SUNSHINE HILL COUNTY BLOCK - B is a residential apartment project in Ameenapur, Ameenpur mandal, Sangareddy district, developed by registered promoter SAMALA DEVELOPERS. The project covers 743.1 m² and comprises one building, identified in the permit as Building - A, with 1 Stilt + 5 upper floors. The TG-RERA unit schedule lists 20 apartments, all 2BHK, with a saleable area of 114.73 m². Its TG-RERA registration number is P01100002712, and its proposed completion date is 18 July 2025.

More from Samala Developers · 2 projects →

01What we found

Period endedTG-RERA registration ran to 18 Jul 2025 - check its extension on TG-RERA
9documents on file - each fact links to its page
0court cases on this project's land in the court records searched
9items to check - 5 high

Read from TG-RERA filings, approvals, land and registration records and court records. A court case is counted only when the court record states this project's survey number with its village, or names the project.

02Check before you pay

9 items to check before you pay, 5 high - from the title chain, court records and approvals, each with what to ask the builder or your advocate. An item may not be a problem with the project: records can be incomplete.

Sign in to see each item and what to do

1. Project at a glance

Project identity

FieldRecord
Registered project nameSUNSHINE HILL COUNTY BLOCK - B RERA record
Project typeResidential apartment project RERA record RERA filing
Phase / registered portionBlock - B is the registered project name; the permit identifies one proposed building, “Building - A.” The filing does not further describe a phase-wise scope. RERA record
TG-RERA registrationP01100002712 Approvals record
Registration validityThe certificate states validity from 30/03/2021 to 18/07/2025. This is the registration period, not an occupancy certificate.
RERA status in supplied recordRegistration certificate supplied; no extension is recorded in it. The portal registration data was captured 10 September 2026 and shows the same expiry date. Approvals record
Registered promoterSAMALA DEVELOPERS, identified as a proprietorship in the RERA filing. RERA record RERA filing

Land and geographic identity

FieldRecord
LocalityAmeenpur / Ameenapur; the building permit describes the site as Asian Colony. RERA record
Revenue villageAMEENAPUR RERA record RERA filing
Mandal / district / PINAMEENPUR / Sangareddy / 502032 RERA record
Project survey numbers and subdivisions343/6/I, 343/6/O, 343/6/OO, 343/6/AU, 343/6/AM RERA record
Plot references in RERA record281 WESTERN PART, 282, 283, EASTERN PART RERA filing
Registered site extent743.1 m²
Total / net area; road-affected areaTotal site area 743.1 m²; net area 743.1 m²; road-affected area 0 m², as recorded in the permit.
Boundaries in RERA recordNorth: 40 FEET WIDE ROAD; South: LAND IN SURVEY NO 343-16; East: PLOT NO 281 EASTERN PART; West: WESTERN PART OF PLOT NO 283. RERA filing

Development identity

FieldRecord
Sanctioning authorityAmeenpur Municipality Approvals record
Principal building-permit number / date3121/W1/2019/0158, approved 18 July, 2019 Approvals record
Approved buildingOne proposed residential building, identified in the permit as Building - A (PROPOSED BUILDING)
Sanctioned floor configuration1 Stilt + 5 upper floors in the permit’s building description. The permit’s sanctioned-parameters extract separately records Residential upper floors: 6; the supplied record does not reconcile those labels.
Height14.95 m
Approved built-up area1,896.70 m² residential area; the RERA fields also report approved built-up area as 1896.70 sqmts. RERA filing
Stilt area403.72 m²
Buildings / blocksOne building unit is recorded in the RERA project information; one building is identified in the permit. RERA filing
Approved versus RERA-filed unitsApproved-plan total: 1 building unit. RERA unit schedule: 20 apartments, all identified as 2BHK. RERA filing RERA unit table

Offering and status

FieldRecord
Unit type2BHK RERA unit table
RERA-filed saleable area114.73 m² RERA unit table
Booked / available0 booked / 20 available, as last read from the TG-RERA portal; the record gives no as-of date for these counts, so they are indicative. RERA unit table
Promoter-declared completion date18 July 2025 in Form B.
Original / revised completion datesThe supplied project record gives 18 July 2025 as the proposed completion date. No revised date or registration extension is supplied. RERA record
Construction stageNo project-specific construction-progress percentage or independently verified site status is supplied. Document index RERA amenities
Occupancy / completion certificateNo occupancy or completion certificate is supplied in the reviewed documents; the permit states that an occupancy certificate is required before occupation. This does not establish whether one was later issued.

2. The project story

  • SUNSHINE HILL COUNTY BLOCK - B is a registered residential apartment project in Ameenapur village, Ameenpur mandal, Sangareddy district. Its RERA-identified land comprises subdivisions 343/6/I, 343/6/O, 343/6/OO, 343/6/AU and 343/6/AM. The building permit describes the location as Asian Colony and sanctions one proposed residential building. RERA record
  • The RERA unit schedule lists twenty 2BHK apartments. The recorded booking count is zero and availability is twenty, but no as-of date accompanies those counts. The permit describes a stilt and five upper floors; no construction-progress update, site inspection result, or occupancy/completion certificate is included in the supplied evidence. Accordingly, the record supports describing the building as proposed in the sanction, but does not establish its present physical completion or occupation status. RERA unit table Document index

3. Master plan, architecture & building design

  • The building-permit record describes one proposed residential building on a 743.1 m² site, with 1,896.70 m² of residential area, a 403.72 m² stilt area and a recorded building height of 14.95 m. It specifies 1 Stilt + 5 upper floors; its separate sanctioned-parameters extract says Residential upper floors: 6. The supplied evidence does not include a drawing-based explanation of this floor-label difference.
  • The permit records front, rear, and side setbacks of 3.5 m, 4.5 m, 3 m, and 2.5 m, respectively, and 14% OPEN SPACE CONTRIBUTION CHARGES. It also records road-affected area as 0 m² and net site area as 743.1 m². A building plan or layout drawing was not available for this review, so the building footprint, apartment arrangement by floor, lifts, stairs, entrances, internal circulation, and landscaped/open-space layout cannot be described from drawings.
  • The permit lists a tot-lot area as NA. No separate figures for FSI-counted area, carpet area by sanctioned schedule, or common-area distribution are supplied in the permit extract. The RERA-filed saleable area and software-measured carpet area are presented separately below. RERA unit table Floor plans

4. Homes, configurations & floor plans

  • The TG-RERA unit record lists twenty 2BHK apartments and a filed saleable area of 114.73 m² per unit. The supplied booking figures are indicative because no reading date is provided. RERA unit table
ConfigurationUnitsBookedAvailableRERA saleable areaMeasured carpet areaLoading (if supplied)
2BHK20020114.73 m²Software-measured range: 68.5–83.4 m²; median: 71.8 m²37% RERA unit table Floor plans
  • The carpet-area measurements were produced by software from the approved floor-plan drawing geometry, across 8 measured 2BHK designs; the supplied review note says some measurements need review. They are not TG-RERA-filed carpet-area disclosures. The drawing records also show a utility area in the measured example, which is excluded from the software carpet calculation. Floor plans RERA unit details
  • Carpet area, saleable area, and any common-area component are different measures; the software-measured carpet figures should not be read as a substitute for the RERA-filed saleable area. The supplied evidence does not provide a unit-by-unit allotment schedule or a complete room and dimension schedule for all designs. Floor plans RERA unit table

5. Parking & vehicle circulation

  • The RERA record marks the 2BHK configuration as mortgaged and reports a total mortgage area of 245.30 m²; it does not identify a parking count or establish that any particular bay is allocated to a buyer. RERA unit table RERA filing
  • The building permit describes a stilt level but does not state the number or type of parking spaces, visitor or accessible provision, parking allocation, ramp or driveway arrangement, or EV charging facilities. A parking layout is not supplied. The vendor listing mentions car parking and open parking, but provides no counts or project-plan evidence for those claims. Promoter website

6. Amenities, recreation & open spaces

  • The building-permit extract identifies a rainwater-harvesting percolation pit, space for a transformer, and a garbage house as permit conditions or listed site provisions. The RERA amenity record lists several infrastructure categories with availability marked “YES” but shows 0% against the recorded progress fields; these entries are not evidence of completion. RERA amenities
FacilityDescription / sizeEvidence sourceDeclared progress / verified status
Tot-lotNA in the permit extractNo completion evidence supplied
Green strip / tot lot / parkSize not statedRERA amenities“YES” recorded; progress field 0%; completion not verified
Aggregate recreational open spacePermit records 14% OPEN SPACE CONTRIBUTION CHARGES; no facility area is providedRERA amenitiesNo completion evidence supplied
Community buildingsNo description or size suppliedRERA amenitiesProgress field 0%
Rainwater harvestingPercolation pit required by permitRequired by permit; completion not verified
Landscape garden / tree plantingMentioned in the vendor listing; no area or planting plan suppliedPromoter websiteMarketing/listing claim; not independently verified
  • The vendor listing also names a children’s play area and jogging track, among other features, but the supplied RERA documents do not establish these as sanctioned or delivered facilities. Promoter website Document index

7. Utilities, building services & safety

  • The permit requires a rainwater-harvesting percolation pit, transformer space and a garbage house within the premises. The RERA amenity record marks water supply, sewerage, storm-water drains, rainwater harvesting and an electrical meter room/sub-station/receiving station as “YES”; the progress fields shown for these items are 0%. These are recorded provisions or status fields, not independent evidence of installed or operating services. RERA amenities
  • The permit also requires an occupancy certificate before occupation and states that a completion notice is to be submitted after building completion. It identifies no lift count or capacity, water source or storage capacity, treatment plant capacity, electrical backup, fire-system design, accessible circulation, CCTV or security arrangements. The vendor listing mentions some of these types of features, but does not provide project-specific capacities or verification. Promoter website

8. Location, access & connectivity

  • The registered revenue location is AMEENAPUR village, AMEENPUR mandal, Sangareddy district, PIN 502032. The RERA certificate describes the locality as AMEENAPUR, AMEENPUR, and the building permit names Asian Colony. RERA record
  • The supplied location data gives the nearest sampled Outer Ring Road interchange at approximately 8.4 km. No public-transport stop, school, hospital, or other landmark distance is supplied in the structured location record. The vendor listing refers generally to nearby schools, restaurants, bus stops and railway stations but gives no distances; those claims are not quantified here. Location record Promoter website

9. Developer & development status

  • The registered promoter is SAMALA DEVELOPERS, recorded as a proprietorship. The RERA record names SAMALA NAGAVARDHANA REDDY as proprietor and authorized signatory. The certificate gives the promoter office as Village: Miyapur, Mandal: Serilingampally, District: Ranga Reddy, Pin: 500049. RERA filing Parties record
  • In Form B, S. Nagavardhana Reddy states that the project is to be completed by 18 July 2025 and identifies four project landowners: MADINENI CHANDRA MOHAN; PRATAP REDDY PARAMAYYA; ANIL KUMAR REDDY KANCHANA; and SAMALA DEVELOPERS, represented by its proprietor. The supplied record does not include an updated completion schedule, construction-progress certification, or occupancy certificate. Document index

10. Approvals, official records & documents

RecordDetails
TG-RERA registration certificateForm C records registration P01100002712 for SUNSHINE HILL COUNTY BLOCK - B, granted under section 5; stated validity 30/03/2021–18/07/2025.
Building permit orderAmeenpur Municipality, 3121/W1/2019/0158, dated 18 July, 2019; sanctions one proposed residential building.
Commencement / permit documentThe supplied document is titled “Commencement Certificates for each building in each phase,” and its extract is a building permit order. The order requires a commencement notice before construction; no separate commencement notice is supplied.
Layout planA RERA-filed layout-plan document entry exists, but the supplied record says the document was not extracted.
Form B declarationFebruary 2021 affidavit-cum-declaration by S. Nagavardhana Reddy, authorized by the promoter; includes the completion undertaking and project disclosures.
Title reportAdvocate B. Sairam Krishna’s legal title report dated 30.11.2020 is filed as a project document.
Occupancy / completion certificateNone supplied in the reviewed project documents; the building permit requires an occupancy certificate before occupation.
HMDA layout lookupThe public HMDA DPMS lookup was unavailable in the supplied record; no approved-layout result is established here. HMDA
  • The permit also requires surrender of any road-affected portion at no cost under the stated undertaking or registered gift deed and requires an occupancy certificate before occupation. The permit lists a construction-permission duration of SIX YEARS from date of this order and says construction should commence before 18 January, 2021.

Other registrations of Sunshine Hill County

Frequently asked questions

Is SUNSHINE HILL COUNTY BLOCK - B registered with Telangana RERA?

Yes. SUNSHINE HILL COUNTY BLOCK - B is registered with the Telangana Real Estate Regulatory Authority as P01100002712; the registration status is New Project.

Who is the developer of SUNSHINE HILL COUNTY BLOCK - B?

The promoter named in the RERA registration is SAMALA DEVELOPERS.

Where is SUNSHINE HILL COUNTY BLOCK - B located?

SUNSHINE HILL COUNTY BLOCK - B is in AMEENPUR, AMEENAPUR, Sangareddy, Telangana (502032).

When will SUNSHINE HILL COUNTY BLOCK - B be completed?

The promoter's proposed date of completion filed with RERA is 18/07/2025. This is the promoter's declaration, not a guarantee.

More projects in Ameenapur