Makuta Horizon

MAKUTA DEVELOPERS LLP · Medchal-Malkajgiri · RERA P02200005394

MAKUTA HORIZON is a Mixed Development (Residential & Commercial) in Kompally Village, Dundigal Gandimaisamma Mandal, Medchal-Malkajgiri District, developed by registered promoter MAKUTA DEVELOPERS LLP. The project covers 26575.16 sq m and comprises two blocks: Block-A (Commercial), with 2 Cellar + Ground + 8 Upper Floors (8th TDR), and Block-B (Residential), with 2 Cellar + Ground + 16 Upper Floors (15th and 16th TDR Floors). The RERA record lists 73 units: 64 residential homes in 3BHK and 4BHK configurations, and 9 commercial units. Its TG-RERA registration is P02200005394, and the proposed completion date is 12/03/2029.

More from Makuta Developers LLP · 3 projects →

01What we found

RegisteredTG-RERA - valid till 12 Nov 2028
45documents on file - each fact links to its page
9court cases on this project's land (survey 179, 180, Kompally)
6items to check - 3 high

Read from TG-RERA filings, approvals, land and registration records and court records. A court case is counted only when the court record states this project's survey number with its village, or names the project.

02Check before you pay

6 items to check before you pay, 3 high - from the title chain, court records and approvals, each with what to ask the builder or your advocate. An item may not be a problem with the project: records can be incomplete.

Sign in to see each item and what to do

1. Project at a glance

Project identity

ItemTG-RERA record
Registered projectMAKUTA HORIZON
Project typeMixed Development (Residential & Commercial)
Registered portion / phaseNot separately named in the supplied record
TG-RERA registrationP02200005394
Registration validity03/12/2022 to 12/11/2028; certificate states five years. No extension is recorded in the supplied evidence. This is registration validity, not the construction deadline.
Registered promoterMAKUTA DEVELOPERS LLP
RERA statusNew Project; registration certificate issued under section 5.

Sources: RERA record RERA filing

Land and geographic identity

ItemProject record
Locality / revenue villageKompally / Kompally Village
MandalDundigal Gandimaisamma
DistrictMedchal-Malkajgiri
PIN500100
Survey numbers179 and 180. The RERA record does not specify project subdivisions; title documents refer to 179/A and 179/B, as well as 179 and 180.
Registered site extent26575.16 sq m
Total / net land area26575.16 sq m total; 26575.16 sq m net; affected area reported as 0 sq m in the RERA land fields.
BoundariesNorth: Existing 100 ft wide road; South: residential apartments; East: owners’ land; West: neighbors’ land.

Sources: RERA filing RERA filing Land records

Development identity

ItemRecord
Sanctioning authorityHyderabad Metropolitan Development Authority (HMDA); technical approval delegated to the local municipality, as stated in the approval documents.
Principal approvalFile No. 137/MED/PLG/HMDA/2022, dated 12-11-2022. A corrected technical approval proceeding dated 06-07-2023 carries the same file number.
Approved built-up area27171.29 sq m in the RERA project fields.
Buildings / blocksTwo: Block-A (Commercial) and Block-B (Residential), per the HMDA approval.
Sanctioned configurationBlock-A: 2 Cellar + Ground + 8 Upper Floors (8th TDR). Block-B: 2 Cellar + Ground + 16 Upper Floors (15th and 16th TDR Floors).
ParkingApproved cellars are designated for parking; the supplied records do not establish a total parking-space count.
UnitsRERA record: 73 units total—64 residential units and 9 commercial units. HMDA approval describes two blocks; no separate phase-wise unit count is provided.

Sources: RERA filing RERA unit table RERA unit details

Offering and status

ItemRERA-filed information
Residential configurations3BHK and 4BHK
Commercial offeringCommercial Space
RERA saleable area3BHK: 262.64 sq m; 4BHK: 344.54 sq m; Commercial Space: 884.83 sq m. These are filed saleable areas, not measured carpet areas.
Booked / available3BHK: 1 / 16; 4BHK: 3 / 44; Commercial Space: 1 / 8. Portal counts are indicative; the record does not provide an as-of date.
Completion timelineRERA project record gives proposed completion 12/03/2029. The promoter’s Form B declaration dated 15-11-2022 undertakes completion within “6 Years.”
Construction / occupancyApproval documents describe proposed development and require an occupancy certificate after construction. They do not certify completion or occupancy. No occupancy certificate is included in the supplied material.

Sources: RERA record RERA unit table RERA unit details

2. The project story

MAKUTA HORIZON is registered as a mixed residential and commercial development in Kompally Village, Dundigal Gandimaisamma Mandal, Medchal-Malkajgiri District. The HMDA approval describes two blocks: a commercial block and a residential block. The registered land identity covers Survey Nos. 179 and 180; the filed title materials also refer to subdivisions 179/A and 179/B. RERA record RERA filing Land records

The RERA unit schedule lists 64 homes—17 3BHK and 47 4BHK—and 9 commercial units. At the portal reading represented in the supplied record, 5 units were booked and 68 were available; no as-of date accompanies those counts. RERA unit table RERA unit details

The approved building configuration, approval conditions, stated completion date, and occupancy-certificate status are set out above. The records describe the development as proposed and subject to construction conditions; they do not establish independently verified site progress or certify completion. RERA record Document index

3. Master plan, architecture & building design

The RERA project fields state a site area of 26575.16 sq m and approved built-up area of 27171.29 sq m. The supplied extracts do not provide a verified floor-by-floor apartment arrangement, building footprints, flats per floor, lift or stair counts, or detailed internal circulation plans. RERA filing RERA filing

The cellars are designated for parking in the approval. The approval also specifies tot-lot/open-space/buffer areas for greenery, rainwater harvesting structures, a transformer, a garbage house and an STP. It does not quantify the open-space area or supply a detailed site-layout breakdown in the materials provided.

The approved plan’s built-up area and the RERA-filed saleable areas are different categories of measurement: the former is an approved development figure; the latter is recorded by unit type. No FSI-counted area or RERA-filed carpet-area schedule is supplied. The available floor-plan drawing set has 24 drawings, but none has been software-measured; therefore, no drawing-measured carpet or room dimensions can be reported. RERA filing RERA unit details Floor plans

4. Homes, configurations & floor plans

The following unit counts and saleable areas are from the TG-RERA record. Booked and available counts are portal figures without an as-of date. No carpet-area measurements are available: the supplied floor-plan record says 24 drawings are pending scanning and 0 are measured. RERA unit table RERA unit details Floor plans

ConfigurationUnitsBookedAvailableRERA saleable areaMeasured carpet areaLoading (if supplied)
3BHK17116262.64 sq mNot availableNot supplied
4BHK47344344.54 sq mNot availableNot supplied
Commercial Space918884.83 sq mNot availableNot supplied

Saleable area is the area filed for the unit offering; it should not be treated as carpet area. The supplied records do not provide measured room layouts or balcony, utility, or common-area loading figures. RERA unit details Floor plans

5. Parking & vehicle circulation

The HMDA approval designates the approved cellar floors for parking and states that cellar/stilt areas are to be used exclusively for vehicle parking, without partition walls or rolling shutters, and not converted to another use. The RERA filing indicates that all three unit categories are marked mortgaged; this does not establish an individual buyer’s parking allocation. RERA unit table

The supplied evidence does not establish the number of sanctioned parking spaces, visitor or accessible parking provision, parking allocation by unit, ramp and driveway arrangement, or EV-charging provision. A specific parking entitlement should therefore be confirmed in the approved drawings and the buyer’s registered agreement. RERA unit table

6. Amenities, recreation & open spaces

The RERA amenities record marks the following 14 infrastructure and facility categories as available/provided, but records 0% progress for each. “Available: YES” is the filed provision status, not evidence that the facility has been completed or independently inspected. RERA amenities

FacilityDescription / sizeEvidence sourceDeclared progress / verified status
Internal roads and footpathsNo size suppliedRERA amenities scheduleMarked YES; 0% recorded
Water supplyNo source or capacity specified in this scheduleRERA amenities scheduleMarked YES; 0% recorded
Sewerage, treatment and disposalChambers, lines, septic tank/STP category; no capacity suppliedRERA amenities scheduleMarked YES; 0% recorded
Storm-water drainsNo size suppliedRERA amenities scheduleMarked YES; 0% recorded
Green strip / tot-lot / parkHMDA approval also requires tot-lot/open-space/buffer for greenery; no area suppliedRERA amenities schedule;Marked YES; 0% recorded; completion not verified
Street lightingNo specification suppliedRERA amenities scheduleMarked YES; 0% recorded
Community buildingsNo description or size suppliedRERA amenities scheduleMarked YES; 0% recorded
Solid-waste management and disposalHMDA approval requires a garbage house and a municipal solid-waste system; no capacity suppliedRERA amenities schedule;Marked YES; 0% recorded
Water conservation / rainwater harvestingHMDA approval requires rainwater-harvesting structures; no capacity suppliedRERA amenities schedule;Marked YES; 0% recorded
Energy managementNo system details suppliedRERA amenities scheduleMarked YES; 0% recorded
Fire protection and fire safetyApproval requires fire-safety requirements to be complied with; no equipment schedule suppliedRERA amenities schedule;Marked YES; 0% recorded
Electrical meter room / substation / receiving stationApproval requires provision for a transformer; no capacity suppliedRERA amenities schedule;Marked YES; 0% recorded
Recreational open spaceNo area or facilities schedule suppliedRERA amenities scheduleMarked YES; 0% recorded

7. Utilities, building services & safety

HMDA’s approval requires the applicant to approach HMWS & SB for bulk water supply or provide a water-treatment plant. It also requires rainwater-harvesting structures, an STP, a comprehensive system for municipal solid-waste collection and disposal, and provision for a transformer and garbage house. These are approval requirements or provisions; the supplied documents do not establish installation, capacity, or completed operation.

The approvals require compliance with fire-safety requirements and state that occupation is subject to a “Fit for Occupancy” certificate. They also require construction according to the approved plan and an occupancy certificate after completion. The evidence supplied does not include a fire clearance certificate, completed fire-system inspection, water or STP capacity, electrical backup specification in the RERA/approval documents, lift details, or accessibility details.

8. Location, access & connectivity

The registered location is Kompally, Kompally Village, Dundigal Gandimaisamma Mandal, Medchal-Malkajgiri District, PIN 500100. The HMDA approval identifies the northern boundary as an existing 100 ft wide road. The supplied location record provides a cadastral parcel-centroid coordinate of 17.41528, 78.35459. RERA record RERA filing RERA filing Location record

The evidence does not provide a verified public-transport route or measured distances to local services or landmarks. No travel times are stated here. Location record

9. Developer & development status

The TG-RERA-registered promoter is MAKUTA DEVELOPERS LLP, an LLP. Its GSTIN is 36ABTFM0194M1ZK. The RERA record identifies Vanga Harsha Vardhan as an authorized signatory. The promoter address supplied in the project record is CFC-IV, WLL Exchange, Mindspace, Kompally Village, Kompally, Dundigal Gandimaisamma, Medchal-Malkajgiri, 500100. Corporate record Parties record RERA filing RERA filing

The promoter’s Form B affidavit-cum-declaration, dated 15-11-2022, states a six-year completion undertaking and declares the project land free from encumbrances; these are promoter declarations in the RERA-filed document. The project record states a proposed completion date of 12/03/2029. The supplied approval documents do not certify completion, and no occupancy certificate is included. RERA record Document index

10. Approvals, official records & documents

TG-RERA registration
Supplied evidenceForm C, P02200005394, issued 03/12/2022
What it establishesRegistration of MAKUTA HORIZON; validity through 12/11/2028 as stated on the certificate.
HMDA technical approval
Supplied evidenceFile No. 137/MED/PLG/HMDA/2022, dated 12-11-2022
What it establishesApproval describing the two-block mixed-use development, floor configuration, conditions and required post-completion occupancy certificate.
Corrected HMDA proceeding
Supplied evidenceFile No. 137/MED/PLG/HMDA/2022, dated 06-07-2023
What it establishesCorrected technical proceeding describing the two blocks and related conditions; it does not certify completion or occupancy.
RERA project declaration
Supplied evidenceForm B, dated 15-11-2022
What it establishesPromoter affidavit and declared completion, account, audit and approval commitments.
Occupancy / completion certificate
Supplied evidenceNot supplied
What it establishesNo completion or occupancy certification is evidenced by the supplied documents.
Approved layout / detailed floor-plan measurements
Supplied evidenceNot available in the supplied extracted records
What it establishesThe HMDA documents describe building approval; the 24 floor-plan drawings are not yet measured. HMDA Floor plans

The approvals call for cellar parking, water-supply arrangements, rainwater harvesting, an STP, solid-waste provision, a transformer, fire-safety compliance and a later occupancy certificate. Their full conditions and land/title matters are addressed in the relevant report sections.

Frequently asked questions

Is MAKUTA HORIZON registered with Telangana RERA?

Yes. MAKUTA HORIZON is registered with the Telangana Real Estate Regulatory Authority as P02200005394; the registration status is New Project.

Who is the developer of MAKUTA HORIZON?

The promoter named in the RERA registration is MAKUTA DEVELOPERS LLP.

Where is MAKUTA HORIZON located?

MAKUTA HORIZON is in KOMPALLY, Dundigal Gandimaisamma, Medchal-Malkajgiri, Telangana (500100).

When will MAKUTA HORIZON be completed?

The promoter's proposed date of completion filed with RERA is 12/03/2029. This is the promoter's declaration, not a guarantee.

More projects in Kompally