Rama Saikrishna Nilayam
GK Constructions · Medchal-Malkajgiri · RERA P02200008580
RAMA SAIKRISHNA NILAYAM is a residential apartment project in Gokul Nagar (Circle 1), Mallapur, Uppal Mandal, Medchal-Malkajgiri. The registered promoter is GK Constructions, recorded as a Proprietorship. The project has a total land area of 334.52 sq. m and one residential building with 1 Stilt + 5 upper floors, comprising 10 DOUBLE BEDROOM units with RERA-filed saleable areas of 94.46–94.96 sq. m. Its TG-RERA registration number is P02200008580, and its proposed completion date is 18 April 2027.
More from GK Constructions · 5 projects →
01What we found
Read from TG-RERA filings, approvals, land and registration records and court records. A court case is counted only when the court record states this project's survey number with its village, or names the project.
02Check before you pay
8 items to check before you pay, 3 high - from the title chain, court records and approvals, each with what to ask the builder or your advocate. An item may not be a problem with the project: records can be incomplete.
1. Project at a glance
Project identity
| Field | Project record |
|---|---|
| Registered project name | RAMA SAIKRISHNA NILAYAM RERA record |
| Project type / phase | Residential apartment project; phase or separately named registered portion is not disclosed RERA record |
| TG-RERA registration | P02200008580; valid from 30 July 2024 to 18 April 2027, unless extended by the Authority RERA record Approvals record |
| RERA status | Recorded as New Project; registration record captured 10 September 2026 RERA record Approvals record |
| Registered promoter | GK Constructions, recorded as a Proprietorship RERA record Corporate record |
Land and geographic identity
| Field | Project record |
|---|---|
| Locality / PIN | Gokul Nagar (Circle 1), 500076 RERA record RERA filing |
| Revenue village / mandal / district | Mallapur / Uppal / Medchal-Malkajgiri RERA record RERA filing |
| Project survey numbers | 96, 97 and 98; subdivisions are not disclosed in the project identity record RERA record RERA filing |
| RERA-filed plot/site area | 334.52 sq. m total; 324.39 sq. m net; 10.13 sq. m shown as affected in the RERA land details RERA filing |
| Sanctioned site area | The building-permit extraction records 334.52 sq. m plot area and 324.39 sq. m net plot area |
| Boundaries in RERA land record | East: Plot No. 179; West: 30-0 Wide Road; North: Plot No. 167; South: 30-0 Wide Road RERA filing |
| Drawing identification | Plot No. 168, in Survey Nos. 96, 97 and 98, “Gokul Nagar,” Mallapur Village, Uppal Mandal, Medchal-Malkajgiri District |
Development identity
| Field | Project record |
|---|---|
| Sanctioning authority | Greater Hyderabad Municipal Corporation (GHMC) Approvals record |
| Principal building permission | 0698/GHMC/LBN/2024-BP, dated 18 April 2024 Approvals record |
| Building configuration | One residential building: 1 Stilt + 5 upper floors |
| Approved built-up area | Approval-plan extraction records 949.55 sq. m proposed built-up area excluding parking, 1139.45 sq. m including parking and 1148.45 sq. m total BUA; it separately records 949.55 sq. m net BUA and 189.90 sq. m parking area |
| Building height | The approval-plan extraction records 20.45mt. total height and 15.00 mt. Excluding Stilt Floor; the building-permit extraction also records a building height of 15.00 |
| Unit count | 10 units in the approved plan and 10 in the TG-RERA unit record RERA unit table |
| Parking | The drawing extraction identifies 189.90 sq. m stilt parking area; the building-permit extraction separately records 133.7 total parking area |
Offering and status
| Field | Project record |
|---|---|
| RERA-filed configuration | 2BHK, listed as “DOUBLE BEDROOM” units RERA unit table RERA unit details |
| RERA-filed saleable area | 94.46–94.96 sq. m RERA unit table RERA unit details |
| Booked / available | 0 booked / 10 available, as last read from the TG-RERA portal; the record has no as-of date, so counts are indicative RERA unit table |
| Construction stage | Current physical construction stage is not established by the supplied evidence. The promoter’s filed completion undertaking is 18 April 2027 |
| Completion deadline | 18 April 2027, as recorded in the TG-RERA project record and Form B declaration RERA record |
| Registration validity | Through 18 April 2027, unless extended; this is distinct from the stated completion deadline |
| Occupancy certificate (OC) | No OC for this project is evidenced in the supplied records. The supplied OC document relates to a different building at Plot Nos. 89 and 90, Survey Nos. 111 and 116, Mallapur, and is not identified as this project’s OC |
2. The project story
RAMA SAIKRISHNA NILAYAM is registered with TG-RERA as a residential apartment project on Plot No. 168 in Survey Nos. 96, 97 and 98, at Gokul Nagar, Mallapur, Uppal Mandal, Medchal-Malkajgiri. Its filed identity describes a single building and ten apartments; the GHMC building-permit record describes a residential building of one stilt level and five upper floors. RERA record RERA filing
The RERA unit schedule lists ten two-bedroom (“DOUBLE BEDROOM”) units. The portal-derived booking record shows all ten as available and none booked, but has no recorded as-of date. The promoter’s filed completion undertaking gives 18 April 2027; the supplied documents do not establish the project’s present construction progress or a project-specific occupancy certificate. RERA unit details RERA unit table
3. Master plan, architecture & building design
The filed building-plan extraction describes one residential building, “BLDG (SESHAGIRI RAO),” with 1 Stilt + 5 upper floors. It identifies plot area of 334.52 and net plot area of 324.39, and records 949.55 proposed built-up area excluding parking, 1139.45 including parking, 1148.45 total BUA, and 189.90 parking area. These are distinct figures as recorded in the plan extraction; the supplied material does not define them further.
The plan extraction gives individual areas of 189.91 for each of the first through fifth floors, 189.90 for stilt parking and 9.00 for the terrace floor. It records total height as 20.45mt., with 15.00 mt. Excluding Stilt Floor. The GHMC permit identifies a 30 FT wide road and the plan extraction also refers to a 30'-0" (9.14M) wide road and an 18 mt. road.
The available material does not establish building footprint, flat count per floor, lift or stair arrangement, detailed circulation, or a complete common-area schedule. The plan’s conditions include a requirement for a tot-lot to be fenced and maintained as greenery before OC, periphery tree planting/greenery, rainwater harvesting and a garbage house; these are approval conditions, not evidence that the facilities are complete.
4. Homes, configurations & floor plans
| Configuration | Units | Booked | Available | RERA saleable area | Measured carpet area | Loading (if supplied) |
|---|---|---|---|---|---|---|
| 2BHK | 10 | 0 | 10 | 94.46–94.96 sq. m | 61.7–64.4 sq. m software-measured range; median 62.7 sq. m | 34% |
Unit counts, bookings and saleable areas are from the TG-RERA record; booking counts are indicative because no as-of date is supplied. Software measured four flat designs from the approved floor-plan drawing; its carpet-area measurements are not RERA disclosures and are flagged as needing review. The drawing-derived median is 675 sq. ft. (range 664–693 sq. ft.). RERA unit details RERA unit table Floor plans
The plan for flat 101 shows two bedrooms, a drawing room, living/dining area, kitchen, two toilets and two balconies. The supplied drawing-based room measurements include bedrooms of 3.0 × 3.5 m, a drawing room of 2.35 × 3.5 m, a living/dining area of 3.36 × 5.63 m, kitchen of 2.35 × 2.5 m, and toilets of 1.99 × 1.5 m each. Balconies are identified but no dimensions are supplied. RERA unit details
Carpet area describes the measured internal floor-plan area in this analysis; the RERA-filed saleable area is a separate figure and is larger. The supplied data cautions that saleable area includes the home’s share of common areas; the precise area definitions and measurement basis should be checked against the registered sale agreement and drawings. Floor plans RERA unit details
5. Parking & vehicle circulation
The building-plan extraction records a 189.90 sq. m stilt parking area and states that the stilt approved for parking is to be used exclusively for vehicle parking, without partition walls or rolling shutters and not converted to another use. The building-permit extraction separately records 133.7 as total parking area. The supplied material does not establish a sanctioned parking-space count, separate resident or visitor allocation, accessible spaces, two-wheeler count, ramp arrangement, or an individual buyer’s legally documented parking allocation.
The plan conditions require parking places in buildings to provide electric-vehicle charging infrastructure in accordance with the cited requirements. This is a condition in the approval record, not evidence of installed charging equipment.
6. Amenities, recreation & open spaces
The TG-RERA amenities record shows the listed items below with 0% progress where a percentage is provided. “YES” indicates the filed availability field only; it does not establish completion. RERA amenities
| Facility | Description / size | Evidence source | Declared progress / verified status |
|---|---|---|---|
| Tot-lot / green strip | Size not supplied; the building-plan conditions require fencing and maintenance as greenery before OC | RERA amenities | RERA progress 0%; completion not independently verified |
| Aggregate recreational open space | Size not supplied | RERA amenities | RERA progress 0% |
| Internal roads and footpaths | Details not supplied | RERA amenities | RERA progress 0% |
| Street lighting | Details not supplied | RERA amenities | RERA progress 0% |
| Community buildings | Details not supplied | RERA amenities | RERA progress 0% |
| Water supply | Capacity/source not supplied | RERA amenities | Filed as YES; RERA progress 0% |
| Sewerage | Filed under “Sewerage (Chamber, Lines, Septic Tank, STP)”; system details not supplied | RERA amenities | Filed as YES; RERA progress 0% |
| Storm-water drains | Details not supplied | RERA amenities | RERA progress 0% |
| Sewage and sullage treatment/disposal | Details not supplied | RERA amenities | RERA progress 0% |
| Solid-waste management and disposal | Details not supplied | RERA amenities | RERA progress 0% |
| Water conservation / rainwater harvesting | The plan lists a rainwater-harvesting structure (percolation pit); permit extraction records 1 rainwater-harvesting pit | RERA amenities | RERA progress 0%; installation not independently verified |
| Energy management | Details not supplied | RERA amenities | RERA progress 0% |
7. Utilities, building services & safety
The GHMC building-plan extraction lists water supply, electricity connections, a space for a transformer, a garbage house, a rainwater-harvesting percolation pit, a generator and emergency lighting. It also specifies separate underground static water storage and terrace tanks of 25,000 lits. capacity each for residential buildings. These are plan-record details and conditions; installation, connection, operating status and actual capacity have not been independently verified.
The plan lists a hose reel, down corner, automatic sprinkler system and fire-fighting installations. The permit assigns responsibility for structural safety, means of escape and fire-fighting installations to the owner/developer and technical professionals, and states that an Occupancy FIRE NOC is to be obtained before issue of an OC. No project-specific fire NOC or OC is evidenced here.
A dual-piping system is described in the plan conditions, with a provision specified for constructions over 10,000 Sq.mt and above and group housing buildings of 100 units and above. The supplied project records do not establish that a dual-piping system has been installed. Lift details, accessibility features, CCTV, security arrangements and waste-segregation arrangements are not established in the project documents supplied for this overview.
8. Location, access & connectivity
The registered location is Plot No. 168, Gokul Nagar (Circle 1), Mallapur, Uppal Mandal, Medchal-Malkajgiri, Telangana 500076, on Survey Nos. 96, 97 and 98. The site boundary record identifies roads to the west and south, each described as “30-0 Wide Road”; the approved-plan extraction also records a 30'-0" (9.14M) wide road. RERA record RERA filing
A location record gives the nearest sampled Outer Ring Road interchange at approximately 10.1 km. The supplied data does not identify the interchange or provide measured distances to public transport, schools, hospitals or other landmarks. Location record
9. Developer & development status
The registered promoter is GK Constructions, recorded as a Proprietorship. The registration certificate lists its address as Village Boduppal, Mandal Medipally, District Medchal-Malkajgiri, PIN 500039. The project record identifies Kondal Rao Gulla as an authorized signatory. A separate registered office contact number, email address or official website is not supplied. Corporate record Parties record
In Form B, the promoter’s authorized signatory declares that the project will be completed by 18 April 2027 and gives project-account, audit and pending-approval undertakings. This is a promoter declaration; supplied records do not establish current construction progress or completion.
10. Approvals, official records & documents
| Identifier / date | P02200008580; valid 30 July 2024–18 April 2027, unless extended |
|---|---|
| Scope and note | Form C certificate for RAMA SAIKRISHNA NILAYAM; identifies GK Constructions as promoter and sets registration conditions |
| Identifier / date | 0698/GHMC/LBN/2024-BP, 18 April 2024; file 002763/GHMC/1330/LBN2/2024-BP |
|---|---|
| Scope and note | Permit record for one residential building, 1 Stilt + 5 upper floors, at Plot No. 168 in Survey Nos. 96, 97 and 98 |
| Identifier / date | Drawing for Plot No. 168, Survey Nos. 96, 97 and 98 |
|---|---|
| Scope and note | Includes proposed floor configuration, area information and approval conditions |
| Identifier / date | Layout/LRS C/GHMC/119530/2020; TDR DRC 01941/TDR/2022; contractor’s all-risk policy 431190/44/2024/826 dated 12 March 2024; notarised affidavit IV58/2024 dated 08 April 2024; floor handed over 1978/2024 dated 08 April 2024 |
|---|---|
| Scope and note | Identifiers recorded in the GHMC permit extraction |
| Identifier / date | Form B; completion undertaking 18 April 2027 |
|---|---|
| Scope and note | Project-account, audit, approval and other promoter undertakings |
| Identifier / date | 1438/GHMC/LBN/2024-OC, dated 01 June 2024 |
|---|---|
| Scope and note | The extracted certificate concerns a different building at Plot Nos. 89 and 90, Survey Nos. 111 and 116, Mallapur; it is not identified as an OC for RAMA SAIKRISHNA NILAYAM |
The supplied evidence does not establish a project-specific occupancy certificate or current construction status. The plan and permit records describe the sanctioned development and its conditions; they should not be read as confirmation that construction or listed services are complete.
1. Project at a glance
Project identity
Registered project name: RAMA SAIKRISHNA NILAYAM
Project type / phase: Residential apartment project; phase or separately named registered portion is not disclosed
TG-RERA registration: P02200008580; valid from 30 July 2024 to 18 April 2027, unless extended by the Authority
RERA status: Recorded as New Project; registration record captured 10 September 2026
Registered promoter: GK Constructions, recorded as a Proprietorship
Land and geographic identity
Locality / PIN: Gokul Nagar (Circle 1), 500076
Revenue village / mandal / district: Mallapur / Uppal / Medchal-Malkajgiri
Project survey numbers: 96, 97 and 98; subdivisions are not disclosed in the project identity record
RERA-filed plot/site area: 334.52 sq. m total; 324.39 sq. m net; 10.13 sq. m shown as affected in the RERA land details
Sanctioned site area: The building-permit extraction records 334.52 sq. m plot area and 324.39 sq. m net plot area
Boundaries in RERA land record: East: Plot No. 179; West: 30-0 Wide Road; North: Plot No. 167; South: 30-0 Wide Road
Drawing identification: Plot No. 168, in Survey Nos. 96, 97 and 98, “Gokul Nagar,” Mallapur Village, Uppal Mandal, Medchal-Malkajgiri District
Development identity
Sanctioning authority: Greater Hyderabad Municipal Corporation (GHMC)
Principal building permission: 0698/GHMC/LBN/2024-BP, dated 18 April 2024
Building configuration: One residential building: 1 Stilt + 5 upper floors
Approved built-up area: Approval-plan extraction records 949.55 sq. m proposed built-up area excluding parking, 1139.45 sq. m including parking and 1148.45 sq. m total BUA; it separately records 949.55 sq. m net BUA and 189.90 sq. m parking area
Building height: The approval-plan extraction records 20.45mt. total height and 15.00 mt. Excluding Stilt Floor; the building-permit extraction also records a building height of 15.00
Unit count: 10 units in the approved plan and 10 in the TG-RERA unit record
Parking: The drawing extraction identifies 189.90 sq. m stilt parking area; the building-permit extraction separately records 133.7 total parking area
Offering and status
RERA-filed configuration: 2BHK, listed as “DOUBLE BEDROOM” units
RERA-filed saleable area: 94.46–94.96 sq. m
Booked / available: 0 booked / 10 available, as last read from the TG-RERA portal; the record has no as-of date, so counts are indicative
Construction stage: Current physical construction stage is not established by the supplied evidence. The promoter’s filed completion undertaking is 18 April 2027
Completion deadline: 18 April 2027, as recorded in the TG-RERA project record and Form B declaration
Registration validity: Through 18 April 2027, unless extended; this is distinct from the stated completion deadline
Occupancy certificate (OC): No OC for this project is evidenced in the supplied records. The supplied OC document relates to a different building at Plot Nos. 89 and 90, Survey Nos. 111 and 116, Mallapur, and is not identified as this project’s OC
2. The project story
RAMA SAIKRISHNA NILAYAM is registered with TG-RERA as a residential apartment project on Plot No. 168 in Survey Nos. 96, 97 and 98, at Gokul Nagar, Mallapur, Uppal Mandal, Medchal-Malkajgiri. Its filed identity describes a single building and ten apartments; the GHMC building-permit record describes a residential building of one stilt level and five upper floors.
The RERA unit schedule lists ten two-bedroom (“DOUBLE BEDROOM”) units. The portal-derived booking record shows all ten as available and none booked, but has no recorded as-of date. The promoter’s filed completion undertaking gives 18 April 2027; the supplied documents do not establish the project’s present construction progress or a project-specific occupancy certificate.
3. Master plan, architecture & building design
The filed building-plan extraction describes one residential building, “BLDG (SESHAGIRI RAO),” with 1 Stilt + 5 upper floors. It identifies plot area of 334.52 and net plot area of 324.39, and records 949.55 proposed built-up area excluding parking, 1139.45 including parking, 1148.45 total BUA, and 189.90 parking area. These are distinct figures as recorded in the plan extraction; the supplied material does not define them further.
The plan extraction gives individual areas of 189.91 for each of the first through fifth floors, 189.90 for stilt parking and 9.00 for the terrace floor. It records total height as 20.45mt., with 15.00 mt. Excluding Stilt Floor. The GHMC permit identifies a 30 FT wide road and the plan extraction also refers to a 30'-0" (9.14M) wide road and an 18 mt. road.
The available material does not establish building footprint, flat count per floor, lift or stair arrangement, detailed circulation, or a complete common-area schedule. The plan’s conditions include a requirement for a tot-lot to be fenced and maintained as greenery before OC, periphery tree planting/greenery, rainwater harvesting and a garbage house; these are approval conditions, not evidence that the facilities are complete.
4. Homes, configurations & floor plans
| Configuration | Units | Booked | Available | RERA saleable area | Measured carpet area | Loading (if supplied) |
|---|---|---|---|---|---|---|
| 2BHK | 10 | 0 | 10 | 94.46–94.96 sq. m | 61.7–64.4 sq. m software-measured range; median 62.7 sq. m | 34% |
Unit counts, bookings and saleable areas are from the TG-RERA record; booking counts are indicative because no as-of date is supplied. Software measured four flat designs from the approved floor-plan drawing; its carpet-area measurements are not RERA disclosures and are flagged as needing review. The drawing-derived median is 675 sq. ft. (range 664–693 sq. ft.).
The plan for flat 101 shows two bedrooms, a drawing room, living/dining area, kitchen, two toilets and two balconies. The supplied drawing-based room measurements include bedrooms of 3.0 × 3.5 m, a drawing room of 2.35 × 3.5 m, a living/dining area of 3.36 × 5.63 m, kitchen of 2.35 × 2.5 m, and toilets of 1.99 × 1.5 m each. Balconies are identified but no dimensions are supplied.
Carpet area describes the measured internal floor-plan area in this analysis; the RERA-filed saleable area is a separate figure and is larger. The supplied data cautions that saleable area includes the home’s share of common areas; the precise area definitions and measurement basis should be checked against the registered sale agreement and drawings.
5. Parking & vehicle circulation
The building-plan extraction records a 189.90 sq. m stilt parking area and states that the stilt approved for parking is to be used exclusively for vehicle parking, without partition walls or rolling shutters and not converted to another use. The building-permit extraction separately records 133.7 as total parking area. The supplied material does not establish a sanctioned parking-space count, separate resident or visitor allocation, accessible spaces, two-wheeler count, ramp arrangement, or an individual buyer’s legally documented parking allocation.
The plan conditions require parking places in buildings to provide electric-vehicle charging infrastructure in accordance with the cited requirements. This is a condition in the approval record, not evidence of installed charging equipment.
6. Amenities, recreation & open spaces
The TG-RERA amenities record shows the listed items below with 0% progress where a percentage is provided. “YES” indicates the filed availability field only; it does not establish completion.
| Facility | Description / size | Evidence source | Declared progress / verified status |
|---|---|---|---|
| Tot-lot / green strip | Size not supplied; the building-plan conditions require fencing and maintenance as greenery before OC | RERA progress 0%; completion not independently verified | |
| Aggregate recreational open space | Size not supplied | RERA progress 0% | |
| Internal roads and footpaths | Details not supplied | RERA progress 0% | |
| Street lighting | Details not supplied | RERA progress 0% | |
| Community buildings | Details not supplied | RERA progress 0% | |
| Water supply | Capacity/source not supplied | Filed as YES; RERA progress 0% | |
| Sewerage | Filed under “Sewerage (Chamber, Lines, Septic Tank, STP)”; system details not supplied | Filed as YES; RERA progress 0% | |
| Storm-water drains | Details not supplied | RERA progress 0% | |
| Sewage and sullage treatment/disposal | Details not supplied | RERA progress 0% | |
| Solid-waste management and disposal | Details not supplied | RERA progress 0% | |
| Water conservation / rainwater harvesting | The plan lists a rainwater-harvesting structure (percolation pit); permit extraction records 1 rainwater-harvesting pit | RERA progress 0%; installation not independently verified | |
| Energy management | Details not supplied | RERA progress 0% |
7. Utilities, building services & safety
The GHMC building-plan extraction lists water supply, electricity connections, a space for a transformer, a garbage house, a rainwater-harvesting percolation pit, a generator and emergency lighting. It also specifies separate underground static water storage and terrace tanks of 25,000 lits. capacity each for residential buildings. These are plan-record details and conditions; installation, connection, operating status and actual capacity have not been independently verified.
The plan lists a hose reel, down corner, automatic sprinkler system and fire-fighting installations. The permit assigns responsibility for structural safety, means of escape and fire-fighting installations to the owner/developer and technical professionals, and states that an Occupancy FIRE NOC is to be obtained before issue of an OC. No project-specific fire NOC or OC is evidenced here.
A dual-piping system is described in the plan conditions, with a provision specified for constructions over 10,000 Sq.mt and above and group housing buildings of 100 units and above. The supplied project records do not establish that a dual-piping system has been installed. Lift details, accessibility features, CCTV, security arrangements and waste-segregation arrangements are not established in the project documents supplied for this overview.
8. Location, access & connectivity
The registered location is Plot No. 168, Gokul Nagar (Circle 1), Mallapur, Uppal Mandal, Medchal-Malkajgiri, Telangana 500076, on Survey Nos. 96, 97 and 98. The site boundary record identifies roads to the west and south, each described as “30-0 Wide Road”; the approved-plan extraction also records a 30'-0" (9.14M) wide road.
A location record gives the nearest sampled Outer Ring Road interchange at approximately 10.1 km. The supplied data does not identify the interchange or provide measured distances to public transport, schools, hospitals or other landmarks.
9. Developer & development status
The registered promoter is GK Constructions, recorded as a Proprietorship. The registration certificate lists its address as Village Boduppal, Mandal Medipally, District Medchal-Malkajgiri, PIN 500039. The project record identifies Kondal Rao Gulla as an authorized signatory. A separate registered office contact number, email address or official website is not supplied.
In Form B, the promoter’s authorized signatory declares that the project will be completed by 18 April 2027 and gives project-account, audit and pending-approval undertakings. This is a promoter declaration; supplied records do not establish current construction progress or completion.
10. Approvals, official records & documents
| Identifier / date | P02200008580; valid 30 July 2024–18 April 2027, unless extended |
|---|---|
| Scope and note | Form C certificate for RAMA SAIKRISHNA NILAYAM; identifies GK Constructions as promoter and sets registration conditions |
| Identifier / date | 0698/GHMC/LBN/2024-BP, 18 April 2024; file 002763/GHMC/1330/LBN2/2024-BP |
|---|---|
| Scope and note | Permit record for one residential building, 1 Stilt + 5 upper floors, at Plot No. 168 in Survey Nos. 96, 97 and 98 |
| Identifier / date | Drawing for Plot No. 168, Survey Nos. 96, 97 and 98 |
|---|---|
| Scope and note | Includes proposed floor configuration, area information and approval conditions |
| Identifier / date | Layout/LRS C/GHMC/119530/2020; TDR DRC 01941/TDR/2022; contractor’s all-risk policy 431190/44/2024/826 dated 12 March 2024; notarised affidavit IV58/2024 dated 08 April 2024; floor handed over 1978/2024 dated 08 April 2024 |
|---|---|
| Scope and note | Identifiers recorded in the GHMC permit extraction |
| Identifier / date | Form B; completion undertaking 18 April 2027 |
|---|---|
| Scope and note | Project-account, audit, approval and other promoter undertakings |
| Identifier / date | 1438/GHMC/LBN/2024-OC, dated 01 June 2024 |
|---|---|
| Scope and note | The extracted certificate concerns a different building at Plot Nos. 89 and 90, Survey Nos. 111 and 116, Mallapur; it is not identified as an OC for RAMA SAIKRISHNA NILAYAM |
The supplied evidence does not establish a project-specific occupancy certificate or current construction status. The plan and permit records describe the sanctioned development and its conditions; they should not be read as confirmation that construction or listed services are complete.
Frequently asked questions
Is RAMA SAIKRISHNA NILAYAM registered with Telangana RERA?
Yes. RAMA SAIKRISHNA NILAYAM is registered with the Telangana Real Estate Regulatory Authority as P02200008580; the registration status is New Project.
Who is the developer of RAMA SAIKRISHNA NILAYAM?
The promoter named in the RERA registration is GK Constructions.
Where is RAMA SAIKRISHNA NILAYAM located?
RAMA SAIKRISHNA NILAYAM is in Gokul Nagar ( Circle 1), Mallapur, Uppal, Medchal-Malkajgiri, Telangana (500076).
When will RAMA SAIKRISHNA NILAYAM be completed?
The promoter's proposed date of completion filed with RERA is 18/04/2027. This is the promoter's declaration, not a guarantee.
More projects in Mallapur