Aadya One

AADYA DEVELOPERS · Sangareddy · RERA P01100007961

AADYA ONE is a residential apartment project in Ameenapur, AMEENPUR mandal, Sangareddy district, developed by the registered promoter AADYA DEVELOPERS. It is on a 576.00 sq.m site and comprises one residential building with 1 stilt + 5 upper floors and 21 2BHK apartments, each with a saleable area of 45.1 sq.m. The project is registered under TG-RERA registration P01100007961, with a proposed completion date of 30-3-2025.

More from Aadya Developers · 2 projects →

01What we found

Period endedTG-RERA registration ran to 30 Mar 2025 - check its extension on TG-RERA
17documents on file - each fact links to its page
0court cases on this project's land in the court records searched
9items to check - 3 high

Read from TG-RERA filings, approvals, land and registration records and court records. A court case is counted only when the court record states this project's survey number with its village, or names the project.

02Check before you pay

9 items to check before you pay, 3 high - from the title chain, court records and approvals, each with what to ask the builder or your advocate. An item may not be a problem with the project: records can be incomplete.

Sign in to see each item and what to do

1. Project at a glance

Project identity

ItemRecord
Registered project nameAADYA ONE RERA record
Project type / statusResidential apartment project; recorded as “New Project” RERA record RERA filing
Phase / registered portionPhase is not separately identified in the supplied record. The registered development is described as one residential building RERA record
TG-RERA registrationP01100007961 RERA record
Registration validity24/03/2024 to 30/03/2025, unless extended by the Authority
Registered promoterAADYA DEVELOPERS RERA record Corporate record
RERA statusRegistration certificate is on file; the supplied evidence does not establish whether the registration was extended

Land and geographic identity

ItemRecord
Locality / revenue villageAmeenpur / AMEENAPUR; the building-permit record also uses “AMEENPUR” RERA record RERA filing
Mandal / district / PINAMEENPUR mandal; Sangareddy district; 502032 RERA record RERA filing
Project survey numbersSurvey Nos. 107 and 108 RERA record Land records
Plot numbers identified in approval records385/Part, 386, 387/Part, 388, 389/Part, 402/Part and 403
Project site extent576.00 sq.m Land records
Net / total area in RERA land detailsNet area 576.00 sq.m; total area 576 sq.m; affected area shown as 0 sq.m Land records
BoundariesEast: 30ft Wide road; west: 40ft Wide road; north: Plot no 389P and Plot no 402P; south: Plot no 385P 386P 387P Land records

Development identity

ItemRecord
Sanctioning / planning authoritiesHMDA issued technical approval; Ameenpur Municipality issued the building G Permit Order
Principal building approvalHMDA technical approval 045389/SKP/R1/U6/HMDA/22042021, dated 04/01/2022; municipal building-permit order dated 31 03 2022
Approved building configuration1 stilt + 5 upper floors
Building countOne residential building is recorded in the RERA land details RERA filing
Approved built-up area1439.19 sq.m (proposed net BUA in the HMDA-filed plan); the municipal permit records upper-floor area of 1439.19 m2
Other area figures in approval recordsProposed coverage area: 284.73 sq.m (49.43%); HMDA technical approval records total built-up area 1714.52 sq.m, including mortgage areas
Parking provisionParking is identified in the approval documents; the municipal order says cellar and stilt approved for parking. A count of spaces is not supplied
Unit countRERA-filed: 21 units, all recorded as 2BHK RERA unit table RERA unit details

Offering and status

ItemRecord
Configuration and RERA saleable area2BHK; 45.1 sq.m per unit RERA unit table RERA unit details
Booked / available0 booked; 21 available, as last read from the TG-RERA portal; no portal as-of date is supplied, so counts are indicative RERA unit table
Promoter’s filed completion undertaking30-3-2025
Occupancy certificateHMDA OC 007763/OC/HMDA/SKP/2025, dated 04 April, 2025; the certificate identifies the residential apartment in Survey Nos. 107 and 108
Construction stage / completion evidenceAn architect’s Form 1A states development work is complete; HMDA’s OC records the building as fit for occupation. These records indicate completion and occupancy certification for the identified building, not independent site verification by this report

2. The project story

  • AADYA ONE is recorded with TG-RERA as a residential apartment project on a 576.00 sq.m site in Ameenapur village, Ameenpur mandal, Sangareddy district. The registered land identity names Survey Nos. 107 and 108; building-approval documents further identify the site through plot numbers 385/Part, 386, 387/Part, 388, 389/Part, 402/Part and 403. RERA record Land records
  • The filed and approved development is one residential building with a stilt and five upper floors. The RERA unit record lists 21 two-bedroom apartments, with a filed saleable area of 45.1 sq.m each. The portal’s booking figures show 0 booked and 21 available, but no “as of” date is attached to that snapshot. RERA filing RERA unit table RERA unit details
  • The promoter’s Form B affidavit undertook completion by 30-3-2025. The supplied architect’s certificate and HMDA occupancy certificate are dated after that undertaking and record completed development and an OC for the building. Those documents are completion/authority records; they do not constitute an independent physical inspection for this report.

3. Master plan, architecture & building design

  • The HMDA-filed plan describes a residential apartment building on a 576.00 sq.m site, with 1 stilt + 5 upper floors. It records proposed coverage of 284.73 sq.m (49.43%) and proposed net built-up area of 1439.19 sq.m. HMDA’s technical-approval record separately lists total built-up area of 1714.52 sq.m, including a 149.40 sq.m mortgage area and a 73.63 sq.m additional mortgage area. These figures are reported under the labels used in the respective approval records; they are not interchangeable area measures.
  • The municipal permit identifies a cellar as well as stilt and five upper floors, and states that cellar and stilt are approved for vehicle parking. The occupancy certificate describes the building as “Cellar Ground Stilt 5 Upper Floor.” The supplied material does not provide a complete architectural drawing set or enough detail to establish the floor-by-floor arrangement, footprint layout, flat count per floor, lift/stair configuration, entrances, or residential-to-common-area breakdown.
  • The RERA record identifies one building. No approved site-plan detail establishing internal roads, landscape-area dimensions, or the arrangement of open spaces is supplied. The occupancy certificate lists tot-lot area as 0 m2. RERA filing

4. Homes, configurations & floor plans

The RERA filing lists 21 two-bedroom apartments, each with a saleable area of 45.1 sq.m. Booked and available figures are the portal snapshot supplied with the record and carry no as-of date. RERA unit table RERA unit details

ConfigurationUnitsBookedAvailableRERA saleable areaMeasured carpet areaLoading (if supplied)
2BHK2102145.1 sq.mNot measuredNot supplied

The floor-plan dataset contains two drawings, both still pending scan; no software-measured carpet or room dimensions are available. Saleable area is the RERA-filed unit figure. It should not be treated as carpet area: the supplied methodology notes that saleable area also includes a share of common areas, while carpet area is measured from the unit drawing geometry. Floor plans RERA unit details

5. Parking & vehicle circulation

  • The filed plan identifies parking, and the Ameenpur Municipality order states that cellar and stilt areas approved for parking must be used exclusively for vehicles. The plan records proposed coverage of 284.73 sq.m, but no number of car or two-wheeler spaces, visitor or accessible spaces, or individual unit parking allocations is supplied. A drawn or sanctioned parking area does not, by itself, establish exclusive ownership or allotment to a particular apartment.
  • The municipal order requires one entry and one exit, with a minimum width of 4.5mts. and height clearance of 5mts. The supplied evidence does not establish the final as-built vehicle circulation arrangement, ramp configuration, pedestrian separation, mechanical parking, or EV charging.

6. Amenities, recreation & open spaces

The RERA amenity record marks water supply, sewerage, green strip/tot lot/park, electrical meter room/sub-station/receiving station, and aggregate recreational open space as available; the same record shows progress figures of 0% for the listed amenities. These are filed portal entries, not verification that the facilities are physically complete. RERA amenities

Green strip / tot lot / park
Description / sizeRERA amenity record says available; municipal permit requires a fenced tot-lot maintained as greenery. OC lists tot-lot area as 0 m2.
Evidence sourceRERA amenities
Declared progress / verified statusRERA progress shown as 0%; physical delivery not independently verified
Aggregate recreational open space
Description / sizeMarked available in the RERA amenity record; no area supplied.
Evidence sourceRERA amenities
Declared progress / verified statusProgress shown as 0%; not independently verified
Internal roads and footpaths
Description / sizeListed in the RERA amenity record; no dimensions supplied.
Evidence sourceRERA amenities
Declared progress / verified statusProgress shown as 0%; not independently verified
Community buildings
Description / sizeListed in the RERA amenity record; no facility or size specified.
Evidence sourceRERA amenities
Declared progress / verified statusProgress shown as 0%; not independently verified

No clubhouse, indoor recreation facility, or sports facility is specified in the supplied RERA amenity data. Vendor-listed facilities are not treated here as RERA-declared or sanctioned amenities. RERA amenities Promoter website

7. Utilities, building services & safety

  • The approval records identify a water pipeline and existing drainage line, and the HMDA application/intimation calls for an STP and septic tank. The Ameenpur Municipality permit also requires a rainwater-harvesting structure (percolation pit) and records 10 RWHPs. The occupancy certificate lists rainwater harvesting. These are records of stated requirements or entries; the supplied evidence does not establish utility capacities or independently verify operational status.
  • The municipal permit specifies a generator as an alternate electricity source, emergency lighting in corridors/common passages and staircases, a transformer space, fire-safety equipment and systems, and separate underground and terrace water tanks of 25,000 litres each. It also specifies a hose reel and down corner, and an automatic sprinkler system if the basement area exceeds 200 Sq.mts. The records do not establish which systems have been installed or tested.
  • A lift is listed in the plan’s amenities/utilities; no lift count, capacity, or service-lift provision is given. The approvals require fire-safety measures and emergency arrangements, but no supplied evidence establishes an independent fire-compliance inspection or current operational status.

8. Location, access & connectivity

  • The project’s registered location is AMEENAPUR, AMEENPUR, Sangareddy, 502032. The RERA land record gives the site boundaries as a 30ft Wide road to the east and a 40ft Wide road to the west. Approval records also refer to plot numbers 385/Part, 386, 387/Part, 388, 389/Part, 402/Part and 403 within Survey Nos. 107 and 108. Land records
  • A cadastral-parcel centroid is supplied at 17.536212311093237, 78.32977092678605. The nearest sampled Outer Ring Road interchange is recorded at 7.4 km (approx). The evidence does not provide verified public-transport routes, further measured landmark distances, or travel times. Location record Cadastral map

9. Developer & development status

  • The registered promoter is AADYA DEVELOPERS, recorded as a partnership, with GSTIN 36ABPFM9604E1Z0. The supplied corporate record gives the promoter’s address as “na, Malakpet gunj road, Ameenpur, Ameenpur, AMEENPUR, Sangareddy, 502032.” An entity registration number and official contact details are not supplied here. Corporate record Parties record
  • The promoter’s Form B affidavit, dated December 2023, states that the project would be completed by 30-3-2025 and includes declarations concerning title, encumbrances, approvals and the separate account. The RERA certificate records registration validity through 30/03/2025; the supplied data does not establish an extension. The architect’s completion certificate and HMDA OC record completion/occupancy for the identified building, with the OC dated 04 April, 2025.

10. Approvals, official records & documents

TG-RERA registration certificate
Identifier / dateP01100007961; valid 24/03/2024–30/03/2025
Scope and evidenceForm C certificate for AADYA ONE and Aadya Developers
HMDA technical approval
Identifier / date045389/SKP/R1/U6/HMDA/22042021; 04/01/2022
Scope and evidenceResidential building, 1 stilt + 5 upper floors; Survey Nos. 107 and 108
HMDA-filed approval plan
Identifier / dateApproval no. SANSXPR AJGMMOA20(2021); approved date recorded as 04/17/2022
Scope and evidencePlan identifies residential building, 576.00 sq.m site and 1 stilt + 5 upper floors
Ameenpur Municipality building permit
Identifier / dateApplication no. 199/2022; order dated 31 03 2022
Scope and evidenceG Permit Order for the building on Survey Nos. 107, 108 and the listed plot portions
HMDA occupancy certificate
Identifier / date007763/OC/HMDA/SKP/2025; 04 April, 2025
Scope and evidenceOC for the residential apartment in Survey Nos. 107 and 108; identifies a cellar, ground, stilt and five upper floors
Architect’s completion certificate
Identifier / dateForm 1A; OC number recorded as 007 7 63 I OCIH M DA I SKP I 2O2s, dated 04.04.2025
Scope and evidenceArchitect’s certificate states completion of development work for AADYA ONE and cites HMDA occupancy certification
Promoter declaration
Identifier / dateForm B; December 2023
Scope and evidencePromoter declaration includes the 30-3-2025 completion undertaking

The supplied documents include the registration certificate, technical approval, building permit, architect’s completion certificate and occupancy certificate. A separate approved-layout certificate or complete set of architectural drawings is not established by the materials summarized here; the HMDA-filed plan document and its stated building particulars are listed above. Document index

Frequently asked questions

Is AADYA ONE registered with Telangana RERA?

Yes. AADYA ONE is registered with the Telangana Real Estate Regulatory Authority as P01100007961; the registration status is New Project.

Who is the developer of AADYA ONE?

The promoter named in the RERA registration is AADYA DEVELOPERS.

Where is AADYA ONE located?

AADYA ONE is in Ameenpur, AMEENAPUR, Sangareddy, Telangana (502032).

When will AADYA ONE be completed?

The promoter's proposed date of completion filed with RERA is 30/03/2025. This is the promoter's declaration, not a guarantee.