THIRUMALAS SAGAR SIMHA NILAYAM is a residential apartment project in Yapral, Alwal mandal, Medchal-Malkajgiri district, developed by registered promoter THIRUMALA CONSTRUCTIONS DEVELOPERS. The project occupies 313.41 sq. m and comprises one building with 1 Stilt + 5 upper floors and 10 two-bedroom units, each with a filed saleable area of 86.71 sq. m. Its TG-RERA registration number is P02200006810, and the project record gives a proposed completion date of 30/11/2026.
More from Thirumala Constructions Developers · 6 projects →
01What we found
Read from TG-RERA filings, approvals, land and registration records and court records. A court case is counted only when the court record states this project's survey number with its village, or names the project.
02Check before you pay
11 items to check before you pay, 3 high - from the title chain, court records and approvals, each with what to ask the builder or your advocate. An item may not be a problem with the project: records can be incomplete.
1. Project at a glance
Project identity
| Item | TG-RERA / filed record |
|---|---|
| Registered project name | THIRUMALAS SAGAR SIMHA NILAYAM RERA record |
| Project type | Residential apartment project RERA record RERA filing |
| Phase / registered portion | Phase not separately identified in the supplied record; the registration is for the project named above RERA record |
| TG-RERA registration | P02200006810 |
| Registration validity | Certificate states validity from 30/08/2023 to 08/05/2026; no extension is recorded in the supplied certificate |
| RERA status | Registered under section 5; certificate records a two-year validity period |
| Registered promoter | THIRUMALA CONSTRUCTIONS DEVELOPERS (also rendered in filed documents as “Thirumala Constructions and Developers”) RERA record Corporate record |
| RERA status label | “New Project” in the registration record RERA filing |
Land and geographic identity
| Item | Filed / recorded detail |
|---|---|
| Locality / revenue village | Yapral; the certificate gives “Yapral, Alwal” as locality RERA record |
| Mandal | Alwal in the project record RERA record |
| District | Medchal-Malkajgiri RERA record |
| PIN | 500087 RERA record |
| Project survey numbers | Sy. No. 161/B and 185 Land records |
| Plot | Plot No. 16 RERA filing |
| Registered site extent | 313.41 sq. m in the RERA land record RERA filing |
| Total / net area in building permit | Plot area 313.41 sq. m; net plot area 313.41 sq. m |
| Road-affected / nala-affected area in building permit | 0.0 sq. m each |
| Boundaries | North: Plot No. 15; South: Plot No. 17; East: Plot No. 21; West: 30 wide road RERA filing |
Development identity
| Item | Sanctioned / filed detail |
|---|---|
| Sanctioning authority | Greater Hyderabad Municipal Corporation (GHMC) Approvals record |
| Principal building-permit number / date | 1235/GHMC/SEC/2023-BP, dated 08 May, 2023 Approvals record |
| File number | 002601/GHMC/1276/SEC2/2023-BP Approvals record |
| Approved building | One residential building, identified in the permit as BLDG (GEETHA) |
| Sanctioned configuration | 1 Stilt + 5 upper floors; building height recorded as 14.50 m |
| Approved built-up area | 867.15 sq. m for the five upper residential floors; stilt area 160.56 sq. m is listed separately in the permit RERA filing |
| Building / tower count | One building / one tower in the RERA record RERA filing RERA unit table |
| Units | 10 units in the filed schedule; the RERA land record lists one building unit RERA unit table RERA unit table |
| Parking | Permit lists total parking area of 173.45 sq. m and says stilt parking is to be used exclusively for vehicles; a parking-space count is not supplied |
Offering and status
| Item | RERA-filed / available evidence |
|---|---|
| Configuration | 2-bedroom units, filed under unit names “DOUBLE BEDROOM 101” through “DOUBLE BEDROOM 502” RERA unit table RERA unit table |
| Filed saleable area | 86.71 sq. m per unit RERA unit table RERA unit table |
| Booked / available | 0 booked; 10 available, as last read from the TG-RERA portal; the portal record supplied has no as-of date, so these counts are indicative RERA unit table |
| Promoter-declared completion date | 08 May 2026 in Form B and the building permit; the project header separately records proposed completion as 30/11/2026 RERA record |
| Construction stage | No construction-progress percentage or independently verified site-status evidence is supplied RERA amenities |
| Occupancy / completion certificate | No occupancy or completion certificate is supplied; GHMC’s permit states that an occupancy certificate is required before occupation |
Registration validity, the completion date and occupancy certification are separate matters: the certificate records registration validity through 08/05/2026, the project record gives a proposed completion date of 30/11/2026, and the supplied documents do not include an occupancy certificate. RERA record
2. The project story
The RERA record describes a small, single-building residential apartment development at Plot No. 16, Yapral, on land identified as Sy. No. 161/B and 185. The GHMC permit is for one building of 1 Stilt + 5 upper floors; the RERA unit schedule lists ten 2-bedroom apartments, with two numbered units on each of floors 1 through 5. RERA filing Land records RERA unit table
The filed schedule shows all ten units as available and none booked in the portal data supplied, but those counts have no stated retrieval date. The documents establish permission and a declared completion undertaking, not the present physical construction stage. No site inspection, progress percentage or occupancy certificate is included in this evidence set. RERA unit table
3. Master plan, architecture & building design
The approved GHMC permit records a 313.41 sq. m plot and net plot area, with 867.15 sq. m of approved residential built-up area and a separately stated stilt area of 160.56 sq. m. The permit describes one building, 1 Stilt + 5 upper floors, and a building height of 14.50 m. These are sanctioned-plan figures, not a software measurement of floor-plan geometry.
The permit identifies Plot No. 16, survey numbers 161/B and 185, and an approved layout reference 13162/MP2/HUDA/90. The supplied material does not establish a separate phase organization or provide enough extracted drawing detail to describe flat-per-floor arrangements beyond the numbered units, building footprint, lift and stair configuration, internal circulation, or common-area allocation. RERA unit table
GHMC’s permit lists a total parking area of 173.45 sq. m and specifies that the stilt approved for parking must be used exclusively for vehicle parking. It also requires a fenced tot-lot maintained as greenery, peripheral greenery and rainwater-harvesting structures. No separate FSI-counted area, carpet-area figure or gross built-up-area figure is stated in the permit extract.
4. Homes, configurations & floor plans
| Configuration | Units | Booked | Available | RERA saleable area | Measured carpet area | Loading (if supplied) |
|---|---|---|---|---|---|---|
| 2BHK | 10 | 0 | 10 | 86.71 sq. m per unit | Software-measured median 62.8 sq. m; measured range 62.1–70.0 sq. m | 28% |
RERA identifies ten “DOUBLE BEDROOM” units, numbered 101, 102, 201, 202, 301, 302, 401, 402, 501 and 502, each with filed saleable area of 86.71 sq. m. Booking and availability figures are portal counts without an as-of date. The carpet-area figures are software measurements from the approved floor-plan drawing, not RERA-filed disclosures; the measurements cover five flat designs and are flagged as needing review. The drawing’s measured room schedule for unit 201 includes a hall, kitchen, two bedrooms and two toilets. Room dimensions and the measured carpet-area result should be checked against the drawing. Saleable area and carpet area are different measures; the supplied drawing note says saleable area also counts the home’s share of common areas. RERA unit table RERA unit table Floor plans RERA unit details
5. Parking & vehicle circulation
The GHMC permit records 173.45 sq. m as total parking area and specifies that the approved stilt parking is to be used exclusively for vehicles. It also requires a space for a transformer within the site. The permit extract does not state the number of car or two-wheeler spaces, visitor or accessible parking provision, parking allocation to individual units, or whether any parking is mechanical or surface parking.
A third-party vendor record mentions “Bike and Car Parking,” but does not provide a count or allocation; it is not evidence of sanctioned capacity or an individual buyer’s parking entitlement. Promoter website
6. Amenities, recreation & open spaces
| Description / size | Listed as available “YES”; no source, storage or capacity stated |
|---|---|
| Evidence source | TG-RERA amenities RERA amenities |
| Declared progress / verified status | Progress shown as 0%; completion not independently verified |
| Description / size | “Sewerage (Chamber, Lines, Septic Tank, STP)” listed as available “YES”; the specific system is not identified |
|---|---|
| Evidence source | TG-RERA amenities RERA amenities |
| Declared progress / verified status | Progress shown as 0%; completion not independently verified |
| Description / size | Listed as available “YES”; GHMC permit requires rainwater-harvesting structures and specifies 3 pits |
|---|---|
| Evidence source | TG-RERA amenities RERA amenities |
| Declared progress / verified status | Progress shown as 0%; installation not independently verified |
| Description / size | RERA lists the facility; GHMC permit requires the tot-lot to be fenced and maintained as greenery, and a peripheral green strip |
|---|---|
| Evidence source | TG-RERA amenities RERA amenities |
| Declared progress / verified status | Progress shown as 0%; completion not independently verified |
| Description / size | Listed in RERA amenities; no dimensions or layout detail supplied |
|---|---|
| Evidence source | TG-RERA amenities RERA amenities |
| Declared progress / verified status | Progress shown as 0%; completion not independently verified |
| Description / size | Listed in RERA amenities; no design or dimensions supplied |
|---|---|
| Evidence source | TG-RERA amenities RERA amenities |
| Declared progress / verified status | Progress shown as 0%; completion not independently verified |
| Description / size | Listed in RERA amenities |
|---|---|
| Evidence source | TG-RERA amenities RERA amenities |
| Declared progress / verified status | Progress shown as 0%; completion not independently verified |
| Description / size | Listed in RERA amenities; no facility description or size supplied |
|---|---|
| Evidence source | TG-RERA amenities RERA amenities |
| Declared progress / verified status | Progress shown as 0%; completion not independently verified |
| Description / size | Listed in RERA amenities; no treatment capacity or reuse arrangement supplied |
|---|---|
| Evidence source | TG-RERA amenities RERA amenities |
| Declared progress / verified status | Progress shown as 0%; completion not independently verified |
| Description / size | Listed in RERA amenities; GHMC permit also requires a garbage house within the premises |
|---|---|
| Evidence source | TG-RERA amenities RERA amenities |
| Declared progress / verified status | Progress shown as 0%; completion not independently verified |
| Description / size | Listed as available “YES”; GHMC permit requires space for a transformer |
|---|---|
| Evidence source | TG-RERA amenities RERA amenities |
| Declared progress / verified status | Progress shown as 0%; installation not independently verified |
| Description / size | Listed in RERA amenities; no area stated |
|---|---|
| Evidence source | TG-RERA amenities RERA amenities |
| Declared progress / verified status | Progress shown as 0%; completion not independently verified |
7. Utilities, building services & safety
The RERA amenities record marks water supply and sewerage as available, but supplies no water source, storage or treatment capacity and does not identify which sewerage arrangement applies. Rainwater harvesting is listed; the GHMC permit specifies 3 rainwater-harvesting pits. No storm-water design, sewage-treatment capacity, treated-water reuse arrangement or utility-completion evidence is supplied. RERA amenities
The RERA amenities record marks the electrical meter room / sub-station / receiving station as available. The GHMC permit requires transformer space, but no electrical load, backup-power provision, EV charging facility, lift details or lift capacity is given in the supplied record. RERA amenities
For safety, the permit requires a fire NOC from the Director (EV&DM) before issue of the occupancy certificate and states that an occupancy certificate is compulsory before occupation. The supplied documents do not include the fire NOC, an occupancy certificate, or details of fire-fighting systems, escape stairs, accessibility provisions, CCTV or security arrangements.
8. Location, access & connectivity
The registered location is Yapral, Alwal, Medchal-Malkajgiri district, PIN 500087; the site is identified as Plot No. 16 in Sy. No. 161/B and 185. The recorded parcel-centroid coordinates are 17.501534018418347, 78.54402092647183. RERA record Land records Location record
The supplied location data gives the nearest sampled Outer Ring Road interchange at approximately 4.6 km. No other verified road, public-transport or landmark distances are supplied. Location record
9. Developer & development status
The registered promoter is THIRUMALA CONSTRUCTIONS DEVELOPERS, recorded as a partnership, with GSTIN 36AAGFT3933P1ZL. The registration certificate gives the promoter office as “Village: Mandal: Abdullapurmet, District: Ranga Reddy, Pin: 500039.” The project record lists VENAKTA SUDHAKARA RAO as authorized signatory and PRASANTHI GATTAMANENI as partner. Corporate record Parties record
The promoter’s Form B declaration, dated 03/07/2023, undertakes completion by 8th May 2026 and includes declarations concerning project funds, audits and pending approvals. The supplied record does not include independently verified construction progress or an occupancy certificate. RERA amenities
10. Approvals, official records & documents
| Identifier / date | P02200006810; issued 30/08/2023; validity to 08/05/2026 |
|---|---|
| Scope and evidence | Registration for THIRUMALAS SAGAR SIMHA NILAYAM; records Plot No. 16 and survey numbers Sy. No. 161/B and 185 |
| Identifier / date | 1235/GHMC/SEC/2023-BP; 08 May, 2023 |
|---|---|
| Scope and evidence | Residential building permission for one building at Yapral; file no. 002601/GHMC/1276/SEC2/2023-BP |
| Identifier / date | 13162/MP2/HUDA/90 |
|---|---|
| Scope and evidence | Reference reproduced in the GHMC building-permit record |
| Identifier / date | 03/07/2023 |
|---|---|
| Scope and evidence | Promoter declaration including the completion undertaking and project-fund statements |
| Identifier / date | Document 338179 |
|---|---|
| Scope and evidence | Filed drawing document used for the software-measured floor-plan figures; the supplied evidence does not include extracted layout approval particulars beyond the reference in the building permit |
| Identifier / date | Not supplied |
|---|---|
| Scope and evidence | GHMC permit requires an occupancy certificate before occupation; no certificate is present in the reviewed material |
The building permit also records DRC No. 02341/TDR/2023, notarised affidavit No. 2569/2023, and contractor’s all-risk policy No. 431190/44/2023/546, stated valid up to 27 February, 2029.
1. Project at a glance
Project identity
Registered project name: THIRUMALAS SAGAR SIMHA NILAYAM
Project type: Residential apartment project
Phase / registered portion: Phase not separately identified in the supplied record; the registration is for the project named above
TG-RERA registration: P02200006810
Registration validity: Certificate states validity from 30/08/2023 to 08/05/2026; no extension is recorded in the supplied certificate
RERA status: Registered under section 5; certificate records a two-year validity period
Registered promoter: THIRUMALA CONSTRUCTIONS DEVELOPERS (also rendered in filed documents as “Thirumala Constructions and Developers”)
RERA status label: “New Project” in the registration record
Land and geographic identity
Locality / revenue village: Yapral; the certificate gives “Yapral, Alwal” as locality
Mandal: Alwal in the project record
District: Medchal-Malkajgiri
PIN: 500087
Project survey numbers: Sy. No. 161/B and 185
Plot: Plot No. 16
Registered site extent: 313.41 sq. m in the RERA land record
Total / net area in building permit: Plot area 313.41 sq. m; net plot area 313.41 sq. m
Road-affected / nala-affected area in building permit: 0.0 sq. m each
Boundaries: North: Plot No. 15; South: Plot No. 17; East: Plot No. 21; West: 30 wide road
Development identity
Sanctioning authority: Greater Hyderabad Municipal Corporation (GHMC)
Principal building-permit number / date: 1235/GHMC/SEC/2023-BP, dated 08 May, 2023
File number: 002601/GHMC/1276/SEC2/2023-BP
Approved building: One residential building, identified in the permit as BLDG (GEETHA)
Sanctioned configuration: 1 Stilt + 5 upper floors; building height recorded as 14.50 m
Approved built-up area: 867.15 sq. m for the five upper residential floors; stilt area 160.56 sq. m is listed separately in the permit
Building / tower count: One building / one tower in the RERA record
Units: 10 units in the filed schedule; the RERA land record lists one building unit
Parking: Permit lists total parking area of 173.45 sq. m and says stilt parking is to be used exclusively for vehicles; a parking-space count is not supplied
Offering and status
Configuration: 2-bedroom units, filed under unit names “DOUBLE BEDROOM 101” through “DOUBLE BEDROOM 502”
Filed saleable area: 86.71 sq. m per unit
Booked / available: 0 booked; 10 available, as last read from the TG-RERA portal; the portal record supplied has no as-of date, so these counts are indicative
Promoter-declared completion date: 08 May 2026 in Form B and the building permit; the project header separately records proposed completion as 30/11/2026
Construction stage: No construction-progress percentage or independently verified site-status evidence is supplied
Occupancy / completion certificate: No occupancy or completion certificate is supplied; GHMC’s permit states that an occupancy certificate is required before occupation
Registration validity, the completion date and occupancy certification are separate matters: the certificate records registration validity through 08/05/2026, the project record gives a proposed completion date of 30/11/2026, and the supplied documents do not include an occupancy certificate.
2. The project story
The RERA record describes a small, single-building residential apartment development at Plot No. 16, Yapral, on land identified as Sy. No. 161/B and 185. The GHMC permit is for one building of 1 Stilt + 5 upper floors; the RERA unit schedule lists ten 2-bedroom apartments, with two numbered units on each of floors 1 through 5.
The filed schedule shows all ten units as available and none booked in the portal data supplied, but those counts have no stated retrieval date. The documents establish permission and a declared completion undertaking, not the present physical construction stage. No site inspection, progress percentage or occupancy certificate is included in this evidence set.
3. Master plan, architecture & building design
The approved GHMC permit records a 313.41 sq. m plot and net plot area, with 867.15 sq. m of approved residential built-up area and a separately stated stilt area of 160.56 sq. m. The permit describes one building, 1 Stilt + 5 upper floors, and a building height of 14.50 m. These are sanctioned-plan figures, not a software measurement of floor-plan geometry.
The permit identifies Plot No. 16, survey numbers 161/B and 185, and an approved layout reference 13162/MP2/HUDA/90. The supplied material does not establish a separate phase organization or provide enough extracted drawing detail to describe flat-per-floor arrangements beyond the numbered units, building footprint, lift and stair configuration, internal circulation, or common-area allocation.
GHMC’s permit lists a total parking area of 173.45 sq. m and specifies that the stilt approved for parking must be used exclusively for vehicle parking. It also requires a fenced tot-lot maintained as greenery, peripheral greenery and rainwater-harvesting structures. No separate FSI-counted area, carpet-area figure or gross built-up-area figure is stated in the permit extract.
4. Homes, configurations & floor plans
| Configuration | Units | Booked | Available | RERA saleable area | Measured carpet area | Loading (if supplied) |
|---|---|---|---|---|---|---|
| 2BHK | 10 | 0 | 10 | 86.71 sq. m per unit | Software-measured median 62.8 sq. m; measured range 62.1–70.0 sq. m | 28% |
RERA identifies ten “DOUBLE BEDROOM” units, numbered 101, 102, 201, 202, 301, 302, 401, 402, 501 and 502, each with filed saleable area of 86.71 sq. m. Booking and availability figures are portal counts without an as-of date. The carpet-area figures are software measurements from the approved floor-plan drawing, not RERA-filed disclosures; the measurements cover five flat designs and are flagged as needing review. The drawing’s measured room schedule for unit 201 includes a hall, kitchen, two bedrooms and two toilets. Room dimensions and the measured carpet-area result should be checked against the drawing. Saleable area and carpet area are different measures; the supplied drawing note says saleable area also counts the home’s share of common areas.
5. Parking & vehicle circulation
The GHMC permit records 173.45 sq. m as total parking area and specifies that the approved stilt parking is to be used exclusively for vehicles. It also requires a space for a transformer within the site. The permit extract does not state the number of car or two-wheeler spaces, visitor or accessible parking provision, parking allocation to individual units, or whether any parking is mechanical or surface parking.
A third-party vendor record mentions “Bike and Car Parking,” but does not provide a count or allocation; it is not evidence of sanctioned capacity or an individual buyer’s parking entitlement.
6. Amenities, recreation & open spaces
| Description / size | Listed as available “YES”; no source, storage or capacity stated |
|---|---|
| Evidence source | TG-RERA amenities |
| Declared progress / verified status | Progress shown as 0%; completion not independently verified |
| Description / size | “Sewerage (Chamber, Lines, Septic Tank, STP)” listed as available “YES”; the specific system is not identified |
|---|---|
| Evidence source | TG-RERA amenities |
| Declared progress / verified status | Progress shown as 0%; completion not independently verified |
| Description / size | Listed as available “YES”; GHMC permit requires rainwater-harvesting structures and specifies 3 pits |
|---|---|
| Evidence source | TG-RERA amenities |
| Declared progress / verified status | Progress shown as 0%; installation not independently verified |
| Description / size | RERA lists the facility; GHMC permit requires the tot-lot to be fenced and maintained as greenery, and a peripheral green strip |
|---|---|
| Evidence source | TG-RERA amenities |
| Declared progress / verified status | Progress shown as 0%; completion not independently verified |
| Description / size | Listed in RERA amenities; no dimensions or layout detail supplied |
|---|---|
| Evidence source | TG-RERA amenities |
| Declared progress / verified status | Progress shown as 0%; completion not independently verified |
| Description / size | Listed in RERA amenities; no design or dimensions supplied |
|---|---|
| Evidence source | TG-RERA amenities |
| Declared progress / verified status | Progress shown as 0%; completion not independently verified |
| Description / size | Listed in RERA amenities |
|---|---|
| Evidence source | TG-RERA amenities |
| Declared progress / verified status | Progress shown as 0%; completion not independently verified |
| Description / size | Listed in RERA amenities; no facility description or size supplied |
|---|---|
| Evidence source | TG-RERA amenities |
| Declared progress / verified status | Progress shown as 0%; completion not independently verified |
| Description / size | Listed in RERA amenities; no treatment capacity or reuse arrangement supplied |
|---|---|
| Evidence source | TG-RERA amenities |
| Declared progress / verified status | Progress shown as 0%; completion not independently verified |
| Description / size | Listed in RERA amenities; GHMC permit also requires a garbage house within the premises |
|---|---|
| Evidence source | TG-RERA amenities |
| Declared progress / verified status | Progress shown as 0%; completion not independently verified |
| Description / size | Listed as available “YES”; GHMC permit requires space for a transformer |
|---|---|
| Evidence source | TG-RERA amenities |
| Declared progress / verified status | Progress shown as 0%; installation not independently verified |
| Description / size | Listed in RERA amenities; no area stated |
|---|---|
| Evidence source | TG-RERA amenities |
| Declared progress / verified status | Progress shown as 0%; completion not independently verified |
7. Utilities, building services & safety
The RERA amenities record marks water supply and sewerage as available, but supplies no water source, storage or treatment capacity and does not identify which sewerage arrangement applies. Rainwater harvesting is listed; the GHMC permit specifies 3 rainwater-harvesting pits. No storm-water design, sewage-treatment capacity, treated-water reuse arrangement or utility-completion evidence is supplied.
The RERA amenities record marks the electrical meter room / sub-station / receiving station as available. The GHMC permit requires transformer space, but no electrical load, backup-power provision, EV charging facility, lift details or lift capacity is given in the supplied record.
For safety, the permit requires a fire NOC from the Director (EV&DM) before issue of the occupancy certificate and states that an occupancy certificate is compulsory before occupation. The supplied documents do not include the fire NOC, an occupancy certificate, or details of fire-fighting systems, escape stairs, accessibility provisions, CCTV or security arrangements.
8. Location, access & connectivity
The registered location is Yapral, Alwal, Medchal-Malkajgiri district, PIN 500087; the site is identified as Plot No. 16 in Sy. No. 161/B and 185. The recorded parcel-centroid coordinates are 17.501534018418347, 78.54402092647183.
The supplied location data gives the nearest sampled Outer Ring Road interchange at approximately 4.6 km. No other verified road, public-transport or landmark distances are supplied.
9. Developer & development status
The registered promoter is THIRUMALA CONSTRUCTIONS DEVELOPERS, recorded as a partnership, with GSTIN 36AAGFT3933P1ZL. The registration certificate gives the promoter office as “Village: Mandal: Abdullapurmet, District: Ranga Reddy, Pin: 500039.” The project record lists VENAKTA SUDHAKARA RAO as authorized signatory and PRASANTHI GATTAMANENI as partner.
The promoter’s Form B declaration, dated 03/07/2023, undertakes completion by 8th May 2026 and includes declarations concerning project funds, audits and pending approvals. The supplied record does not include independently verified construction progress or an occupancy certificate.
10. Approvals, official records & documents
| Identifier / date | P02200006810; issued 30/08/2023; validity to 08/05/2026 |
|---|---|
| Scope and evidence | Registration for THIRUMALAS SAGAR SIMHA NILAYAM; records Plot No. 16 and survey numbers Sy. No. 161/B and 185 |
| Identifier / date | 1235/GHMC/SEC/2023-BP; 08 May, 2023 |
|---|---|
| Scope and evidence | Residential building permission for one building at Yapral; file no. 002601/GHMC/1276/SEC2/2023-BP |
| Identifier / date | 13162/MP2/HUDA/90 |
|---|---|
| Scope and evidence | Reference reproduced in the GHMC building-permit record |
| Identifier / date | 03/07/2023 |
|---|---|
| Scope and evidence | Promoter declaration including the completion undertaking and project-fund statements |
| Identifier / date | Document 338179 |
|---|---|
| Scope and evidence | Filed drawing document used for the software-measured floor-plan figures; the supplied evidence does not include extracted layout approval particulars beyond the reference in the building permit |
| Identifier / date | Not supplied |
|---|---|
| Scope and evidence | GHMC permit requires an occupancy certificate before occupation; no certificate is present in the reviewed material |
The building permit also records DRC No. 02341/TDR/2023, notarised affidavit No. 2569/2023, and contractor’s all-risk policy No. 431190/44/2023/546, stated valid up to 27 February, 2029.
Frequently asked questions
Is THIRUMALAS SAGAR SIMHA NILAYAM registered with Telangana RERA?
Yes. THIRUMALAS SAGAR SIMHA NILAYAM is registered with the Telangana Real Estate Regulatory Authority as P02200006810; the registration status is New Project.
Who is the developer of THIRUMALAS SAGAR SIMHA NILAYAM?
The promoter named in the RERA registration is THIRUMALA CONSTRUCTIONS DEVELOPERS.
Where is THIRUMALAS SAGAR SIMHA NILAYAM located?
THIRUMALAS SAGAR SIMHA NILAYAM is in Alwal, Yapral, Medchal-Malkajgiri, Telangana (500087).
When will THIRUMALAS SAGAR SIMHA NILAYAM be completed?
The promoter's proposed date of completion filed with RERA is 30/11/2026. This is the promoter's declaration, not a guarantee.
More projects in Yapral