Sign in

BK s KARTHIKEYA IMPERIAL BLOCK A

BK INFRA PROJECTS · Medchal-Malkajgiri · RERA P02200006599

BK s KARTHIKEYA IMPERIAL BLOCK A is a residential apartment project in Bachupally, Bachupally Mandal, Medchal-Malkajgiri District. It is being developed by registered promoter BK INFRA PROJECTS, a partnership, on a site measuring 701.44 sq. m. The registered portion comprises one residential building with 1 Stilt + 5 upper floors and 20 2BHK apartments, each with a RERA-filed saleable area of 109.18 sq. m. Its TG-RERA registration is P02200006599, and the promoter-declared completion deadline is 26/09/2025.

More from Bk Infra Projects · 6 projects →

01What we found

Period endedTG-RERA registration ran to 26 Sep 2025 - check its extension on TG-RERA
13documents on file - each fact links to its page
12court cases on this project's land (survey 135, 136, Bachupally)
8items to check - 3 high

Read from TG-RERA filings, approvals, land and registration records and court records. A court case is counted only when the court record states this project's survey number with its village, or names the project.

02Check before you pay

8 items to check before you pay, 3 high - from the title chain, court records and approvals, each with what to ask the builder or your advocate. An item may not be a problem with the project: records can be incomplete.

Sign in to see each item and what to do

1. Project at a glance

Project identity

FieldRecord
Registered project nameBK s KARTHIKEYA IMPERIAL BLOCK A RERA record
Project type / registered portionResidential apartment project; Block A is the registered portion. RERA record
TG-RERA registrationP02200006599, granted 07/07/2023; the certificate states validity through 26/09/2025. The captured record shows no extension. RERA record
Registered promoterBK INFRA PROJECTS, a partnership. RERA filing Corporate record
RERA statusThe supplied certificate records registration through 26/09/2025; the supplied record does not establish a later extension or current registration status.

Land and geographic identity

FieldRecord
Locality / revenue villageBachupally / Bachupally Village RERA record RERA filing
Mandal / district / PINBachupally / Medchal-Malkajgiri / 500090 RERA record
Project survey numbers and subdivisionsSurvey Nos. 135 P and 136
Plot identifiers649, 650/Southern Part, 662/Southern Part & 663 RERA filing
Site area701.44 sq. m.; RERA land details state total area and net area as 701.44 sq. m., with 0 area affected by road widening/FTL/nala widening. RERA filing
Boundaries recorded in RERAEast: 33 WIDE ROAD; West: 33 WIDE ROAD; South: 33 WIDE ROAD; North: PLOT NO 650 662. RERA filing

Development identity

FieldRecord
Building-permit authority / principal approvalNizampet Municipal Corporation building permit order, approval no. 007403/BP/HMDA/1490/MED/2022, dated 26 September, 2022. The filed technical approval is also identified as HMDA approval.
Building configurationOne residential building: 1 Stilt + 5 upper floors.
Height14.99 (as recorded in the approval extraction; unit not stated there).
Approved built-up areaThe approval extraction records 2,153.80 Sq.mts. total built up area. It separately records 1,747.50 Sq.mts. built-up area and a 174.75 Sq.mts. required 10% mortgage area.
Mortgage area recorded in approval263.06 Sq.mts. provided mortgage area.
UnitsThe RERA unit record lists 20 2BHK apartments; the building permit extraction does not provide a separate approved apartment count for comparison. RERA unit table
ParkingThe supplied material does not state a total sanctioned parking-space count or unit-by-unit allocation.

Offering and status

FieldRecord
RERA-filed configuration2BHK, 20 units. RERA unit table
RERA-filed saleable area109.18 sq. m. per listed configuration. RERA unit table
Portal booking snapshot0 booked / 20 available; the supplied portal data has no as-of date, so these counts are indicative. RERA unit table
Promoter-declared completion deadlineThe Form B declaration states completion by 26/09/2025. This is distinct from registration validity.
Construction stageThe supplied records do not establish independently verified construction progress or a current site stage. RERA infrastructure entries show 0% progress where a percentage is recorded. RERA amenities
Occupancy / completion certificateNo occupancy or completion certificate is included in the supplied project documents. The building permit states an occupancy certificate is compulsory before occupation.

2. The project story

  • BK s KARTHIKEYA IMPERIAL BLOCK A is a residential apartment project registered for land at Bachupally Village, Bachupally Mandal, Medchal-Malkajgiri District, on Survey Nos. 135 P and 136. The RERA record identifies the site as Plots 649, 650/Southern Part, 662/Southern Part and 663, with a recorded extent of 701.44 sq. m. RERA record RERA filing
  • The filed building permission is for one residential building comprising 1 Stilt + 5 upper floors. The RERA unit record lists 20 two-bedroom apartments, each with a filed saleable area of 109.18 sq. m. The portal snapshot lists all 20 as available, but has no stated snapshot date. RERA unit table
  • The promoter’s Form B declares completion by 26/09/2025. That deadline is not evidence that construction was completed. No occupancy certificate is supplied, and the available project record does not establish the present construction stage through independent site verification. RERA amenities

3. Master plan, architecture & building design

  • The filed building permit describes one residential building on 701.44 Sq. Mt., with 1 Stilt + 5 upper floors and a recorded height of 14.99 (unit not stated in the extracted approval data). It records total built-up area of 2,153.80 Sq.mts. and separately lists 1,747.50 Sq.mts. built-up area; the supplied extraction does not explain the distinction between those two figures. These are approval-record figures, not saleable or carpet areas.
  • The RERA land record gives site area and net area as 701.44 sq. m. The available drawing record is identified as a floor-plan submission, but no extracted evidence here establishes building footprint, number of flats per floor, lift or stair count, circulation layout, open-space dimensions, or phase-wise arrangement. RERA filing
  • The HMDA master-plan sheet is image-only in the supplied record and has not been read to a survey-specific zoning conclusion. HMDA

4. Homes, configurations & floor plans

ConfigurationUnitsBookedAvailableRERA saleable areaMeasured carpet areaLoading (if supplied)
2BHK20020109.18 sq. m.65.9–71.4 sq. m.; median 68.8 sq. m.37%
  • The unit count, booking snapshot and saleable area are from the RERA unit record. Booking counts have no supplied as-of date. Carpet-area measurements are software-measured from the submitted floor-plan drawings, not RERA-filed disclosures; the measurement record says they need review. RERA unit table RERA unit details
  • The drawing measurement record covers 4 measured 2BHK designs. One extracted second-floor plan identifies flat 04, with living/dining, kitchen, wash area, two bedrooms, two toilets and a balcony; its recorded balcony area is 3.0 m² and is excluded from carpet area. These are drawing-derived measurements and should be checked against the plan. RERA unit details
  • Carpet area, balcony/utility areas and common-area loading are distinct from the RERA-filed saleable area. The supplied record does not provide an independently verified carpet-area figure or unit-specific allocation of common areas. RERA unit details RERA unit table

5. Parking & vehicle circulation

  • The building permit is for 1 Stilt + 5 upper floors, but the supplied extraction does not give a total count of parking spaces, identify resident or visitor allocations, or provide unit-wise parking assignments. It also does not establish accessible parking, mechanical parking, EV charging, pedestrian separation, or the number and arrangement of vehicle ramps or driveways.
  • The approval conditions refer to the common parking floor/stilt and prohibit parking or construction in setback areas. A drawn or permitted parking provision does not, by itself, establish exclusive parking ownership or a buyer’s allocation; no such allocation is supplied here.

6. Amenities, recreation & open spaces

  • The RERA infrastructure record marks water supply, sewerage and sewage-treatment provisions, green strip/park, rainwater harvesting, and electrical meter room/sub-station/receiving station as available; the recorded progress percentage for each listed infrastructure item is 0%. This is a RERA-record status, not independent verification of delivery. RERA amenities
FacilityDescription / sizeEvidence sourceDeclared progress / verified status
Green strip / TOT lot / parkListed as available; no size suppliedRERA infrastructure record RERA amenities0% recorded; not independently verified
Community buildingsListed; no description or size suppliedRERA infrastructure record RERA amenities0% recorded
Aggregate recreational open spaceListed; no area suppliedRERA infrastructure record RERA amenities0% recorded
  • No RERA-filed clubhouse, indoor recreation, sports-facility schedule, facility capacity, or amenity dimensions are established by the supplied project data. RERA amenities

7. Utilities, building services & safety

Water
Supplied project evidenceRERA infrastructure record lists water supply as available. RERA amenities
Status / limitationPercentage recorded: 0%; source, storage capacity and treatment details are not supplied.
Sewerage and drainage
Supplied project evidenceRERA record lists sewerage and sewage/sullage treatment and disposal. The building approval requires an STP to standard specification. Storm-water drains are also listed. RERA amenities
Status / limitationProgress recorded: 0% where stated; STP capacity, reuse arrangements and drainage design are not supplied.
Water conservation
Supplied project evidenceRainwater harvesting is listed in the RERA infrastructure record. RERA amenities
Status / limitationPercentage recorded: 0%; system details and completion are not established.
Electrical
Supplied project evidenceRERA record lists an electrical meter room, sub-station or receiving station; the approval extraction also lists a transformer. RERA amenities
Status / limitationPercentage recorded: 0%; supply capacity and backup arrangements are not supplied.
Vertical transportation
Supplied project evidenceNo lift count, capacity or service-lift details supplied
Status / limitationNot established in the available records.
Fire and life safety
Supplied project evidenceFire protection and fire-safety requirements are listed in the RERA infrastructure record. RERA amenities
Status / limitationPercentage recorded: 0%; equipment, escape routes and clearance evidence are not supplied here.
Solid waste
Supplied project evidenceSolid-waste management and disposal is listed in the RERA infrastructure record; the approval extraction lists a garbage house. RERA amenities
Status / limitationPercentage recorded: 0%; operating arrangements and completion are not established.
Accessibility and security
Supplied project evidenceNo project-specific accessibility, CCTV, access-control or security-system details supplied
Status / limitationNot established in the available RERA project evidence.

8. Location, access & connectivity

  • The registered project location is Bachupally, Bachupally Mandal, Medchal-Malkajgiri District, PIN 500090, on Survey Nos. 135 P and 136. The cadastral parcel-centroid coordinate supplied is 17.54317471449446, 78.38526077099147; it is a parcel-centroid location, not a surveyed building entrance. RERA record Location record
  • The building permit records an approach-road requirement, including a minimum width of 4.5mts., and requires the indicated approach road to be developed and maintained as a black-topped road before release of occupancy certificate. The supplied location record identifies HITEC City — 11.1 km as an anchor distance. Location record
  • No project-specific public-transport details or verified approach-route description are supplied. Location record

9. Developer & development status

  • The registered promoter is BK INFRA PROJECTS, recorded as a partnership, with GSTIN 36AAUFB1258R1ZN. The RERA filing identifies KADULURI KASHINATH GOUD as authorized signatory and MARUPAKULA BUCHI LINGAM GOUD as partner. RERA filing Corporate record
  • The supplied RERA record gives the promoter’s address as DHRUVA DREAMZ APT, ANDHRA BANK LANE, BACHUPALLY, BACHUPALLY, Bachupally, Medchal-Malkajgiri, 500090. The registration certificate separately prints a promoter-office entry of “Village: Mandal: District: Hyderabad, Pin: 500067.” No official promoter website or contact details are established in the supplied evidence. Parties record
  • The promoter’s Form B declares a completion deadline of 26/09/2025. The RERA registration certificate records validity from 07/07/2023 through 26/09/2025, with no extension shown in the supplied certificate. No occupancy certificate or independently verified construction-stage report is included. RERA amenities

10. Approvals, official records & documents

TG-RERA registration certificate
Identifier / dateP02200006599, issued 07/07/2023
What the supplied record establishesForm C registration for BK s KARTHIKEYA IMPERIAL BLOCK A; certificate states validity through 26/09/2025 and includes the separate-account condition.
Building permit order
Identifier / date007403/BP/HMDA/1490/MED/2022, 26 September, 2022
What the supplied record establishesNizampet Municipal Corporation permit for a residential building on Survey Nos. 135 P and 136, 1 Stilt + 5 upper floors.
HMDA technical building approval
Identifier / date007403/BP/HMDA/1490/MED/2022, 26 September, 2022
What the supplied record establishesTechnical approval addressed to Nizampet Municipal Corporation; the extraction records project conditions, including submission of a NALA conversion certificate before applying for occupancy certificate.
Form B declaration
Identifier / dateFiled by authorized signatory KADULURI KASHINATH GOUD
What the supplied record establishesPromoter declaration including the completion undertaking of 26/09/2025.
Floor-plan submission
Identifier / dateDocument 301816
What the supplied record establishesFloor-plan record used for software-measured unit observations; those measurements are not RERA-filed carpet-area disclosures.
Occupancy / completion certificate
Identifier / dateNot supplied
What the supplied record establishesThe building permit states an occupancy certificate is compulsory before occupation; the supplied file does not establish issuance.
  • The supplied records do not establish a separate approved-layout number, project-specific occupancy certificate, or independently verified construction-completion evidence. Approvals record Document index

Other registrations of BK s KARTHIKEYA IMPERIAL

Frequently asked questions

Is BK s KARTHIKEYA IMPERIAL BLOCK A registered with Telangana RERA?

Yes. BK s KARTHIKEYA IMPERIAL BLOCK A is registered with the Telangana Real Estate Regulatory Authority as P02200006599; the registration status is New Project.

Who is the developer of BK s KARTHIKEYA IMPERIAL BLOCK A?

The promoter named in the RERA registration is BK INFRA PROJECTS.

Where is BK s KARTHIKEYA IMPERIAL BLOCK A located?

BK s KARTHIKEYA IMPERIAL BLOCK A is in BACHUPALLY, Medchal-Malkajgiri, Telangana (500090).

When will BK s KARTHIKEYA IMPERIAL BLOCK A be completed?

The promoter's proposed date of completion filed with RERA is 26/09/2025. This is the promoter's declaration, not a guarantee.

More projects in Bachupally