Square One BLOCK A is a residential apartment project in Uppal, Uppal Mandal, Medchal-Malkajgiri District, developed by the registered promoter VR INFRATECH. The registered site extent is 438.22 sq. m, and the project comprises one building with 1 Stilt + 5 upper floors and 10 homes, all in the 3BHK configuration. The project is registered with TG-RERA under P02200008719, with a proposed completion date of 06/11/2026.

More from Vr Infratech · 4 projects →

01What we found

Period endedTG-RERA registration ran to 6 Nov 2026 - check its extension on TG-RERA
14documents on file - each fact links to its page
9court cases on this project's land (survey 1, 282, Uppal)
7items to check - 4 high

Read from TG-RERA filings, approvals, land and registration records and court records. A court case is counted only when the court record states this project's survey number with its village, or names the project.

02Check before you pay

7 items to check before you pay, 4 high - from the title chain, court records and approvals, each with what to ask the builder or your advocate. An item may not be a problem with the project: records can be incomplete.

Sign in to see each item and what to do

Project at a glance

Project identity

ItemProject record
Registered project nameSquare One BLOCK A RERA record
Project typeResidential apartment project RERA record RERA filing
Phase / registered portionBLOCK A is the TG-RERA registered project name. The filing identifies the site as Plot No. 880, south-east part, Block-C; the GHMC permit identifies the sanctioned building as “PRO (VR INFRATECH BLOCK C).” RERA record RERA filing
TG-RERA registrationP02200008719 RERA record
Registration validity28 August 2024–6 November 2026, unless extended by the Authority RERA record
Registered promoterVR INFRATECH; the certificate styles the name as “Vr Infratech.” RERA record Corporate record
RERA record statusThe registration certificate records the project as registered. The available record does not state that registration has been extended. RERA record

Land and geographic identity

ItemProject record
Locality / site descriptionUppal; Plot No. 880 SOUTH-EAST PART, BLOCK-C RERA filing
Revenue villageUppal in the RERA record; project documents also use Uppal Bagayath / Uppal Bhagath. RERA record RERA filing
MandalUppal RERA record RERA filing
DistrictMedchal-Malkajgiri RERA record RERA filing
PIN500039 RERA record
Project survey numbers and subdivisions1 TO 40, 282 TO 368, 369P, 370 TO 373, 374P, 375 TO 387, 395 TO 401, 454, 456 TO 459, 505P, 510 TO 564 RERA filing
Registered site extent438.22 sq. m; the building-permit record states plot area 438.22 Sq. Mtrs, road-affected area 0.0, nala-affected area 0.0, and net plot area 438.22 Sq. Mtrs. RERA filing
Boundaries recorded in RERAEast: 80FT WIDE ROAD; West: BLOCK-A VR INFRATECH; North: BLOCK-D VR INFRATECH; South: PLOT NO 879 RERA filing

Development identity

ItemProject record
Sanctioning authorityGreater Hyderabad Municipal Corporation (GHMC) Approvals record
Principal building approval4269/GHMC/LBN/2023-BP, dated 06 November, 2023 Approvals record
Other approval/file referencesFile No. 009465/GHMC/4710/LBN2/2023-BP; technical file No. 171/ENG/TP10/GHMC/2020-25 Approvals record
Approved built-up area1,094.60 sq. m excluding parking; the floor-plan extraction separately states 1,313.50 sq. m including parking.
Building count / heightOne building is recorded in the RERA site information. Sanctioned configuration: 1 Stilt + 5 upper floors; building height 14.95 M. RERA filing
Parking provision in sanction recordStilt area 202.01 Sq.Mt.; total parking area 218.9 (also recorded as 218.90).
UnitsGHMC floor-plan extraction records 10 units; TG-RERA records 10 proposed building units and 10 units in the 3BHK configuration. RERA filing RERA unit table

Offering and status

ItemProject record
RERA-filed configuration3BHK, 10 units; saleable area 68.14 sq. m each as recorded in the configuration data RERA unit table RERA unit details
Booked / available0 booked; 10 available, as last read from the TG-RERA portal; no as-of date is supplied, so counts are indicative. RERA unit table RERA unit details
Completion deadline06/11/2026, stated in the project record and Form B completion undertaking RERA record
Construction-stage evidenceArchitect’s Form–1A reports excavation at 100%, stilt floor at 20%, superstructure slabs at 100%, internal walls/plaster/flooring/doors/windows at 35%, and 0% for the listed fittings, services, and common-area works. This is a filed architect’s report, not independent site verification.
Occupancy / completion certificateNo occupancy or completion certificate is supplied in the reviewed documents. The permit requires an occupancy certificate before occupation.

The project story

  • Square One BLOCK A is a registered residential apartment project on the RERA-identified 438.22 sq. m site at Plot No. 880, south-east part, Block-C, Uppal. Its filed land identity covers the survey numbers and subdivisions listed above. The RERA record describes one proposed building and one building unit; the GHMC permit and plan extract describe a residential building with a stilt and five upper floors and 10 units. RERA record RERA filing
  • The registration certificate is valid through 6 November 2026, while the promoter’s Form B completion undertaking gives 06/11/2026 as the project completion period. These are separate record entries: registration validity is not evidence of completion or of an occupancy certificate.
  • The architect’s Form–1A records reported progress across building activities and common works; some structural stages are reported complete while several fittings, building services and site works are recorded at 0%. The certificate does not certify overall completion, and the supplied material does not independently verify progress at the site.

Master plan, architecture & building design

  • The GHMC permit records a 438.22 Sq. Mtrs plot and 1,094.60 sq. m residential built-up area. The plan extraction gives 1,313.50 sq. m proposed built-up area including parking, with 218.90 parking area; these are distinct recorded area measures and should not be treated as saleable or carpet area. The same extraction records 219.30 vacant plot area.
  • The sanctioned arrangement is one residential building, 1 Stilt + 5 upper floors, with a stated building height of 14.95 M. The plan extract lists a stilt, first, second, third, fourth and fifth floors and 10 units. It identifies a lift, staircase, parking, fire-fighting installations, generator, emergency lighting and water tanks, but the supplied extracts do not establish detailed floor-by-floor layouts, flats per floor, lift capacity, building footprint or a separate basement or podium.
  • The building-permit record includes rainwater-harvesting pits, a tot-lot entry recorded as “NA,” transformer space and a garbage house. Its stated conditions also address peripheral greenery and the treatment of the road-affected portion. These are permit-record provisions or conditions; the available material does not establish their completion.

Homes, configurations & floor plans

ConfigurationUnitsBookedAvailableRERA saleable areaMeasured carpet areaLoading (if supplied)
3BHK1001068.14 sq. mNot establishedNot supplied

The unit count, booking count, availability and saleable area are RERA-filed configuration data; booking counts have no supplied as-of date and are indicative. RERA unit details RERA unit table

Two approved floor-plan drawings were processed, but the drawing-derived record reports 0 flat designs measured for the 3BHK configuration and notes that four implausible measurements were held back. No software-measured carpet area or room dimensions are therefore reported here. Any carpet-area measurement would be a drawing-based measurement, not a RERA disclosure; saleable area and carpet area are different measures. Floor plans RERA unit details

Parking & vehicle circulation

  • The sanctioned record identifies a stilt and records a stilt area of 202.01 Sq.Mt. and total parking area of 218.9 (also shown as 218.90). The plan extraction states that parking in the approved plan is to be used exclusively for vehicle parking and not converted or misused.
  • The supplied record does not state the number of car or two-wheeler spaces, visitor or accessible parking, EV-charging quantity, ramp arrangement, or unit-specific parking allocations. A marked parking area does not itself establish exclusive parking ownership or allocation.

Amenities, recreation & open spaces

The table below summarizes facilities recorded in the GHMC plan/permit and the architect’s Form–1A. The progress values in Form–1A are filed architect reports; they are not independent verification.

Tot-lot / green strip
Description / sizePermit says tot-lot is to be fenced and maintained as greenery; plan record lists “Tot Lot NA.”
Declared progress / verified statusNo completion evidence supplied
Peripheral greenery / tree planting
Description / sizePermit requires a strip of greenery on the site perimeter; plan record also calls for tree planting.
Declared progress / verified statusForm–1A lists landscaping and tree planting at 0%; not independently verified
Common-area paving and entrance works
Description / sizeIncluded within the Form–1A common-area completion description.
Declared progress / verified statusListed completion item recorded at 0%
Internal roads, footpaths and street lighting
Description / sizeRERA amenity list includes these facilities.
Evidence sourceRERA amenities
Declared progress / verified statusEach listed at 0%
Community buildings / recreational open space
Description / sizeRERA amenity list includes community buildings and aggregate recreational open space.
Evidence sourceRERA amenities
Declared progress / verified statusEach listed at 0%; no size or facility description supplied

No clubhouse or indoor recreation inventory, sports-facility schedule, or facility sizes/capacities are established by the supplied project evidence. RERA amenities

Utilities, building services & safety

Water
What the supplied record saysThe plan extract lists an underground static water storage tank of 25,000 lits. and a separate terrace tank of 25,000 lits for residential buildings; the amenity list marks water supply “YES.”
Status evidenceForm–1A lists water supply at 0%; completion is not verified.
Sewerage and drainage
What the supplied record saysThe plan extract lists sewerage provisions as “chamber, lines, septic tank, STP”; the RERA amenity list marks sewerage “YES” and lists storm-water drains.
Status evidenceForm–1A records sewerage at 0%; storm-water-drain progress is 0% in the amenity record. No supplied evidence confirms an operational STP or reuse system. RERA amenities
Rainwater harvesting
What the supplied record saysPermit requires a rainwater-harvesting structure; the permit extract lists Rain Water Harvesting Pits 2.
Status evidenceForm–1A lists water conservation/rainwater harvesting at 0%; completion is not verified.
Electrical supply / backup
What the supplied record saysPlan extract lists a transformer space, electrical wiring and installation, generator, emergency lighting, and electrical meter room/sub-station/receiving station.
Status evidenceForm–1A records the meter room/sub-station/receiving station at 0%; completion is not verified.
Lifts and circulation
What the supplied record saysLift and staircase are listed in the plan extract.
Status evidenceForm–1A reports staircases, lifts, wells and lobbies at 0%. Lift count and capacity are not supplied.
Fire and life safety
What the supplied record saysThe plan extract lists fire-fighting installations, hose reel, down-comer and automatic sprinkler system. The permit places responsibility for fire-safety installations on the owner/developer and states that a Fire NOC is required before an occupancy certificate.
Status evidenceForm–1A records the relevant installation/common-area completion item at 0%. No Fire NOC or completed-system evidence is supplied.
Waste
What the supplied record saysPermit and plan record call for a garbage house; the RERA amenity list includes solid-waste management and disposal.
Status evidenceNo completion evidence supplied; the amenity entry is recorded at 0%. RERA amenities
Accessibility
What the supplied record saysThe supplied plan conditions refer to accessibility requirements for public and semi-public buildings above 300 sq. m.
Status evidenceThe evidence does not establish that this condition applies to this residential building or document completed accessible circulation.

Location, access & connectivity

  • The registered location is Uppal, Uppal Mandal, Medchal-Malkajgiri District, PIN 500039; the site is identified as Plot No. 880, south-east part, Block-C. The GHMC permit describes the locality as New Bharath Nagar Colony, Uppal, and the project documents also use Uppal Bagayath / Uppal Bhagath. RERA record RERA filing
  • The RERA land record gives an 80FT WIDE ROAD on the east boundary. The building-plan extract also refers to 24.00 MT WIDE EXISTING ROAD, 24.00 MT WIDE PROPOSED ROAD, and 18 mt. road width; the supplied material does not identify the exact relationship of each road reference to the project’s access. RERA filing
  • The location record supplies a cadastral parcel centroid of 17.401211424029405, 78.35417703673448 and lists Financial District (Nanakramguda) at 2.0 km. No travel time or public-transport details are supplied. Location record

Developer & development status

  • The registered promoter is VR INFRATECH, identified in the project record as a partnership. The RERA record lists GSTIN 36AATFV7222N1ZC and names MUKKA HARI CHARAN as authorized signatory. RERA record Corporate record Parties record
  • The project registration certificate describes the promoter’s registered office as “Village: Mandal: District: Hyderabad, Pin: 500034.” The supplied evidence does not provide a complete street address or official website/contact details for the promoter.
  • See the completion deadline and construction-stage evidence above.

Approvals, official records & documents

TG-RERA registration certificate (Form C)
Reference / scopeProject Square One BLOCK A; registration P02200008719; validity 28 August 2024–6 November 2026
GHMC building permit order
Reference / scope4269/GHMC/LBN/2023-BP, dated 06 November, 2023; residential building at Uppal, 438.22 Sq. Mtrs; conditional permission
Building-plan extraction
Reference / scopeFile No. 171/ENG/TP10/GHMC/2020-25; 1 Stilt + 5 upper floors; 10 units; plan particulars and conditions
Layout reference in permit
Reference / scope14741/PLG/HMDA/2018
Architect’s progress certificate (Form–1A)
Reference / scopeFiled for project P02200008719; reports construction and common-area progress; does not certify completion
Promoter Form B declaration
Reference / scopeDated 03-07-2024; includes title-basis, encumbrance and completion declarations
Title and development-rights documents filed with RERA
Reference / scopeAdvocate’s title search report; registered development agreement/GPA; conveyance deed; mortgage deed
Occupancy / completion certificate
Reference / scopeNot supplied in the reviewed project documents; the GHMC permit states an occupancy certificate is compulsory before occupation.

The document index identifies a building permit and floor-plan extraction, but does not supply a distinct occupancy/completion certificate. The detailed permit conditions and title matters are addressed in the relevant report sections.

Other registrations of Square One

Frequently asked questions

Is Square One BLOCK A registered with Telangana RERA?

Yes. Square One BLOCK A is registered with the Telangana Real Estate Regulatory Authority as P02200008719; the registration status is New Project.

Who is the developer of Square One BLOCK A?

The promoter named in the RERA registration is VR INFRATECH.

Where is Square One BLOCK A located?

Square One BLOCK A is in UPPAL, Medchal-Malkajgiri, Telangana (500039).

When will Square One BLOCK A be completed?

The promoter's proposed date of completion filed with RERA is 06/11/2026. This is the promoter's declaration, not a guarantee.