Sign in

Ananya Enclave

AJAY CONSTRUCTIONS · Medchal-Malkajgiri · RERA P02200003763

ANANYA ENCLAVE is a residential apartment project in Kompally, Dundigal Gandimaisamma mandal, Medchal-Malkajgiri district. The registered promoter is AJAY CONSTRUCTIONS. The project has a site extent of 749.12 m² and one building with 1 Stilt + 5 upper floors, comprising 20 2BHK apartments with a filed saleable area of 116.12 m². Its TG-RERA registration number is P02200003763, and the promoter’s Form B declares completion by 13th July 2024.

01What we found

Period endedTG-RERA registration ran to 13 Jul 2024 - check its extension on TG-RERA
11documents on file - each fact links to its page
22court cases on this project's land (survey 149, Kompally)
8items to check - 4 high

Read from TG-RERA filings, approvals, land and registration records and court records. A court case is counted only when the court record states this project's survey number with its village, or names the project.

02Check before you pay

8 items to check before you pay, 4 high - from the title chain, court records and approvals, each with what to ask the builder or your advocate. An item may not be a problem with the project: records can be incomplete.

Sign in to see each item and what to do

Photo from nobroker.in

1. Project at a glance

Project identity

ItemRecord
Registered project nameANANYA ENCLAVE
Project type / registered portionResidential apartment project; the supplied record identifies one building and does not state a separately named phase. RERA record RERA filing
TG-RERA registration numberP02200003763
Registration validity20/12/2021 to 13/07/2024; the supplied certificate record says it was not extended. This is registration validity, not the occupancy-certificate status.
Registered promoterAJAY CONSTRUCTIONS, stated to be a proprietorship. RERA record RERA filing
RERA status in supplied recordNew Project; registration certificate issued under section 5. The supplied data does not establish a current registration status after the stated validity end date. RERA record

Land and geographic identity

ItemRecord
Locality / revenue villageKompally; the approval identifies the locality within Jayabheri Park. RERA record RERA filing
Mandal / district / PINDundigal Gandimaisamma / Medchal-Malkajgiri / 500043. RERA record
Project survey number(s)Survey No. 149; no project subdivision is identified in the registration identity. RERA filing Land records
Plot numbers129 and 130. RERA filing
Registered site extent749.12 m²; recorded as both total area and net area, with road-affected area recorded as 0 m². RERA filing
BoundariesEast: Neighbours Land; West: 60 Feet Wide Road; North: Plot No 128; South: Plot No 131. RERA filing

Development identity

ItemRecord
Sanctioning authorityKompally Municipality/Municipal Corporation; the RERA filing identifies GHMC as authority for the plan approval. Approvals record
Principal building approvalTS/001513/2021, approved 13 July, 2021. Approvals record
Approved built-up / residential area1,780.40 m² residential area in the building approval.
Building count and configurationOne building is recorded; the approval allows 1 Stilt + 5 upper floors, with a stated height of 15 m. RERA filing
Parking provision in approvalStilt parking area 385.20 m²; the supplied extract does not give a parking-space count.
UnitsRERA filing records 20 2BHK apartments. The land details separately state one building unit; that field is not an apartment count. RERA unit table RERA unit details RERA filing

Offering and status

ItemRecord
Configuration and filed saleable area2BHK; 116.12 m² saleable area. [unit_types] RERA unit details
Booked / available13 booked / 7 available, as last read from the TG-RERA portal; the portal record supplied has no as-of date, so counts are indicative. RERA unit table
Construction completion undertakingPromoter’s Form B declares completion by 13th July 2024.
Occupancy certificateAn occupancy certificate is supplied for the residential building at Plot Nos. 129 and 130, Survey No. 149; it records the building fit for occupation. Certificate 0010/OC/3143/2023, dated 03 April, 2023, records completion notice submission on 15 March, 2023.
Construction stageThe supplied certificate records completed and occupancy-certified building status; no independent site inspection or current construction-progress measurement is supplied.

2. The project story

  • ANANYA ENCLAVE is registered as a residential apartment project in Kompally, in the Dundigal Gandimaisamma mandal of Medchal-Malkajgiri district. The registered site is Survey No. 149, Plot Nos. 129 and 130, with a recorded extent of 749.12 m². RERA record RERA filing RERA filing
  • The RERA filing records 20 apartments of 2BHK configuration. The building approval describes one residential building with a stilt and five upper floors. The supplied occupancy certificate identifies that building and declares it fit for occupation; it records a completion notice submitted on 15 March, 2023. This is documentary certificate evidence, not an independent inspection of present-day condition. RERA unit table

3. Master plan, architecture & building design

  • The building approval identifies a single residential building, Building A, on a 749.12 m² site, with 1 stilt and 5 upper floors and a stated height of 15 m. The approved residential area is 1,780.40 m². The approval also records a 385.20 m² stilt parking area and 5% open space. The supplied extracts do not provide a floor-by-floor apartment schedule, building footprint, lift or stair layout, or detailed internal circulation plan.
  • The approved plan’s site particulars record 0 m² road-affected area and net area of 749.12 m². The approval includes a condition requiring surrender of any road-affected portion to the municipality; the extract does not describe such an affected portion as present. RERA filing
  • The supplied occupancy certificate identifies the same building and states that it is fit for occupation. No architectural floor-plan measurements are available in the supplied drawing records: the two drawing files are listed as having no flats measured. Floor plans

4. Homes, configurations & floor plans

The RERA unit record lists 20 apartments, all in the 2BHK configuration, with a filed saleable area of 116.12 m² per unit. Booked and available counts are portal figures without a supplied as-of date. The floor-plan record contains no measured flat drawings, so no software-measured carpet area or room dimensions can be reported. [unit_types] RERA unit details RERA unit table Floor plans

ConfigurationUnitsBookedAvailableRERA saleable areaMeasured carpet areaLoading (if supplied)
2BHK20137116.12 m²Not available from supplied drawing measurementsNot supplied

Saleable area is the RERA-filed area. A drawing-based carpet measurement is not available here; the supplied floor-plan record cautions that such measurements, when available, are software-measured rather than RERA disclosures. RERA unit details Floor plans

5. Parking & vehicle circulation

  • The building approval records a 385.20 m² stilt parking area and requires the approved cellar and stilt parking areas to be used exclusively for vehicle parking. The supplied approval extract does not state the number or allocation of parking bays, visitor or accessible spaces, or a parking arrangement for individual apartments.
  • No evidence in the supplied project records establishes a parking-space count, EV charging, ramp configuration, or pedestrian/vehicle separation.

6. Amenities, recreation & open spaces

The RERA amenities record marks water supply, sewerage, rainwater harvesting and an electrical meter room/sub-station/receiving station as available. Other listed items are recorded at 0% in that dataset; these percentages are portal-record fields and are not independent completion verification. RERA amenities

FacilityDescription / sizeEvidence sourceDeclared progress / verified status
Water supplyNo source, storage or capacity specifiedRERA amenities recordAvailable: YES; 100% recorded; not independently verified RERA amenities
SewerageListed as “Sewerage (Chamber, Lines, Septic Tank, STP)”RERA amenities recordAvailable: YES; 100% recorded; not independently verified RERA amenities
Water conservation / rainwater harvestingBuilding approval requires 11 rain water harvesting pitsRERA amenities record; building approvalRERA record: available YES; 100% recorded. Approval specifies 11 pits; installation not independently verified RERA amenities
Electrical meter room / sub-station / receiving stationNo capacity specifiedRERA amenities recordAvailable: YES; 100% recorded; not independently verified RERA amenities
Green strip / tot lot / parkNo area or facility details supplied beyond the approval’s 5% open-space figureRERA amenities record; building approval0% recorded in amenities dataset; no independent verification RERA amenities
Community buildingsNo details suppliedRERA amenities record0% recorded RERA amenities
Internal roads and footpathsNo details suppliedRERA amenities record0% recorded RERA amenities
Storm-water drainsNo details suppliedRERA amenities record0% recorded RERA amenities
Street lightingNo details suppliedRERA amenities record0% recorded RERA amenities
Solid-waste management and disposalNo details suppliedRERA amenities record0% recorded RERA amenities
Fire protection and fire-safety requirementsNo system details suppliedRERA amenities record0% recorded RERA amenities

7. Utilities, building services & safety

  • The RERA amenities record marks water supply and sewerage as available, without specifying supply source, storage, treatment capacity, an STP design, or reuse arrangements. It also records rainwater harvesting as available; the building approval specifies 11 harvesting pits. These are recorded provisions, not independent confirmation of installation or operation. RERA amenities
  • The approval requires space for a transformer and a garbage house with dry and wet waste segregation. It also requires construction in accordance with the sanctioned plan and calls for safety of construction workers. The supplied material does not give electrical backup capacity, lift specifications, fire-system details, accessible circulation, or a security/CCTV plan.

8. Location, access & connectivity

The project’s recorded revenue location is Kompally, Dundigal Gandimaisamma mandal, Medchal-Malkajgiri district, PIN 500043. The approval identifies Jayabheri Park and Plot Nos. 129 and 130 in Survey No. 149; the recorded west boundary is a 60 Feet Wide Road. RERA record RERA filing

The supplied connectivity record gives one distance: Financial District (Nanakramguda), 1.2 km, associated with the supplied cadastral parcel centroid record. No project-specific approach-road route, public-transport details, travel times, or measured distances to other facilities are supplied in the RERA evidence used for this profile. Location record

9. Developer & development status

  • The registered promoter is AJAY CONSTRUCTIONS, identified in the RERA filing as a proprietorship. The Form B declaration is made by Talakola Ajay Krishna Reddy on behalf of the promoter and declares completion by 13th July 2024. RERA filing
  • The building approval records construction of Building A, with a construction start deadline before 13 January, 2022 and completion deadline before 13 July, 2024. The supplied occupancy certificate records completion notice submission on 15 March, 2023 and certifies the building fit for occupation. No separate phase-wise or tower-wise construction schedule is provided.

10. Approvals, official records & documents

RecordSupplied evidence
TG-RERA registrationForm C for ANANYA ENCLAVE, registration P02200003763, issued 20/12/2021; validity stated through 13/07/2024.
Building construction approvalKompally Municipality/Municipal Corporation; approval TS/001513/2021, dated 13 July, 2021; Building A, 1 Stilt + 5 upper floors.
Occupancy certificateCertificate 0010/OC/3143/2023, dated 03 April, 2023; identifies Plot Nos. 129 and 130, Survey No. 149, and declares the building fit for occupation.
Promoter declarationForm B dated 20 October 2021, made by Talakola Ajay Krishna Reddy as authorised signatory for AJAY CONSTRUCTIONS (Proprietorship).
Title-report document filed with RERAAdvocate’s report dated 25 October 2021 concerning Plot Nos. 129 and 130 in Survey No. 149, Kompally Village.
Layout recordThe supplied approval extract references layout/subdivision number 3285/LRS/ZOM/HMDA/12; an approved layout drawing is not available in the supplied records.

The public HMDA DPMS layout lookup is reported unavailable from the supplied evidence, so no independent layout-portal verification is included here. HMDA

Frequently asked questions

Is ANANYA ENCLAVE registered with Telangana RERA?

Yes. ANANYA ENCLAVE is registered with the Telangana Real Estate Regulatory Authority as P02200003763; the registration status is New Project.

Who is the developer of ANANYA ENCLAVE?

The promoter named in the RERA registration is AJAY CONSTRUCTIONS.

Where is ANANYA ENCLAVE located?

ANANYA ENCLAVE is in Kompally, Dundigal Gandimaisamma, Medchal-Malkajgiri, Telangana (500043).

When will ANANYA ENCLAVE be completed?

The promoter's proposed date of completion filed with RERA is 13/07/2024. This is the promoter's declaration, not a guarantee.