilt + 5 upper floors. |
| Approved built-up area | 1,489.70 sq. m total built-up area, including 248.30 sq. m parking area; the plan records 1,241.40 sq. m proposed built-up area excluding parking. |
| Building height | The plan records 14.50 MT excluding the stilt floor and also records a total height of 20.25mt. |
| Parking levels / counts | Stilt is designated for vehicle parking. A sanctioned parking-space count is not established in the supplied records. |
| Unit count | 15 dwelling units in one block, per the RERA-filed configuration record and plan extraction. RERA unit table |
Offering and status
| Item | Project record |
|---|---|
| RERA-filed configuration and saleable area | 2BHK; 104.36 sq. m saleable area. RERA unit table |
| Booked / available | The portal snapshot lists 0 booked and 15 available; the booking record has no as-of date, so these counts are indicative. RERA unit table |
| Construction stage | A building-specific HMDA Occupancy Certificate records the building as completed and fit for occupation; it is dated 29/10/2025 and records a completion date of 05/10/2025. |
| Completion dates in project records | The RERA filing lists proposed completion as 27/01/2028. The Form-B declaration states 27/09/2027. RERA record |
| Occupancy-certificate scope | The supplied OC is for the residential building named NEON INFRA at Plot Nos. 45 and 46, Survey No. 136/PART, under building permit 000914/BP/HMDA/0210/SKP/2024. |
2. The project story
- AAROHI is recorded with TG-RERA as a residential apartment project in Ameenpur, Sangareddy district. The registered site is identified as Plots 45 and 46 in revenue village AMEENAPUR, Survey No. 136/PART, with a RERA-filed area of 446.49 sq. m. RERA record RERA filing
- The HMDA building-permit record describes one residential block of 1 Stilt + 5 upper floors, while the project filing records 15 2BHK units. RERA unit table The supplied occupancy certificate concerns this building and states that it was inspected and declared fit for occupation. This is a building-specific certificate; the evidence does not identify any other phase or tower.
- Registration validity, the promoter’s completion declarations and the building’s occupancy status are separate records: the registration certificate states validity through 27/09/2027 unless extended, while the supplied OC is for the identified building and is dated 29/10/2025.
3. Master plan, architecture & building design
- The HMDA-filed plan depicts a single residential block on 446.49 sq. m of plot area, with 1,241.40 sq. m of proposed built-up area excluding parking and 1,489.70 sq. m including parking. It records a 248.30 sq. m parking area and a six-floor count; the permit describes this as 1 Stilt + 5 upper floors.
- The plan records a 14.50 MT building height excluding the stilt floor and separately states a total height of 20.25mt. The supplied records do not establish a unit count per floor, building footprint, lift capacity, number of stairs, or detailed internal circulation arrangement.
- The drawings list a lift and stair, and identify a 2.50 M. WIDE PASSAGE and 1.50 M. WIDE BALC among plan features. The supplied material does not provide a complete, reliably extracted description of entries, exits, landscaping or common-area distribution.
4. Homes, configurations & floor plans
- The RERA filing lists 15 units as 2BHK, each with a saleable area of 104.36 sq. m. The table below separates that filed saleable area from software measurements taken from the approved floor-plan drawing geometry. The software-measured carpet figures are not RERA disclosures and are flagged as needing review. RERA unit table Floor plans
| Configuration | Units | Booked | Available | RERA saleable area | Measured carpet area | Loading (if supplied) |
|---|---|---|---|---|---|---|
| 2BHK | 15 | 0 | 15 | 104.36 sq. m | Software-measured: 56.4–68.6 sq. m; median 56.8 sq. m | 46% |
- The drawing sample covers 6 flat designs. One illustrated flat includes two bedrooms, two toilets, a combined living/kitchen area, a wash area and a utility area; the utility is excluded from the software-measured carpet calculation. The illustrated room dimensions are drawing measurements, not separately RERA-filed unit specifications. RERA unit details
- Carpet area refers to the measured internal area under the stated drawing methodology. Saleable area is a separate RERA-filed figure and may include the home’s share of common areas; it should not be treated as carpet area. Floor plans RERA unit table
5. Parking & vehicle circulation
- The sanctioned building arrangement provides a stilt level designated for vehicle parking, and the HMDA conditions state that the stilt/cellar is to be used exclusively for vehicle parking. The plan extraction records 248.30 sq. m of parking area.
- The available evidence does not establish the number of parking spaces, visitor or accessible-space provision, two-wheeler allocation, EV-charging locations, ramps, or a legally documented parking allotment for any individual unit. A parking area shown in a plan does not by itself establish exclusive ownership or allocation. The plan lists EV charging infrastructure as a provision, but the supplied record does not establish its installed status.
6. Amenities, recreation & open spaces
- The RERA amenity record marks the following 14 categories “YES” at 100%. This is a filed availability record, not independent verification of completion. The building-permit documents also list specified on-site provisions, which remain subject to their stated approval conditions. RERA amenities
| Facility | Description / size | Evidence source | Declared progress / verified status |
|---|---|---|---|
| Internal roads & footpaths | Size not stated | RERA amenities | RERA record: YES, 100%; completion not independently verified |
| Green strip / tot lot / park | Size and components not specified | RERA amenities | RERA record: YES, 100%; completion not independently verified |
| Community buildings | No further description or size supplied | RERA amenities | RERA record: YES, 100%; completion not independently verified |
| Aggregate recreational open space | Area not stated | RERA amenities | RERA record: YES, 100%; completion not independently verified |
No RERA-filed clubhouse, gym, swimming pool, children’s play area or other individually described recreational facility is established in the supplied amenity record.
7. Utilities, building services & safety
- The RERA amenity record marks water supply, sewerage, storm-water drains, sewage/sullage treatment and disposal, solid-waste management, rainwater harvesting, energy management, fire protection and fire-safety requirements, and an electrical meter room/sub-station/receiving station as “YES” at 100%. These are filed status entries; the evidence supplied does not independently verify installation, operating condition or capacity. RERA amenities
- The HMDA building-permit documents list an STP, septic tank, transformer, garbage house and rainwater-harvesting structures. They also include a CCTV-camera condition, and the plan lists a lift and stair. The permit requires fire and structural-safety provisions; no fire-clearance certificate, equipment schedule, lift capacity or system commissioning evidence is supplied here.
- Water sources and storage capacity, treatment capacity, sewerage reuse arrangements, electrical backup capacity, waste-segregation details, access control and accessibility provisions are not established by the supplied project records. The approval documents describe required provisions and conditions; they do not alone prove that those services are complete or operational.
8. Location, access & connectivity
- The registered location is AMEENAPUR village, AMEENPUR mandal, Sangareddy district, PIN 502032, at Plot Nos. 45 and 46, Survey No. 136/PART. The RERA-filed eastern boundary is a 10 MT WIDE EXISTING ROAD. RERA record RERA filing
- The cadastral parcel centroid is recorded at 17.53208, 78.33591. The supplied location data identifies the nearest sampled Outer Ring Road interchange at approximately 8.1 km; this is a mapped distance, not a stated travel time. Cadastral map Location record
9. Developer & development status
- The registered promoter is NEON INFRA, identified in the project record as a partnership. The RERA record lists GSTIN 36AATFN2947C1Z1 and authorized signatory KOTAPATI NARASIMHA RAO. Corporate record Parties record The registration certificate gives a registered-office location in Medchal-Malkajgiri, PIN 500072, but does not provide a complete street address or official contact details in the supplied extraction.
- The HMDA permit identifies NEON INFRA as DAGPA holder/developer for the landowners. The project records include a building-specific occupancy certificate for the building at Plots 45 and 46. No separate tower or phase-wise construction-progress schedule is established in the supplied evidence.
10. Approvals, official records & documents
| Record | What it establishes |
|---|---|
| TG-RERA registration certificate, P01100009579 | Registration of AAROHI; validity stated from 28/09/2024 through 27/09/2027, unless extended. |
| HMDA building permit, 000914/BP/HMDA/0210/SKP/2024, dated 28 September 2024 | Building permission for the residential development on Plot Nos. 45 and 46, Survey No. 136/PART. |
| HMDA technical approval / plan material | Records one block, 1 Stilt + 5 upper floors, approved area figures and plan conditions; filed under the same principal approval number. |
| HMDA Occupancy Certificate, 008331/HMDA/02462/SWOC/SKP2/2025, dated 29/10/2025 | Occupancy certification for the identified building under the 2024 building permit; records completion date 05/10/2025. |
| Form-B declaration | Promoter declaration including a completion undertaking of 27/09/2027 and statements concerning title and project funds. |
| RERA-filed plan and unit record | One residential block and 15 dwelling units; plan document records the listed building configuration. RERA unit table |
1. Project at a glance
Project identity
Registered project name: AAROHI
Project type / phase: Residential apartment project; registered portion is identified as one building on Plots 45 and 46. A separate phase name is not disclosed.
TG-RERA registration: P01100009579; registration began 28/09/2024 and the certificate states validity through 27/09/2027, unless extended by the Authority.
Registered promoter: NEON INFRA, a partnership.
RERA status: Registered; the portal record was captured on 10 September 2026.
Land and geographic identity
Locality / site: Ameenpur; Plot Nos. 45 and 46.
Revenue village: AMEENAPUR (also rendered “Ameenpur Village” in the building-permit documents).
Mandal / district / PIN: AMEENPUR mandal; Sangareddy district; 502032.
Project survey number and subdivision: 136/PART.
RERA-filed site area: 446.49 sq. m net and total area; road-widening/FTL/nala-affected area is recorded as 0.
Boundaries in the RERA filing: North: Plot No. 44; South: Plot No. 47; East: 10 MT wide existing road; West: Plot Nos. 59 and 60.
Development identity
Sanctioning authority / principal approval: HMDA building permission 000914/BP/HMDA/0210/SKP/2024, approved 28 September 2024.
Approved building form: One residential block: 1 Stilt + 5 upper floors.
Approved built-up area: 1,489.70 sq. m total built-up area, including 248.30 sq. m parking area; the plan records 1,241.40 sq. m proposed built-up area excluding parking.
Building height: The plan records 14.50 MT excluding the stilt floor and also records a total height of 20.25mt.
Parking levels / counts: Stilt is designated for vehicle parking. A sanctioned parking-space count is not established in the supplied records.
Unit count: 15 dwelling units in one block, per the RERA-filed configuration record and plan extraction.
Offering and status
RERA-filed configuration and saleable area: 2BHK; 104.36 sq. m saleable area.
Booked / available: The portal snapshot lists 0 booked and 15 available; the booking record has no as-of date, so these counts are indicative.
Construction stage: A building-specific HMDA Occupancy Certificate records the building as completed and fit for occupation; it is dated 29/10/2025 and records a completion date of 05/10/2025.
Completion dates in project records: The RERA filing lists proposed completion as 27/01/2028. The Form-B declaration states 27/09/2027.
Occupancy-certificate scope: The supplied OC is for the residential building named NEON INFRA at Plot Nos. 45 and 46, Survey No. 136/PART, under building permit 000914/BP/HMDA/0210/SKP/2024.
2. The project story
- AAROHI is recorded with TG-RERA as a residential apartment project in Ameenpur, Sangareddy district. The registered site is identified as Plots 45 and 46 in revenue village AMEENAPUR, Survey No. 136/PART, with a RERA-filed area of 446.49 sq. m.
- The HMDA building-permit record describes one residential block of 1 Stilt + 5 upper floors, while the project filing records 15 2BHK units. The supplied occupancy certificate concerns this building and states that it was inspected and declared fit for occupation. This is a building-specific certificate; the evidence does not identify any other phase or tower.
- Registration validity, the promoter’s completion declarations and the building’s occupancy status are separate records: the registration certificate states validity through 27/09/2027 unless extended, while the supplied OC is for the identified building and is dated 29/10/2025.
3. Master plan, architecture & building design
- The HMDA-filed plan depicts a single residential block on 446.49 sq. m of plot area, with 1,241.40 sq. m of proposed built-up area excluding parking and 1,489.70 sq. m including parking. It records a 248.30 sq. m parking area and a six-floor count; the permit describes this as 1 Stilt + 5 upper floors.
- The plan records a 14.50 MT building height excluding the stilt floor and separately states a total height of 20.25mt. The supplied records do not establish a unit count per floor, building footprint, lift capacity, number of stairs, or detailed internal circulation arrangement.
- The drawings list a lift and stair, and identify a 2.50 M. WIDE PASSAGE and 1.50 M. WIDE BALC among plan features. The supplied material does not provide a complete, reliably extracted description of entries, exits, landscaping or common-area distribution.
4. Homes, configurations & floor plans
- The RERA filing lists 15 units as 2BHK, each with a saleable area of 104.36 sq. m. The table below separates that filed saleable area from software measurements taken from the approved floor-plan drawing geometry. The software-measured carpet figures are not RERA disclosures and are flagged as needing review.
| Configuration | Units | Booked | Available | RERA saleable area | Measured carpet area | Loading (if supplied) |
|---|---|---|---|---|---|---|
| 2BHK | 15 | 0 | 15 | 104.36 sq. m | Software-measured: 56.4–68.6 sq. m; median 56.8 sq. m | 46% |
- The drawing sample covers 6 flat designs. One illustrated flat includes two bedrooms, two toilets, a combined living/kitchen area, a wash area and a utility area; the utility is excluded from the software-measured carpet calculation. The illustrated room dimensions are drawing measurements, not separately RERA-filed unit specifications.
- Carpet area refers to the measured internal area under the stated drawing methodology. Saleable area is a separate RERA-filed figure and may include the home’s share of common areas; it should not be treated as carpet area.
5. Parking & vehicle circulation
- The sanctioned building arrangement provides a stilt level designated for vehicle parking, and the HMDA conditions state that the stilt/cellar is to be used exclusively for vehicle parking. The plan extraction records 248.30 sq. m of parking area.
- The available evidence does not establish the number of parking spaces, visitor or accessible-space provision, two-wheeler allocation, EV-charging locations, ramps, or a legally documented parking allotment for any individual unit. A parking area shown in a plan does not by itself establish exclusive ownership or allocation. The plan lists EV charging infrastructure as a provision, but the supplied record does not establish its installed status.
6. Amenities, recreation & open spaces
- The RERA amenity record marks the following 14 categories “YES” at 100%. This is a filed availability record, not independent verification of completion. The building-permit documents also list specified on-site provisions, which remain subject to their stated approval conditions.
| Facility | Description / size | Evidence source | Declared progress / verified status |
|---|---|---|---|
| Internal roads & footpaths | Size not stated | RERA record: YES, 100%; completion not independently verified | |
| Green strip / tot lot / park | Size and components not specified | RERA record: YES, 100%; completion not independently verified | |
| Community buildings | No further description or size supplied | RERA record: YES, 100%; completion not independently verified | |
| Aggregate recreational open space | Area not stated | RERA record: YES, 100%; completion not independently verified |
No RERA-filed clubhouse, gym, swimming pool, children’s play area or other individually described recreational facility is established in the supplied amenity record.
7. Utilities, building services & safety
- The RERA amenity record marks water supply, sewerage, storm-water drains, sewage/sullage treatment and disposal, solid-waste management, rainwater harvesting, energy management, fire protection and fire-safety requirements, and an electrical meter room/sub-station/receiving station as “YES” at 100%. These are filed status entries; the evidence supplied does not independently verify installation, operating condition or capacity.
- The HMDA building-permit documents list an STP, septic tank, transformer, garbage house and rainwater-harvesting structures. They also include a CCTV-camera condition, and the plan lists a lift and stair. The permit requires fire and structural-safety provisions; no fire-clearance certificate, equipment schedule, lift capacity or system commissioning evidence is supplied here.
- Water sources and storage capacity, treatment capacity, sewerage reuse arrangements, electrical backup capacity, waste-segregation details, access control and accessibility provisions are not established by the supplied project records. The approval documents describe required provisions and conditions; they do not alone prove that those services are complete or operational.
8. Location, access & connectivity
- The registered location is AMEENAPUR village, AMEENPUR mandal, Sangareddy district, PIN 502032, at Plot Nos. 45 and 46, Survey No. 136/PART. The RERA-filed eastern boundary is a 10 MT WIDE EXISTING ROAD.
- The cadastral parcel centroid is recorded at 17.53208, 78.33591. The supplied location data identifies the nearest sampled Outer Ring Road interchange at approximately 8.1 km; this is a mapped distance, not a stated travel time.
9. Developer & development status
- The registered promoter is NEON INFRA, identified in the project record as a partnership. The RERA record lists GSTIN 36AATFN2947C1Z1 and authorized signatory KOTAPATI NARASIMHA RAO. The registration certificate gives a registered-office location in Medchal-Malkajgiri, PIN 500072, but does not provide a complete street address or official contact details in the supplied extraction.
- The HMDA permit identifies NEON INFRA as DAGPA holder/developer for the landowners. The project records include a building-specific occupancy certificate for the building at Plots 45 and 46. No separate tower or phase-wise construction-progress schedule is established in the supplied evidence.
10. Approvals, official records & documents
TG-RERA registration certificate, P01100009579: Registration of AAROHI; validity stated from 28/09/2024 through 27/09/2027, unless extended.
HMDA building permit, 000914/BP/HMDA/0210/SKP/2024, dated 28 September 2024: Building permission for the residential development on Plot Nos. 45 and 46, Survey No. 136/PART.
HMDA technical approval / plan material: Records one block, 1 Stilt + 5 upper floors, approved area figures and plan conditions; filed under the same principal approval number.
HMDA Occupancy Certificate, 008331/HMDA/02462/SWOC/SKP2/2025, dated 29/10/2025: Occupancy certification for the identified building under the 2024 building permit; records completion date 05/10/2025.
Form-B declaration: Promoter declaration including a completion undertaking of 27/09/2027 and statements concerning title and project funds.
RERA-filed plan and unit record: One residential block and 15 dwelling units; plan document records the listed building configuration.
Frequently asked questions
Is AAROHI registered with Telangana RERA?
Yes. AAROHI is registered with the Telangana Real Estate Regulatory Authority as P01100009579; the registration status is New Project.
Who is the developer of AAROHI?
The promoter named in the RERA registration is NEON INFRA.
Where is AAROHI located?
AAROHI is in AMEENPUR MANDAL, AMEENAPUR, AMEENPUR, Sangareddy, Telangana (502032).
When will AAROHI be completed?
The promoter's proposed date of completion filed with RERA is 27/01/2028. This is the promoter's declaration, not a guarantee.