Wind Flower
HIGHRISE CONSTRUCTIONS · Hyderabad · RERA P02500005512
WIND FLOWER is a residential apartment project in Saidabad, Saidabad Mandal, Hyderabad District, developed by registered promoter HIGHRISE CONSTRUCTIONS. The project has a total plot area of 836.07 sq. m and one residential building with 1 Stilt + 5 upper floors, comprising 10 4BHK units. It is registered under TG-RERA number P02500005512, granted on 14/12/2022, and the promoter’s Form B gives a proposed completion date of 10/03/2025.
More from Highrise Constructions · 4 projects →
01What we found
Read from TG-RERA filings, approvals, land and registration records and court records. A court case is counted only when the court record states this project's survey number with its village, or names the project.
02Check before you pay
7 items to check before you pay, 4 high - from the title chain, court records and approvals, each with what to ask the builder or your advocate. An item may not be a problem with the project: records can be incomplete.
1. Project at a glance
Project identity
| Field | Project record |
|---|---|
| Registered project name | WIND FLOWER |
| Project type | Residential apartment project RERA record |
| Phase / registered portion | Phase not separately identified in the supplied record; registration is for the project RERA record |
| TG-RERA registration | P02500005512; granted under section 5 on 14/12/2022 Approvals record |
| Registration validity | Certificate states validity from 14/12/2022 to 10/03/2025; no extension is recorded in the supplied certificate |
| Registered promoter | HIGHRISE CONSTRUCTIONS; entity type recorded as Partnership RERA record Corporate record |
| RERA status | The project is recorded as “New Project”; the registration certificate’s stated validity ended 10/03/2025 RERA record |
Land and geographic identity
| Field | Project record |
|---|---|
| Locality / colony | Saidabad; the building permit describes the site as Srilaxminagar, Saidabad RERA record |
| Revenue village | Saidabad RERA record Land records |
| Mandal | Saidabad RERA record |
| District / PIN | Hyderabad / 500059 RERA record |
| Survey number / subdivision and site identity | H.NO 17-1-388/9, IN PLOT NO 9 RERA record Land records |
| Registered site extent | 836.07 sq. m total plot area; 91.44 sq. m road-affected area; 744.63 sq. m net plot area, as stated in the building permit |
| Boundaries | East: ROAD; West: PLOT NO 8; North: ROAD; South: PLOT NOS 10 AND 11 Land records |
Development identity
| Field | Project record |
|---|---|
| Sanctioning authority | Greater Hyderabad Municipal Corporation (GHMC) Approvals record |
| Principal building approval | Building Permit Order 2327/GHMC/CHR/2022-BP, approved 10 March 2022; file no. 005019/GHMC/2735/CHR1/2021-BP Approvals record |
| Approved built-up area | 2,001.40 sq. m in the project record RERA filing |
| Building count | One residential building RERA record |
| Sanctioned configuration | 1 Stilt + 5 upper floors; stated building height 14.99 |
| Parking provision in permit | Cellar and stilt areas approved for parking; stated total parking area 412.8 |
| Units | 10 units in the RERA filing; the permit requires that the sanctioned unit count not be increased without GHMC approval RERA unit table |
Offering and status
| Field | Project record |
|---|---|
| RERA-filed configuration | 4BHK; 10 units RERA unit table |
| RERA-filed saleable area | 121.7 sq. m per unit RERA unit table |
| Booked / available | 0 booked / 10 available, as last read from the TG-RERA portal; the record supplies no as-of date, so counts are indicative RERA unit table |
| Promoter-declared completion deadline | 10/03/2025 in Form B |
| Construction stage | No independently verified site-progress information is supplied. The RERA amenity/infrastructure progress fields shown in the supplied record are all 0%; these do not independently establish physical site progress RERA amenities |
| Occupancy / completion certificate | No occupancy or completion certificate is included in the supplied project documents; the building permit states that an occupancy certificate is compulsory before occupation |
2. The project story
WIND FLOWER is registered as a residential apartment project on the Saidabad site identified as H.NO 17-1-388/9, IN PLOT NO 9. The supplied GHMC building permit sanctions one residential building, with 1 Stilt + 5 upper floors, on a net plot area of 744.63 sq. m. The permit names Sunkireddy Raghavender Reddy as applicant and HIGH RISE CONSTRUCTIONS as developer/builder. RERA record Land records
The RERA filing lists ten 4BHK homes, with no units recorded as booked and ten as available in the portal snapshot; no snapshot date is provided. The promoter’s Form B undertaking gives 10/03/2025 as the completion date. The supplied record does not establish current construction progress or confirm that the building has been completed or received an occupancy certificate. RERA unit table
3. Master plan, architecture & building design
The GHMC permit describes a single residential building at the stated Saidabad site, sanctioned as 1 Stilt + 5 upper floors, with a stated height of 14.99. It records 836.07 sq. m as plot area, 91.44 sq. m as road-affected area and 744.63 sq. m as net plot area. The approved built-up area recorded in the RERA project fields is 2,001.40 sq. m; the supplied material does not provide a separate FSI-counted area, gross built-up area or carpet-area total. RERA filing
The permit specifies setbacks of Front 5.73, Rear 2.5, Side I 2.5 and Side II 2.5, and describes an 18 mt. road width. It records 209.75 for the fifth-floor area and 1,997.65 and 399.15 among the sanctioned parameters, but the supplied extraction does not label the latter two figures clearly enough to assign them a further architectural meaning.
The supplied drawing review contains two drawings, both measured, but no matched RERA configuration for the measured designs; the drawing-based results are held back as implausible. Accordingly, no drawing-derived apartment layout, room dimensions, floor arrangement or carpet-area figure is reported here. Floor plans
4. Homes, configurations & floor plans
| Configuration | Units | Booked | Available | RERA saleable area | Measured carpet area | Loading (if supplied) |
|---|---|---|---|---|---|---|
| 4BHK | 10 | 0 | 10 | 121.7 sq. m | Not available for this RERA-matched configuration | Not supplied |
The 121.7 sq. m figure is the RERA-filed saleable area, not a carpet-area measurement. The drawing review does not provide a usable carpet-area measurement matched to the filed 4BHK configuration. Carpet area and saleable area are distinct measures; the supplied drawing-review note states that saleable area also counts the home’s share of common areas. RERA unit table RERA unit details Floor plans
5. Parking & vehicle circulation
The GHMC permit records a total parking area of 412.8 and states that the cellar and stilt areas approved for parking must be used exclusively for vehicle parking, without partition walls or rolling shutters. The permit does not provide a count of parking spaces, identify resident or visitor allocations, or document an exclusive parking allocation to any unit. No accessible-parking, mechanical-parking, EV-charging, ramp or internal-driveway details are supplied.
6. Amenities, recreation & open spaces
The GHMC permit requires a tot-lot to be fenced and maintained as greenery before an occupancy certificate is issued, and records three rainwater-harvesting pits. It also requires transformer space and a garbage house within the premises. These are permit requirements, not evidence that the facilities have been completed.
| Description / size | Permit condition: fence and maintain as greenery before OC; permit parameters record “Tot Lot NA” |
|---|---|
| Declared progress / verified status | Completion not verified; RERA progress field is 0% RERA amenities |
| Description / size | Three pits recorded; permit also requires a rainwater-harvesting structure (percolation pit) |
|---|---|
| Declared progress / verified status | Completion not verified; RERA progress field is 0% RERA amenities |
| Description / size | Required within the site |
|---|---|
| Declared progress / verified status | Completion not verified; RERA progress field is 0% RERA amenities |
| Description / size | Required within the premises |
|---|---|
| Declared progress / verified status | Completion not verified; RERA progress field is 0% RERA amenities |
| Description / size | Listed in a third-party vendor description, not established by the supplied RERA or sanction records |
|---|---|
| Evidence source | Promoter website |
| Declared progress / verified status | Marketing/vendor-listed only; delivery and sanction status not established |
The RERA infrastructure and amenity fields supplied for internal roads and footpaths, water supply, sewerage, storm-water drains, green strip/tot-lot/park, street lighting, community buildings, sewage treatment, solid-waste management, water conservation, energy management, fire safety, electrical rooms/substation and recreational open space each show 0% declared progress. RERA amenities
7. Utilities, building services & safety
The building permit requires a rainwater-harvesting structure, space for a transformer, and a garbage house. It also states that an occupancy fire NOC is to be obtained from the Director (EV&DM) before issue of an occupancy certificate; this is a stated permit condition, not evidence that the NOC has been obtained. The permit further requires minimum clearances from high- and low-tension electrical lines.
The supplied project record does not establish water source or storage capacity, a treatment system, sewage-treatment or reuse arrangements, storm-water design, electrical backup, lift numbers or capacities, fire-system specifications, waste-segregation arrangements, CCTV, access control, accessible circulation or completed safety works. A vendor description lists a sewage treatment plant, power backup, CCTV, fire sprinklers and fire-fighting equipment, but does not establish that these are sanctioned or delivered for this project. Promoter website
8. Location, access & connectivity
The registered location is Saidabad, Saidabad Mandal, Hyderabad District, Telangana, PIN 500059. The building permit identifies the site as Srilaxminagar, Saidabad, and records roads on the north and east boundaries, with Plot No. 8 to the west and Plot Nos. 10 and 11 to the south. The permit refers to an 18 mt. road width. RERA record Land records
The supplied location data gives a cadastral parcel centroid of 17.41528, 78.35459 and lists Financial District (Nanakramguda) at 1.2 km. No other access, transit or landmark distances are provided. Location record
9. Developer & development status
The registered promoter is HIGHRISE CONSTRUCTIONS, recorded as a partnership, with GSTIN 36AAMFH9274K1ZN. The supplied promoter address is SECOND FLOOR, SURYA MEADOWS, VASAVI COLONY, SAIDABAD, Saidabad, Hyderabad, Telangana 500059; the record also lists VINAY NAGAR COLONY as the street. The named authorized signatory is ANNIREDDY NARSIMHA REDDY. An official contact number, email address or promoter website is not supplied. Corporate record Parties record RERA filing
The permit identifies HIGH RISE CONSTRUCTIONS as developer/builder. The promoter’s Form B declaration undertakes completion by 10/03/2025. No current construction-progress certification, completion certificate or occupancy certificate is supplied, so the project’s present physical stage cannot be established from this evidence. Document index
10. Approvals, official records & documents
| Record | Supplied evidence |
|---|---|
| TG-RERA registration | Form C certificate for WIND FLOWER, P02500005512, issued 14/12/2022; stated validity ends 10/03/2025 |
| GHMC building permit | Building Permit Order 2327/GHMC/CHR/2022-BP, approved 10 March 2022; file no. 005019/GHMC/2735/CHR1/2021-BP |
| Permit scope | One residential building, 1 Stilt + 5 upper floors; permit identifies the site and records the plot-area breakdown |
| Form B declaration | Promoter declaration dated 21-10-2022, including the promoter’s stated title basis, encumbrance declaration and completion undertaking |
| Occupancy / completion certificate | Not included in the supplied document set; the permit states that an occupancy certificate is compulsory before occupation |
| Approved layout plan | No approved-layout document or layout number is established in the supplied evidence Document index HMDA |
| Third-party listing | Vendor description lists additional facilities; it is not a project approval or evidence of delivery Promoter website |
1. Project at a glance
Project identity
Registered project name: WIND FLOWER
Project type: Residential apartment project
Phase / registered portion: Phase not separately identified in the supplied record; registration is for the project
TG-RERA registration: P02500005512; granted under section 5 on 14/12/2022
Registration validity: Certificate states validity from 14/12/2022 to 10/03/2025; no extension is recorded in the supplied certificate
Registered promoter: HIGHRISE CONSTRUCTIONS; entity type recorded as Partnership
RERA status: The project is recorded as “New Project”; the registration certificate’s stated validity ended 10/03/2025
Land and geographic identity
Locality / colony: Saidabad; the building permit describes the site as Srilaxminagar, Saidabad
Revenue village: Saidabad
Mandal: Saidabad
District / PIN: Hyderabad / 500059
Survey number / subdivision and site identity: H.NO 17-1-388/9, IN PLOT NO 9
Registered site extent: 836.07 sq. m total plot area; 91.44 sq. m road-affected area; 744.63 sq. m net plot area, as stated in the building permit
Boundaries: East: ROAD; West: PLOT NO 8; North: ROAD; South: PLOT NOS 10 AND 11
Development identity
Sanctioning authority: Greater Hyderabad Municipal Corporation (GHMC)
Principal building approval: Building Permit Order 2327/GHMC/CHR/2022-BP, approved 10 March 2022; file no. 005019/GHMC/2735/CHR1/2021-BP
Approved built-up area: 2,001.40 sq. m in the project record
Building count: One residential building
Sanctioned configuration: 1 Stilt + 5 upper floors; stated building height 14.99
Parking provision in permit: Cellar and stilt areas approved for parking; stated total parking area 412.8
Units: 10 units in the RERA filing; the permit requires that the sanctioned unit count not be increased without GHMC approval
Offering and status
RERA-filed configuration: 4BHK; 10 units
RERA-filed saleable area: 121.7 sq. m per unit
Booked / available: 0 booked / 10 available, as last read from the TG-RERA portal; the record supplies no as-of date, so counts are indicative
Promoter-declared completion deadline: 10/03/2025 in Form B
Construction stage: No independently verified site-progress information is supplied. The RERA amenity/infrastructure progress fields shown in the supplied record are all 0%; these do not independently establish physical site progress
Occupancy / completion certificate: No occupancy or completion certificate is included in the supplied project documents; the building permit states that an occupancy certificate is compulsory before occupation
2. The project story
WIND FLOWER is registered as a residential apartment project on the Saidabad site identified as H.NO 17-1-388/9, IN PLOT NO 9. The supplied GHMC building permit sanctions one residential building, with 1 Stilt + 5 upper floors, on a net plot area of 744.63 sq. m. The permit names Sunkireddy Raghavender Reddy as applicant and HIGH RISE CONSTRUCTIONS as developer/builder.
The RERA filing lists ten 4BHK homes, with no units recorded as booked and ten as available in the portal snapshot; no snapshot date is provided. The promoter’s Form B undertaking gives 10/03/2025 as the completion date. The supplied record does not establish current construction progress or confirm that the building has been completed or received an occupancy certificate.
3. Master plan, architecture & building design
The GHMC permit describes a single residential building at the stated Saidabad site, sanctioned as 1 Stilt + 5 upper floors, with a stated height of 14.99. It records 836.07 sq. m as plot area, 91.44 sq. m as road-affected area and 744.63 sq. m as net plot area. The approved built-up area recorded in the RERA project fields is 2,001.40 sq. m; the supplied material does not provide a separate FSI-counted area, gross built-up area or carpet-area total.
The permit specifies setbacks of Front 5.73, Rear 2.5, Side I 2.5 and Side II 2.5, and describes an 18 mt. road width. It records 209.75 for the fifth-floor area and 1,997.65 and 399.15 among the sanctioned parameters, but the supplied extraction does not label the latter two figures clearly enough to assign them a further architectural meaning.
The supplied drawing review contains two drawings, both measured, but no matched RERA configuration for the measured designs; the drawing-based results are held back as implausible. Accordingly, no drawing-derived apartment layout, room dimensions, floor arrangement or carpet-area figure is reported here.
4. Homes, configurations & floor plans
| Configuration | Units | Booked | Available | RERA saleable area | Measured carpet area | Loading (if supplied) |
|---|---|---|---|---|---|---|
| 4BHK | 10 | 0 | 10 | 121.7 sq. m | Not available for this RERA-matched configuration | Not supplied |
The 121.7 sq. m figure is the RERA-filed saleable area, not a carpet-area measurement. The drawing review does not provide a usable carpet-area measurement matched to the filed 4BHK configuration. Carpet area and saleable area are distinct measures; the supplied drawing-review note states that saleable area also counts the home’s share of common areas.
5. Parking & vehicle circulation
The GHMC permit records a total parking area of 412.8 and states that the cellar and stilt areas approved for parking must be used exclusively for vehicle parking, without partition walls or rolling shutters. The permit does not provide a count of parking spaces, identify resident or visitor allocations, or document an exclusive parking allocation to any unit. No accessible-parking, mechanical-parking, EV-charging, ramp or internal-driveway details are supplied.
6. Amenities, recreation & open spaces
The GHMC permit requires a tot-lot to be fenced and maintained as greenery before an occupancy certificate is issued, and records three rainwater-harvesting pits. It also requires transformer space and a garbage house within the premises. These are permit requirements, not evidence that the facilities have been completed.
| Facility | Description / size | Evidence source | Declared progress / verified status |
|---|---|---|---|
| Tot-lot / greenery | Permit condition: fence and maintain as greenery before OC; permit parameters record “Tot Lot NA” | Completion not verified; RERA progress field is 0% | |
| Rainwater harvesting | Three pits recorded; permit also requires a rainwater-harvesting structure (percolation pit) | Completion not verified; RERA progress field is 0% | |
| Transformer space | Required within the site | Completion not verified; RERA progress field is 0% | |
| Garbage house | Required within the premises | Completion not verified; RERA progress field is 0% | |
| Clubhouse, swimming pool, gymnasium, park, community hall and children’s play area | Listed in a third-party vendor description, not established by the supplied RERA or sanction records | Marketing/vendor-listed only; delivery and sanction status not established |
The RERA infrastructure and amenity fields supplied for internal roads and footpaths, water supply, sewerage, storm-water drains, green strip/tot-lot/park, street lighting, community buildings, sewage treatment, solid-waste management, water conservation, energy management, fire safety, electrical rooms/substation and recreational open space each show 0% declared progress.
7. Utilities, building services & safety
The building permit requires a rainwater-harvesting structure, space for a transformer, and a garbage house. It also states that an occupancy fire NOC is to be obtained from the Director (EV&DM) before issue of an occupancy certificate; this is a stated permit condition, not evidence that the NOC has been obtained. The permit further requires minimum clearances from high- and low-tension electrical lines.
The supplied project record does not establish water source or storage capacity, a treatment system, sewage-treatment or reuse arrangements, storm-water design, electrical backup, lift numbers or capacities, fire-system specifications, waste-segregation arrangements, CCTV, access control, accessible circulation or completed safety works. A vendor description lists a sewage treatment plant, power backup, CCTV, fire sprinklers and fire-fighting equipment, but does not establish that these are sanctioned or delivered for this project.
8. Location, access & connectivity
The registered location is Saidabad, Saidabad Mandal, Hyderabad District, Telangana, PIN 500059. The building permit identifies the site as Srilaxminagar, Saidabad, and records roads on the north and east boundaries, with Plot No. 8 to the west and Plot Nos. 10 and 11 to the south. The permit refers to an 18 mt. road width.
The supplied location data gives a cadastral parcel centroid of 17.41528, 78.35459 and lists Financial District (Nanakramguda) at 1.2 km. No other access, transit or landmark distances are provided.
9. Developer & development status
The registered promoter is HIGHRISE CONSTRUCTIONS, recorded as a partnership, with GSTIN 36AAMFH9274K1ZN. The supplied promoter address is SECOND FLOOR, SURYA MEADOWS, VASAVI COLONY, SAIDABAD, Saidabad, Hyderabad, Telangana 500059; the record also lists VINAY NAGAR COLONY as the street. The named authorized signatory is ANNIREDDY NARSIMHA REDDY. An official contact number, email address or promoter website is not supplied.
The permit identifies HIGH RISE CONSTRUCTIONS as developer/builder. The promoter’s Form B declaration undertakes completion by 10/03/2025. No current construction-progress certification, completion certificate or occupancy certificate is supplied, so the project’s present physical stage cannot be established from this evidence.
10. Approvals, official records & documents
TG-RERA registration: Form C certificate for WIND FLOWER, P02500005512, issued 14/12/2022; stated validity ends 10/03/2025
GHMC building permit: Building Permit Order 2327/GHMC/CHR/2022-BP, approved 10 March 2022; file no. 005019/GHMC/2735/CHR1/2021-BP
Permit scope: One residential building, 1 Stilt + 5 upper floors; permit identifies the site and records the plot-area breakdown
Form B declaration: Promoter declaration dated 21-10-2022, including the promoter’s stated title basis, encumbrance declaration and completion undertaking
Occupancy / completion certificate: Not included in the supplied document set; the permit states that an occupancy certificate is compulsory before occupation
Approved layout plan: No approved-layout document or layout number is established in the supplied evidence
Third-party listing: Vendor description lists additional facilities; it is not a project approval or evidence of delivery
Frequently asked questions
Is WIND FLOWER registered with Telangana RERA?
Yes. WIND FLOWER is registered with the Telangana Real Estate Regulatory Authority as P02500005512; the registration status is New Project.
Who is the developer of WIND FLOWER?
The promoter named in the RERA registration is HIGHRISE CONSTRUCTIONS.
Where is WIND FLOWER located?
WIND FLOWER is in SAIDABAD, Hyderabad, Telangana (500059).
When will WIND FLOWER be completed?
The promoter's proposed date of completion filed with RERA is 10/03/2025. This is the promoter's declaration, not a guarantee.
More projects in Saidabad