Tejha S Lake View

TEJHA CONSTRUCTIONS · Sangareddy · RERA P01100006768

TEJHA S LAKE VIEW is a residential apartment project in TELLAPUR, RC PURAM mandal, Sangareddy district, developed by the registered promoter TEJHA CONSTRUCTIONS. The site extent is 2,023.17 sq. m.; the RERA land record lists 2 building units, and the supplied approval extract describes a proposed residential building with 1 Stilt + 5 Upper floors. The RERA unit schedule lists 50 apartments: 30 2BHK at 99.77 sq. m. and 20 3BHK at 142.13 sq. m. The project is registered as P01100006768, with proposed completion by 04-07-2028.

More from Tejha Constructions · 2 projects →

01What we found

RegisteredTG-RERA - valid till 4 Jul 2028
12documents on file - each fact links to its page
0court cases on this project's land in the court records searched
9items to check - 3 high

Read from TG-RERA filings, approvals, land and registration records and court records. A court case is counted only when the court record states this project's survey number with its village, or names the project.

02Check before you pay

9 items to check before you pay, 3 high - from the title chain, court records and approvals, each with what to ask the builder or your advocate. An item may not be a problem with the project: records can be incomplete.

Sign in to see each item and what to do

1. Project at a glance

Project identity

ItemTG-RERA / project record
Registered project nameTEJHA S LAKE VIEW RERA record
Project typeResidential apartment project RERA record RERA filing
Phase / registered portionPhase not separately identified in the supplied record; registration is for the project on the listed survey numbers
TG-RERA registrationP01100006768
Registration validity25/08/2023 to 04/07/2028; certificate states 4 years. This is the registration period, not the completion date or an occupancy certificate.
RERA statusRegistration certificate issued; no extension is recorded in the supplied certificate extract.
Registered promoterTEJHA CONSTRUCTIONS, stated to be a partnership Corporate record RERA filing

Land and geographic identity

ItemRERA-filed / supplied record
LocalityTELLAPUR RERA record
Revenue villageTELAPUR; the HMDA technical approval describes the village as Tellapur Village. RERA record
MandalRC PURAM in the project record; the HMDA approval extract says “Tellapur Muncipality Mandal.” RERA record
DistrictSangareddy RERA record
PIN500035 in the project/RERA certificate record RERA record
Project survey numbers102, 102/AA/2, 102/AA/3&4 RERA record
Site extent2,023.17 sq. m.; the RERA land record gives total area and net area as 2023.17 sq. m. Land records
Boundaries recordedEast: ROAD AFTER ALUGU KALUVA; West: LAND OF DAYANAND GOUD; north and south: not stated in the supplied project record. Land records

Development identity

ItemSupplied approval / project record
Sanctioning authorityHyderabad Metropolitan Development Authority (HMDA) technical approval; the approval directs that building plans be sanctioned by the Executive Authority. Approvals record
Principal approval038258/SKP/R1/U6/HMDA/18082020, dated 04/07/2022 Approvals record
Approved built-up area3,278.08 sq. m. total built-up area; the same approval extract separately lists “Built up Area 2640.6” without a fuller area label. These figures are retained as stated, not treated as interchangeable.
Building count2 building units in the RERA land record; the supplied approval extract describes one proposed residential building, “A (PROP).” Land records
Sanctioned configurationApproval extract: 1 Stilt + 5 Upper floors for the proposed residential building. Basement, podium and separate parking-level details are not stated.
Approved vs. RERA-declared homesApproved-plan record: 2 building units (not a flat count). RERA unit schedule: 50 apartments. Land records RERA unit table
Mortgage areaRERA land record: 324.98 sq. m.; the HMDA approval extract records a mortgage in HMDA’s favour and also contains a separate first-floor reference of 267 sq. m. Land records

Offering and status

ItemSupplied record
Configurations and RERA saleable areas2BHK: 99.77 sq. m.; 3BHK: 142.13 sq. m. RERA unit table
Unit counts30 2BHK and 20 3BHK; 50 total in the RERA unit schedule. RERA unit table
Booked / availablePortal-derived schedule reports 0 booked and 30 available 2BHKs, and 0 booked and 20 available 3BHKs. Counts are indicative: the portal record has no as-of date. RERA unit table
Construction stageNo independently verified site-progress percentage or construction-stage record is supplied. The amenities schedule records 0% for listed items; this is not a building-completion percentage. RERA amenities
Completion datePromoter’s Form B undertaking: 04-07-2028.
OC / completion certificateNo occupancy certificate or completion certificate is supplied. The HMDA approval states an OC is compulsory before occupation.

2. The project story

TEJHA S LAKE VIEW is registered with TG-RERA as a residential apartment project at Tellapur, in the project record’s RC PURAM mandal and Sangareddy district. The registered land identity covers survey numbers 102, 102/AA/2 and 102/AA/3&4, with a filed site extent of 2,023.17 sq. m. RERA record Land records

The RERA unit schedule describes a two-building project with 50 apartments: 30 two-bedroom and 20 three-bedroom units. The supplied HMDA technical-approval extract identifies a proposed residential building with 1 stilt and 5 upper floors; it does not provide a complete tower-by-tower drawing description in the extracted material. Land records RERA unit table

The promoter’s Form B declaration undertakes completion by 04-07-2028. No independently verified construction progress, completed phase, or occupancy-certified building is established by the supplied evidence. The amenities schedule’s 0% entries concern listed infrastructure and facilities and do not establish the building’s overall construction progress. RERA amenities

3. Master plan, architecture & building design

The HMDA technical approval extract records a site extent of 2,023.17 sq. m., a total built-up area of 3,278.08 sq. m., and a proposed residential configuration of 1 stilt plus 5 upper floors. It also separately lists “Built up Area 2640.6”; the supplied extract does not further label that figure, so it should not be treated as the total built-up area. The RERA record lists 2 building units, while the extracted approval identifies “A (PROP)” and does not provide enough drawing detail to describe the arrangement of both buildings, floor-by-floor apartment distribution, building footprints, lifts, stairs, entries, internal circulation or open-space layout. The approved layout document is listed in the RERA file but its contents were not extracted. Land records Document index

The approval extract lists an 18 mt. road width and requires a BT road to be formed before release of the occupancy certificate. It also identifies a 324.98 sq. m. mortgage area in favour of HMDA in its approval parameters. Basement, podium, tower-height, landscape-area, and FSI-counted-area details are not established in the supplied material.

4. Homes, configurations & floor plans

RERA-filed unit counts and saleable areas are shown below. The 3BHK carpet figures come from software measurement of the floor-plan drawing, not from the RERA filing; the drawing measurements are flagged for review. RERA unit table Floor plans

ConfigurationUnitsBookedAvailableRERA saleable areaMeasured carpet areaLoading (if supplied)
2BHK3003099.77 sq. m.Not suppliedNot supplied
3BHK20020142.13 sq. m.90.6–114.2 sq. m.; median 98.6 sq. m. (software-measured)31%

The 3BHK drawing measurement covers four flat designs. One typical-floor-plan unit identified as flat 04 shows three bedrooms, a living room, kitchen and toilet in the extracted room schedule; the listed dimensions are bedroom 3.41 × 4.73 m, living 3.41 × 7.03 m, toilet 1.5 × 2.5 m, kitchen 2.99 × 3.5 m, bedroom 3.5 × 4.61 m, and bedroom 2.99 × 3.42 m. These are drawing-based software measurements, not RERA-filed room dimensions. RERA unit details

Carpet area is not the same as saleable area: the supplied drawing-analysis note says saleable area includes the home’s share of common areas and is greater than the measured carpet area. The 3BHK measurement set needs review; verify dimensions and areas against the approved drawing before relying on them. Floor plans RERA unit details

5. Parking & vehicle circulation

The approval extract states that the stilt/cellar area should be used exclusively for vehicle parking, without partition walls or rolling shutters. It does not establish a total number of car or two-wheeler spaces, visitor or accessible parking, a parking allocation for a specific apartment, or a basement/podium arrangement.

The RERA unit schedule marks the 20 3BHK units as mortgaged and the 30 2BHK units as not mortgaged; it does not identify parking allocations. The HMDA approval also directs that flats mortgaged in HMDA’s favour are not to be sold. Confirm any specific unit and associated parking entitlement from the current project and lender/authority records; a parking provision in a plan alone does not establish exclusive ownership. RERA unit table

6. Amenities, recreation & open spaces

The RERA amenities schedule lists the following items. For entries with a reported percentage, the supplied schedule states 0%; no independently verified completion is supplied. RERA amenities

FacilityDescription / sizeEvidence sourceDeclared progress / verified status
Internal Roads & FootpathsSize not statedRERA amenities schedule0%; completion not independently verified
Water SupplySize/capacity not statedRERA amenities scheduleAvailable: YES; 0%; completion not independently verified
Sewerage (Chamber, Lines, Septic Tank, STP)Size/capacity not statedRERA amenities scheduleAvailable: YES; 0%; completion not independently verified
Storm Water DrainsSize/capacity not statedRERA amenities schedule0%; completion not independently verified
Green Strip/TOT LOT/ParkArea not statedRERA amenities schedule0%; completion not independently verified
Street LightingQuantity not statedRERA amenities schedule0%; completion not independently verified
Community BuildingsSize/capacity not statedRERA amenities schedule0%; completion not independently verified
Treatment and Disposal of Sewage and Sullage WaterCapacity not statedRERA amenities schedule0%; completion not independently verified
Solid Waste Management and DisposalCapacity not statedRERA amenities schedule0%; completion not independently verified
Water Conservation, Rain Water HarvestingSize/capacity not statedRERA amenities schedule; HMDA approvalAvailable: YES; schedule records 0%; completion not independently verified
Energy managementDetails not statedRERA amenities scheduleAvailable: YES; 0%; completion not independently verified
Fire Protection and Fire Safety RequirementsSystem details not statedRERA amenities scheduleAvailable: YES; 0%; completion not independently verified
Electrical Meter Room, Sub-Station, Receiving StationCapacity not statedRERA amenities scheduleAvailable: YES; 0%; completion not independently verified
Aggregate area of recreational Open SpaceArea not statedRERA amenities schedule0%; completion not independently verified

The HMDA approval additionally requires a transformer, garbage house, rainwater-harvesting structures and an ETP. These are approval conditions, not evidence that the facilities have been installed or are operational.

7. Utilities, building services & safety

The RERA amenities schedule marks water supply, sewerage/STP, storm-water drains, rainwater harvesting, energy management, fire protection and electrical meter-room/sub-station/receiving-station provision as “YES,” while recording 0% for the listed items. The supplied evidence does not state water sources, storage or treatment capacities, STP/ETP capacity, electrical load, generator capacity, lift count or capacity, or waste-processing arrangements. RERA amenities

The HMDA approval requires rainwater-harvesting structures, a transformer and a garbage house, and refers to an ETP. It also requires structural safety provisions in accordance with the National Building Code of 2005, identifies fire-service requirements by reference to the Fire Service Act 1999, and states that an occupancy certificate is compulsory before occupation. These recorded conditions do not, by themselves, establish installation, testing, clearance or completed compliance.

The supplied material does not establish CCTV coverage, access-control arrangements, emergency-access design, accessible routes or ramps, or the number and capacity of lifts. RERA amenities Promoter website

8. Location, access & connectivity

The registered location is TELAPUR village, RC PURAM mandal, Sangareddy district, PIN 500035; the project boundary record identifies a road after Alugu Kaluva on the east. The supplied location data gives the Outer Ring Road nearest sampled interchange at approximately 7.4 km. RERA record Land records Location record

The HMDA approval extract refers to an 18 mt. road width and requires a BT road to be formed before release of the occupancy certificate. It does not identify the road’s completion status. No measured distances to public transport, schools, hospitals or other landmarks are supplied in the project evidence.

9. Developer & development status

The TG-RERA-registered promoter is TEJHA CONSTRUCTIONS, identified in the project record as a partnership. The supplied project record names N Gopala Krishna Rao as authorised signatory and D Seetha Ram Prasad and N Chiradeep as partners. The RERA certificate states the promoter office as Village: Chanda Nagar, Mandal: Serilingampally, District: Ranga Reddy, PIN: 500050. Corporate record Parties record

The promoter’s Form B declaration undertakes completion by 04-07-2028. No independently verified construction-stage percentage or occupancy/completion certificate is supplied, and the project record does not establish a completed or occupied phase. Document index

10. Approvals, official records & documents

RecordSupplied evidence
TG-RERA registrationForm C registration certificate for TEJHA S LAKE VIEW, P01100006768, issued 25/08/2023; valid through 04/07/2028.
HMDA technical building approval038258/SKP/R1/U6/HMDA/18082020, dated 04/07/2022; extracted as a technical approval for the proposed residential building. The approval says building plans are to be sanctioned by the Executive Authority.
Approved layout / plan documentA layout-plan document is listed in the RERA file, but its contents were not extracted in the supplied evidence. Document index
Promoter declarationForm B affidavit-cum-declaration by N. Gopala Krishna Rao for TEJHA CONSTRUCTIONS, including the promoter’s completion undertaking of 04-07-2028.
Occupancy/completion certificateNot supplied in the evidence reviewed. The HMDA approval states that an occupancy certificate is compulsory before occupation.
Building-drawing measurementsFloor-plan drawing document 344876 is the source for the software-measured 3BHK figures; these are not RERA disclosures and are flagged for review.

The supplied records do not establish an occupancy certificate, nor do they provide the full contents of the listed layout-plan document.

Frequently asked questions

Is TEJHA S LAKE VIEW registered with Telangana RERA?

Yes. TEJHA S LAKE VIEW is registered with the Telangana Real Estate Regulatory Authority as P01100006768; the registration status is New Project.

Who is the developer of TEJHA S LAKE VIEW?

The promoter named in the RERA registration is TEJHA CONSTRUCTIONS.

Where is TEJHA S LAKE VIEW located?

TEJHA S LAKE VIEW is in TELLAPUR, TELAPUR, RC PURAM, Sangareddy, Telangana (500035).

When will TEJHA S LAKE VIEW be completed?

The promoter's proposed date of completion filed with RERA is 04/11/2028. This is the promoter's declaration, not a guarantee.

More projects in Telapur