Devi Kalyan Towers Block B

KALYAN CONSTRUCTIONS · Medchal-Malkajgiri · RERA P02200001106

DEVI KALYAN TOWERS BLOCK B is a residential apartment project in Yapral, Alwal Mandal, Medchal-Malkajgiri District. Kalyan Constructions is the registered promoter developing it on a site of 1,866.42 sq. m, with one building comprising a cellar, stilt and 5 upper floors, and 40 apartments in 2BHK and 3BHK configurations. The project is registered under TG-RERA number P02200001106, with a proposed completion date of 10/03/2024.

More from Kalyan Constructions · 3 projects →

01What we found

Period endedTG-RERA registration ran to 10 Mar 2024 - check its extension on TG-RERA
13documents on file - each fact links to its page
1court case on this project's land (survey 193, Yapral)
7items to check - 4 high

Read from TG-RERA filings, approvals, land and registration records and court records. A court case is counted only when the court record states this project's survey number with its village, or names the project.

02Check before you pay

7 items to check before you pay, 4 high - from the title chain, court records and approvals, each with what to ask the builder or your advocate. An item may not be a problem with the project: records can be incomplete.

Sign in to see each item and what to do

Photo from nobroker.in

1. Project at a glance

Project identity

FieldRecord
Registered project nameDEVI KALYAN TOWERS BLOCK B RERA record
Project typeResidential apartment project RERA record RERA filing
Phase / registered portionBlock B is named in the registration. The certificate records plots 67, 68, 69, 70, 71, 77 and 78; no separate phase number is disclosed.
TG-RERA registrationP02200001106 RERA record
Registration validity05/08/2019–10/03/2024; the certificate states four years and no extension is recorded in the supplied certificate. Registration validity is distinct from the project’s completion deadline.
Registered promoterKalyan Constructions (also named in the filing as M/s. KALYAN CONSTRUCTIONS) RERA record RERA filing
RERA statusThe record labels the project “On-Going Project.” The registration certificate’s stated validity ended on 10/03/2024. RERA filing

Land and geographic identity

FieldRecord
Locality / revenue villageYapral; the RERA record and building-permit order identify Yapral. RERA record RERA filing
MandalAlwal RERA record RERA filing
DistrictMedchal-Malkajgiri RERA record RERA filing
PIN500087 RERA record
Project survey number(s)193. No project subdivision is stated in the RERA project identity or building-permit order. RERA filing
Registered plots67, 68, 69, 70, 71, 77 and 78
Registered site extent1,866.42 sq. m; net area is also recorded as 1,866.42 sq. m. RERA filing
Boundaries in RERA filingEast: ROAD; West: ROAD; North: ROAD; South: OTHER PLOTS RERA filing

Development identity

FieldRecord
Sanctioning authorityGreater Hyderabad Municipal Corporation (GHMC) Approvals record
Principal building approval1/C16/04283/2018, approved 10 March 2018 Approvals record
Related file number1/C16/11373/2017 Approvals record
Approved built-up area5,192.62 sq. m is recorded as the residential upper-floor area and as the approved built-up area in the RERA filing. RERA filing
Building countOne approved building; the filing records one building unit. RERA filing
Sanctioned floor configurationCellar + Stilt + 5 upper floors; building height recorded as 14.95 m.
Parking levels / sanctioned parkingCellar and stilt are approved for vehicle parking. No parking-space count is supplied.
Unit count40 units are recorded in the RERA unit data; the approved plan records no increase beyond the number of sanctioned units without prior GHMC approval. RERA unit table

Offering and status

FieldRecord
Unit types2BHK and 3BHK apartments RERA unit table
RERA-filed saleable area2BHK: 107.77 sq. m; 3BHK: 141.21 sq. m RERA unit table
Booked / available2BHK: 0 booked, 10 available; 3BHK: 1 booked, 29 available. These are portal-read counts with no recorded as-of date, so treat them as indicative. RERA unit table
Construction-stage recordThe RERA amenity-progress data reports water supply at 60%, sewerage at 50%, green strip/tot-lot/park at 10%, and rainwater harvesting/water conservation at 80%; many other listed works are recorded at 0%. These are reported percentages, not independent site verification. RERA amenities
Completion deadlineRERA filing and Form B state 10/03/2024. The deadline is separate from registration validity and from occupancy certification. RERA record
Occupancy / completion certificateNo occupancy or completion certificate is recorded in the supplied project documents; the GHMC permit states that an occupancy certificate is compulsory before occupation.

2. The project story

DEVI KALYAN TOWERS BLOCK B is a RERA-registered residential apartment project in Yapral, Alwal Mandal, Medchal-Malkajgiri District, on the project land recorded as Survey No. 193 and plots 67–71, 77 and 78. The sanctioned development is a single residential building with a cellar, stilt and five upper floors, on a site recorded as 1,866.42 sq. m. RERA record RERA filing

The filed offering comprises 40 apartments: 10 two-bedroom and 30 three-bedroom units. The portal-read booking figures show one 3BHK booked and none of the 2BHK units booked, but the filing extract does not provide an as-of date for those figures. RERA unit table

The promoter’s Form B declares a completion period ending 10 March 2024. The supplied record labels the project on-going and does not include an occupancy/completion certificate. Progress percentages supplied for selected site works are reported RERA data, not independent confirmation of construction progress or completion. RERA filing RERA amenities

3. Master plan, architecture & building design

The GHMC building-permit order identifies one proposed residential building, 14.95 m high, with Cellar + Stilt + 5 upper floors. It records a site area of 1,866.42 sq. m, a residential upper-floor area of 5,192.62 sq. m, a cellar area of 1,377.63 sq. m, and a stilt area of 1,374.96 sq. m. The permit also records a 97.64 sq. m tot-lot and 90 trees.

The RERA filing records approved built-up area as 5,192.62 sq. m. The permit’s separate cellar and stilt area figures are not substituted for that approved built-up-area figure. No floor-by-floor apartment distribution, building footprint, lift or stair count, open-space schedule, or internal-circulation plan is supplied in the reviewed extracts. RERA filing

The permit identifies the project as residential and includes a tot-lot, peripheral greenery and parking in the cellar and stilt. It does not establish the completion or delivery of these features.

4. Homes, configurations & floor plans

RERA records 40 apartments in two configurations. The saleable areas below are RERA-filed. Carpet-area figures are software measurements from the approved floor-plan drawing geometry, not RERA disclosures; the measurement record says they need review. Saleable area and measured carpet area are different measures, and the supplied measured carpet figures are smaller. RERA unit table Floor plans

ConfigurationUnitsBookedAvailableRERA saleable areaMeasured carpet areaLoading (if supplied)
2BHK10010107.77 sq. m54.8–58.0 sq. m; median 55.7 sq. m48%
3BHK30129141.21 sq. m70.6–118.8 sq. m; median 74.6 sq. m47%

The measured 2BHK drawing example shows a drawing room, dining area, kitchen, two bedrooms, two toilets, utility and balcony. The measured 3BHK example shows a drawing room, dining area, kitchen, three bedrooms, two toilets, utility and balcony. These are drawing-based measurements and room labels, not a substitute for checking the applicable unit plan.

The portal-read booking counts carry no as-of date and are indicative. RERA unit table

5. Parking & vehicle circulation

The GHMC permit approves the cellar and stilt for vehicle parking and states they are to be used exclusively for parking, without partition walls or rolling shutters. The permit does not provide a parking-space count, visitor or accessible-space allocation, EV provision, or parking allocation by apartment. No parking allotment document is supplied.

6. Amenities, recreation & open spaces

The RERA progress data lists the following works and reported availability/progress. Percentages are portal-recorded progress, not independent verification of completion. RERA amenities

FacilityDescription / sizeEvidence sourceDeclared progress / verified status
Tot-lot / green stripGHMC permit records tot-lot 97.64 sq. m; the RERA progress entry is “Green Strip/TOT LOT/Park.”RERA amenitiesRERA progress: 10%; not independently verified.
Water conservation / rainwater harvestingThe GHMC permit requires a rainwater-harvesting structure (percolation pit).RERA amenitiesRERA progress: 80%; not independently verified.
Community buildingsListed in RERA progress data; no facility or size details supplied.RERA amenitiesRERA progress: 0%.
Aggregate recreational open spaceListed in RERA progress data; no area supplied.RERA amenitiesRERA progress: 0%.

Other facilities mentioned in third-party vendor data—including a swimming pool, gym, clubhouse, indoor games, yoga areas and jogging/cycle track—are not established by the supplied RERA filing or permit extract and are not presented here as approved or delivered project facilities. Promoter website

7. Utilities, building services & safety

The GHMC permit requires a rainwater-harvesting percolation pit, space for a transformer, a garbage house within the premises and an ETP. It also requires the tot-lot to be fenced and maintained as greenery before issue of an occupancy certificate. These are permit requirements; the supplied data does not independently verify installation or operation.

RERA progress data records water supply at 60%, sewerage (chambers, lines, septic tank, STP) at 50%, and water conservation/rainwater harvesting at 80%. Storm-water drains, street lighting, sewage/sullage treatment and disposal, solid-waste management, energy management, fire-protection and fire-safety requirements, and electrical meter room/sub-station/receiving station are each recorded at 0% in that data. These are reported project-progress entries, not a finding of present site condition. RERA amenities

The permit requires the applicant to submit a commencement notice before building work and a completion notice after completion, and states that an occupancy certificate is compulsory before occupation. It also specifies a minimum staircase width of 2.5 m and requires specified clearances from high- and low-tension electrical lines. The supplied extract does not provide evidence of an issued occupancy certificate or independent verification of these requirements on site.

8. Location, access & connectivity

The registered project location is Yapral, Alwal Mandal, Medchal-Malkajgiri District, PIN 500087. RERA record RERA filing

Supplied location data gives the following distances: Location record

Place / referenceDistance
Outer Ring Road (nearest sampled interchange, approximate)4.3 km
Union Bank0.7 km
Jain Multi Speciality Hospital0.9 km
Unnamed park0.4 km
Alwal railway station2.4 km
St. Pauls Model School1.4 km

The evidence does not provide measured distances to bus stops or a verified project approach-road description. The GHMC permit records road widths of 18 mt., 4.5mts. and 5mts. in the approval extract; it does not identify these as a project-specific travel route.

9. Developer & development status

The registered promoter is Kalyan Constructions, identified in the RERA organization record as a partnership. The filing names MURALI KRISHNA VANKAYALAPATI as authorized signatory and RAJA RAJESWARI VANKAYALAPATI and SATYA MANI KALYAN VANKAYALAPATI as partners. RERA record RERA filing Parties record

The RERA-recorded promoter address is GANAPATHI COMPLEX, NAVODAYA COLONY, SRI DEVI KALYAN ESTATE, YAPRAL, Alwal, Medchal-Malkajgiri, 500087. The registration certificate separately prints a promoter-office address in Yellareddyguda, Khairtabad, Hyderabad, PIN 500073; this Overview does not reconcile address records. Parties record

Form B, dated 3 May 2019, is an affidavit-cum-declaration by V.M. Murali Krishna, Managing Partner and authorized signatory for Kalyan Constructions. It names Jagadish G. Patel, Rajesh G. Patel and Mahesh G. Patel as landowners, cites Development Agreement-cum-General Power of Attorney No. 1207/2017 as the development arrangement, and declares a completion period ending 10 March 2024. These are promoter-filed declarations.

The RERA record labels the project on-going, and the supplied certificate records no extension. The supplied project records do not establish an issued occupancy/completion certificate or independently verified current construction status. RERA filing

10. Approvals, official records & documents

RecordDetails
TG-RERA registration certificateForm C; P02200001106; project DEVI KALYAN TOWERS BLOCK B; issued 05/08/2019; validity stated through 10/03/2024.
GHMC building permit orderApproval 1/C16/04283/2018; file 1/C16/11373/2017; approved 10 March 2018; for the proposed building on Survey No. 193 at Yapral.
RERA Form B declarationPromoter affidavit dated 3 May 2019, including the stated development arrangement and completion undertaking.
Occupancy / completion certificateNot present in the supplied document set. The GHMC permit requires an occupancy certificate before occupation.
Other approval recordsThe GHMC permit extract lists Layout / Sub Divn. No. 5137/MP1/H98. The supplied data does not include a separate layout-plan approval document.
HMDA layout lookupPublic approved-layout lookup is recorded as unavailable; this is not evidence of approval or refusal. HMDA

Frequently asked questions

Is DEVI KALYAN TOWERS BLOCK B registered with Telangana RERA?

Yes. DEVI KALYAN TOWERS BLOCK B is registered with the Telangana Real Estate Regulatory Authority as P02200001106; the registration status is On-Going Project.

Who is the developer of DEVI KALYAN TOWERS BLOCK B?

The promoter named in the RERA registration is KALYAN CONSTRUCTIONS.

Where is DEVI KALYAN TOWERS BLOCK B located?

DEVI KALYAN TOWERS BLOCK B is in YAPRAL, Alwal, Medchal-Malkajgiri, Telangana (500087).

When will DEVI KALYAN TOWERS BLOCK B be completed?

The promoter's proposed date of completion filed with RERA is 10/03/2024. This is the promoter's declaration, not a guarantee.

More projects in Yapral