BHAVANI CONSTRUCTIONS · Medchal-Malkajgiri · RERA P02200001253

BHAVANI CONSTRUCTIONAS is a residential apartment project in Kompally, Dundigal Gandimaisamma mandal, Medchal-Malkajgiri district. Registered promoter BHAVANI CONSTRUCTIONS is developing it on 1358.70 sq.mts of land, with one building comprising 1Cellar + 1Stilt + 5 Upper floors and 25 apartments: 15 2BHK units of 102.45 sq.m and 10 3BHK units of 128.86 sq.m. The project is registered under TG-RERA P02200001253, with a proposed completion date of 20/12/2020.

01What we found

Period endedTG-RERA registration ran to 20 Dec 2020 - check its extension on TG-RERA
12documents on file - each fact links to its page
1court case on this project's land (survey 148, Kompally)
9items to check - 4 high

Read from TG-RERA filings, approvals, land and registration records and court records. A court case is counted only when the court record states this project's survey number with its village, or names the project.

02Check before you pay

9 items to check before you pay, 4 high - from the title chain, court records and approvals, each with what to ask the builder or your advocate. An item may not be a problem with the project: records can be incomplete.

Sign in to see each item and what to do

1. Project at a glance

Project identity

ItemProject record
Registered project nameBHAVANI CONSTRUCTIONAS RERA record
Project typeResidential apartment project RERA record
Phase / registered portionNo separate phase name or phase number is disclosed. The registration and approval records refer to the project in Survey No. 148. RERA record
TG-RERA registrationP02200001253; granted 05/10/2019, stated valid through 20/12/2020. The certificate records no extension. Registration validity is distinct from the declared completion date.
Registered promoterBHAVANI CONSTRUCTIONS; the registration certificate names “Bhavani Constructions.” RERA record
RERA statusRecorded as On-Going Project in the project record. The registration certificate’s stated validity ended on 20/12/2020; no extension is recorded in the supplied certificate. RERA record

Land and geographic identity

ItemProject record
LocalityKompally RERA record
Revenue villageKompally; approval and title records also render the village as “Kompalle.” RERA record
MandalDundigal Gandimaisamma; approval record renders it “Dundigal/Gandimaisamma.” RERA record
District / PINMedchal-Malkajgiri / 500100 RERA record
Project survey number(s)Survey No. 148; no subdivision is disclosed in the supplied project identity. RERA record Land records
Registered site extent1358.70 sq.mts in the RERA project record. RERA filing
Approval-document extent1,359.90 Sq. Mt. stated in the HMDA technical approval.
Net / total land areaRERA record: total area 1358.70 sq.mts; net area 1358.70 sq.mts; affected area 0 sq.mts. RERA filing
BoundariesEast: 30 FEE ROAD; West: LAND IN SY NO 153; North: NEIGHBOURS LAND; South: LAND OF SRIKANTH MORLAWARA AND VIJAYALAXMI. RERA filing

Development identity

ItemProject record
Sanctioning authorityHyderabad Metropolitan Development Authority (HMDA); approval directs the applicant to obtain building-plan sanction from the Kompally Gram Panchayath Executive Authority. Approvals record
Principal approvalTechnical approval No. 004794/MED/R1/U6/HMDA/06112017, dated 02/04/2018. Approvals record
Approved built-up area2525.6 sq.mts stated in the approval parameters. The same approval also lists Proposed Built-up Area 3072.2; the supplied extract does not define that figure further.
Building count and configurationOne residential building, “A (BUILDING)”: 1Cellar + 1Stilt + 5 Upper floors. RERA filing
Parking levels / provisionsApproval requires cellar and stilt to be used exclusively for vehicle parking. No parking-space count or unit-level allocation is supplied.
Unit countsRERA-filed configuration totals: 25 units—15 2BHK and 10 3BHK. The approved-plan field records 1 total building unit, not a dwelling-unit total. RERA unit table RERA unit details RERA filing
Mortgage recorded with approval255.14 sq.mts in the second floor in favour of the Metropolitan Commissioner, HMDA, under document 2045/2018.

Offering and status

ItemProject record
RERA-filed configurations2BHK: 15 units; 3BHK: 10 units. RERA unit table RERA unit details
RERA-filed saleable areas2BHK: 102.45 sq.m; 3BHK: 128.86 sq.m. RERA unit table RERA unit details
Booked / availablePortal figures show 0 booked and 15 available 2BHK units, and 0 booked and 10 available 3BHK units. These figures have no supplied as-of date and are indicative. RERA unit table
Construction stageRERA-filed amenity/service progress values include water supply at 25% and electrical meter room/substation/receiving station at 5%; other listed amenity progress values are 0%. These are declared portal figures, not an independent site inspection. RERA amenities
Original / revised completion20/12/2020 / 20/12/2020 in the project record. The Form B OCR separately transcribes a completion undertaking as “24 Mouls,” which is not a usable completion date. RERA record
OC / completion certificateNo occupancy or completion certificate is identified in the supplied project documents. The available approval is a technical approval, not an OC. Document index

2. The project story

BHAVANI CONSTRUCTIONAS is recorded as a residential apartment project on Survey No. 148, Kompally village, Dundigal Gandimaisamma mandal, Medchal-Malkajgiri district. The RERA record describes a site of 1358.70 sq.mts and one building; the HMDA technical approval identifies a residential building with a cellar, stilt and five upper floors. RERA record RERA filing

The RERA-filed offering comprises 15 two-bedroom and 10 three-bedroom apartments. The portal’s latest supplied inventory reading shows all 25 as available, but gives no as-of date. The supplied record does not establish independently verified construction progress or identify completed, occupied or OC-certified portions. Declared progress entries show water supply at 25% and electrical meter room/substation/receiving station at 5%; other listed amenity entries are recorded at 0%. RERA unit table RERA amenities

The registration certificate states a validity period ending 20/12/2020, while the project record gives the same date as the original and revised proposed completion date. These are separate milestones; the supplied materials do not establish a later registration extension or an occupancy/completion certificate. RERA record

3. Master plan, architecture & building design

The project record identifies one building on Survey No. 148. HMDA’s technical approval describes it as “A (BUILDING)”, with 1Cellar + 1Stilt + 5 Upper floors. It records a built-up area of 2525.6 sq.mts, a building height of 14.75, and a separate entry for Proposed Built-up Area 3072.2; the supplied extract does not explain the measurement basis for the latter figure. RERA filing

The approved drawing extraction requires the cellar and stilt to be used exclusively for vehicle parking and specifies one entry and one exit, each with minimum width of 4.5 meters and height clearance of 5 meters. The supplied information does not establish floor-by-floor apartment arrangement, building footprint, flats per floor, lifts, stair count, internal circulation, or the site’s open-space and landscaping arrangement.

The building-plan approval extract is the available drawing-related evidence; no separate sanctioned layout plan or measured floor-plan geometry is supplied. Document index Floor plans

4. Homes, configurations & floor plans

The RERA-filed unit schedule contains 25 apartments. Saleable areas below are RERA-filed figures. The supplied floor-plan data records two drawings, with zero measured, one scan pending and one with no flats; therefore no software-measured carpet area or room dimensions can be reported. RERA unit table RERA unit details Floor plans

ConfigurationUnitsBookedAvailableRERA saleable areaMeasured carpet areaLoading (if supplied)
2BHK15015102.45 sq.mNot measured in supplied drawingsNot supplied
3BHK10010128.86 sq.mNot measured in supplied drawingsNot supplied

The RERA filing supplies saleable area, not carpet area. No drawing-based carpet, balcony, utility or common-area measurements are available in the supplied evidence. The booked/available figures are a portal reading without an as-of date and should be treated as indicative. RERA unit details Floor plans RERA unit table

5. Parking & vehicle circulation

HMDA’s technical approval requires the cellar and stilt to be used exclusively for vehicle parking, without partition walls or rolling shutters, and not to be converted from that use. It also requires one entry and one exit with minimum width of 4.5 meters and height clearance of 5 meters.

No sanctioned parking-space count, visitor or accessible parking provision, two-wheeler count, ramp details, EV charging provision, or unit-specific parking allocation is present in the supplied record. The approval’s parking-use requirement does not itself establish exclusive parking ownership or an allocation to a particular apartment.

6. Amenities, recreation & open spaces

The RERA portal lists the following 14 amenity and infrastructure entries. Progress percentages are portal declarations, not independently verified completion. RERA amenities

FacilityDescription / sizeEvidence sourceDeclared progress / verified status
Internal Roads & FootpathsSize not suppliedRERA portal RERA amenities0%; not independently verified
Water SupplySource, storage and capacity not suppliedRERA portal RERA amenitiesAvailable: YES; 25%; not independently verified
Sewerage (Chamber, Lines, Septic Tank, STP)No STP capacity or system details suppliedRERA portal RERA amenities0%; not independently verified
Storm Water DrainsDetails not suppliedRERA portal RERA amenities0%; not independently verified
Green Strip/TOT LOT/ParkArea and facilities not suppliedRERA portal RERA amenities0%; not independently verified
Street LightingDetails not suppliedRERA portal RERA amenities0%; not independently verified
Community BuildingsType, size and capacity not suppliedRERA portal RERA amenities0%; not independently verified
Treatment and Disposal of Sewage and Sullage WaterDetails not suppliedRERA portal RERA amenities0%; not independently verified
Solid Waste Management and DisposalDetails not suppliedRERA portal RERA amenities0%; not independently verified
Water Conservation, Rain water HarvestingSize and capacity not suppliedRERA portal RERA amenities; HMDA approvalAvailable: YES; portal progress 0%; not independently verified
Energy managementDetails not suppliedRERA portal RERA amenities0%; not independently verified
Fire Protection and Fire Safety RequirementsDetails not suppliedRERA portal RERA amenities; HMDA approval0%; not independently verified
Electrical Meter Room, Sub-Station, Receiving StationCapacity and equipment details not suppliedRERA portal RERA amenitiesAvailable: YES; 5%; not independently verified
Aggregate area of recreational Open SpaceArea not suppliedRERA portal RERA amenities0%; not independently verified

The HMDA approval also requires provision for a transformer and garbage house within the premises. It does not establish that these facilities have been installed or completed.

7. Utilities, building services & safety

Water and drainage: The RERA portal marks water supply as available and records 25% progress, but does not identify its source, storage, treatment or capacity. The HMDA approval requires a septic tank; the RERA portal lists sewerage works and sewage/sullage treatment and disposal at 0%. No STP or reuse capacity is supplied. RERA amenities

Rainwater, electrical and waste: Rainwater harvesting is marked available on the portal with 0% progress; HMDA’s technical approval requires rainwater-harvesting structures. The portal lists the electrical meter room/substation/receiving station as available at 5% progress. HMDA’s approval also requires a transformer and garbage house within the premises. Installation and operating status are not independently established. RERA amenities

Fire and life safety: HMDA’s approval specifies fire-safety conditions, including fire-resistant swing doors for collapsible lifts, emergency lighting in corridors/common passages and staircases, fire extinguishers, an automatic sprinkler system if the basement area exceeds 200 sq.mts, and a joint open space with neighbouring premises for fire-vehicle manoeuvrability. These are approval conditions; the supplied evidence does not verify implementation or provide a fire clearance.

The available record does not specify lift number or capacity, generator capacity, electrical backup capacity, CCTV, access control, accessibility features or accessible circulation. Document index RERA amenities

8. Location, access & connectivity

The official project location is recorded as Kompally, Kompally village, Dundigal Gandimaisamma mandal, Medchal-Malkajgiri district, PIN 500100. The project boundary description identifies 30 FEE ROAD on the east. A cadastral parcel centroid is supplied at 17.41528, 78.35459. RERA record RERA filing Location record

The supplied location dataset reports these distances:

Nearby placeCategoryReported distance
IndusInd BankBank0.4 km
Nanakramguda Govt primary schoolSchool0.5 km
Financial District (Nanakramguda)Anchor1.2 km
Unnamed parkPark1.2 km
Manuu Polytechnic HyderabadCollege1.6 km
Sankaraya Eye HospitalHospital1.6 km
Unnamed bus stationBus station2.2 km
South india shopping mallMall2.6 km
ADPIT office0.0 km

These are supplied location-dataset distances; no travel times, route descriptions or independently confirmed transport links are provided. Location record

9. Developer & development status

The registered promoter is BHAVANI CONSTRUCTIONS, recorded as a partnership. The project record names VIKRAM CHAVAN as Partner and DEEPA LAXMI CHAVAN as Authorized Signatory. The promoter address supplied in the project record is BHAVANI APARTMENTS, PADMA RAO NAGAR, KOMPALLY, KOMPALLY, Dundigal Gandimaisamma, Medchal-Malkajgiri, 500100. No corporate registration number, official website or project contact details are supplied. RERA record Corporate record Parties record

The RERA record describes one building and records a proposed completion date of 20/12/2020, unchanged as the revised proposed date. The certificate states registration validity through 20/12/2020 and records no extension. Portal progress entries are declarations only; there is no supplied independent site-progress report or occupancy/completion certificate. RERA record RERA amenities Document index

10. Approvals, official records & documents

RecordSupplied evidence
TG-RERA registrationForm C records registration P02200001253 under section 5, for BHAVANI CONSTRUCTIONAS, issued 05/10/2019, valid through 20/12/2020; certificate records no extension.
HMDA technical building approvalApproval No. 004794/MED/R1/U6/HMDA/06112017, dated 02/04/2018, for Survey No. 148, Kompalle village. The document describes the building as 1Cellar + 1Stilt + 5 Upper floors and directs the applicant to obtain sanction from the Kompally Gram Panchayath Executive Authority.
Commencement / building-plan evidenceThe supplied document is described as “Commencement Certificates for each building in each phase”; its extracted content is HMDA technical approval and conditions. No separate local-authority sanctioned building-plan certificate is supplied in the reviewed documents. Document index
Layout approvalNo layout-plan approval document is supplied. Document index
Occupancy / completion certificateNo OC or completion certificate is identified in the supplied documents. Document index
Form B declarationForm B extract records declarations concerning title, encumbrances, separate-account obligations and a completion undertaking; the OCR does not clearly identify the promoter or registration number, and transcribes the completion period as “24 Mouls.”
Title reportLegal title report concerning 1625.21 square yards in Survey No. 148, Kompally Village; filed RERA document.
Development agreementRegistered Development Agreement Cum General Power of Attorney dated 03/07/2017, document 3944/2017, concerning Survey No. 148; filed RERA document.
Encumbrance statementProject-filed encumbrance records include Development Agreement Cum GPA 3944/2017 and Deposit of Title Deeds 2045/2018.
Agreement-for-sale formA partially completed proposed agreement form is on file; the supplied extraction does not establish a completed agreement for a particular unit.

Frequently asked questions

Is BHAVANI CONSTRUCTIONAS registered with Telangana RERA?

Yes. BHAVANI CONSTRUCTIONAS is registered with the Telangana Real Estate Regulatory Authority as P02200001253; the registration status is On-Going Project.

Who is the developer of BHAVANI CONSTRUCTIONAS?

The promoter named in the RERA registration is BHAVANI CONSTRUCTIONS.

Where is BHAVANI CONSTRUCTIONAS located?

BHAVANI CONSTRUCTIONAS is in KOMPALLY, Dundigal Gandimaisamma, Medchal-Malkajgiri, Telangana (500100).

When will BHAVANI CONSTRUCTIONAS be completed?

The promoter's proposed date of completion filed with RERA is 20/12/2020. This is the promoter's declaration, not a guarantee.