Abode Mj Lake View Heights
ABODE DEVELOPERS · Sangareddy · RERA P01100009015
ABODE MJ LAKE VIEW HEIGHTS is a residential apartment project in Ameenpur, Ameenpur Mandal, Sangareddy District, developed by the registered promoter ABODE DEVELOPERS. It is on a 6,171.40 sq. m site and comprises one residential building with 1 cellar, 1 stilt and 10 upper floors. The project has 174 apartments: 96 2BHK and 78 3BHK, with RERA-filed saleable areas of 120.08 sq. m and 167.54 sq. m, respectively. Its TG-RERA registration number is P01100009015, and its proposed completion is 13/02/2029.
📘 Project brochure from the promoter’s website ↗More from Abode Developers · 5 projects →
01What we found
Read from TG-RERA filings, approvals, land and registration records and court records. A court case is counted only when the court record states this project's survey number with its village, or names the project.
02Check before you pay
8 items to check before you pay, 3 high - from the title chain, court records and approvals, each with what to ask the builder or your advocate. An item may not be a problem with the project: records can be incomplete.
1. Project at a glance
Project identity
| Item | Project record |
|---|---|
| Registered project name | ABODE MJ LAKE VIEW HEIGHTS RERA record |
| Project type | Residential apartment project RERA record RERA filing |
| Phase / registered portion | The registration identifies this project; no separate phase name or phase number is disclosed. RERA record |
| TG-RERA registration | P01100009015 RERA record |
| Registration validity | 13/10/2023 to 13/10/2028; the certificate records five years and no extension. This is the registration period, not the construction-completion deadline. RERA record |
| Registered promoter | ABODE DEVELOPERS (partnership) RERA record Corporate record |
| RERA status | Registration certificate issued under section 5. |
Land and geographic identity
| Item | Project record |
|---|---|
| Locality | Ameenpur / Ameenapur RERA record |
| Revenue village | Ameenapur (also rendered as Ameenpur in project documents) RERA record RERA filing |
| Mandal / district / PIN | Ameenpur Mandal, Sangareddy District; PIN 502032 RERA record |
| Project survey numbers and subdivisions | 112/A2/1/1/1, 112/A3/1/1, 112/A4/1/1, 112/A5/1/1/1 RERA record Land records |
| Registered site extent | 6,171.40 sq. m Land records |
| Net / total land area | RERA land record states total area 6,171.40 sq. m, affected area 0, and net area 6,171.40 sq. m. RERA filing Land records |
| Boundaries in RERA record | East: neighbours’ land in survey no. 112 part; west: land in survey no. 112 part; north: land in survey no. 112 part; south: road. RERA filing |
Development identity
| Item | Project record |
|---|---|
| Sanctioning authority | HMDA; building permit issued through Ameenpur Municipality Approvals record |
| Principal approval | Building Permit Order 003373/BP/HMDA/0688/SKP/2023, dated 13 October 2023 Approvals record |
| Approved built-up area | The permit extraction lists 25,303.81 sq. m as “Built-up Area” and 33,571.00 sq. m as “Total Built up Area.” These are kept as separately labelled permit figures. |
| Buildings / blocks | One residential building is recorded. RERA filing |
| Sanctioned floor configuration | 1 cellar + 1 stilt + 10 upper floors |
| Parking provision | Cellar and stilt are approved for vehicle parking; the available record does not state a parking-space count. |
| Unit counts | Approved plan: 1 building unit; RERA filing: 174 apartments (96 2BHK and 78 3BHK). RERA filing RERA unit table |
Offering and status
| Item | Project record |
|---|---|
| RERA-filed configurations | 2BHK: 96 units; 3BHK: 78 units. RERA unit table |
| RERA-filed saleable area | 2BHK: 120.08 sq. m; 3BHK: 167.54 sq. m. RERA unit table |
| Portal booking snapshot | 0 booked / 174 available (96 2BHK and 78 3BHK). Counts are indicative: the portal record supplies no as-of date. RERA unit table |
| Construction stage | The permit authorizes proposed construction; no independently verified site-progress figure is supplied. The RERA amenities record shows 0% progress for its listed items. RERA amenities |
| Completion deadline | Promoter Form B undertakes completion by 12 October 2028; the project header separately lists proposed completion as 13/02/2029. RERA record |
| Occupancy / completion certificate | The building permit says an occupancy certificate is compulsory before occupation; the supplied permit extraction records completion certified as false. No occupancy or completion certificate is supplied. |
2. The project story
ABODE MJ LAKE VIEW HEIGHTS is registered as a residential apartment project on a 6,171.40 sq. m site in Ameenapur village, Ameenpur Mandal, Sangareddy District. Its RERA identity specifies survey subdivisions 112/A2/1/1/1, 112/A3/1/1, 112/A4/1/1 and 112/A5/1/1/1. RERA record Land records
The HMDA building permit describes one residential building comprising one cellar, one stilt and ten upper floors. The RERA filing lists 174 apartments: 96 two-bedroom and 78 three-bedroom units. The permit extraction includes a parking-use restriction for the cellar and stilt. RERA unit table
The available evidence establishes permission to build, not completed construction. No site-verified construction progress, completion certificate or occupancy certificate is provided. The RERA amenities record lists several project infrastructure items as available “YES,” while showing 0% progress for all 14 listed items; those entries do not establish on-site completion. RERA amenities
3. Master plan, architecture & building design
The building permit records a single residential building on the stated survey subdivisions and site extent. Its sanctioned configuration is one cellar, one stilt and ten upper floors. The permit extraction reports both 25,303.81 sq. m as “Built-up Area” and 33,571.00 sq. m as “Total Built up Area”; the evidence does not define these figures further, so they should not be treated as interchangeable.
The RERA land record gives total and net area as 6,171.40 sq. m, with 0 area affected by road widening, FTL or nala widening. It records one building unit. RERA filing
A floor-plan file is listed, but the supplied layout-plan document record is not extracted; the available information does not establish building footprint, flats per floor, lift and stair counts, internal circulation, open-space dimensions, or residential/common-area distribution. Document index
4. Homes, configurations & floor plans
The RERA filing lists 174 apartments across two configurations. Its saleable areas are shown separately from software-measured carpet areas taken from the floor-plan drawing geometry; the latter are not RERA disclosures and are flagged for review in the supplied measurements. Saleable area includes the apartment’s share of common areas under the distinction stated in the floor-plan record; no carpet area should be inferred from the RERA saleable figure. RERA unit table RERA unit details Floor plans
| Configuration | Units | Booked | Available | RERA saleable area | Measured carpet area | Loading (if supplied) |
|---|---|---|---|---|---|---|
| 2BHK | 96 | 0 | 96 | 120.08 sq. m | Software-measured range: 77.4–92.9 sq. m; median 83.2 sq. m | 31% |
| 3BHK | 78 | 0 | 78 | 167.54 sq. m | Software-measured range: 102.2–118.8 sq. m; median 112.6 sq. m | 33% |
The measurements are based on 32 2BHK and 24 3BHK flat designs in drawing document 491015. The drawing-based figures are software measurements, not RERA-filed areas, and require review against the drawing. Sampled plans show living and dining spaces, bedrooms, kitchen, wash area, toilets and balconies; the supplied sample room dimensions are drawing measurements, not a schedule of every unit. RERA unit details Floor plans
5. Parking & vehicle circulation
The building permit approves the cellar and stilt for parking and states that these areas are to remain exclusively for vehicle parking, without partition walls or rolling shutters, and are not to be converted to another use. The permit extraction does not provide the number of car or two-wheeler spaces, visitor or accessible-space provision, ramp details, or a parking-allocation schedule.
A separate RERA filing field records a 2,595.00 sq. m mortgage area; the permit identifies the mortgaged built-up area as security in favour of MC, HMDA and states that registration of that area is allowed only after an occupancy certificate is produced. This is not a count or allocation of parking spaces. RERA filing
6. Amenities, recreation & open spaces
The table below summarizes the RERA amenities record and the building-permit extraction. “YES” and progress values are filing entries, not independent verification of completed facilities. RERA amenities
| Description / size | Listed as available “YES”; no size or facility schedule supplied |
|---|---|
| Evidence source | RERA amenities record RERA amenities |
| Declared progress / verified status | 0%; completion not independently verified |
| Description / size | Listed as available “YES”; no area or layout supplied |
|---|---|
| Evidence source | RERA amenities record RERA amenities |
| Declared progress / verified status | 0%; completion not independently verified |
| Description / size | Listed; no dimensions or network details supplied |
|---|---|
| Evidence source | RERA amenities record RERA amenities |
| Declared progress / verified status | 0%; completion not independently verified |
| Description / size | Listed; no design or capacity supplied |
|---|---|
| Evidence source | RERA amenities record RERA amenities |
| Declared progress / verified status | 0%; completion not independently verified |
| Description / size | Listed; no fixture or coverage details supplied |
|---|---|
| Evidence source | RERA amenities record RERA amenities |
| Declared progress / verified status | 0%; completion not independently verified |
| Description / size | Listed as available “YES”; no source or capacity in this record |
|---|---|
| Evidence source | RERA amenities record RERA amenities |
| Declared progress / verified status | 0%; completion not independently verified |
| Description / size | Sewerage (including STP) listed as “YES”; permit also requires provision of an STP |
|---|---|
| Evidence source | RERA amenities record RERA amenities |
| Declared progress / verified status | RERA record: 0%; no independent completion evidence |
| Description / size | Listed; no capacity or reuse details supplied |
|---|---|
| Evidence source | RERA amenities record RERA amenities |
| Declared progress / verified status | 0%; completion not independently verified |
| Description / size | Listed; no system details supplied |
|---|---|
| Evidence source | RERA amenities record RERA amenities |
| Declared progress / verified status | 0%; completion not independently verified |
| Description / size | Listed as available “YES”; permit requires rainwater-harvesting structures and rainwater-recycling provision |
|---|---|
| Evidence source | RERA amenities record RERA amenities |
| Declared progress / verified status | RERA record: 0%; completion not independently verified |
| Description / size | Listed as available “YES”; no system details supplied |
|---|---|
| Evidence source | RERA amenities record RERA amenities |
| Declared progress / verified status | 0%; no independent verification or compliance determination |
| Description / size | Listed as available “YES”; permit extraction also names a transformer |
|---|---|
| Evidence source | RERA amenities record RERA amenities |
| Declared progress / verified status | RERA record: 0%; completion not independently verified |
| Description / size | Listed; no area supplied |
|---|---|
| Evidence source | RERA amenities record RERA amenities |
| Declared progress / verified status | 0%; completion not independently verified |
7. Utilities, building services & safety
The building permit extraction identifies an STP, transformer, garbage house and rainwater-harvesting structures as amenities/utilities, and requires an STP, rainwater harvesting and rainwater-recycling provision. It does not state capacities or establish that these facilities have been installed or commissioned.
The RERA amenities record lists water supply, sewerage/STP, fire protection, an electrical meter room/sub-station/receiving station, and water conservation/rainwater harvesting as “YES,” while recording 0% progress for the listed items. No project-filed capacities, water-source details, storage volumes, treatment/reuse scheme, electrical backup particulars, lift capacities, fire-system specifications, security/CCTV details or accessibility provisions are supplied in the reviewed evidence. RERA amenities
The permit requires an occupancy certificate before occupation and requires construction in accordance with the technically approved plans. These are recorded conditions; this Overview does not determine compliance.
8. Location, access & connectivity
The project’s registered location is Ameenapur/Ameenpur, Ameenpur Mandal, Sangareddy District, Telangana, PIN 502032, on survey subdivisions 112/A2/1/1/1, 112/A3/1/1, 112/A4/1/1 and 112/A5/1/1/1. RERA record Land records
A supplied parcel-centroid connectivity record places the nearest sampled Outer Ring Road interchange at approximately 8.4 km; this is a sampled distance, not a stated travel time or route assessment. Location record The building permit identifies a road along the southern boundary and specifies a 4.5 mts. road width among the extracted road-width figures; it also requires the minimum approach road indicated in the plan to be developed and maintained as a black-topped road before release of an occupancy certificate. RERA filing
9. Developer & development status
The registered promoter is ABODE DEVELOPERS, identified in the RERA record as a partnership. Its listed partners are Boyidi Ramacharitha, Ramacharan Gumma and Gorla Satyanarayana; Boyidi Nagaraju is listed as authorized signatory. The promoter’s registered office recorded on the RERA certificate is Village Nallagandla, Mandal Serilingampally, District Ranga Reddy, PIN 500019. GSTIN: 36ABKFA8944Q1ZJ. Corporate record Parties record
The project site is in Ameenapur, Sangareddy District. The building-permit extraction identifies ABODE DEVELOPERS as developer under an owner-plus-developer arrangement. The promoter’s Form B declaration undertakes completion by 12 October 2028; the project header records proposed completion as 13/02/2029. No independently verified progress or occupancy status is supplied. RERA record
10. Approvals, official records & documents
| Reference and scope | P01100009015, ABODE MJ LAKE VIEW HEIGHTS; valid 13/10/2023–13/10/2028 |
|---|---|
| Evidence in this review | Registration certificate, Form C |
| Reference and scope | 003373/BP/HMDA/0688/SKP/2023, dated 13 October 2023; residential building on the four registered survey subdivisions |
|---|---|
| Evidence in this review | Building Permit Order extraction |
| Reference and scope | One cellar, one stilt and ten upper floors; permit conditions include occupancy certification before occupation |
|---|
| Reference and scope | Promoter declaration on title, encumbrances, project funding account and completion undertaking; dated 28 October 2024 |
|---|
| Reference and scope | Site extent and boundaries; one building unit; 174 apartments in 2BHK and 3BHK configurations |
|---|---|
| Evidence in this review | RERA filing RERA unit table |
| Reference and scope | Document 491015 is listed as a layout-plan document; drawing geometry was used for software-measured apartment areas |
|---|---|
| Evidence in this review | Document index Floor plans |
| Reference and scope | None supplied; permit extraction records completion certified as false |
|---|
The available project record does not include an occupancy or completion certificate. The public HMDA approved-layout lookup was unavailable for review, and no LP number is recorded in the supplied RERA data. HMDA
1. Project at a glance
Project identity
Registered project name: ABODE MJ LAKE VIEW HEIGHTS
Project type: Residential apartment project
Phase / registered portion: The registration identifies this project; no separate phase name or phase number is disclosed.
TG-RERA registration: P01100009015
Registration validity: 13/10/2023 to 13/10/2028; the certificate records five years and no extension. This is the registration period, not the construction-completion deadline.
Registered promoter: ABODE DEVELOPERS (partnership)
RERA status: Registration certificate issued under section 5.
Land and geographic identity
Locality: Ameenpur / Ameenapur
Revenue village: Ameenapur (also rendered as Ameenpur in project documents)
Mandal / district / PIN: Ameenpur Mandal, Sangareddy District; PIN 502032
Project survey numbers and subdivisions: 112/A2/1/1/1, 112/A3/1/1, 112/A4/1/1, 112/A5/1/1/1
Registered site extent: 6,171.40 sq. m
Net / total land area: RERA land record states total area 6,171.40 sq. m, affected area 0, and net area 6,171.40 sq. m.
Boundaries in RERA record: East: neighbours’ land in survey no. 112 part; west: land in survey no. 112 part; north: land in survey no. 112 part; south: road.
Development identity
Sanctioning authority: HMDA; building permit issued through Ameenpur Municipality
Principal approval: Building Permit Order 003373/BP/HMDA/0688/SKP/2023, dated 13 October 2023
Approved built-up area: The permit extraction lists 25,303.81 sq. m as “Built-up Area” and 33,571.00 sq. m as “Total Built up Area.” These are kept as separately labelled permit figures.
Buildings / blocks: One residential building is recorded.
Sanctioned floor configuration: 1 cellar + 1 stilt + 10 upper floors
Parking provision: Cellar and stilt are approved for vehicle parking; the available record does not state a parking-space count.
Unit counts: Approved plan: 1 building unit; RERA filing: 174 apartments (96 2BHK and 78 3BHK).
Offering and status
RERA-filed configurations: 2BHK: 96 units; 3BHK: 78 units.
RERA-filed saleable area: 2BHK: 120.08 sq. m; 3BHK: 167.54 sq. m.
Portal booking snapshot: 0 booked / 174 available (96 2BHK and 78 3BHK). Counts are indicative: the portal record supplies no as-of date.
Construction stage: The permit authorizes proposed construction; no independently verified site-progress figure is supplied. The RERA amenities record shows 0% progress for its listed items.
Completion deadline: Promoter Form B undertakes completion by 12 October 2028; the project header separately lists proposed completion as 13/02/2029.
Occupancy / completion certificate: The building permit says an occupancy certificate is compulsory before occupation; the supplied permit extraction records completion certified as false. No occupancy or completion certificate is supplied.
2. The project story
ABODE MJ LAKE VIEW HEIGHTS is registered as a residential apartment project on a 6,171.40 sq. m site in Ameenapur village, Ameenpur Mandal, Sangareddy District. Its RERA identity specifies survey subdivisions 112/A2/1/1/1, 112/A3/1/1, 112/A4/1/1 and 112/A5/1/1/1.
The HMDA building permit describes one residential building comprising one cellar, one stilt and ten upper floors. The RERA filing lists 174 apartments: 96 two-bedroom and 78 three-bedroom units. The permit extraction includes a parking-use restriction for the cellar and stilt.
The available evidence establishes permission to build, not completed construction. No site-verified construction progress, completion certificate or occupancy certificate is provided. The RERA amenities record lists several project infrastructure items as available “YES,” while showing 0% progress for all 14 listed items; those entries do not establish on-site completion.
3. Master plan, architecture & building design
The building permit records a single residential building on the stated survey subdivisions and site extent. Its sanctioned configuration is one cellar, one stilt and ten upper floors. The permit extraction reports both 25,303.81 sq. m as “Built-up Area” and 33,571.00 sq. m as “Total Built up Area”; the evidence does not define these figures further, so they should not be treated as interchangeable.
The RERA land record gives total and net area as 6,171.40 sq. m, with 0 area affected by road widening, FTL or nala widening. It records one building unit.
A floor-plan file is listed, but the supplied layout-plan document record is not extracted; the available information does not establish building footprint, flats per floor, lift and stair counts, internal circulation, open-space dimensions, or residential/common-area distribution.
4. Homes, configurations & floor plans
The RERA filing lists 174 apartments across two configurations. Its saleable areas are shown separately from software-measured carpet areas taken from the floor-plan drawing geometry; the latter are not RERA disclosures and are flagged for review in the supplied measurements. Saleable area includes the apartment’s share of common areas under the distinction stated in the floor-plan record; no carpet area should be inferred from the RERA saleable figure.
| Configuration | Units | Booked | Available | RERA saleable area | Measured carpet area | Loading (if supplied) |
|---|---|---|---|---|---|---|
| 2BHK | 96 | 0 | 96 | 120.08 sq. m | Software-measured range: 77.4–92.9 sq. m; median 83.2 sq. m | 31% |
| 3BHK | 78 | 0 | 78 | 167.54 sq. m | Software-measured range: 102.2–118.8 sq. m; median 112.6 sq. m | 33% |
The measurements are based on 32 2BHK and 24 3BHK flat designs in drawing document 491015. The drawing-based figures are software measurements, not RERA-filed areas, and require review against the drawing. Sampled plans show living and dining spaces, bedrooms, kitchen, wash area, toilets and balconies; the supplied sample room dimensions are drawing measurements, not a schedule of every unit.
5. Parking & vehicle circulation
The building permit approves the cellar and stilt for parking and states that these areas are to remain exclusively for vehicle parking, without partition walls or rolling shutters, and are not to be converted to another use. The permit extraction does not provide the number of car or two-wheeler spaces, visitor or accessible-space provision, ramp details, or a parking-allocation schedule.
A separate RERA filing field records a 2,595.00 sq. m mortgage area; the permit identifies the mortgaged built-up area as security in favour of MC, HMDA and states that registration of that area is allowed only after an occupancy certificate is produced. This is not a count or allocation of parking spaces.
6. Amenities, recreation & open spaces
The table below summarizes the RERA amenities record and the building-permit extraction. “YES” and progress values are filing entries, not independent verification of completed facilities.
| Facility | Description / size | Evidence source | Declared progress / verified status |
|---|---|---|---|
| Community buildings | Listed as available “YES”; no size or facility schedule supplied | RERA amenities record | 0%; completion not independently verified |
| Green strip / tot lot / park | Listed as available “YES”; no area or layout supplied | RERA amenities record | 0%; completion not independently verified |
| Internal roads and footpaths | Listed; no dimensions or network details supplied | RERA amenities record | 0%; completion not independently verified |
| Storm-water drains | Listed; no design or capacity supplied | RERA amenities record | 0%; completion not independently verified |
| Street lighting | Listed; no fixture or coverage details supplied | RERA amenities record | 0%; completion not independently verified |
| Water supply | Listed as available “YES”; no source or capacity in this record | RERA amenities record | 0%; completion not independently verified |
| Sewerage / STP | Sewerage (including STP) listed as “YES”; permit also requires provision of an STP | RERA amenities record | RERA record: 0%; no independent completion evidence |
| Sewage and sullage treatment/disposal | Listed; no capacity or reuse details supplied | RERA amenities record | 0%; completion not independently verified |
| Solid-waste management and disposal | Listed; no system details supplied | RERA amenities record | 0%; completion not independently verified |
| Water conservation / rainwater harvesting | Listed as available “YES”; permit requires rainwater-harvesting structures and rainwater-recycling provision | RERA amenities record | RERA record: 0%; completion not independently verified |
| Fire protection and fire-safety requirements | Listed as available “YES”; no system details supplied | RERA amenities record | 0%; no independent verification or compliance determination |
| Electrical meter room / sub-station / receiving station | Listed as available “YES”; permit extraction also names a transformer | RERA amenities record | RERA record: 0%; completion not independently verified |
| Aggregate recreational open space | Listed; no area supplied | RERA amenities record | 0%; completion not independently verified |
7. Utilities, building services & safety
The building permit extraction identifies an STP, transformer, garbage house and rainwater-harvesting structures as amenities/utilities, and requires an STP, rainwater harvesting and rainwater-recycling provision. It does not state capacities or establish that these facilities have been installed or commissioned.
The RERA amenities record lists water supply, sewerage/STP, fire protection, an electrical meter room/sub-station/receiving station, and water conservation/rainwater harvesting as “YES,” while recording 0% progress for the listed items. No project-filed capacities, water-source details, storage volumes, treatment/reuse scheme, electrical backup particulars, lift capacities, fire-system specifications, security/CCTV details or accessibility provisions are supplied in the reviewed evidence.
The permit requires an occupancy certificate before occupation and requires construction in accordance with the technically approved plans. These are recorded conditions; this Overview does not determine compliance.
8. Location, access & connectivity
The project’s registered location is Ameenapur/Ameenpur, Ameenpur Mandal, Sangareddy District, Telangana, PIN 502032, on survey subdivisions 112/A2/1/1/1, 112/A3/1/1, 112/A4/1/1 and 112/A5/1/1/1.
A supplied parcel-centroid connectivity record places the nearest sampled Outer Ring Road interchange at approximately 8.4 km; this is a sampled distance, not a stated travel time or route assessment. The building permit identifies a road along the southern boundary and specifies a 4.5 mts. road width among the extracted road-width figures; it also requires the minimum approach road indicated in the plan to be developed and maintained as a black-topped road before release of an occupancy certificate.
9. Developer & development status
The registered promoter is ABODE DEVELOPERS, identified in the RERA record as a partnership. Its listed partners are Boyidi Ramacharitha, Ramacharan Gumma and Gorla Satyanarayana; Boyidi Nagaraju is listed as authorized signatory. The promoter’s registered office recorded on the RERA certificate is Village Nallagandla, Mandal Serilingampally, District Ranga Reddy, PIN 500019. GSTIN: 36ABKFA8944Q1ZJ.
The project site is in Ameenapur, Sangareddy District. The building-permit extraction identifies ABODE DEVELOPERS as developer under an owner-plus-developer arrangement. The promoter’s Form B declaration undertakes completion by 12 October 2028; the project header records proposed completion as 13/02/2029. No independently verified progress or occupancy status is supplied.
10. Approvals, official records & documents
| Reference and scope | P01100009015, ABODE MJ LAKE VIEW HEIGHTS; valid 13/10/2023–13/10/2028 |
|---|---|
| Evidence in this review | Registration certificate, Form C |
| Reference and scope | 003373/BP/HMDA/0688/SKP/2023, dated 13 October 2023; residential building on the four registered survey subdivisions |
|---|---|
| Evidence in this review | Building Permit Order extraction |
| Reference and scope | One cellar, one stilt and ten upper floors; permit conditions include occupancy certification before occupation |
|---|
| Reference and scope | Promoter declaration on title, encumbrances, project funding account and completion undertaking; dated 28 October 2024 |
|---|
| Reference and scope | Site extent and boundaries; one building unit; 174 apartments in 2BHK and 3BHK configurations |
|---|
| Reference and scope | Document 491015 is listed as a layout-plan document; drawing geometry was used for software-measured apartment areas |
|---|
| Reference and scope | None supplied; permit extraction records completion certified as false |
|---|
The available project record does not include an occupancy or completion certificate. The public HMDA approved-layout lookup was unavailable for review, and no LP number is recorded in the supplied RERA data.
Frequently asked questions
Is ABODE MJ LAKE VIEW HEIGHTS registered with Telangana RERA?
Yes. ABODE MJ LAKE VIEW HEIGHTS is registered with the Telangana Real Estate Regulatory Authority as P01100009015; the registration status is New Project.
Who is the developer of ABODE MJ LAKE VIEW HEIGHTS?
The promoter named in the RERA registration is ABODE DEVELOPERS.
Where is ABODE MJ LAKE VIEW HEIGHTS located?
ABODE MJ LAKE VIEW HEIGHTS is in AMEENPUR, AMEENAPUR, Sangareddy, Telangana (502032).
When will ABODE MJ LAKE VIEW HEIGHTS be completed?
The promoter's proposed date of completion filed with RERA is 13/02/2029. This is the promoter's declaration, not a guarantee.
More projects in Ameenapur