Incor Lake City

INCOR LAKE CITY PROJECTS PVT LTD · Sangareddy · RERA P01100007421

INCOR LAKE CITY is a residential apartment project in PATANCHERU A, PATANCHERU Mandal, Sangareddy District. The registered promoter is INCOR LAKE CITY PROJECTS PVT LTD. The project covers a total land area of 99585.45 sq m and comprises four residential blocks and one amenity building, with 2,198 homes in 1BHK, 2BHK, 3BHK and unspecified “BHK” configurations. Its TG-RERA registration is P01100007421, and the proposed completion date is 05/12/2028.

📘 Project brochure from the promoter’s website ↗

More from Incor Lake City Projects Pvt Ltd · 2 projects →

01What we found

RegisteredTG-RERA - valid till 5 Dec 2028
42documents on file - each fact links to its page
0court cases on this project's land in the court records searched
11items to check - 3 high

Read from TG-RERA filings, approvals, land and registration records and court records. A court case is counted only when the court record states this project's survey number with its village, or names the project.

02Check before you pay

11 items to check before you pay, 3 high - from the title chain, court records and approvals, each with what to ask the builder or your advocate. An item may not be a problem with the project: records can be incomplete.

Sign in to see each item and what to do

1. Project at a glance

Project identity

ItemProject record
Registered nameINCOR LAKE CITY RERA record
Project typeResidential apartment project RERA record RERA filing
Phase / registered portionThe RERA record describes the project as “New Project” and lists five building units; a separate phase name or phase number is not disclosed. RERA record RERA filing
TG-RERA registrationP01100007421, granted under section 5; captured on the RERA portal on 10 September 2026. RERA record Approvals record
Registration validity19/12/2023 to 05/12/2028; the supplied certificate records no extension. This is the registration period, not a statement of construction completion or occupancy certification.
Registered promoterINCOR LAKE CITY PROJECTS PVT LTD RERA record
RERA status“New Project” in the supplied project record. A current completion or occupancy certificate is not supplied. RERA record Document index

Land and geographic identity

ItemProject record
LocalityPATANCHERU / PATANCHERU A in the RERA record; the building-permit order identifies Shanthi Nagar Colony, Patancheru. RERA record RERA filing
Revenue villagePATANCHERU A in the RERA project identity; PATANCHERU / Patancheru Village in the approval and title materials. RERA record
Mandal / district / PINPATANCHERU / Sangareddy / 502324 RERA record
Project survey numbers and subdivisions691P TO 694P, 695 TO 699, 700P, 701 TO 713, 714P, 715P, 730P, 731 TO 733, 780, 736, 737, 735P, 734 RERA record
Site areaRERA land details state total area 99585.45 sq m, affected area 9029.64 sq m, and net area 90555.81 sq m. The permit records plot area 99585.45 sq m, road-affected area 9029.64 sq m, and net plot area 90544 Sq. Mtrs. RERA filing
Boundaries (RERA-filed)East: SAKHI LAKE; West: PRIVATE PREPOERTY; North: NATIONAL HIGHWAY 65; South: PRIVATE PROPERTY. RERA filing

Development identity

ItemProject record
Sanctioning authorityGreater Hyderabad Municipal Corporation (GHMC) Approvals record
Principal building permissionRevised Building Permit Order 5951/GHMC/SLP/2023-BP, approved 05 December, 2023; file no. 005783/GHMC/2898/SLP1/2022-BP. Approvals record
Approved built-up area256302.39 sq mts in the RERA project record. RERA filing
Building countFive units in the RERA approved-plan record: four residential buildings/blocks and one amenity building. RERA filing
Sanctioned floor configurationBlock A: 1 Stilt + 23 upper floors; Block B: 2 Cellar + 1 Stilt + 23 upper floors; Block C: Existing 1 Stilt + 20 upper floors and Proposed 0 upper floors; Block E: 1 Stilt + 23 upper floors; Amenity building: 1 Ground + 3 upper floors. The permit also lists heights: A 68.99, B 68.99, C 59.99, E 68.99, Amenity 12.45; units are not stated.
ParkingThe permit records Total Parking Area 102496.6 (unit not stated in the extracted item) and requires cellar/stilt areas approved for parking to be used exclusively for vehicle parking. A parking-space count is not supplied.
Approved versus RERA-declared homesThe RERA form states 5 total building units and 5 proposed building units; the filed unit table lists 2,198 homes across configurations, plus four amenity-space entries not for sale. RERA filing RERA unit table

Offering and status

ItemProject record
RERA-filed home types1BHK, 2BHK, 3BHK and 17 units recorded as “BHK” (unspecified). RERA unit table
Filed saleable-area entries1BHK 19.14 sq m; 2BHK 13.02 sq m; 3BHK 17.33 sq m; “BHK” 6.02 sq m. These are the values recorded as saleable area in the supplied RERA unit data. RERA unit table
Booked / available1BHK 58 / 34; 2BHK 765 / 184; 3BHK 525 / 615; unspecified “BHK” 17 / 0. Total: 1,365 booked / 837 available out of 2,202 filed entries, including the four amenity-space entries in the total. Counts are portal-recorded; the unit data has no as-of date. RERA unit table
Construction stageRERA-filed amenity and infrastructure progress entries range from 0% to 50%; these are declared progress figures, not independent site verification. RERA amenities
Completion datesThe registration certificate and promoter Form B state completion by 05/12/2028. A separate Form B by a director/promoter states 07t December 2028. The building permit states construction to be completed before 05 December, 2028.
Occupancy certificate (OC)No OC is supplied in the reviewed project documents. The permit requires an OC before occupation and directs the applicant to obtain one after completion. Document index

2. The project story

Incor Lake City is registered as a residential apartment development at Patancheru, Sangareddy district. Its GHMC building-permit record covers four residential blocks—A, B, C and E—and a separate amenity building. Blocks A, B and E are sanctioned with 23 upper floors above stilt (Block B also has two cellars); Block C is recorded as existing with 20 upper floors above stilt and no proposed additional upper floors. The amenity building is sanctioned as ground plus three upper floors. RERA record

The RERA filing lists 2,202 unit-table entries: 2,198 homes and four amenity-space entries, which are not homes for sale. The home inventory comprises 1BHK, 2BHK, 3BHK and 17 unspecified “BHK” entries. The portal counts show 1,365 booked and 837 available, but the record does not provide an as-of date for those counts. RERA unit table

The project’s RERA record includes progress percentages for roads, sewerage, drains, greenery, community buildings, rainwater harvesting and fire-safety requirements. These figures are promoter-reported portal data; the supplied evidence does not independently verify construction at site. No project OC or completion certificate is included in the material reviewed. RERA amenities Document index

3. Master plan, architecture & building design

The GHMC permit separately records a net plot area of 90544 Sq. Mtrs, while RERA land details state a net area of 90555.81 sq m, total area of 99585.45 sq m, and affected area of 9029.64 sq m. The approved built-up area recorded in the RERA filing is 256302.39 sq mts; no separate FSI-counted area, gross built-up area, or project carpet-area total is supplied. RERA filing RERA filing

The permit’s building schedule identifies four residential blocks and one amenity building. It states the floor configuration and heights shown in the development table above. It also records a floor handover entry for 1 ST, 2 ND, 3 RD AND FOURTH FLOORS; Area 22,214.37 m2; the extracted text does not establish the scope of that entry beyond what it states.

The permit records Tot Lot 12270.05 and two rainwater-harvesting pits, without specifying a unit for the tot-lot figure in the extracted item. It requires periphery greenery, a fenced tot-lot maintained as greenery before OC, a transformer space, a garbage house, an STP, a nala channel and associated services. No sanctioned drawing-derived information is supplied on floor-by-floor apartment counts, lift or stair counts, internal-road geometry, or residential versus common-area floor-area distribution.

4. Homes, configurations & floor plans

The supplied floor-plan measurement record contains six drawings, but reports no measured flat designs for 2BHK or 3BHK; there are no software-measured carpet-area figures available for this table. RERA unit details Floor plans

ConfigurationUnitsBookedAvailableRERA saleable areaMeasured carpet areaLoading (if supplied)
1BHK92583419.14 sq mNot suppliedNot supplied
2BHK94976518413.02 sq mNot suppliedNot supplied
3BHK1,14052561517.33 sq mNot suppliedNot supplied
Unspecified (“BHK”)171706.02 sq mNot suppliedNot supplied

The supplied RERA data labels the areas above “saleable area.” The drawing-measurement record explains that software-measured carpet area would be a separate drawing-derived measure, not a RERA disclosure, and would be smaller than saleable area because saleable area also includes a share of common areas. No measured carpet area or loading value is available here. RERA unit table Floor plans

5. Parking & vehicle circulation

The permit requires cellar and stilt areas approved for parking to remain exclusively for vehicle parking, without partition walls or rolling shutters. Block B is the only block whose extracted floor schedule expressly lists cellar levels: two cellars.

The permit does not provide a car-space or two-wheeler-space count, visitor or accessible-bay allocation, or unit-specific parking allocation. The supplied evidence also does not establish parking ownership or exclusive rights for any particular apartment. Document index

6. Amenities, recreation & open spaces

The RERA portal lists 14 infrastructure/amenity categories, all marked “YES,” with declared progress percentages. These are filing progress entries, not independent verification of delivery. RERA amenities

Community buildings
Description / sizeProject-level amenity category; permit identifies one amenity building, ground plus three upper floors.
Evidence sourceRERA amenities
Declared progress / verified statusRERA progress 35%; not independently verified.
Green strip / tot lot / park
Description / sizePermit records Tot Lot 12270.05 (unit not stated in extracted item); requires fencing and greenery before OC.
Evidence sourceRERA amenities
Declared progress / verified statusRERA progress 10%; not independently verified.
Aggregate recreational open space
Description / sizeRERA-filed category; no area stated in supplied data.
Evidence sourceRERA amenities
Declared progress / verified statusRERA progress 0%; not independently verified.
Indoor recreation and sports facilities
Description / sizeA developer brochure lists gym, yoga and meditation space, multipurpose hall, badminton court, indoor games, swimming pool, children’s play area, amphitheatre, cricket net, jogging/walking track, cycling track and basketball court, among other features. These are brochure claims, not established as delivered or as sanctioned facilities in the supplied evidence.
Other brochure-listed facilities
Description / sizeThe brochure also lists a salon, crèche, library, restaurants, coffee shops, elderly seating, bird-watching area and security/CCTV features.
Declared progress / verified statusPromoter-marketed; delivery status not verified.

7. Utilities, building services & safety

The GHMC permit requires an STP sized to the number of flats, to be installed in cellars; a nala channel as per plan; structural-stability documentation for the proposed slab over the approach nala at OC stage; two rainwater-harvesting pits; transformer space; and a garbage house. It also requires storm-water disposal, sewerage, rainwater harvesting and garbage disposal as per plans submitted to GHMC. The supplied record does not give STP capacity, water-storage capacity, sewage-reuse volumes, or electrical-substation capacity.

RERA portal progress entries are: water supply 0%; sewerage (chamber, lines, septic tank, STP) 50%; storm-water drains 25%; treatment and disposal of sewage and sullage water 0%; solid-waste management and disposal 0%; water conservation/rainwater harvesting 20%; energy management 0%; electrical meter room/sub-station/receiving station 0%; and fire protection/fire-safety requirements 35%. These are declared figures and do not establish independent completion or statutory compliance. RERA amenities

The permit requires fire-fighting installations and escape-safety provisions, an occupancy Fire NOC before OC, and execution of services—including sanitation, plumbing, fire safety, lifts and electrical installations—under qualified technical personnel. It also requires EV-charging infrastructure in parking areas and dual piping for qualifying large/group-housing buildings; the supplied evidence does not confirm completed installation or provide capacities.

The promoter’s brochure lists a lift with “A R D” (Automatic Rescue Device), CCTV in common areas, and electrical-backup specifications, including 1KW DG back up for the listed flat types. These are marketing/document specifications, not independent evidence of installation or operation.

8. Location, access & connectivity

The project is registered in PATANCHERU A, Patancheru Mandal, Sangareddy District, PIN 502324. The GHMC permit identifies Shanthi Nagar Colony, Patancheru; the RERA-filed north boundary is National Highway 65 and the east boundary is SAKHI LAKE. RERA record RERA filing RERA filing

A supplied cadastral centroid is 17.52500745915608, 78.25758833807078. The location record gives the nearest sampled Outer Ring Road interchange as approximately 0.6 km; this is a sampled location measurement, not a travel-time estimate. Cadastral map Location record

9. Developer & development status

The registered promoter is INCOR LAKE CITY PROJECTS PVT LTD, a private limited company. The supplied corporate identifier is CIN U45100TG2010PTC066744 and GSTIN 36AACCI2481G1ZO. The promoter address in the project record is INCOR OFFICE, Kavuri Hills Main Road, Patancheru, Sangareddy, PIN 502324. Corporate record Parties record RERA filing

The RERA certificate lists the promoter office as “Village: Mandal: District: Hyderabad, Pin: 500033.” The supplied project record does not give an official project contact number or promoter website. The developer brochure names INCOR Infrastructure Pvt. Ltd. as builder and lists a booking number, +91 90143 00400; these are brochure details, not the registered promoter identity.

The promoter’s RERA Form B declares completion by 5 December 2028, separate-account fund use and annual audit commitments. The building permit also requires completion before 05 December, 2028. These are declared/sanctioned dates; no independent progress verification or OC is supplied.

10. Approvals, official records & documents

RecordWhat the supplied evidence establishes
TG-RERA registration certificateForm C registration for INCOR LAKE CITY, P01100007421, issued 19/12/2023, valid to 05/12/2028; it lists the project survey numbers and conditions including the 70% separate-account requirement.
GHMC building permitRevised Building Permit Order 5951/GHMC/SLP/2023-BP, dated 05 December, 2023, file no. 005783/GHMC/2898/SLP1/2022-BP; covers the identified residential blocks and amenity building, with conditions.
Permit-linked identifiersOld permit no. 1/C22/11551/2020 dated 09 November, 2020; application no. 1/HO/22371/2019; floor-handed-over registration numbers 23422/2023, 23425/2023, 23423/2023 dated 18 November, 2023.
Title and land documents in RERA fileAdvocate title search report dated 28.07.2021; title-report copies of conveyance and sale deeds; and mortgage/rectification materials. These are listed in the supplied document register; the title chain and encumbrances are addressed in the Land & Title section.
Layout approval / approved layout planLayout-plan document slots 376258, 376260 and 376262 are present in the RERA document list but are not extracted. The supplied evidence does not include an extracted approved layout plan. Document index
Commencement / occupancy recordsThe RERA document is labelled “Commencement Certificates for each building in each phase,” while its extracted content is a revised building permit order. No separate OC or completion certificate is supplied. Document index
Promoter declarations and sale formsForm B declarations are filed by the company and a director/promoter; an allotment-letter form and agreement-for-sale form are listed with unfilled allottee/unit particulars.
Other official project recordsThe supplied project data includes a GHMC sanction and TG-RERA registration. The reviewed evidence does not include an extracted project OC or completion certificate. Approvals record Document index

Frequently asked questions

Is INCOR LAKE CITY registered with Telangana RERA?

Yes. INCOR LAKE CITY is registered with the Telangana Real Estate Regulatory Authority as P01100007421; the registration status is New Project.

Who is the developer of INCOR LAKE CITY?

The promoter named in the RERA registration is INCOR LAKE CITY PROJECTS PVT LTD.

Where is INCOR LAKE CITY located?

INCOR LAKE CITY is in PATANCHERU, PATANCHERU A, Sangareddy, Telangana (502324).

When will INCOR LAKE CITY be completed?

The promoter's proposed date of completion filed with RERA is 05/04/2029. This is the promoter's declaration, not a guarantee.