Sign in

Square One

VR INFRATECH · Medchal-Malkajgiri · RERA P02200007574

SQUARE ONE is a residential apartment project in Uppal Bhagayath Layout, Uppal mandal, Medchal-Malkajgiri district. The registered promoter developing it is VR INFRATECH. The project has a registered site extent of 398.83 sq. m. and one proposed residential building, VR INFRATECH BLOCK-B, with 1 Stilt + 5 upper floors and 10 3BHK units. It is registered with TG-RERA as P02200007574, with proposed completion by 01/06/2026.

More from Vr Infratech · 4 projects →

01What we found

Period endedTG-RERA registration ran to 1 Jun 2026 - check its extension on TG-RERA
17documents on file - each fact links to its page
7court cases on this project's land (survey 1, 282, Uppal Bhagayat Layout)
9items to check - 3 high

Read from TG-RERA filings, approvals, land and registration records and court records. A court case is counted only when the court record states this project's survey number with its village, or names the project.

02Check before you pay

9 items to check before you pay, 3 high - from the title chain, court records and approvals, each with what to ask the builder or your advocate. An item may not be a problem with the project: records can be incomplete.

Sign in to see each item and what to do

1. Project at a glance

Project identity

FieldProject record
Registered nameSQUARE ONE RERA record
Project typeResidential apartment project RERA record RERA filing
Phase / registered portionThe approval identifies PROPOSED (VR INFRATECH BLOCK-B). The supplied record does not separately state a phase number.
TG-RERA registrationP02200007574
Registration validity13/01/2024 to 01/06/2026, unless extended by the Authority. This is registration validity, not confirmation of completion or occupancy.
RERA statusRegistered; the supplied certificate records the validity dates above. A current extension or post-expiry status is not provided.
Registered promoterVR INFRATECH RERA record

Land and geographic identity

FieldProject record
Locality / site descriptionUppal Bhagayath Layout; Schedule-B Property, Plot No. 880, North-West Part (Block-B). The building-permit extraction describes the site at Raghavendra Colony, Uppal. RERA filing
Revenue villageUppal Bhagath (V) is stated in the title documents; the registration certificate records Uppal.
Mandal / district / PINUppal mandal; Medchal-Malkajgiri district; 500039. RERA record RERA filing
Project survey numbers and subdivisions1 TO 40, 282 TO 368, 369P, 370 TO 373, 374P, 375 TO 387, 395 TO 401, 454, 456 TO 459, 505P, 510 TO 564.
Registered site extent398.83 sq. m.; net plot area is also recorded as 398.83 sq. m. RERA filing
Boundaries in RERA recordEast: eastern part of Plot No. 880; west: 40-feet-wide road; north: Plot No. 881; south: south-west part of Plot No. 880, Block A. RERA filing
Road-affected / nala-affected area in permit extraction0.0 sq. m. for each.

Development identity

FieldProject record
Sanctioning authorityGreater Hyderabad Municipal Corporation (GHMC).
Principal building-permit approval1717/GHMC/LBN/2023-BP, dated 01 June, 2023; file no. 004882/GHMC/2446/LBN2/2023-BP.
Approval number also recorded in RERA materials171/ENG/TP10/GHMC/2020-25, dated 25-04-2023.
Approved built-up areaThe permit extraction records NET BUA RESIDENTIAL: 1196.50 and TOTAL PROPOSED BUILT UP AREA INCLUDING PARKING: 1435.80. It also separately lists Total proposed built up area: 1439.60; the supplied record does not explain that figure’s basis.
Building / block countOne proposed residential building, identified as VR INFRATECH BLOCK-B.
Sanctioned floor configuration1 Stilt + 5 upper floors. The permit extraction also records N NO OF FLOORS: 6.
Height recorded in permit extraction14.95 MT. is listed as building height; 20.25mt. is separately listed as total height.
ParkingThe permit extraction contains both PROPOSED NUMBER OF PARKINGS: 0 and Proposed parking: 10, and records parking area of 239.30. The actual sanctioned provision and allocation require confirmation from the approved plan.
Unit count10 units in the RERA unit record; the approval extraction does not provide a clear sanctioned unit count. RERA unit table RERA unit details

Offering and status

FieldProject record
RERA-filed configuration3BHK, 10 units; filed saleable area 75.25 sq. m. per unit. RERA unit table RERA unit details
Booked / available0 booked / 10 available, as last read from the TG-RERA portal; the record has no as-of date, so these counts are indicative. RERA unit table
Construction stageNo project construction-progress percentage or independently verified site-stage evidence is supplied. RERA amenities Document index
Promoter-declared completion01/06/2026 in Form B; the registration certificate also ends on that date.
Original / revised completion datesThe supplied material records the completion undertaking above but does not establish whether it is an original or revised date, or document an extension.
Occupancy / completion certificateNo occupancy certificate or completion certificate is supplied for the project or Block-B. The building permit states that an occupancy certificate is required before occupation.

2. The project story

SQUARE ONE is registered with TG-RERA as a residential apartment project at Plot No. 880, North-West Part (Block-B), in the Uppal Bhagayath Layout area. The RERA-filed land extent is 398.83 sq. m.; GHMC’s building-permit extraction identifies one proposed residential block, VR INFRATECH BLOCK-B, with 1 Stilt + 5 upper floors. RERA record RERA filing

The TG-RERA unit record lists 10 three-bedroom apartments, all shown as available and none booked at the time of the portal capture; no capture date is stated. The promoter’s Form B undertakes completion by 01/06/2026. The material supplied does not establish construction progress, completed units, an occupancy certificate, or a registration extension. RERA unit table RERA unit details

3. Master plan, architecture & building design

The GHMC permit extraction describes a residential building on a 398.83 sq. m. plot, with 1 Stilt + 5 upper floors. The permit records 1196.50 as net residential built-up area and 1435.80 as total proposed built-up area including parking. It separately lists 1439.60 as total proposed built-up area; the supplied material does not identify the basis of that entry. These are permit-extraction figures, not carpet or saleable-area measurements.

The permit materials also list vacant plot area 159.53, proposed coverage area 239.30, parking area 239.30, and mortgage area 120.08. No drawing-derived floor arrangement, flats-per-floor count, building footprint plan, lift/stair count, or measured common-area schedule is supplied here.

The RERA record identifies one block; no separate phase-wise building organization is described. The permit conditions include a fenced tot-lot/greenery, peripheral greenery and rainwater harvesting, but the supplied evidence does not establish their completion.

4. Homes, configurations & floor plans

ConfigurationUnitsBookedAvailableRERA saleable areaMeasured carpet areaLoading (if supplied)
3BHK1001075.25 sq. m.Not establishedNot supplied

The configuration, unit count, booking count and saleable area are from the TG-RERA unit record; the portal record has no stated as-of date. The supplied drawing review reports two drawings measured, but no 3BHK flat design was measured, so no drawing-based carpet area or room dimensions can be reported. RERA unit table RERA unit details Floor plans

Saleable area and carpet area are different measures: the RERA-filed figure is saleable area, while a software-measured carpet figure would be drawing-based and would require review. No balcony, utility, or common-area loading figures are supplied. RERA unit table Floor plans

5. Parking & vehicle circulation

The permit extraction records 239.30 as parking area and lists both PROPOSED NUMBER OF PARKINGS: 0 and Proposed parking: 10. The supplied data does not resolve these entries into a confirmed sanctioned parking-space count. The permit describes the stilt as parking and requires the approved parking space to be used exclusively for vehicles without partition walls or rolling shutters.

No resident-versus-visitor breakdown, accessible-bay count, parking allocation to individual units, EV charging provision, or circulation-plan details are supplied. A parking bay in an approval drawing, by itself, would not establish exclusive ownership or allocation.

6. Amenities, recreation & open spaces

The available amenity record lists the following facilities and reports 0% progress for each item. “YES” indicates an availability entry in that record, not independently verified completion. RERA amenities

Clubhouse / indoor
Description / sizeNo clubhouse or indoor recreational facility is identified in the supplied record.
Evidence sourceRERA amenities
Declared progress / verified statusNot supplied
Sports / recreation
Description / sizeGreen Strip / TOT LOT / Park; permit requires a fenced tot-lot maintained as greenery. No size is supplied.
Evidence sourceRERA amenities
Declared progress / verified statusListed as available “YES”; progress recorded as 0%; completion not independently verified
Landscape / open space
Description / sizeAggregate area of recreational open space is listed without an area; permit also requires peripheral greenery.
Evidence sourceRERA amenities
Declared progress / verified statusProgress recorded as 0%; completion not independently verified
Convenience / community
Description / sizeCommunity Buildings are listed, with no description or size.
Evidence sourceRERA amenities
Declared progress / verified statusProgress recorded as 0%; completion not independently verified

7. Utilities, building services & safety

The RERA amenity record marks Water Supply, Sewerage (Chamber, Lines, Septic Tank, STP), Water Conservation, Rain water Harvesting, and Electrical Meter Room, Sub-Station, Receiving Station as “YES”; it does not provide capacities, technical specifications, or confirmation of completed installation. It also lists storm-water drains, street lighting, sewage/sullage treatment, solid-waste management and disposal, energy management, and fire protection/fire-safety requirements, each with progress recorded as 0%. RERA amenities

The GHMC permit conditions specify rainwater-harvesting pits, a transformer space, a garbage house, generator backup, emergency lighting in common corridors and staircases, fire-safety equipment and systems, hose reel/downcomer, and water storage tanks of 25,000 litres underground and 25,000 litres at terrace level for residential buildings. These are approval conditions or specified provisions; the supplied records do not establish that the systems have been installed or tested.

No supplied material confirms lift numbers or capacities, sewerage-treatment capacity or reuse arrangements, water source, generator capacity, CCTV/security systems, or accessible circulation. The permit requires an occupancy certificate before occupation and includes fire-safety requirements; no occupancy certificate is supplied.

8. Location, access & connectivity

The registered location is Uppal Bhagayath Layout, Uppal mandal, Medchal-Malkajgiri district, PIN 500039. The building permit places the proposed block at Raghavendra Colony, Uppal, and identifies 12.00-metre existing and proposed roads in the layout-plan extraction and an 18-metre road in the building-permit materials. RERA record RERA filing

A supplied cadastral parcel-centroid location is 17.41528, 78.35459. The separate location record lists Financial District (Nanakramguda) at 1.2 km as a connectivity reference. Location record

The promoter-marketing/vendor record lists distances to Uppal Metro Station (0.5 km), Uppal X Road Junction Bus Stop (0.3 km), and other destinations. These are vendor-attributed figures, not measurements independently established in the supplied project records. Promoter website

9. Developer & development status

The registered promoter is VR INFRATECH, recorded as a partnership. Its GSTIN is 36AATFV7222N1ZC; the supplied project record does not establish a separate company registration number or full registered-office address. The registration certificate gives an address as Hyderabad, PIN 500034, without a complete street address. The project records identify MUKKA HARI CHARAN as authorized signatory. RERA record Corporate record Parties record

The promoter’s Form B affidavit, dated 13-12-2023, declares the project land free from encumbrances and undertakes completion by 01/06/2026. These are promoter declarations, not independent findings. The project record gives no construction-progress percentage, verified site update, or occupancy certificate. RERA amenities Document index

10. Approvals, official records & documents

RecordWhat the supplied document establishes
TG-RERA registration certificate P02200007574Form C certificate for SQUARE ONE; records validity from 13/01/2024 to 01/06/2026 and identifies VR INFRATECH as promoter.
GHMC building permit 1717/GHMC/LBN/2023-BPBuilding permit dated 01 June, 2023 for proposed residential VR INFRATECH BLOCK-B, 1 Stilt + 5 upper floors, on 398.83 sq. m.
RERA-filed approval reference 171/ENG/TP10/GHMC/2020-25Approval reference recorded in the RERA-filed layout-plan material, dated 25-04-2023.
Layout-plan submission 378118Contains a GHMC building-plan extraction, site and survey identifiers, conditions, and building parameters; it is not evidence of an occupancy certificate.
Form B affidavitPromoter declaration dated 13-12-2023, including the completion undertaking and land-encumbrance declaration.
Completion / occupancy recordNo project occupancy or completion certificate is supplied. The permit states that an occupancy certificate is compulsory before occupation.
Other project filingA certificate dated 13.11.2024 is described in the supplied extraction as a Chartered Accountant’s certificate based on unaudited books, records and management explanations; it is not a building or layout approval.

Other registrations of Square One

Frequently asked questions

Is SQUARE ONE registered with Telangana RERA?

Yes. SQUARE ONE is registered with the Telangana Real Estate Regulatory Authority as P02200007574; the registration status is New Project.

Who is the developer of SQUARE ONE?

The promoter named in the RERA registration is VR INFRATECH.

Where is SQUARE ONE located?

SQUARE ONE is in UPPAL BHAGAYAT LAYOUT, Uppal, Medchal-Malkajgiri, Telangana (500039).

When will SQUARE ONE be completed?

The promoter's proposed date of completion filed with RERA is 01/06/2026. This is the promoter's declaration, not a guarantee.

More projects in Uppal