Sgb Srr Nilayam

SREE GANGA BHAVANI INFRASTRUCTURE PRIVATE LIMITED · Medchal-Malkajgiri · RERA P02200008046

SGB SRR NILAYAM is a residential apartment project in Padma Nagar, Qutballapur, Medchal-Malkajgiri. It is being developed by SREE GANGA BHAVANI INFRASTRUCTURE PRIVATE LIMITED on a site of 417.94 sq. m, with one building comprising 1 Stilt + 5 upper floors and 10 apartments: five 2BHK and five 3BHK. The project is registered with TG-RERA as P02200008046, with proposed completion recorded as 20/12/2026.

More from Sree Ganga Bhavani Infrastructure Pvt Ltd · 2 projects →

01What we found

Period endedTG-RERA registration ran to 20 Aug 2026 - check its extension on TG-RERA
15documents on file - each fact links to its page
3court cases on this project's land (survey 101, 105, Padma Nagar)
12items to check - 4 high

Read from TG-RERA filings, approvals, land and registration records and court records. A court case is counted only when the court record states this project's survey number with its village, or names the project.

02Check before you pay

12 items to check before you pay, 4 high - from the title chain, court records and approvals, each with what to ask the builder or your advocate. An item may not be a problem with the project: records can be incomplete.

Sign in to see each item and what to do

1. Project at a glance

Project identity

ItemRecord
Registered project nameSGB SRR NILAYAM RERA record
Project typeResidential apartment project RERA record RERA filing
Phase / registered portionPhase not separately identified in the supplied record; registration is for project P02200008046 RERA record
TG-RERA registrationP02200008046; valid from 8 April 2024 to 20 August 2026, unless extended by the Authority RERA record
Registered promoterSREE GANGA BHAVANI INFRASTRUCTURE PRIVATE LIMITED RERA record Corporate record
RERA statusListed as New Project. The registration certificate records the registration validity dates above; it does not establish an occupancy certificate or completion RERA record

Land and geographic identity

ItemRecord
Locality / site descriptionPadma Nagar; the filed building-permit material also identifies Padma Nagar-2 / Padmanagar Colony-II and Plot No. 24, H No. 49-403/5/1 RERA filing
Revenue villageProject record: Padma Nagar. Title and approval documents identify QUTHBULLAPUR VILLAGE / QUTHBULLAPUR (V); these are retained as stated in the respective records RERA filing
Mandal / district / PINQutballapur / Medchal-Malkajgiri / 500054 RERA record RERA filing
Project survey numbers101 and 105; no subdivision numbers are stated in the supplied project identity or registration certificate RERA filing Land records
Registered site extent417.94 sq. m in the RERA land record and building-permit extraction RERA filing
Total / net areaRERA land record: total 417.94 sq. m, affected area 0, net 417.94 sq. m. The GHMC permit extraction also records 417.94 sq. m net plot area RERA filing
Boundaries (RERA record)East: ROAD WIDTH - 30; West: PLOT NO 712 OF PADMANAGAR COLONY II; North: PLOT NO 23; South: PLOT NO 25 RERA filing

Development identity

ItemRecord
Sanctioning authorityGreater Hyderabad Municipal Corporation (GHMC) Approvals record
Principal building-permit number / date3031/GHMC/KPL/2023-BP, dated 21 August, 2023 Approvals record
Other permit referenceTS/038100/2023 appears as a GHMC / TS-bPASS reference in the filed approval records Approvals record
Approved built-up areaGHMC plan extraction records 1,122.50 sq. m residential built-up area and 1,347.00 sq. m proposed built-up area including parking
Buildings / floorsOne residential building, described as 1 Stilt + 5 upper floors
HeightPermit extraction records 14.75 for “Height of the Building”; the same extracted plan also contains a separate “Total Ht. 19.71mt.” entry. This table does not resolve those plan entries
ParkingGHMC plan extraction records 6 proposed parkings and 224.50 parking area; another permit parameter records “Total Parking Area 224.55”
Unit count10 units in the RERA record: one building, with 5 2BHK and 5 3BHK units. GHMC’s extracted conditions state that sanctioned unit numbers must not be increased without prior approval RERA unit table

Offering and status

ItemRecord
RERA-filed configurations2BHK: 5 units; 3BHK: 5 units RERA unit table RERA unit details
RERA-filed saleable area2BHK: 116.12 sq. m; 3BHK: 146.32 sq. m RERA unit table RERA unit details
Booked / availablePortal snapshot: 0 booked and 5 available in each configuration (10 available total). No as-of date is supplied, so counts are indicative RERA unit table RERA unit details
Construction stageThe supplied amenity record includes reported percentages for some infrastructure items, but no independent site inspection or overall construction-progress certification is supplied. See sections 2 and 6 RERA amenities
Completion datesGHMC permit: construction to be completed before 21 August, 2026. RERA Form B undertaking: 20/08/2026. The project header also records proposed completion as 20/12/2026 RERA record
Registration validity20 August 2026; this is the RERA registration end date, not an occupancy certificate
Occupancy / completion certificateNo occupancy or completion certificate is included in the supplied evidence; status is not established Document index Approvals record

2. The project story

SGB SRR NILAYAM is registered with TG-RERA as a residential apartment project on a 417.94 sq. m site associated in the project record with Padma Nagar and surveys 101 and 105. The filed GHMC permit describes one residential building with a stilt floor and five upper floors. The RERA unit record lists ten apartments—five 2BHK and five 3BHK. RERA record RERA filing RERA unit table

The GHMC permit and RERA filing identify a proposed development; the supplied evidence does not establish that the building is complete or occupied. The amenity portal data gives percentages for certain infrastructure items, but these are reported record values, not an independent inspection or certification of construction progress. No occupancy certificate is supplied. RERA amenities Document index

3. Master plan, architecture & building design

The filed GHMC building-permit material describes a single residential building on a 417.94 sq. m plot, with 1 Stilt + 5 upper floors. It records 1,122.50 sq. m of residential built-up area and 1,347.00 sq. m proposed built-up area including parking. The plan extraction separately lists 224.50 sq. m parking area and a proposed coverage area of 224.50 sq. m. These are permit-extracted figures; no carpet-area or FSI-counted-area figure is supplied here.

The approval extraction lists front, rear and side setbacks of 3 m, 2.5 m, 2.5 m and 2.5 m, respectively. It also identifies a tot-lot, transformer space and garbage house in the premises. The supplied data does not establish the building’s flat arrangement per floor, number of lifts or stairs, floor-by-floor residential layout, or detailed common-area allocation.

The GHMC record describes the stilt as parking and identifies five upper floors. The plan extraction also includes a terrace-floor entry of 1.95; the supplied information does not clarify its unit or functional treatment, so it is not interpreted further.

4. Homes, configurations & floor plans

The RERA filing lists ten homes in total, comprising five 2BHK and five 3BHK apartments. Saleable areas below are RERA-filed. Carpet areas and loading are software measurements from the filed floor-plan drawing, not RERA disclosures; the floor-plan measurement record says these measurements need review. RERA unit table RERA unit details Floor plans

ConfigurationUnitsBookedAvailableRERA saleable areaMeasured carpet areaLoading (if supplied)
2BHK505116.12 sq. m85.4–85.8 sq. m (software-measured; median 85.4 sq. m)26%
3BHK505146.32 sq. m84.7–101.7 sq. m (software-measured; median 84.7 sq. m)42%

The drawing extraction shows, for one measured 2BHK plan, living, dining, kitchen, two bedrooms, two toilets and one balcony. For one measured 3BHK plan, it shows living, dining, kitchen, three bedrooms, three toilets and two balconies. Example room dimensions and drawing panels are recorded in the unit-measurement data; they are drawing-based measurements, not RERA-filed room specifications. RERA unit details

Carpet area refers to the measured internal area represented by the drawing extraction; the saleable-area figure is the RERA-filed figure and is not interchangeable with that measurement. Balcony areas are identified separately from carpet in the drawing measurement. The supplied record does not provide a unit-specific allocation of common-area loading. Floor plans RERA unit details

5. Parking & vehicle circulation

The GHMC plan extraction records 6 proposed parkings, a parking area of 224.50, and a stilt floor used for parking; another extracted permit parameter gives “Total Parking Area 224.55.” The available evidence does not identify spaces by resident or visitor use, accessible parking, two-wheeler provision, mechanical parking, or allocation to individual apartments.

A permit condition requires the approved parking areas to be used for vehicle parking and not converted or misused; the supplied record does not establish actual implementation or exclusive parking rights for a buyer.

6. Amenities, recreation & open spaces

The TG-RERA amenity data reports progress percentages for listed project infrastructure. The percentages are portal-recorded values; no independent verification of completion is supplied. GHMC approval material also identifies certain facilities or site provisions, which are distinguished below from portal progress reporting. RERA amenities

Clubhouse / indoor
Description / sizeNo clubhouse or indoor recreation facility is identified in the supplied approval or RERA amenity records
Evidence sourceRERA amenities
Declared progress / verified statusNot established in these records
Sports / recreation
Description / sizeTot-lot / green strip is identified in GHMC approval material; no size is supplied
Declared progress / verified statusRERA amenity data: Green Strip/TOT LOT/Park 0%; completion not independently verified RERA amenities
Landscape / open space
Description / sizePeriphery greenery and tot-lot are referenced in GHMC approval conditions; no area or capacity is supplied
Declared progress / verified statusRERA amenity data: Aggregate area of recreational open space 0%; independent completion status not supplied RERA amenities
Convenience / community
Description / sizeGarbage house and transformer space are identified in the approval material
Declared progress / verified statusRERA amenity data: Electrical meter room / sub-station / receiving station 0%; approval material requires transformer space, but completion is not established RERA amenities

The third-party listing mentions facilities such as a swimming pool, gym and clubhouse, but these are not established as sanctioned or delivered by the supplied TG-RERA and approval records and are therefore not presented as project facilities. Promoter website

7. Utilities, building services & safety

The GHMC approval material identifies a rainwater-harvesting structure, transformer space, garbage house, generator, emergency lighting, fire-fighting installations and a septic tank. It specifies separate underground and terrace water-storage tanks of 25,000 litres each in the extracted plan conditions. These are approval-document provisions, not evidence that the facilities have been installed or are operational.

The RERA amenity record reports water supply at 40%, sewerage at 50%, street lighting at 80%, internal roads and footpaths at 30%, and storm-water drains at 0%. Treatment and disposal of sewage and sullage water, solid-waste management and disposal, water conservation/rainwater harvesting, energy management, fire protection and fire safety requirements, and aggregate recreational open space are each recorded at 0%. These portal percentages are not independent verification of work completed. RERA amenities

The supplied approval extraction includes fire and life-safety provisions, including fire-fighting installations, emergency lighting, hose reel/down corner, fire extinguishers and a manually operated alarm system. It also states that a fire NOC is to be obtained before an occupancy certificate. The evidence supplied does not include a fire NOC, occupancy certificate, lift details, accessible circulation details, or verified operating-capacity information for utilities.

8. Location, access & connectivity

The registered project location is at H NO 49-403/5/1, PLOT NO 24, Padma Nagar, Qutballapur, Medchal-Malkajgiri, PIN 500054, with surveys 101 and 105. Project and approval records also describe the locality as Padma Nagar-2 / Padmanagar Colony-II and identify QUTHBULLAPUR village. RERA filing

The approval material refers to road widths including 18 mt. road widths, and the RERA boundary record identifies the eastern boundary as ROAD WIDTH - 30. No project-specific public-transport details or verified access route information are supplied. A location record gives HITEC City — 10.7 km; no travel time is supplied. RERA filing Location record

9. Developer & development status

The registered promoter is SREE GANGA BHAVANI INFRASTRUCTURE PRIVATE LIMITED, a company, with GSTIN 36ABDCS8301D1ZM. The RERA record gives its address as AMAN TEJA HEIGHTS, JAYABHERI COLONY, PADMA NAGAR COLONY - II, QUTHBULLAPUR, Qutballapur, Medchal-Malkajgiri, 500054. The supplied records do not provide an official website or contact details. Corporate record Parties record

The RERA record identifies KAREKKAT NANUNAIR CHANDRAN MENON as a landowner under an AreaShare arrangement. The GHMC permit identifies him as applicant and lists M KISHAN as developer / builder. Parties record

The promoter’s Form B declaration states a completion undertaking of 20/08/2026. The GHMC permit gives a completion deadline of 21 August, 2026, while the project header records proposed completion as 20/12/2026. The RERA registration certificate runs to 20 August 2026, unless extended. These are separate completion and registration records; no occupancy certificate or independently verified completion status is supplied. RERA record

10. Approvals, official records & documents

RecordEvidence in supplied file
TG-RERA registrationForm C certificate for SGB SRR NILAYAM, registration P02200008046; identifies surveys 101 and 105 and states validity from 08/04/2024 to 20/08/2026 unless extended
GHMC building permit3031/GHMC/KPL/2023-BP, dated 21 August, 2023; residential building with 1 Stilt + 5 upper floors
Permit-related referenceTS/038100/2023 appears in the filed building-permit material
Plan materialGHMC approval-plan extraction for surveys 101 and 105, at QUTHBULLAPUR / Padma Nagar-2; describes the proposed stilt-and-five-upper-floor residential building
Promoter declarationForm B affidavit-cum-declaration by BANALA GANGA REDDY, authorized signatory of the registered promoter; includes a completion undertaking and other promoter declarations
Occupancy / completion recordNo occupancy or completion certificate is included in the supplied documents Document index Approvals record
Layout verificationNo separately verified approved-layout lookup result is supplied; the HMDA DPMS lookup is recorded as unavailable from the public internet HMDA
Environmental recordThe supplied promoter-name search reports no EC found; this is a promoter-level name match and does not establish project-specific environmental status Regulatory record

Frequently asked questions

Is SGB SRR NILAYAM registered with Telangana RERA?

Yes. SGB SRR NILAYAM is registered with the Telangana Real Estate Regulatory Authority as P02200008046; the registration status is New Project.

Who is the developer of SGB SRR NILAYAM?

The promoter named in the RERA registration is SREE GANGA BHAVANI INFRASTRUCTURE PRIVATE LIMITED.

Where is SGB SRR NILAYAM located?

SGB SRR NILAYAM is in QUTHBULLAPUR, Padma Nagar, Qutballapur, Medchal-Malkajgiri, Telangana (500054).

When will SGB SRR NILAYAM be completed?

The promoter's proposed date of completion filed with RERA is 20/12/2026. This is the promoter's declaration, not a guarantee.