Shabari Nilayam
GK Constructions · Medchal-Malkajgiri · RERA P02200006893
SHABARI NILAYAM is a residential apartment project in Mallapur, Uppal Mandal, Medchal-Malkajgiri District, developed by registered promoter GK Constructions. The project covers 449.6 sq. m and comprises one residential building with 1 Stilt + 5 upper floors and 10 3BHK homes, each with a saleable area of 128.95 sq. m. Its TG-RERA registration number is P02200006893, issued 06/09/2023, and the promoter-declared completion date is 09th May, 2026.
More from GK Constructions · 5 projects →
01What we found
Read from TG-RERA filings, approvals, land and registration records and court records. A court case is counted only when the court record states this project's survey number with its village, or names the project.
02Check before you pay
8 items to check before you pay, 3 high - from the title chain, court records and approvals, each with what to ask the builder or your advocate. An item may not be a problem with the project: records can be incomplete.
1. Project at a glance
Project identity
| Item | Record |
|---|---|
| Registered project name | SHABARI NILAYAM RERA record |
| Project type | Residential apartment project RERA record |
| Phase / registered portion | Phase is not separately identified in the supplied record; registration covers the project recorded under P02200006893. RERA record |
| TG-RERA registration number | P02200006893; certificate issued 06/09/2023. RERA record |
| Registration validity | 06/09/2023–09/05/2026; the certificate says two years and provides for extension in accordance with the Act and Rules. This is the registration validity period, not an OC statement. RERA record |
| Registered promoter | GK Constructions, identified as a proprietorship in the project record. RERA record Corporate record |
| RERA status in supplied record | “New Project”; the supplied certificate records registration. No later extension or revised registration date is supplied. RERA record |
Land and geographic identity
| Item | Record |
|---|---|
| Locality | Mallapur; the GHMC building permit identifies Mallapur Village. RERA record |
| Revenue village | Mallapur RERA record |
| Mandal | Uppal RERA record |
| District | Medchal-Malkajgiri in the project identity; the building-permit extraction says Medchal. RERA record |
| PIN | 500079 RERA record |
| Project survey numbers | 111 and 116; no project subdivision is disclosed in the supplied project filing. RERA record Land records |
| Plots | 89 and 90 |
| Registered site extent | The building-permit extraction records Plot Area 459.73 sq. m, Net Plot Area 449.6 sq. m and Road affected area 0.0 sq. m. The RERA land record gives total and net area as 449.6 sq. m. Land records |
| Boundaries in the RERA land record | East: 40-0 WIDE ROAD; North: 40-0 WIDE ROAD; West: Plot No 73 74; South: Plot No 88. Land records |
Development identity
| Item | Record |
|---|---|
| Sanctioning authority | Greater Hyderabad Municipal Corporation (GHMC). The RERA record names HMDA as “Authority Name”; the cited building permit is a GHMC permit. RERA record Approvals record |
| Principal building permit | 1253/GHMC/LBN/2023-BP, dated 09 May, 2023. Approvals record |
| Approved building | One residential building, BLDG (KONDAL RAO). |
| Sanctioned floor configuration | 1 Stilt + 5 upper floors; sanctioned height 15 m. |
| Approved area | Residential upper floors area 1,289.50 sq. m; Stilt area 245.02 sq. m. The occupancy-certificate record separately lists sanctioned floor area as 1289.5 m². |
| Parking provision shown in approval | Total Parking Area 257.85 m²; the permit requires the approved cellar/stilt parking areas to be used exclusively for vehicle parking. A parking-space count is not supplied. |
| Unit count | The RERA filing lists 10 3BHK units. The GHMC permit is for one building; an approved unit count is not stated in the supplied permit extraction. RERA unit table |
Offering and status
| Item | Record |
|---|---|
| RERA-filed configuration | 3BHK; 10 units, each recorded with saleable area 128.95 sq. m. RERA unit table RERA unit details |
| Booked / available | 0 booked / 10 available, as last read from the TG-RERA portal; the filing extract has no as-of date, so counts are indicative. RERA unit table |
| Construction stage | The GHMC occupancy-certificate document states the building was inspected and declared fit for occupation; the completion notice is dated 16 May, 2024. This is documentary certification, not an independent current-site inspection. |
| Promoter-declared completion date | 09th May, 2026 in the Form B declaration. |
| Occupancy-certificate status and scope | An OC, 1438/GHMC/LBN/2024-OC, is recorded for the residential building at Plot Nos. 89 and 90, Survey Nos. 111 and 116, Mallapur. The supplied document identifies one building, BLDG (KONDAL RAO). Approvals record |
| Registration deadline vs. OC | The RERA certificate’s validity ends 09/05/2026; the GHMC OC document records completion notice dated 16 May, 2024 and is dated 01 June, 2024. These are separate registration and building-certification records. |
2. The project story
SHABARI NILAYAM is recorded with TG-RERA as a residential apartment project in Mallapur, Uppal Mandal, Medchal-Malkajgiri District. Its registered land identification is Survey Nos. 111 and 116, Plot Nos. 89 and 90. The project filing records a single building and 10 three-bedroom apartments. RERA record Land records RERA unit table
The GHMC building permit authorizes 1 Stilt + 5 upper floors for the residential building named BLDG (KONDAL RAO). A GHMC occupancy-certificate document for this building states that it was inspected and declared fit for occupation, with a completion notice dated 16 May, 2024. The RERA-filed Form B declaration separately states a project completion undertaking of 09th May, 2026; that declaration and the building’s OC are different records and should not be read as the same status measure.
The portal-derived RERA inventory shows all 10 units available and none booked, but carries no as-of date. The submitted floor-plan drawings are scans pending measurement in the supplied data, so room layouts and drawing-based carpet measurements cannot be described from this record. RERA unit table Floor plans
3. Master plan, architecture & building design
The approved building permit identifies one residential building and a 1 Stilt + 5 upper floors configuration, with a sanctioned height of 15 m. It records a net plot area of 449.6 sq. m, residential upper-floor area of 1,289.50 sq. m, and stilt area of 245.02 sq. m. These are approval-record figures; no FSI-counted area is supplied.
The occupancy-certificate document lists the sanctioned floor area as 1289.5 m² and the site-building-plan floor area as 1306.33 m², and records an extent of deviation of 4.00. It also describes the building as Stilt 5 Upper Floor in both the sanctioned-plan and site-building-plan fields.
The approved plan and permit extraction do not provide a reliable description of flat arrangement per floor, lift or stair numbers, entries, internal circulation, landscaping, or common-area distribution. The supplied floor-plan set contains two drawings, with both scans pending measurement and no flats yet measured. Floor plans
4. Homes, configurations & floor plans
| Configuration | Units | Booked | Available | RERA saleable area | Measured carpet area | Loading (if supplied) |
|---|---|---|---|---|---|---|
| 3BHK | 10 | 0 | 10 | 128.95 sq. m each | Not available: drawing scans pending measurement | Not supplied |
- The RERA filing identifies the 10 units as TRIPLE BEDROOM 101, 102, 201, 202, 301, 302, 401, 402, 501 and 502. Booked and available counts are portal-derived and have no stated as-of date. RERA unit table RERA unit details
- Saleable area is the area reported in the RERA filing; it is not a carpet-area measurement. Carpet area and room dimensions cannot be reported because the two submitted drawings are scans pending software measurement. No balcony, utility, or common-area loading figures are supplied. RERA unit details Floor plans
5. Parking & vehicle circulation
- The GHMC building permit records Total Parking Area 257.85 and requires cellar and stilt areas approved for parking to be used exclusively for vehicle parking, without partition walls or rolling shutters. The occupancy-certificate record also lists Parking Area (m²): 257.85 for both the sanctioned plan and site building plan.
- The supplied extracts do not establish the number of car or two-wheeler spaces, visitor or accessible parking, a parking allocation for any particular apartment, or the detailed vehicle circulation arrangement. The vendor’s amenity list mentions car parking and closed car parking, but supplies no counts or allocation details. Promoter website
6. Amenities, recreation & open spaces
| Description / size | Permit specifies 3 rainwater-harvesting pits; the OC record also lists rainwater harvesting. |
|---|---|
| Evidence source | GHMC building permit and OC |
| Declared progress / verified status | Required in the permit; completion of the pits is not independently verified in the supplied record. |
| Description / size | OC extraction records Tot -lot area 0. |
|---|---|
| Evidence source | GHMC OC |
| Declared progress / verified status | Recorded area is zero. |
| Description / size | Listed in the vendor amenity data; no count or capacity supplied. |
|---|---|
| Evidence source | Vendor-supplied listing Promoter website |
| Declared progress / verified status | Marketing/vendor claim; no completion evidence supplied. |
| Description / size | Listed in the vendor amenity data; capacity and coverage not supplied. |
|---|---|
| Evidence source | Vendor-supplied listing Promoter website |
| Declared progress / verified status | Marketing/vendor claim; no completion evidence supplied. |
| Description / size | Listed in the vendor amenity data; the permit requires an Occupancy Fire NOC before issue of the OC. |
|---|---|
| Evidence source | Vendor listing; GHMC permit Promoter website |
| Declared progress / verified status | The listing does not establish installed systems or a specific fire-safety facility. |
| Description / size | Listed in the vendor amenity data; the RERA amenities record marks sewerage and treatment/disposal categories “YES” without progress figures. |
|---|---|
| Evidence source | Vendor listing; RERA amenities Promoter website RERA amenities |
| Declared progress / verified status | Filing/listing evidence only; no completion status or plant capacity supplied. |
| Description / size | Listed in the vendor amenity data; no camera count or system details supplied. |
|---|---|
| Evidence source | Vendor-supplied listing Promoter website |
| Declared progress / verified status | Marketing/vendor claim; no completion evidence supplied. |
| Description / size | Listed in the vendor amenity data and in the RERA amenities categories. |
|---|---|
| Evidence source | Vendor listing; RERA amenities Promoter website RERA amenities |
| Declared progress / verified status | No specific facility, capacity, or completion evidence supplied. |
The RERA amenities extract lists internal roads and footpaths, water supply, sewerage, storm-water drains, green strip/tot-lot/park, street lighting, community buildings, solid-waste management, energy management, fire safety, electrical meter room/substation/receiving station, and recreational open space. Most entries have progress recorded as 0; the extract does not provide sizes or completion evidence for these items. RERA amenities
7. Utilities, building services & safety
- The RERA amenities extract marks Water Supply, Sewerage (Chamber, Lines, Septic Tank, STP), and Electrical Meter Room, Sub-Station, Receiving Station as “YES”; the extract records 0 progress for these categories and gives no capacities or operating details. RERA amenities
- The permit requires space for a transformer, a garbage house within the premises, and use of the approved cellar/stilt parking areas exclusively for vehicle parking. It also states that an Occupancy Fire NOC is to be obtained from the Director (EV&DM) before issue of the Occupancy Certificate. These are permit conditions; the supplied material does not provide fire-system specifications, lift capacities, backup capacity, accessible circulation, CCTV coverage, waste-segregation arrangements, or utility plant capacities.
- The vendor amenity list includes lift, power backup, fire safety, sewage treatment plant and CCTV camera security, but does not establish their specifications or completed status. Promoter website
8. Location, access & connectivity
- The registered project location is Mallapur Village, Uppal Mandal, Medchal-Malkajgiri District, PIN 500079, at Plot Nos. 89 and 90, Survey Nos. 111 and 116. RERA record Land records
- The RERA-record land boundaries identify 40-0 WIDE ROAD on the east and north sides. The GHMC permit extraction separately records a 30 FT WIDE ROAD. Land records
- The supplied location data gives the nearest sampled Outer Ring Road interchange at 11.2 km (approx.) from the cadastral parcel centroid. No public-transport routes, travel times, or additional independently measured landmark distances are supplied. Location record
9. Developer & development status
- The registered promoter is GK Constructions, identified in the project record as a proprietorship. Kondal Rao Gulla is listed as authorized signatory; the Form B declaration names KONDALRAO GULLA as the person authorized by the promoter. Corporate record Parties record
- The RERA registration certificate gives the promoter office as Village: Boduppal, Mandal: Medipally, District: Medchal-Malkajgiri, Pin: 500039. The project record lists a different address for the promoter; no official website or contact details are supplied here. Parties record
- The Form B affidavit declares that the project will be completed by 09th May, 2026 and includes declarations concerning project funds, audits, pending approvals, and allottee treatment. The GHMC OC document records an inspected building declared fit for occupation; no independent current construction-progress inspection is supplied.
10. Approvals, official records & documents
| Identifier / date | P02200006893, issued 06/09/2023 |
|---|---|
| Scope and record | FORM ‘C’ records registration of SHABARI NILAYAM and validity through 09/05/2026. |
| Identifier / date | 1253/GHMC/LBN/2023-BP, 09 May, 2023 |
|---|---|
| Scope and record | Residential building at Mallapur, Survey Nos. 111 and 116; authorizes 1 Stilt + 5 upper floors. |
| Identifier / date | 004031/GHMC/1999/LBN2/2023-BP, shown with the building-permit record |
|---|---|
| Scope and record | Permit-related file identifier. |
| Identifier / date | 1438/GHMC/LBN/2024-OC, dated 01 June, 2024 |
|---|---|
| Scope and record | OC document for the residential building at Plot Nos. 89 and 90, Survey Nos. 111 and 116, Mallapur; completion notice dated 16 May, 2024. |
| Identifier / date | 005102/GHMC/2475/LBN2/2024-OC |
|---|---|
| Scope and record | Application identifier shown in the OC document. |
| Identifier / date | 4528/MP2/HUDA/95 |
|---|---|
| Scope and record | Reference shown in the permit and OC document; the supplied evidence does not include a separate layout approval document. |
| Identifier / date | Dated 20/05 / 2023 |
|---|---|
| Scope and record | Promoter declaration by KONDALRAO GULLA, including completion undertaking of 09th May, 2026. |
The permit states, among its conditions, that construction must follow the sanctioned plan; a commencement notice is required before construction; an occupancy certificate is compulsory before occupation; rainwater harvesting and transformer space are required; and the mortgaged built-up area may be registered only after an OC is produced. This overview does not reproduce the full permit conditions.
1. Project at a glance
Project identity
Registered project name: SHABARI NILAYAM
Project type: Residential apartment project
Phase / registered portion: Phase is not separately identified in the supplied record; registration covers the project recorded under P02200006893.
TG-RERA registration number: P02200006893; certificate issued 06/09/2023.
Registration validity: 06/09/2023–09/05/2026; the certificate says two years and provides for extension in accordance with the Act and Rules. This is the registration validity period, not an OC statement.
Registered promoter: GK Constructions, identified as a proprietorship in the project record.
RERA status in supplied record: “New Project”; the supplied certificate records registration. No later extension or revised registration date is supplied.
Land and geographic identity
Locality: Mallapur; the GHMC building permit identifies Mallapur Village.
Revenue village: Mallapur
Mandal: Uppal
District: Medchal-Malkajgiri in the project identity; the building-permit extraction says Medchal.
PIN: 500079
Project survey numbers: 111 and 116; no project subdivision is disclosed in the supplied project filing.
Plots: 89 and 90
Registered site extent: The building-permit extraction records Plot Area 459.73 sq. m, Net Plot Area 449.6 sq. m and Road affected area 0.0 sq. m. The RERA land record gives total and net area as 449.6 sq. m.
Boundaries in the RERA land record: East: 40-0 WIDE ROAD; North: 40-0 WIDE ROAD; West: Plot No 73 74; South: Plot No 88.
Development identity
Sanctioning authority: Greater Hyderabad Municipal Corporation (GHMC). The RERA record names HMDA as “Authority Name”; the cited building permit is a GHMC permit.
Principal building permit: 1253/GHMC/LBN/2023-BP, dated 09 May, 2023.
Approved building: One residential building, BLDG (KONDAL RAO).
Sanctioned floor configuration: 1 Stilt + 5 upper floors; sanctioned height 15 m.
Approved area: Residential upper floors area 1,289.50 sq. m; Stilt area 245.02 sq. m. The occupancy-certificate record separately lists sanctioned floor area as 1289.5 m².
Parking provision shown in approval: Total Parking Area 257.85 m²; the permit requires the approved cellar/stilt parking areas to be used exclusively for vehicle parking. A parking-space count is not supplied.
Unit count: The RERA filing lists 10 3BHK units. The GHMC permit is for one building; an approved unit count is not stated in the supplied permit extraction.
Offering and status
RERA-filed configuration: 3BHK; 10 units, each recorded with saleable area 128.95 sq. m.
Booked / available: 0 booked / 10 available, as last read from the TG-RERA portal; the filing extract has no as-of date, so counts are indicative.
Construction stage: The GHMC occupancy-certificate document states the building was inspected and declared fit for occupation; the completion notice is dated 16 May, 2024. This is documentary certification, not an independent current-site inspection.
Promoter-declared completion date: 09th May, 2026 in the Form B declaration.
Occupancy-certificate status and scope: An OC, 1438/GHMC/LBN/2024-OC, is recorded for the residential building at Plot Nos. 89 and 90, Survey Nos. 111 and 116, Mallapur. The supplied document identifies one building, BLDG (KONDAL RAO).
Registration deadline vs. OC: The RERA certificate’s validity ends 09/05/2026; the GHMC OC document records completion notice dated 16 May, 2024 and is dated 01 June, 2024. These are separate registration and building-certification records.
2. The project story
SHABARI NILAYAM is recorded with TG-RERA as a residential apartment project in Mallapur, Uppal Mandal, Medchal-Malkajgiri District. Its registered land identification is Survey Nos. 111 and 116, Plot Nos. 89 and 90. The project filing records a single building and 10 three-bedroom apartments.
The GHMC building permit authorizes 1 Stilt + 5 upper floors for the residential building named BLDG (KONDAL RAO). A GHMC occupancy-certificate document for this building states that it was inspected and declared fit for occupation, with a completion notice dated 16 May, 2024. The RERA-filed Form B declaration separately states a project completion undertaking of 09th May, 2026; that declaration and the building’s OC are different records and should not be read as the same status measure.
The portal-derived RERA inventory shows all 10 units available and none booked, but carries no as-of date. The submitted floor-plan drawings are scans pending measurement in the supplied data, so room layouts and drawing-based carpet measurements cannot be described from this record.
3. Master plan, architecture & building design
The approved building permit identifies one residential building and a 1 Stilt + 5 upper floors configuration, with a sanctioned height of 15 m. It records a net plot area of 449.6 sq. m, residential upper-floor area of 1,289.50 sq. m, and stilt area of 245.02 sq. m. These are approval-record figures; no FSI-counted area is supplied.
The occupancy-certificate document lists the sanctioned floor area as 1289.5 m² and the site-building-plan floor area as 1306.33 m², and records an extent of deviation of 4.00. It also describes the building as Stilt 5 Upper Floor in both the sanctioned-plan and site-building-plan fields.
The approved plan and permit extraction do not provide a reliable description of flat arrangement per floor, lift or stair numbers, entries, internal circulation, landscaping, or common-area distribution. The supplied floor-plan set contains two drawings, with both scans pending measurement and no flats yet measured.
4. Homes, configurations & floor plans
| Configuration | Units | Booked | Available | RERA saleable area | Measured carpet area | Loading (if supplied) |
|---|---|---|---|---|---|---|
| 3BHK | 10 | 0 | 10 | 128.95 sq. m each | Not available: drawing scans pending measurement | Not supplied |
- The RERA filing identifies the 10 units as TRIPLE BEDROOM 101, 102, 201, 202, 301, 302, 401, 402, 501 and 502. Booked and available counts are portal-derived and have no stated as-of date.
- Saleable area is the area reported in the RERA filing; it is not a carpet-area measurement. Carpet area and room dimensions cannot be reported because the two submitted drawings are scans pending software measurement. No balcony, utility, or common-area loading figures are supplied.
5. Parking & vehicle circulation
- The GHMC building permit records Total Parking Area 257.85 and requires cellar and stilt areas approved for parking to be used exclusively for vehicle parking, without partition walls or rolling shutters. The occupancy-certificate record also lists Parking Area (m²): 257.85 for both the sanctioned plan and site building plan.
- The supplied extracts do not establish the number of car or two-wheeler spaces, visitor or accessible parking, a parking allocation for any particular apartment, or the detailed vehicle circulation arrangement. The vendor’s amenity list mentions car parking and closed car parking, but supplies no counts or allocation details.
6. Amenities, recreation & open spaces
| Description / size | Permit specifies 3 rainwater-harvesting pits; the OC record also lists rainwater harvesting. |
|---|---|
| Evidence source | GHMC building permit and OC |
| Declared progress / verified status | Required in the permit; completion of the pits is not independently verified in the supplied record. |
| Description / size | OC extraction records Tot -lot area 0. |
|---|---|
| Evidence source | GHMC OC |
| Declared progress / verified status | Recorded area is zero. |
| Description / size | Listed in the vendor amenity data; no count or capacity supplied. |
|---|---|
| Evidence source | Vendor-supplied listing |
| Declared progress / verified status | Marketing/vendor claim; no completion evidence supplied. |
| Description / size | Listed in the vendor amenity data; capacity and coverage not supplied. |
|---|---|
| Evidence source | Vendor-supplied listing |
| Declared progress / verified status | Marketing/vendor claim; no completion evidence supplied. |
| Description / size | Listed in the vendor amenity data; the permit requires an Occupancy Fire NOC before issue of the OC. |
|---|---|
| Evidence source | Vendor listing; GHMC permit |
| Declared progress / verified status | The listing does not establish installed systems or a specific fire-safety facility. |
| Description / size | Listed in the vendor amenity data; the RERA amenities record marks sewerage and treatment/disposal categories “YES” without progress figures. |
|---|---|
| Evidence source | Vendor listing; RERA amenities |
| Declared progress / verified status | Filing/listing evidence only; no completion status or plant capacity supplied. |
| Description / size | Listed in the vendor amenity data; no camera count or system details supplied. |
|---|---|
| Evidence source | Vendor-supplied listing |
| Declared progress / verified status | Marketing/vendor claim; no completion evidence supplied. |
| Description / size | Listed in the vendor amenity data and in the RERA amenities categories. |
|---|---|
| Evidence source | Vendor listing; RERA amenities |
| Declared progress / verified status | No specific facility, capacity, or completion evidence supplied. |
The RERA amenities extract lists internal roads and footpaths, water supply, sewerage, storm-water drains, green strip/tot-lot/park, street lighting, community buildings, solid-waste management, energy management, fire safety, electrical meter room/substation/receiving station, and recreational open space. Most entries have progress recorded as 0; the extract does not provide sizes or completion evidence for these items.
7. Utilities, building services & safety
- The RERA amenities extract marks Water Supply, Sewerage (Chamber, Lines, Septic Tank, STP), and Electrical Meter Room, Sub-Station, Receiving Station as “YES”; the extract records 0 progress for these categories and gives no capacities or operating details.
- The permit requires space for a transformer, a garbage house within the premises, and use of the approved cellar/stilt parking areas exclusively for vehicle parking. It also states that an Occupancy Fire NOC is to be obtained from the Director (EV&DM) before issue of the Occupancy Certificate. These are permit conditions; the supplied material does not provide fire-system specifications, lift capacities, backup capacity, accessible circulation, CCTV coverage, waste-segregation arrangements, or utility plant capacities.
- The vendor amenity list includes lift, power backup, fire safety, sewage treatment plant and CCTV camera security, but does not establish their specifications or completed status.
8. Location, access & connectivity
- The registered project location is Mallapur Village, Uppal Mandal, Medchal-Malkajgiri District, PIN 500079, at Plot Nos. 89 and 90, Survey Nos. 111 and 116.
- The RERA-record land boundaries identify 40-0 WIDE ROAD on the east and north sides. The GHMC permit extraction separately records a 30 FT WIDE ROAD.
- The supplied location data gives the nearest sampled Outer Ring Road interchange at 11.2 km (approx.) from the cadastral parcel centroid. No public-transport routes, travel times, or additional independently measured landmark distances are supplied.
9. Developer & development status
- The registered promoter is GK Constructions, identified in the project record as a proprietorship. Kondal Rao Gulla is listed as authorized signatory; the Form B declaration names KONDALRAO GULLA as the person authorized by the promoter.
- The RERA registration certificate gives the promoter office as Village: Boduppal, Mandal: Medipally, District: Medchal-Malkajgiri, Pin: 500039. The project record lists a different address for the promoter; no official website or contact details are supplied here.
- The Form B affidavit declares that the project will be completed by 09th May, 2026 and includes declarations concerning project funds, audits, pending approvals, and allottee treatment. The GHMC OC document records an inspected building declared fit for occupation; no independent current construction-progress inspection is supplied.
10. Approvals, official records & documents
| Identifier / date | P02200006893, issued 06/09/2023 |
|---|---|
| Scope and record | FORM ‘C’ records registration of SHABARI NILAYAM and validity through 09/05/2026. |
| Identifier / date | 1253/GHMC/LBN/2023-BP, 09 May, 2023 |
|---|---|
| Scope and record | Residential building at Mallapur, Survey Nos. 111 and 116; authorizes 1 Stilt + 5 upper floors. |
| Identifier / date | 004031/GHMC/1999/LBN2/2023-BP, shown with the building-permit record |
|---|---|
| Scope and record | Permit-related file identifier. |
| Identifier / date | 1438/GHMC/LBN/2024-OC, dated 01 June, 2024 |
|---|---|
| Scope and record | OC document for the residential building at Plot Nos. 89 and 90, Survey Nos. 111 and 116, Mallapur; completion notice dated 16 May, 2024. |
| Identifier / date | 005102/GHMC/2475/LBN2/2024-OC |
|---|---|
| Scope and record | Application identifier shown in the OC document. |
| Identifier / date | 4528/MP2/HUDA/95 |
|---|---|
| Scope and record | Reference shown in the permit and OC document; the supplied evidence does not include a separate layout approval document. |
| Identifier / date | Dated 20/05 / 2023 |
|---|---|
| Scope and record | Promoter declaration by KONDALRAO GULLA, including completion undertaking of 09th May, 2026. |
The permit states, among its conditions, that construction must follow the sanctioned plan; a commencement notice is required before construction; an occupancy certificate is compulsory before occupation; rainwater harvesting and transformer space are required; and the mortgaged built-up area may be registered only after an OC is produced. This overview does not reproduce the full permit conditions.
Frequently asked questions
Is SHABARI NILAYAM registered with Telangana RERA?
Yes. SHABARI NILAYAM is registered with the Telangana Real Estate Regulatory Authority as P02200006893; the registration status is New Project.
Who is the developer of SHABARI NILAYAM?
The promoter named in the RERA registration is GK Constructions.
Where is SHABARI NILAYAM located?
SHABARI NILAYAM is in Mallapur, Uppal, Medchal-Malkajgiri, Telangana (500079).
When will SHABARI NILAYAM be completed?
The promoter's proposed date of completion filed with RERA is 09/05/2026. This is the promoter's declaration, not a guarantee.
More projects in Mallapur