ETERNAL LAKSHMI is a residential apartment project in Saidabad, Saidabad Mandal, Hyderabad District. The registered promoter is Myra Builders. The project filing records a site extent of 643.44 sq. m, 1 approved building unit, and 10 3BHK apartments, each with a RERA-filed saleable area of 147.72 m²; the building permit identifies Building - A (MAHESH) as Stilt + 5. TG-RERA registration number P02500000135 records a proposed completion date of 11/06/2023.

01What we found

Period endedTG-RERA registration ran to 11 Jun 2023 - check its extension on TG-RERA
11documents on file - each fact links to its page
0court cases on this project's land in the court records searched
8items to check - 2 high

Read from TG-RERA filings, approvals, land and registration records and court records. A court case is counted only when the court record states this project's survey number with its village, or names the project.

02Check before you pay

8 items to check before you pay, 2 high - from the title chain, court records and approvals, each with what to ask the builder or your advocate. An item may not be a problem with the project: records can be incomplete.

Sign in to see each item and what to do

1. Project at a glance

Project identity

ItemRecord
Registered project nameETERNAL LAKSHMI RERA record
Project typeResidential apartment project RERA record RERA filing
Phase / registered portionPhase not separately identified in the supplied record. One building, Building A (MAHESH), is identified in the building-permit and occupancy-certificate extracts.
TG-RERA registrationP02500000135
Registration validity09/01/2019 to 11/06/2023, unless extended by the Authority. The supplied certificate does not record an extension. This is the registration period, not the occupancy-certificate status.
Registered promoterMyra Builders (project record: MYRA BUILDERS); entity type recorded as partnership. RERA record Corporate record
RERA statusRecorded as On-Going Project in the project filing. RERA filing

Land and geographic identity

ItemRecord
LocalitySaidabad; the building-permit and occupancy-certificate extracts identify Saidabad Colony. RERA record
Revenue villageSaidabad RERA record
Mandal / district / PINSaidabad / Hyderabad / 500059 RERA record
Project survey numbers17-1-382/N/37&38 (as recorded in the project filing and RERA certificate). RERA record RERA filing
Site extent643.44 sq. m total and net area in the project filing and building-permit extract; road-affected area is recorded as 0. RERA filing
BoundariesNorth: Plot No. 39; South: neighbours’ land; East: neighbours’ land; West: 50 ft wide road. RERA filing
Project plan identifier1/C4/05336/2017 RERA record

Development identity

ItemRecord
Sanctioning authorityGreater Hyderabad Municipal Corporation (GHMC) Approvals record
Principal building approvalBuilding Permit Order 1/C4/05336/2017, approved 10 June 2017; file no. 1/C4/04813/2017. Approvals record
Approved built-up areaThe RERA project filing records 1,476 sq. m. The building-permit extract specifies residential upper-floor area of 1,476.20 m² and stilt area of 306.88 m²; the occupancy-certificate extract separately records floor area of 1,510.6 m² as per both sanctioned plan and site building plan. These are the figures and labels recorded in those documents. RERA filing
Building count and identified buildingThe filing records 1 approved building unit; the building-permit record identifies Building - A (MAHESH). RERA filing
Sanctioned floor configurationBuilding permit: Stilt + 5; the occupancy-certificate extract describes Cellar + Stilt Ground + Upper Floors 5 Upper Floor.
Height14.95 m in the building-permit and occupancy-certificate records.
ParkingPermit extract says the stilt is approved for parking; the occupancy-certificate extract records parking area of 318.17 m² as per both sanctioned plan and site building plan. No parking-space count or unit-by-unit allocation is supplied.
Units10 units are recorded in the TG-RERA configuration data. The building-permit conditions require prior GHMC approval for any increase in sanctioned units. RERA unit table

Offering and status

ItemRecord
Unit type3BHK apartments RERA unit table
RERA-filed saleable area147.72 m² per recorded 3BHK configuration RERA unit table
Booking / availability10 booked; 0 available, according to the TG-RERA portal data supplied. The portal record has no as-of date, so counts are indicative. RERA unit table
Completion datesOriginal and revised proposed completion dates are both 11/06/2023 in the project filing. RERA record RERA filing
Construction stageProject status is recorded as “On-Going Project.” The supplied GHMC occupancy-certificate extracts certify the identified building as complete and fit for occupation; the extracts state that completion notice was submitted on 22 November 2019. RERA filing
Occupancy certificate (OC)GHMC occupancy-certificate records identify Building A (MAHESH) and application no. 2/C6/21014/2019-OC; approved date 07/12/2019. The supplied evidence establishes the certificate scope for that identified building, not any separately identified phase or additional building.

2. The project story

ETERNAL LAKSHMI is recorded with TG-RERA as a residential apartment project at Saidabad, Saidabad Mandal, Hyderabad District, on the registered site identified as 17-1-382/N/37&38. The project filing describes a single approved building unit on a site of 643.44 sq. m. RERA record RERA filing

The supplied GHMC building-permit extract identifies the residential building as Building - A (MAHESH), sanctioned as Stilt + 5. The occupancy-certificate extracts identify that building as fit for occupation and record a completion notice dated 22 November 2019. These are documentary records for the identified building; the supplied evidence does not include an independent site inspection or a current physical-progress assessment.

The TG-RERA configuration data records ten 3BHK units, all booked and none shown as available in the portal data provided. The booking counts are indicative because the record does not specify when they were last updated. RERA unit table

3. Master plan, architecture & building design

The supplied GHMC building-permit extract records one residential building, Building - A (MAHESH), with a height of 14.95 m and a Stilt + 5 configuration. It records the site area as 643.44 m², road-affected area as 0.00 m², residential upper-floor area as 1,476.20 m², and stilt area as 306.88 m². The project filing separately records approved built-up area as 1,476 sq. m. RERA filing

The occupancy-certificate extract describes the building as Cellar + Stilt Ground + Upper Floors 5 Upper Floor and records floor area as 1,510.6 m² for both the sanctioned plan and site building plan. The supplied records do not provide a complete drawing-derived account of floor-by-floor unit arrangement, footprint, lifts, stairs, entries, common-area distribution, or building circulation.

The building-permit extract lists a tot-lot of 152.57 m², a rainwater-harvesting percolation pit and space for a transformer. The permit also says the tot-lot is to be fenced and maintained as greenery before issue of the occupancy certificate.

The project filing lists plan approval 1/C4/05336/2017. A separate layout-plan filing is listed in the documents, but its supplied record is not extracted into readable plan details; the supplied evidence therefore does not describe any additional layout organization or site landscaping beyond the permit particulars noted above. Approvals record

4. Homes, configurations & floor plans

ConfigurationUnitsBookedAvailableRERA saleable areaMeasured carpet areaLoading (if supplied)
3BHK10100147.72 m²98.6 m² median; measured range 94.2–109.5 m²33%

Unit count, booking count and saleable area are from TG-RERA configuration data; the booking record has no as-of date. Carpet-area range, median and loading are software measurements from the approved floor-plan drawings, not RERA-filed measurements, and are flagged as needing review. RERA unit table RERA unit details Floor plans

The measured drawing record includes a first-floor flat labelled “02,” with three bedrooms, three toilets, a lobby, living and dining areas, kitchen, wash area and a balcony. The listed balcony measures 4.94 m² and is excluded from the software-measured carpet area. The record provides dimensions for those rooms, but they are drawing measurements rather than RERA disclosures. RERA unit details

Carpet area describes the measured internal area reported from the drawing geometry; saleable area is the TG-RERA-filed figure and is not interchangeable with carpet area. The supplied data does not separately quantify a RERA-filed balcony or utility area for the units. RERA unit table Floor plans

5. Parking & vehicle circulation

The GHMC building-permit extract states that the stilt is approved for parking and says cellar and stilt areas approved for parking are to be used exclusively for vehicles, without partition walls or rolling shutters. The occupancy-certificate extract records 318.17 m² of parking area as per both the sanctioned plan and site building plan.

No sanctioned number of car or two-wheeler spaces, visitor or accessible parking count, parking-bay allocation to individual apartments, or detailed ramp and driveway arrangements are available in the supplied records. The presence of parking area in the plan does not establish exclusive ownership or allocation of any particular bay.

6. Amenities, recreation & open spaces

Tot-lot / green space
Description / size152.57 m²; permit says it is to be fenced and maintained as greenery before issue of the OC
Evidence sourceGHMC building-permit extract
Declared progress / verified statusPermit provision and condition recorded; no independent current-status evidence supplied
Rainwater-harvesting structure
Description / sizePercolation pit
Evidence sourceGHMC building-permit extract
Declared progress / verified statusListed in permit; no independent current-status evidence supplied
Green Strip/TOT LOT/Park
Description / sizeMarked “YES,” 100% in the project amenity-progress data
Evidence sourceProject amenity record
Declared progress / verified statusProgress as recorded in the supplied project data; not independently verified here RERA amenities
Water Conservation, Rain water Harvesting
Description / sizeMarked “YES,” 100% in the project amenity-progress data
Evidence sourceProject amenity record
Declared progress / verified statusProgress as recorded in the supplied project data; not independently verified here RERA amenities

The supplied vendor record also lists landscaped gardens, children’s play areas, a fitness centre, clubhouse, indoor games and a park/central green. These are vendor-listed claims, not established here as GHMC-sanctioned or delivered facilities; no sizes or completion verification are supplied for them. Promoter website

7. Utilities, building services & safety

The project amenity record marks Water Supply and Electrical Meter Room, Sub-Station, Receiving Station as “YES,” each with 100% progress. It also marks water conservation/rainwater harvesting as “YES,” 100%. These are recorded progress fields, not an independent verification of service capacity or present operation. RERA amenities

The building-permit extract lists space for a transformer and a rainwater-harvesting percolation pit. The occupancy-certificate extracts include a rainwater-harvesting field, but record 0 as per the sanctioned plan. The supplied evidence does not describe water sources or storage, sewage treatment, storm-water arrangements, electrical backup, lift specifications, fire systems, waste management, CCTV, security arrangements or accessibility provisions. RERA amenities

The building-permit conditions require an occupancy certificate before occupation and require the owner/developers to ensure construction-worker safety. No further system specifications or independent fire/life-safety verification are supplied in this overview.

8. Location, access & connectivity

The registered location is Saidabad, Saidabad Mandal, Hyderabad District, PIN 500059; the building-permit and occupancy-certificate extracts specify Saidabad Colony. The filing records the west boundary as a 50 ft wide road. RERA record RERA filing

A cadastral-parcel centroid is supplied at 17.41528, 78.35459. The structured location data lists the following distances: Location record

PlaceCategoryDistance
Financial District (Nanakramguda)Anchor1.2 km
IndusInd BankBank0.4 km
(unnamed bus_station)Bus station2.2 km
Manuu Polytechnic HyderabadCollege1.6 km
Sankaraya Eye HospitalHospital1.6 km
ADPIT office0.0 km
South india shopping mallMall2.6 km
(unnamed park)Park1.2 km
Nanakramguda Govt primary schoolSchool0.5 km

The supplied vendor record gives separate connectivity claims, but this overview relies on the registered location and structured location distances above. No approach-road route, travel time or public-transport service detail is provided. Location record RERA record

9. Developer & development status

The registered promoter is MYRA BUILDERS, recorded as a partnership. The project record lists Mahesh Kumar Bandaru as authorized signatory and Prabhakar Bandaru and Chandrakala Bandaru as partners. The registration certificate gives the promoter office as Champapet, Saidabad Mandal, Hyderabad District, PIN 500059; the project filing gives an address at APSRTC Officers Colony, Nagarjuna Colony, Saidabad, Hyderabad, PIN 500059. Corporate record Parties record

The building-permit extract names MS ETERNAL BUILDERS as developer/builder, while identifying MYRA BUILDERS as applicant. The supplied records do not provide a separate corporate identifier or official contact details for MYRA BUILDERS. Corporate record

TG-RERA records the proposed and revised completion date as 11/06/2023 and the project status as “On-Going Project”; the GHMC occupancy-certificate records identify Building A (MAHESH) as fit for occupation. No independent construction-progress assessment or separately identified phase/building completion evidence is supplied. RERA filing RERA record

10. Approvals, official records & documents

TG-RERA registration certificate
Identifier / dateP02500000135, issued 09/01/2019; recorded validity through 11/06/2023 unless extended
Scope and evidenceETERNAL LAKSHMI; registered promoter Myra Builders; survey identity 17-1-382/N/37&38. The supplied certificate does not record an extension.
GHMC building permit
Identifier / date1/C4/05336/2017, approved 10 June 2017; file no. 1/C4/04813/2017
Scope and evidenceBuilding - A (MAHESH), residential; permit extract includes building particulars and conditions.
GHMC occupancy certificate
Identifier / dateApplication 2/C6/21014/2019-OC; approved 07/12/2019
Scope and evidenceOccupancy-certificate extracts identify Building A (MAHESH); completion notice is recorded as submitted 22 November 2019.
Form B declaration
Identifier / dateDated 30/11/2018
Scope and evidenceAffidavit by Mahesh Kumar B, authorized signatory for MYRA Builders, including promoter declarations on title, encumbrances and completion undertaking.
Layout-plan document entry
Identifier / dateListed as document 12999
Scope and evidenceThe supplied entry does not provide readable extracted layout details.
Title report and encumbrance statement
Identifier / dateTitle report 12994; encumbrance statement 12996
Scope and evidenceSupporting project-file documents; detailed title and encumbrance assessment is addressed in the Land & Title section.

The available overview records establish a GHMC building permit and an occupancy-certificate record for the identified building. The supplied materials do not provide a readable layout plan or a complete set of drawing-derived building and services details.

Frequently asked questions

Is ETERNAL LAKSHMI registered with Telangana RERA?

Yes. ETERNAL LAKSHMI is registered with the Telangana Real Estate Regulatory Authority as P02500000135; the registration status is On-Going Project.

Who is the developer of ETERNAL LAKSHMI?

The promoter named in the RERA registration is MYRA BUILDERS.

Where is ETERNAL LAKSHMI located?

ETERNAL LAKSHMI is in SAIDABAD, Hyderabad, Telangana (500059).

When will ETERNAL LAKSHMI be completed?

The promoter's proposed date of completion filed with RERA is 11/06/2023. This is the promoter's declaration, not a guarantee.

More projects in Saidabad