MAHALAKSHMI s RIDHIRA BLOCK - 3

MAHALAKSHMI HOMES · Sangareddy · RERA P01100009788

MAHALAKSHMI s RIDHIRA BLOCK - 3 is a residential apartment project in Beeramguda, AMEENPUR Mandal, Sangareddy District. The registered promoter is MAHALAKSHMI HOMES. The project covers 961.55 sq.m and comprises one residential building with 1 Stilt + 5 upper floors and 20 3BHK units, each with a filed saleable area of 144.34 sqm. It is registered with TG-RERA under P01100009788, with a proposed completion date of 15/11/2027.

More from Mahalakshmi Homes · 7 projects →

01What we found

RegisteredTG-RERA - valid till 15 Jul 2027
18documents on file - each fact links to its page
6court cases on this project's land (survey 966, 967, Ameenapur)
7items to check - 3 high

Read from TG-RERA filings, approvals, land and registration records and court records. A court case is counted only when the court record states this project's survey number with its village, or names the project.

02Check before you pay

7 items to check before you pay, 3 high - from the title chain, court records and approvals, each with what to ask the builder or your advocate. An item may not be a problem with the project: records can be incomplete.

Sign in to see each item and what to do

Project at a glance

Project identity

ItemRecord
Registered project nameMAHALAKSHMI s RIDHIRA BLOCK - 3 RERA record
Project type / phaseResidential apartment project; registration identifies BLOCK - 3. The registered portion is this block. RERA record
TG-RERA registrationP01100009788 RERA record
Registration validity15/07/2024 to 15/07/2027, subject to extension by the Authority. This is registration validity, not the completion deadline. RERA record
Registered promoterMAHALAKSHMI HOMES, a partnership according to the RERA filing. RERA record RERA filing
RERA statusThe supplied record identifies the project as New Project and shows it registered. No current portal status beyond the supplied registration record is provided. RERA record Approvals record

Land and geographic identity

ItemRecord
LocalityBeeramguda RERA record
Revenue villageAMEENAPUR (also rendered “Ameenpur” in approval documents) RERA record
Mandal / district / PINAMEENPUR / Sangareddy / 502032 RERA record
Project survey numbers and subdivisionsSy. Nos. 966 and 967. No project-specific subdivision is disclosed in the supplied project identity or land parcel record. RERA record Land records
Registered site extent961.55 sq.m; the filing reports total area and net area as 961.55 sq.m, with 0 area affected by road widening/FTL/Nala widening. RERA filing
Boundaries (RERA filing)North: 30 Feet Wide Road; South: Plot No 371 and 372 and 373; East: Plot No 362; West: Plot No 359 Western Part. RERA filing

Development identity

ItemRecord
Sanctioning authorityAmeenpur Municipality/Municipal Corporation; the approval record also identifies TS-DTCP in its delegated-authority details. Approvals record
Principal building permission0068/BP/3121/2024, approved 15 July, 2024. Approvals record
Building configurationOne residential building, 1 Stilt + 5 upper floors. RERA filing
HeightThe commencement certificate records 14.95 m; the layout-plan extraction records 20.24 mt. total height and 14.95 mt. height excluding stilt floor.
Approved built-up areaThe commencement certificate records residential upper-floor area of 2,405.25 m2. The layout-plan extraction records 2,405.25 proposed built-up area excluding parking, 2,951.65 including parking, and 2,967.78 Total BUA, with 16.13 deductions and 2,405.25 Net BUA. These are document-stated categories, not interchangeable area measures.
Parking area shown in approval recordsThe commencement certificate records 530.76 m2 stilt parking area; the layout-plan extraction records 546.40 parking area.
Units20 units recorded in the RERA filing; the approval-plan extraction also states 20 units. RERA unit table

Offering and status

ItemRecord
RERA-filed configuration3BHK, 20 units; filed saleable area 144.34 sqm per unit. RERA unit table RERA unit details
Booked / availablePortal-derived counts show 0 booked / 20 available. The supplied unit record has no as-of date for those counts, so they are indicative rather than a current availability confirmation. RERA unit table
Construction stageNo construction-progress percentage or independently verified site-stage evidence is supplied. RERA-filed amenity progress entries shown are 0%. RERA amenities
Completion datesThe Form-B declaration undertakes completion by 15th July 2027. The header separately records a proposed completion date of 15/11/2027. RERA record
Occupancy / completion certificateNo occupancy or completion certificate is supplied. The building permission requires an occupancy certificate before occupation.

The project story

This is a registered residential apartment project in Beeramguda locality, revenue village AMEENAPUR, AMEENPUR Mandal, Sangareddy District. Its registered land description covers Sy. Nos. 966 and 967 and the RERA-filed site extent is 961.55 sq.m. The filing identifies the project as MAHALAKSHMI s RIDHIRA BLOCK - 3 and records MAHALAKSHMI HOMES as promoter. RERA record Land records

The approved building record describes one residential building with a stilt level and five upper floors. The RERA unit schedule lists 20 3BHK apartments, with 144.34 sqm saleable area per unit; the supplied portal-derived snapshot shows 0 booked and 20 available, without an as-of date. RERA unit table

The supplied evidence establishes registration and building permission, but does not establish the present physical construction stage or that any portion is complete or occupied. No occupancy/completion certificate is included. The Form-B completion undertaking and the header’s proposed completion date are reported separately in the tables above; neither establishes actual completion. RERA record

Master plan, architecture & building design

The building permission record describes a single residential building, Building - A, with 1 Stilt + 5 upper floors on a 961.55 m2 site. It records 14.95 m height and residential upper-floor area of 2,405.25 m2. The filed layout-plan extraction additionally gives its stated built-up-area categories and parking area in the development table; no independent measurement of the building or site is supplied.

The layout-plan extraction identifies Plot Nos. 359 (Eastern Part), 360 and 361 and records 480.50 vacant plot area. It does not provide a complete, legible architectural description of floor-by-floor dwelling arrangement, flats per floor, building footprint, lift and stair configuration, internal circulation, landscape design, or open-space distribution in the supplied structured facts. The approval record lists 0 tot-lot area; the RERA amenity schedule lists Green Strip/TOT LOT/Park as available, with 0% progress recorded. RERA amenities

The commencement certificate states No. of RWHPs 4, and requires rainwater harvesting structures. It also states that the stilt approved for parking is to be used exclusively for parking. Detailed floor drawings are not supplied here in a form that establishes additional design features.

Homes, configurations & floor plans

RERA records 20 units as 3BHK, with filed saleable area of 144.34 sqm per unit. The portal-derived booking snapshot shows 0 booked and 20 available, but has no as-of date. RERA unit table RERA unit details

ConfigurationUnitsBookedAvailableRERA saleable areaMeasured carpet areaLoading (if supplied)
3BHK20020144.34 sqmSoftware-measured: median 89.7 sqm; range 80.3–119.9 sqm38%

The carpet-area figures are software measurements from the approved floor-plan drawing, not RERA-filed measurements; the supplied record says they require review. The floor-plan data identifies four measured 3BHK designs and gives one example’s room measurements: bedroom 3.1 × 4.16 m; living/kitchen 3.21 × 13.4 m; toilet 3.1 × 1.4 m; bedroom 3.1 × 3.0 m; toilet 3.1 × 1.4 m; and master bedroom 3.1 × 3.0 m. Floor plans RERA unit details

Saleable area is the RERA-filed unit-area figure; software-measured carpet area is based on drawing geometry and is not a substitute for a filed carpet-area disclosure. Balcony/utility areas and the precise treatment of common-area loading are not separately detailed in the supplied unit evidence. Verify the unit’s area and plan against the executed agreement and approved drawing. RERA unit table Floor plans

Parking & vehicle circulation

The building permission approves stilt parking and requires approved stilt parking to be used exclusively for vehicles. The commencement certificate records 530.76 m2 stilt parking area; the layout-plan extraction records 546.40 parking area. The supplied records do not establish a definitive sanctioned number of car or two-wheeler spaces, visitor or accessible spaces, ramp or driveway design, or unit-by-unit parking allocation.

A vendor listing claims 20 Covered Parking, but this is not a RERA-filed or allocation record and is not evidence that a particular space is assigned to a buyer. Promoter website

The layout-plan conditions require parking places in buildings to be provided with EV charging infrastructure. The supplied material does not establish the number, location, capacity, or completion status of charging points.

Amenities, recreation & open spaces

The RERA amenity schedule reports availability for the listed items and shows 0% progress for each item in its progress field. “Available: YES” is a filed status, not independent verification that a facility has been completed or is operational. RERA amenities

FacilityDescription / sizeEvidence sourceDeclared progress / verified status
Green Strip/TOT LOT/ParkSize not stated; approval extraction records tot-lot area 0 m2RERA amenitiesFiled as available; 0% progress recorded; completion not independently verified
Internal roads & footpathsNo size statedRERA amenities0% progress recorded
Street lightingNo details statedRERA amenities0% progress recorded
Community buildingsNo details statedRERA amenities0% progress recorded
Water conservation / rainwater harvestingApproval records No. of RWHPs 4; size not statedRERA amenitiesFiled as available; 0% progress recorded; completion not independently verified

A vendor listing also mentions covered parking, play area, landscaped garden and lawn, among other facilities; those are vendor-listed claims, not evidence of sanctioned or delivered amenities. Promoter website

Utilities, building services & safety

ServiceSupplied evidence
WaterThe RERA amenity schedule marks Water Supply YES, with 0% progress recorded. No source, storage capacity, treatment system, or supply hours are specified. RERA amenities
Sewerage and drainageThe amenity schedule marks “Sewerage (Chamber, Lines, Septic Tank, STP)” and Storm Water Drains YES, with 0% progress recorded. No STP capacity, discharge arrangement, reuse system, or completion status is provided. RERA amenities
RainwaterThe commencement certificate requires a rainwater-harvesting structure and records No. of RWHPs 4. The amenity schedule marks rainwater harvesting available with 0% progress recorded. RERA amenities
ElectricalThe amenity schedule marks Electrical Meter Room, Sub-Station, Receiving Station YES, with 0% progress recorded. No equipment capacity or power-backup details are established in the RERA evidence supplied. RERA amenities
Fire and life safetyFire Protection and Fire Safety Requirements appears in the amenity schedule, but no availability or progress figure is supplied for it. The approval document refers to applicable fire-safety requirements; no completion or clearance evidence is supplied. RERA amenities
Lifts, access and securityNo RERA-filed lift count, capacity, accessible-circulation details, CCTV, access-control or security-system specifications are established in the supplied records. Document index RERA amenities

The vendor listing mentions 24-hour water and electricity backup, lift, security, CCTV, intercom, waste management and a sewage treatment plant; these remain vendor-listed claims and are not confirmed as completed project services by the supplied RERA evidence. Promoter website

Location, access & connectivity

The registered project location is Beeramguda locality, revenue village AMEENAPUR, AMEENPUR Mandal, Sangareddy District, PIN 502032, on Sy. Nos. 966 and 967. The cadastral parcel-centroid coordinate supplied is 17.523061017285638, 78.30240885283385; it is identified as a parcel centroid, not a surveyed entrance location. RERA record Land records Cadastral map

The building-permission record refers to an 18M road width and gives the site boundary as a 30 Feet Wide Road on the north. The supplied location data lists the nearest sampled Outer Ring Road interchange at approximately 4.6 km. RERA filing Location record

The vendor listing separately claims Rajiv Gandhi International Airport is approximately 40 km from Beeramguda, Chanda Nagar railway station is 6 km away, and Lingampally MMTS station is 5 km away. These are vendor-provided distances, not independently verified measurements in the supplied location record. Promoter website

Developer & development status

The registered promoter is MAHALAKSHMI HOMES, identified in the filing as a partnership. Its GSTIN is 36AALFM8031G1Z7. The supplied promoter address is Mahalakshmi Homes, Rajeev Nagar, Beeramguda, AMEENPUR, Sangareddy, 502032. RERA filing Corporate record Parties record

The RERA filing names KATTA RAMADEVI, BELLAM DEEKSHA and KATTA NAGASWARA CHOWDARY as partners, and KATTA DINESH as authorized signatory. The Form-B declaration identifies Sri K. Dinesh as the promoter’s authorized signatory and records the undertaking to complete by 15th July 2027. The supplied evidence does not include a construction-progress assessment or independent site verification. Parties record

Approvals, official records & documents

RecordWhat the supplied evidence establishes
TG-RERA registration certificateForm C certificate for MAHALAKSHMI s RIDHIRA BLOCK - 3, registration P01100009788, promoter MAHALAKSHMI HOMES, covering Sy. Nos. 966 and 967 at AMEENAPUR, AMEENPUR, Sangareddy. The certificate states registration validity from 15/07/2024 to 15/07/2027, unless extended.
Building permission / commencement certificatePermission 0068/BP/3121/2024, dated 15 July, 2024, for a residential building with 1 stilt and 5 upper floors on 961.55 m2 at Beeramguda, Sy. Nos. 966 and 967. The record requires commencement notice, completion notice and an occupancy certificate before occupation. Approvals record
Layout/building-plan filingDocument 551094 is filed under a layout-plan document label and contains an approval-plan extraction for Plot Nos. 359 (Eastern Part), 360 and 361, one building, and 20 units.
Form-B declarationPromoter declaration by Sri K. Dinesh, dated March 2025, identifying the landowners and development agreement-cum-GPA No. 33129/2024, declaring the land free from encumbrances and undertaking completion by 15th July 2027.
Title and supporting recordsThe supplied documents include the advocate’s title search report dated 22.04.2025 (Document 557621) and project-filed title documents, including the development agreement-cum-GPA extract (Document 551089). These are listed here as filed records; title-chain analysis is outside this Overview.
Occupancy/completion certificateNone is included in the supplied documents. Document index

The registration certificate also states that the promoter is to enter into agreements for sale with allottees, execute and register conveyances as applicable, deposit 70% of realised amounts in a separate scheduled-bank account, and submit quarterly updates. These are certificate conditions; this Overview does not determine compliance.

Other registrations of MAHALAKSHMI s RIDHIRA

Frequently asked questions

Is MAHALAKSHMI s RIDHIRA BLOCK - 3 registered with Telangana RERA?

Yes. MAHALAKSHMI s RIDHIRA BLOCK - 3 is registered with the Telangana Real Estate Regulatory Authority as P01100009788; the registration status is New Project.

Who is the developer of MAHALAKSHMI s RIDHIRA BLOCK - 3?

The promoter named in the RERA registration is MAHALAKSHMI HOMES.

Where is MAHALAKSHMI s RIDHIRA BLOCK - 3 located?

MAHALAKSHMI s RIDHIRA BLOCK - 3 is in Beeramguda, AMEENAPUR, AMEENPUR, Sangareddy, Telangana (502032).

When will MAHALAKSHMI s RIDHIRA BLOCK - 3 be completed?

The promoter's proposed date of completion filed with RERA is 15/11/2027. This is the promoter's declaration, not a guarantee.

More projects in Ameenapur