MAHALAKSHMI s RIDHIRA BLOCK - 4
MAHALAKSHMI HOMES · Sangareddy · RERA P01100009740
MAHALAKSHMI s RIDHIRA BLOCK - 4 is a residential apartment project, Block 4, in Beeramguda, Ameenpur mandal, Sangareddy district. It is being developed by the registered promoter MAHALAKSHMI HOMES, a partnership. The project covers 748.25 sq m and comprises one residential building, Building A, with 1 stilt + 5 upper floors and 20 apartments: 10 2BHK of 104.51 m² and 10 3BHK of 131.91 m². It is registered under TG-RERA number P01100009740, with proposed completion on 15/11/2027.
More from Mahalakshmi Homes · 7 projects →
01What we found
Read from TG-RERA filings, approvals, land and registration records and court records. A court case is counted only when the court record states this project's survey number with its village, or names the project.
02Check before you pay
10 items to check before you pay, 2 high - from the title chain, court records and approvals, each with what to ask the builder or your advocate. An item may not be a problem with the project: records can be incomplete.
1. Project at a glance
Project identity
| Item | Project record |
|---|---|
| Registered project name | MAHALAKSHMI s RIDHIRA BLOCK - 4 RERA record |
| Project type and registered portion | Residential apartment project; Block 4 RERA record |
| TG-RERA registration | P01100009740 RERA record |
| Registration validity | 15/07/2024 to 15/07/2027, unless extended by the Authority RERA record |
| Registered promoter | MAHALAKSHMI HOMES; partnership RERA record Corporate record |
| RERA status in supplied record | Registered; described as “New Project” RERA record |
Land and geographic identity
| Item | Project record |
|---|---|
| Locality | Beeramguda RERA record |
| Revenue village(s) | BHEERAMGUDA in the TG-RERA record; the building approval also identifies AMEENPUR. The supplied records do not establish whether these refer to one revenue village or separate locations. RERA record |
| Mandal / district / PIN | AMEENPUR / Sangareddy / 502032 RERA record |
| Survey numbers | 966 and 967; no subdivision is specified in the project identity or approval records. RERA record Land records |
| Site area | 748.25 sq m; both total and net area are recorded as 748.25 sq m. RERA filing |
| Boundaries in RERA filing | East: Plot No. 374; west: Plot No. 371 Western Part; north: Plot Nos. 359, 360 and 361; south: 40 Feet Wide Road. RERA filing |
Development identity
| Item | Project record |
|---|---|
| Sanctioning authority | Ameenpur Municipality/Municipal Corporation; the RERA filing identifies DTCP as the authority. Approvals record |
| Principal building approval | 0069/BP/3121/2024, dated 15 July 2024 Approvals record |
| Approval file number | 004565/BP/DTCP/3121/0072/2024 Approvals record |
| Approved built-up area | Net BUA: 1,983.05 m²; the approval also lists total BUA 2,395.78, deductions 16.13, proposed BUA including parking 2,379.65 and parking area 396.60. These are separately labelled figures in the filed plan data. |
| Building and floors | One residential building, Building A; 1 stilt + 5 upper floors. |
| Parking level | Stilt parking is identified; the approval lists stilt parking area as 380.99 m². |
| Unit count | 20 units in the TG-RERA filing: 10 2BHK and 10 3BHK. The filed approval-plan extraction also states 20 units. RERA unit table |
Offering and status
| Item | Project record |
|---|---|
| Filed configurations and saleable areas | 2BHK: 104.51 m²; 3BHK: 131.91 m² RERA unit table |
| Booked / available | 2BHK: 0 booked, 10 available; 3BHK: 0 booked, 10 available. Portal counts have no recorded as-of date and are indicative. RERA unit table |
| Construction stage | No independently verified site-progress stage is supplied. The RERA amenities record shows 0% for each listed infrastructure item; that is a filed progress field, not an independent site inspection. RERA amenities |
| Completion dates | Promoter’s Form B undertaking states 15 July 2027; the RERA project header gives proposed completion as 15/11/2027. RERA record |
| Occupancy / completion certificate | No completion certificate is recorded in the supplied approval extraction; it says an occupancy certificate must be applied for after completion and before occupation. |
2. The project story
- The registered project is a single-block residential apartment development in Beeramguda, with the land identified in the RERA record as Survey Nos. 966 and 967, at a recorded site area of 748.25 sq m. The approved building is described as Building A, comprising a stilt and five upper floors, for residential use. RERA record Land records
- The RERA filing lists 20 apartments—10 2BHK and 10 3BHK—and reports all 20 as available, with none booked; the portal count has no as-of date in the supplied data. The approval record requires a commencement notice before construction and an occupancy certificate before occupation. The supplied record does not establish the current on-site construction stage or that any portion is complete or occupancy-certified. RERA unit table
- The promoter’s Form B gives a completion undertaking of 15 July 2027, while the project header lists 15/11/2027 as the proposed completion date. These are recorded separately here; the full status of the applicable completion deadline is addressed elsewhere in the report. RERA record
3. Master plan, architecture & building design
The filed building-permission material describes one residential building, Building A, on a 748.25 m² site, with 1 stilt + 5 upper floors. It records a total height of 20.24 m in the sanctioned-parameters extraction and separately identifies the building height as 14.95 m. The plan extraction lists net BUA of 1,983.05 m², parking area of 396.60 m², and total proposed BUA including parking of 2,379.65 m²; it also lists total BUA of 2,395.78 and deductions of 16.13. The supplied data does not define these differently labelled BUA figures further, so they should not be treated as interchangeable.
The plan data gives a vacant plot area of 351.63 m² and identifies a 7.62 m road width. The building approval also records four rainwater-harvesting structures and requires a transformer space, a garbage house, peripheral plantation and a fenced tot-lot maintained as greenery. The supplied material does not provide a verified floor-by-floor flat schedule, lift or stair details, building footprint, or a measured breakdown of common areas.
4. Homes, configurations & floor plans
The TG-RERA filing lists two configurations. Saleable areas below are the RERA-filed areas. Carpet areas and loading percentages are software measurements from the filed plan drawing, not RERA disclosures; the measurement record says the drawing measurements need review. Saleable area includes a home’s share of common areas and should not be read as carpet area. RERA unit table Floor plans
| Configuration | Units | Booked | Available | RERA saleable area | Measured carpet area | Loading (if supplied) |
|---|---|---|---|---|---|---|
| 2BHK | 10 | 0 | 10 | 104.51 m² | 84.0 m² median; 84.0–84.0 m² measured range | 20% |
| 3BHK | 10 | 0 | 10 | 131.91 m² | 70.6 m² median; 69.3–72.0 m² measured range | 46% |
The measured drawing sample describes a 2BHK with living/dining, kitchen, bedrooms and toilets, and a 3BHK with a living/kitchen area, bedrooms and a toilet. The supplied measurements are drawing-based software outputs, not independently measured site areas or RERA-filed carpet areas. The portal’s booked and available counts have no as-of date in the supplied record. RERA unit details Floor plans
5. Parking & vehicle circulation
The sanctioned material identifies a stilt parking area of 380.99 m²; the plan parameters separately list a parking area of 396.60 m². The approval requires the stilt parking to be used exclusively for vehicle parking and not partitioned or converted to another use.
The supplied project records do not establish the number of sanctioned spaces, visitor or accessible spaces, the number of spaces allocated to individual apartments, parking access or ramp arrangements, or EV-charging provision for this project. A drawn or described parking area does not itself establish an exclusive right to a particular bay.
6. Amenities, recreation & open spaces
The RERA amenities record lists 14 infrastructure or facility categories. Each is recorded at 0% progress; these are filing entries and do not independently confirm site delivery. The building approval separately requires plantation, a fenced tot-lot maintained as greenery, and rainwater-harvesting structures. RERA amenities
| Facility | Description / size | Evidence source | Declared progress / verified status |
|---|---|---|---|
| Green strip / tot-lot / park | Listed as available: YES; no size supplied. Approval requires a fenced tot-lot maintained as greenery. | RERA amenities | RERA progress field: 0%; completion not independently verified. |
| Community buildings | Listed; no description or size supplied. | RERA amenities | RERA progress field: 0%; completion not independently verified. |
| Aggregate recreational open space | Listed; no area supplied. | RERA amenities | RERA progress field: 0%; completion not independently verified. |
The supplied RERA amenities record does not provide a clubhouse, indoor-recreation or sports-facility schedule with project-specific sizes or progress. RERA amenities
7. Utilities, building services & safety
The RERA amenities record lists water supply, sewerage, storm-water drains, rainwater harvesting and a sub-station/receiving station/electrical meter room as available: YES; it does not provide capacities or independently verified completion status. The same record lists sewage and sullage treatment/disposal, solid-waste management, energy management, fire protection, street lighting and internal roads/footpaths, each with a 0% progress field. RERA amenities
The approval requires four rainwater-harvesting structures, transformer space and a garbage house. It also places responsibility for structural and fire-safety installations on the owner, builder/developer, architect and site engineer, and requires an occupancy certificate before occupation. The supplied documents do not establish completed fire systems, water-storage or treatment capacity, STP capacity, backup power, lift provision, CCTV, security arrangements, accessibility features or site-level compliance.
8. Location, access & connectivity
The project’s registered location is Beeramguda, recorded under BHEERAMGUDA village, Ameenpur mandal, Sangareddy district, PIN 502032. The RERA filing gives the southern boundary as a 40 Feet Wide Road. RERA record RERA filing
A supplied location record gives the nearest sampled Outer Ring Road interchange at approximately 4.9 km. No public-transport details, other measured landmark distances or verified travel times are supplied. Location record
9. Developer & development status
The registered promoter is MAHALAKSHMI HOMES, recorded as a partnership, with GSTIN 36AALFM8031G1Z7. The promoter address in the project record is Mahalakshmi Homes, Rajeev Nagar, Beeramguda, Beeramguda, Ameenpur, Sangareddy, 502032. The registration certificate’s promoter entry gives a different address in Khairtabad, Hyderabad; this overview identifies the project-record address and does not reconcile the entries. Corporate record Parties record
The RERA record identifies YAMJALA SWAROOPA and R SAI TEJA as landowners. Form B, signed by authorized signatory K. Dinesh on 25 March 2025, states a completion undertaking of 15 July 2027 and declares the land free from encumbrances. Parties record
10. Approvals, official records & documents
| Supplied document / identifier | P01100009740; certificate |
|---|---|
| What it records | Registration of MAHALAKSHMI s RIDHIRA BLOCK - 4; validity 15/07/2024–15/07/2027. |
| Supplied document / identifier | 0069/BP/3121/2024; file 004565/BP/DTCP/3121/0072/2024 |
|---|---|
| What it records | Building-permission extraction for Building A, 1 stilt + 5 upper floors, dated 15 July 2024. |
| What it records | Plan/approval-plan extraction, including site and building parameters. |
|---|
| What it records | Form B affidavit-cum-declaration dated 25 March 2025, including the promoter’s completion undertaking. |
|---|
| Supplied document / identifier | Not present in supplied documents |
|---|---|
| What it records | The approval requires an occupancy certificate after completion and before occupation; no certificate is shown in this evidence set. |
The building-permission document requires commencement notice before work and completion notice and an occupancy certificate after completion. It also states that permission does not confer ownership rights.
1. Project at a glance
Project identity
Registered project name: MAHALAKSHMI s RIDHIRA BLOCK - 4
Project type and registered portion: Residential apartment project; Block 4
TG-RERA registration: P01100009740
Registration validity: 15/07/2024 to 15/07/2027, unless extended by the Authority
Registered promoter: MAHALAKSHMI HOMES; partnership
RERA status in supplied record: Registered; described as “New Project”
Land and geographic identity
Locality: Beeramguda
Revenue village(s): BHEERAMGUDA in the TG-RERA record; the building approval also identifies AMEENPUR. The supplied records do not establish whether these refer to one revenue village or separate locations.
Mandal / district / PIN: AMEENPUR / Sangareddy / 502032
Survey numbers: 966 and 967; no subdivision is specified in the project identity or approval records.
Site area: 748.25 sq m; both total and net area are recorded as 748.25 sq m.
Boundaries in RERA filing: East: Plot No. 374; west: Plot No. 371 Western Part; north: Plot Nos. 359, 360 and 361; south: 40 Feet Wide Road.
Development identity
Sanctioning authority: Ameenpur Municipality/Municipal Corporation; the RERA filing identifies DTCP as the authority.
Principal building approval: 0069/BP/3121/2024, dated 15 July 2024
Approval file number: 004565/BP/DTCP/3121/0072/2024
Approved built-up area: Net BUA: 1,983.05 m²; the approval also lists total BUA 2,395.78, deductions 16.13, proposed BUA including parking 2,379.65 and parking area 396.60. These are separately labelled figures in the filed plan data.
Building and floors: One residential building, Building A; 1 stilt + 5 upper floors.
Parking level: Stilt parking is identified; the approval lists stilt parking area as 380.99 m².
Unit count: 20 units in the TG-RERA filing: 10 2BHK and 10 3BHK. The filed approval-plan extraction also states 20 units.
Offering and status
Filed configurations and saleable areas: 2BHK: 104.51 m²; 3BHK: 131.91 m²
Booked / available: 2BHK: 0 booked, 10 available; 3BHK: 0 booked, 10 available. Portal counts have no recorded as-of date and are indicative.
Construction stage: No independently verified site-progress stage is supplied. The RERA amenities record shows 0% for each listed infrastructure item; that is a filed progress field, not an independent site inspection.
Completion dates: Promoter’s Form B undertaking states 15 July 2027; the RERA project header gives proposed completion as 15/11/2027.
Occupancy / completion certificate: No completion certificate is recorded in the supplied approval extraction; it says an occupancy certificate must be applied for after completion and before occupation.
2. The project story
- The registered project is a single-block residential apartment development in Beeramguda, with the land identified in the RERA record as Survey Nos. 966 and 967, at a recorded site area of 748.25 sq m. The approved building is described as Building A, comprising a stilt and five upper floors, for residential use.
- The RERA filing lists 20 apartments—10 2BHK and 10 3BHK—and reports all 20 as available, with none booked; the portal count has no as-of date in the supplied data. The approval record requires a commencement notice before construction and an occupancy certificate before occupation. The supplied record does not establish the current on-site construction stage or that any portion is complete or occupancy-certified.
- The promoter’s Form B gives a completion undertaking of 15 July 2027, while the project header lists 15/11/2027 as the proposed completion date. These are recorded separately here; the full status of the applicable completion deadline is addressed elsewhere in the report.
3. Master plan, architecture & building design
The filed building-permission material describes one residential building, Building A, on a 748.25 m² site, with 1 stilt + 5 upper floors. It records a total height of 20.24 m in the sanctioned-parameters extraction and separately identifies the building height as 14.95 m. The plan extraction lists net BUA of 1,983.05 m², parking area of 396.60 m², and total proposed BUA including parking of 2,379.65 m²; it also lists total BUA of 2,395.78 and deductions of 16.13. The supplied data does not define these differently labelled BUA figures further, so they should not be treated as interchangeable.
The plan data gives a vacant plot area of 351.63 m² and identifies a 7.62 m road width. The building approval also records four rainwater-harvesting structures and requires a transformer space, a garbage house, peripheral plantation and a fenced tot-lot maintained as greenery. The supplied material does not provide a verified floor-by-floor flat schedule, lift or stair details, building footprint, or a measured breakdown of common areas.
4. Homes, configurations & floor plans
The TG-RERA filing lists two configurations. Saleable areas below are the RERA-filed areas. Carpet areas and loading percentages are software measurements from the filed plan drawing, not RERA disclosures; the measurement record says the drawing measurements need review. Saleable area includes a home’s share of common areas and should not be read as carpet area.
| Configuration | Units | Booked | Available | RERA saleable area | Measured carpet area | Loading (if supplied) |
|---|---|---|---|---|---|---|
| 2BHK | 10 | 0 | 10 | 104.51 m² | 84.0 m² median; 84.0–84.0 m² measured range | 20% |
| 3BHK | 10 | 0 | 10 | 131.91 m² | 70.6 m² median; 69.3–72.0 m² measured range | 46% |
The measured drawing sample describes a 2BHK with living/dining, kitchen, bedrooms and toilets, and a 3BHK with a living/kitchen area, bedrooms and a toilet. The supplied measurements are drawing-based software outputs, not independently measured site areas or RERA-filed carpet areas. The portal’s booked and available counts have no as-of date in the supplied record.
5. Parking & vehicle circulation
The sanctioned material identifies a stilt parking area of 380.99 m²; the plan parameters separately list a parking area of 396.60 m². The approval requires the stilt parking to be used exclusively for vehicle parking and not partitioned or converted to another use.
The supplied project records do not establish the number of sanctioned spaces, visitor or accessible spaces, the number of spaces allocated to individual apartments, parking access or ramp arrangements, or EV-charging provision for this project. A drawn or described parking area does not itself establish an exclusive right to a particular bay.
6. Amenities, recreation & open spaces
The RERA amenities record lists 14 infrastructure or facility categories. Each is recorded at 0% progress; these are filing entries and do not independently confirm site delivery. The building approval separately requires plantation, a fenced tot-lot maintained as greenery, and rainwater-harvesting structures.
| Facility | Description / size | Evidence source | Declared progress / verified status |
|---|---|---|---|
| Green strip / tot-lot / park | Listed as available: YES; no size supplied. Approval requires a fenced tot-lot maintained as greenery. | RERA progress field: 0%; completion not independently verified. | |
| Community buildings | Listed; no description or size supplied. | RERA progress field: 0%; completion not independently verified. | |
| Aggregate recreational open space | Listed; no area supplied. | RERA progress field: 0%; completion not independently verified. |
The supplied RERA amenities record does not provide a clubhouse, indoor-recreation or sports-facility schedule with project-specific sizes or progress.
7. Utilities, building services & safety
The RERA amenities record lists water supply, sewerage, storm-water drains, rainwater harvesting and a sub-station/receiving station/electrical meter room as available: YES; it does not provide capacities or independently verified completion status. The same record lists sewage and sullage treatment/disposal, solid-waste management, energy management, fire protection, street lighting and internal roads/footpaths, each with a 0% progress field.
The approval requires four rainwater-harvesting structures, transformer space and a garbage house. It also places responsibility for structural and fire-safety installations on the owner, builder/developer, architect and site engineer, and requires an occupancy certificate before occupation. The supplied documents do not establish completed fire systems, water-storage or treatment capacity, STP capacity, backup power, lift provision, CCTV, security arrangements, accessibility features or site-level compliance.
8. Location, access & connectivity
The project’s registered location is Beeramguda, recorded under BHEERAMGUDA village, Ameenpur mandal, Sangareddy district, PIN 502032. The RERA filing gives the southern boundary as a 40 Feet Wide Road.
A supplied location record gives the nearest sampled Outer Ring Road interchange at approximately 4.9 km. No public-transport details, other measured landmark distances or verified travel times are supplied.
9. Developer & development status
The registered promoter is MAHALAKSHMI HOMES, recorded as a partnership, with GSTIN 36AALFM8031G1Z7. The promoter address in the project record is Mahalakshmi Homes, Rajeev Nagar, Beeramguda, Beeramguda, Ameenpur, Sangareddy, 502032. The registration certificate’s promoter entry gives a different address in Khairtabad, Hyderabad; this overview identifies the project-record address and does not reconcile the entries.
The RERA record identifies YAMJALA SWAROOPA and R SAI TEJA as landowners. Form B, signed by authorized signatory K. Dinesh on 25 March 2025, states a completion undertaking of 15 July 2027 and declares the land free from encumbrances.
10. Approvals, official records & documents
| Supplied document / identifier | P01100009740; certificate |
|---|---|
| What it records | Registration of MAHALAKSHMI s RIDHIRA BLOCK - 4; validity 15/07/2024–15/07/2027. |
| Supplied document / identifier | 0069/BP/3121/2024; file 004565/BP/DTCP/3121/0072/2024 |
|---|---|
| What it records | Building-permission extraction for Building A, 1 stilt + 5 upper floors, dated 15 July 2024. |
| What it records | Plan/approval-plan extraction, including site and building parameters. |
|---|
| What it records | Form B affidavit-cum-declaration dated 25 March 2025, including the promoter’s completion undertaking. |
|---|
| Supplied document / identifier | Not present in supplied documents |
|---|---|
| What it records | The approval requires an occupancy certificate after completion and before occupation; no certificate is shown in this evidence set. |
The building-permission document requires commencement notice before work and completion notice and an occupancy certificate after completion. It also states that permission does not confer ownership rights.
Other registrations of MAHALAKSHMI s RIDHIRA
Frequently asked questions
Is MAHALAKSHMI s RIDHIRA BLOCK - 4 registered with Telangana RERA?
Yes. MAHALAKSHMI s RIDHIRA BLOCK - 4 is registered with the Telangana Real Estate Regulatory Authority as P01100009740; the registration status is New Project.
Who is the developer of MAHALAKSHMI s RIDHIRA BLOCK - 4?
The promoter named in the RERA registration is MAHALAKSHMI HOMES.
Where is MAHALAKSHMI s RIDHIRA BLOCK - 4 located?
MAHALAKSHMI s RIDHIRA BLOCK - 4 is in Beeramguda, BHEERAMGUDA, AMEENPUR, Sangareddy, Telangana (502032).
When will MAHALAKSHMI s RIDHIRA BLOCK - 4 be completed?
The promoter's proposed date of completion filed with RERA is 15/11/2027. This is the promoter's declaration, not a guarantee.