Aerospace County Phase 4
GREEN CITY SAMARTH ESTATES & PROPERTIES LLP · Rangareddy · RERA P02400001451
AEROSPACE COUNTY PHASE 4 is a plotted development in FEROZGUDA, Ibrahimpatnam Mandal, Ranga Reddy District, developed by the registered promoter GREEN CITY SAMARTH ESTATES & PROPERTIES LLP. The project covers a total site area of 22,770.92 sq.m, with a net layout area of 21,388.60 sq.m, and offers plots; the supplied RERA fields do not disclose a plot count or plot-size configurations. No towers or floors are disclosed for this plotted layout. It is registered with TG-RERA under P02400001451, with proposed completion on 03/05/2022.
More from Green City Samarth Estates & Properties LLP · 3 projects →
01What we found
Read from TG-RERA filings, approvals, land and registration records and court records. A court case is counted only when the court record states this project's survey number with its village, or names the project.
02Check before you pay
12 items to check before you pay, 6 high - from the title chain, court records and approvals, each with what to ask the builder or your advocate. An item may not be a problem with the project: records can be incomplete.
1. Project at a glance
Project identity
| Field | Record |
|---|---|
| Registered project name | AEROSPACE COUNTY PHASE 4 RERA record |
| Project type | Plotted development / open-plot layout RERA record |
| Phase / registered portion | Phase 4; the certificate identifies the registered project as “AEROSPACE COUNTY PHASE 4.” |
| TG-RERA registration | P02400001451 RERA record |
| Registration validity | 25/11/2019 to 03/05/2022; certificate says subject to extension by the Authority. The supplied certificate does not record an extension. This is the registration period, not a current completion or occupancy status. |
| Registered promoter | GREEN CITY SAMARTH ESTATES & PROPERTIES LLP (certificate capitalization: Green City Samarth Estates & Properties Llp) RERA record Corporate record |
| RERA status | Registration certificate issued under section 5; no extension is recorded in the supplied certificate. |
Land and geographic identity
| Field | Record |
|---|---|
| Locality | FEROZGUDA RERA record RERA filing |
| Revenue village | Ibrahimpatnam is the RERA header’s village entry; the HMDA draft layout letter describes the site as Ferozguda Village / Ferozguda Revenue Village. RERA record RERA filing |
| Mandal | Ibrahimpatnam RERA record RERA filing |
| District | Ranga Reddy RERA record RERA filing |
| PIN | 501506 RERA record |
| Project survey numbers / subdivisions | 49/P and 50/P RERA record Land records |
| Total site area | 22,770.92 sq.m RERA filing |
| Area affected by master-plan road | 1,382.32 sq.m RERA filing |
| Net site/layout area | 21,388.60 sq.m RERA filing |
| Boundaries (RERA land record) | East: SY NO 51; West: SY NO 50 PART; North: SYS NO 49 PART; South: SY NO 50 PART. RERA filing |
Development identity
| Field | Record |
|---|---|
| Sanctioning authority | Hyderabad Metropolitan Development Authority (HMDA) Approvals record |
| Principal layout approval | 000106/LO/Plg/HMDA/2019, dated 04 May, 2019; the filed approval is described as a draft layout letter for an open-plot layout. Approvals record |
| Approved built-up area | 14749.57 sq.m is the RERA-filed “Approved Built up Area”; the supplied material does not identify this as a building or apartment area. RERA filing |
| Layout development areas | Plotted area: 14,749.57 sq.m; layout road area: 4,386.01 sq.m; open space: 537.79 sq.m in the HMDA letter. The RERA drawing-derived area statement separately identifies park/open space and social infrastructure; see the layout section below. Layout record |
| Building / floor configuration | Not applicable to the filed development type: the supplied approval is for a plotted layout, not a building scheme. No tower count, floor configuration or building parking levels are disclosed in the supplied project records. RERA record |
| Authority-mortgaged plots | Plots 12–19 (eight plots), extent 2,343.66 sq.m, mortgaged to HMDA under registered mortgage deed 8829/2019 dated 22/03/2019 as approval security. |
Offering and status
| Field | Record |
|---|---|
| Product offered | Plots in a plotted-development layout. RERA record RERA filing |
| RERA-filed plot count / plot-size range | Not disclosed in the supplied RERA fields. The layout drawing extraction is incomplete for plot counts and plot sizes. Layout record |
| Booked / available plots | Not disclosed in the supplied evidence. RERA record Layout record |
| Construction / development stage | No independently verified site-progress evidence is supplied. The RERA registration certificate records the project dates, but does not establish physical completion. |
| Completion dates | The RERA header records proposed completion 03/05/2022. The supplied registration certificate is valid through that date and does not record an extension. RERA record |
| Occupancy / completion certificate | Not supplied. The approval document is a draft layout letter; it is not an occupancy or completion certificate. |
2. The project story
This is a plotted layout registered with TG-RERA as AEROSPACE COUNTY PHASE 4, on land identified in the RERA record as Survey Nos. 49/P and 50/P, at FEROZGUDA, Ibrahimpatnam Mandal, Ranga Reddy District. HMDA’s filed draft layout letter identifies Ferozguda Village and records a total site area of 22,770.92 sq.m, including 1,382.32 sq.m affected by the master-plan road, with a net layout area of 21,388.60 sq.m. RERA record Land records
The approved scheme is for open plots, with internal roads and areas allocated to open space and social infrastructure. The approval letter states that plots 12–19, totalling 2,343.66 sq.m, are mortgaged to HMDA as security and are not to be sold while mortgaged. It also sets out development and handover conditions for roads and designated areas.
The supplied records do not establish the present physical progress, plot-by-plot availability, or whether development works have been completed. The RERA-recorded proposed completion date and registration validity are shown separately above; neither establishes an occupancy or completion certificate. RERA record
3. Master plan, architecture & building design
This project is recorded as a plotted layout rather than a multi-storey building development. The HMDA draft layout letter records a total site area of 22,770.92 sq.m, a master-plan-road-affected area of 1,382.32 sq.m, and a net site area of 21,388.6 sq.m. It identifies 14,749.57 sq.m as plotted area and 4,386.01 sq.m as layout road area.
The RERA-filed layout drawing extraction gives the following land-use statement, based on its stated net layout area of 21,388.6 sq.m. It is a software-read drawing extraction, not a separate survey measurement; the drawing’s plot count and sizes are incomplete in the supplied extraction. Layout record
| Use | Area | Share of net layout area | Evidence |
|---|---|---|---|
| Plots | 14,749.57 sq.m | 69.0% | Software-read approved layout drawing Layout record |
| Roads | 4,386.01 sq.m | 20.5% | Software-read approved layout drawing Layout record |
| Parks / open space | 1,715.21 sq.m | 8.0% | Software-read approved layout drawing Layout record |
| Social infrastructure | 537.79 sq.m | 2.5% | Software-read approved layout drawing Layout record |
| Amenities | 0.00 sq.m | 0.0% | Software-read approved layout drawing Layout record |
The HMDA letter separately describes 537.79 sq.m as “Open space” and gives 0 for “Park”; its land-use fields also contain an illegible social-infrastructure value. The supplied evidence does not provide a complete, independently checked plot schedule or confirm the final release of the layout.
The letter describes the permission as a draft open-plot layout and records conditions including formation of BT roads, opening roads for neighbouring-site access, and transfer of specified roads, open space, utility and social-infrastructure areas to the local body by registered gift deed before final layout release. It also states that buildings are not to be constructed on plots until final layout release.
No tower, floor, apartment, building-footprint, lift or building-parking design information is applicable or disclosed for this plotted-layout project. The RERA-filed 14,749.57 sq.m “Approved Built up Area” is reported as filed; the available material does not explain it as a building-area measure. RERA filing
4. Homes, configurations & floor plans
The registered offering is plotted development. The supplied RERA data does not disclose a plot count, plot-size schedule, booked/available inventory or plot-wise saleable areas. The layout extraction reports 14,749.57 sq.m as plotted area, but its plot-count and plot-size extraction is incomplete. RERA record Layout record
| Configuration | Units | Booked | Available | RERA saleable area | Measured carpet area | Loading (if supplied) |
|---|---|---|---|---|---|---|
| Plots | Not disclosed | Not disclosed | Not disclosed | Not disclosed plot-by-plot; layout drawing extraction records plotted area of 14,749.57 sq.m | Not applicable | Not supplied |
No apartment floor plans or apartment carpet-area measurements are supplied. The supplied drawing review lists two drawings, with one scan pending and no measured flat configuration; it does not establish plot dimensions or inventory. Floor plans Layout record
5. Parking & vehicle circulation
No resident or visitor parking count, plot-wise parking allocation, accessible parking, mechanical parking or parking-level information is supplied. The HMDA approval instead records eight plots, Nos. 12–19, totalling 2,343.66 sq.m, mortgaged to HMDA as approval security; these are not evidence of buyer parking provision or plot allocation.
The approved layout letter requires roads to be opened for access to neighbouring sites and refers to BT-road formation before final layout release. The supplied material does not establish current road completion or give a complete internal-road width schedule.
6. Amenities, recreation & open spaces
The RERA amenity record includes facility labels and completion percentages. A “YES” entry with 100% is a RERA-filed status, not independent verification of delivery. Items listed at 0% are not represented below as completed. RERA amenities
| Facility | Description / size | Evidence source | Declared progress / verified status |
|---|---|---|---|
| Internal roads and footpaths | No size or quantity disclosed | RERA amenity record RERA amenities | RERA-listed at 100%; not independently verified |
| Green strip / tot lot / park | RERA drawing extraction records parks/open space of 1,715.21 sq.m; the HMDA letter separately records 537.79 sq.m as open space | RERA amenities Layout record | Amenity record lists at 100%; physical delivery not independently verified |
| Community buildings | No description or size supplied | RERA amenity record RERA amenities | 0% recorded |
| Aggregate recreational open space | No quantity in the RERA amenity record | RERA amenity record RERA amenities | 0% recorded |
The promoter’s website-listed amenities are not treated here as sanctioned or delivered facilities. The project’s layout and utility services are described in the next section.
7. Utilities, building services & safety
The HMDA draft layout letter lists the following as layout amenities/utilities: common septic tank / STP, internal water-supply pipelines, overhead tank, transformer, avenue plantation, park development, rainwater-harvesting pits, utilities area and social-infrastructure area. This is evidence that these items are specified in the filed approval material; it does not establish their construction or present operating status.
The RERA amenity record lists water supply, sewerage (chambers, lines, septic tank and STP), water conservation/rainwater harvesting, and an electrical meter room/sub-station/receiving station as 100%; it separately records storm-water drains, sewage/sullage treatment and disposal, solid-waste management, energy management and fire-safety requirements at 0%. These are RERA-filed status entries, not independent site verification or a finding of statutory compliance. RERA amenities
The supplied records do not specify water source or storage capacity, STP capacity or treated-water reuse, electrical-load or backup capacity, waste-management arrangements, security systems, accessibility features or fire-safety design details. No lift or building life-safety configuration is applicable to the plotted layout as described in the filed approval. RERA amenities
8. Location, access & connectivity
The RERA project identity places the site in FEROZGUDA, Ibrahimpatnam Mandal, Ranga Reddy District, PIN 501506; the HMDA layout letter calls it Ferozguda Revenue Village and identifies the survey land as 49/P and 50/P. RERA record RERA filing
A location record gives the nearest sampled Outer Ring Road interchange at approximately 24.5 km. This is a supplied mapped distance; no travel time or route is provided. Location record
The HMDA letter identifies a 100 ft wide Master plan road affecting 1,382.32 sq.m of the site and requires roads to be opened for access to neighbouring sites. The supplied records do not provide public-transport details or measured distances to other landmarks.
9. Developer & development status
The registered promoter is GREEN CITY SAMARTH ESTATES & PROPERTIES LLP, an LLP. The RERA record lists a masked corporate identifier ending 237F; the supplied certificate’s promoter-office field is incomplete, while the project-header address identifies Sai Durga Towers, Road no 10, FEROZGUDA, Ibrahimpatnam, Ranga Reddy, 501506. Corporate record RERA filing Parties record
The supplied promoter website is greencityestates.co.in. A promoter website is not itself a TG-RERA filing or proof of project progress. Parties record Promoter website
The RERA header records the proposed completion date as 03/05/2022, and the registration certificate records validity from 25/11/2019 to 03/05/2022 without an extension entry. No current construction-progress report, final layout release, completion certificate or occupancy certificate is supplied, so the present development stage and completion status cannot be established from this evidence. RERA record
10. Approvals, official records & documents
| Record | Supplied evidence and scope |
|---|---|
| TG-RERA registration | Form C registration certificate for AEROSPACE COUNTY PHASE 4, registration P02400001451, issued 25/11/2019 and valid through 03/05/2022 unless extended; no extension is recorded in the supplied certificate. |
| HMDA layout approval | Draft layout letter dated 04 May, 2019, approval 000106/LO/Plg/HMDA/2019, for open-plot development on Survey Nos. 49/P and 50/P at Ferozguda Village. |
| HMDA application reference | 015188/SMD/LT/U6/HMDA/12092018; the document records an application reference date of 01 October, 2018. |
| HMDA mortgage security | Registered mortgage deed 8829/2019, dated 22/03/2019, covering plots 12–19 and 2,343.66 sq.m, in favour of the Metropolitan Commissioner, HMDA. |
| Road-affected-area gift deed | Registered gift deed 8830/19, dated 22/03/2019, for 1,382.32 sq.m affected by the proposed 100 ft wide master-plan road, in favour of the Commissioner of Adibatla Municipality. |
| Local-body confirmation | Letter G/218 /MC/ADB/79/2019-20, dated 16.04.2019. |
| Completion / occupancy documentation | No completion certificate, occupancy certificate or final layout-release document is supplied. Document index |
The registration certificate and HMDA draft layout letter are the principal supplied project records for registration and layout approval. The detailed approval conditions are set out in the filed HMDA letter; this overview summarizes their project-design and development context.
1. Project at a glance
Project identity
Registered project name: AEROSPACE COUNTY PHASE 4
Project type: Plotted development / open-plot layout
Phase / registered portion: Phase 4; the certificate identifies the registered project as “AEROSPACE COUNTY PHASE 4.”
TG-RERA registration: P02400001451
Registration validity: 25/11/2019 to 03/05/2022; certificate says subject to extension by the Authority. The supplied certificate does not record an extension. This is the registration period, not a current completion or occupancy status.
Registered promoter: GREEN CITY SAMARTH ESTATES & PROPERTIES LLP (certificate capitalization: Green City Samarth Estates & Properties Llp)
RERA status: Registration certificate issued under section 5; no extension is recorded in the supplied certificate.
Land and geographic identity
Locality: FEROZGUDA
Revenue village: Ibrahimpatnam is the RERA header’s village entry; the HMDA draft layout letter describes the site as Ferozguda Village / Ferozguda Revenue Village.
Mandal: Ibrahimpatnam
District: Ranga Reddy
PIN: 501506
Project survey numbers / subdivisions: 49/P and 50/P
Total site area: 22,770.92 sq.m
Area affected by master-plan road: 1,382.32 sq.m
Net site/layout area: 21,388.60 sq.m
Boundaries (RERA land record): East: SY NO 51; West: SY NO 50 PART; North: SYS NO 49 PART; South: SY NO 50 PART.
Development identity
Sanctioning authority: Hyderabad Metropolitan Development Authority (HMDA)
Principal layout approval: 000106/LO/Plg/HMDA/2019, dated 04 May, 2019; the filed approval is described as a draft layout letter for an open-plot layout.
Approved built-up area: 14749.57 sq.m is the RERA-filed “Approved Built up Area”; the supplied material does not identify this as a building or apartment area.
Layout development areas: Plotted area: 14,749.57 sq.m; layout road area: 4,386.01 sq.m; open space: 537.79 sq.m in the HMDA letter. The RERA drawing-derived area statement separately identifies park/open space and social infrastructure; see the layout section below.
Building / floor configuration: Not applicable to the filed development type: the supplied approval is for a plotted layout, not a building scheme. No tower count, floor configuration or building parking levels are disclosed in the supplied project records.
Authority-mortgaged plots: Plots 12–19 (eight plots), extent 2,343.66 sq.m, mortgaged to HMDA under registered mortgage deed 8829/2019 dated 22/03/2019 as approval security.
Offering and status
Product offered: Plots in a plotted-development layout.
RERA-filed plot count / plot-size range: Not disclosed in the supplied RERA fields. The layout drawing extraction is incomplete for plot counts and plot sizes.
Booked / available plots: Not disclosed in the supplied evidence.
Construction / development stage: No independently verified site-progress evidence is supplied. The RERA registration certificate records the project dates, but does not establish physical completion.
Completion dates: The RERA header records proposed completion 03/05/2022. The supplied registration certificate is valid through that date and does not record an extension.
Occupancy / completion certificate: Not supplied. The approval document is a draft layout letter; it is not an occupancy or completion certificate.
2. The project story
This is a plotted layout registered with TG-RERA as AEROSPACE COUNTY PHASE 4, on land identified in the RERA record as Survey Nos. 49/P and 50/P, at FEROZGUDA, Ibrahimpatnam Mandal, Ranga Reddy District. HMDA’s filed draft layout letter identifies Ferozguda Village and records a total site area of 22,770.92 sq.m, including 1,382.32 sq.m affected by the master-plan road, with a net layout area of 21,388.60 sq.m.
The approved scheme is for open plots, with internal roads and areas allocated to open space and social infrastructure. The approval letter states that plots 12–19, totalling 2,343.66 sq.m, are mortgaged to HMDA as security and are not to be sold while mortgaged. It also sets out development and handover conditions for roads and designated areas.
The supplied records do not establish the present physical progress, plot-by-plot availability, or whether development works have been completed. The RERA-recorded proposed completion date and registration validity are shown separately above; neither establishes an occupancy or completion certificate.
3. Master plan, architecture & building design
This project is recorded as a plotted layout rather than a multi-storey building development. The HMDA draft layout letter records a total site area of 22,770.92 sq.m, a master-plan-road-affected area of 1,382.32 sq.m, and a net site area of 21,388.6 sq.m. It identifies 14,749.57 sq.m as plotted area and 4,386.01 sq.m as layout road area.
The RERA-filed layout drawing extraction gives the following land-use statement, based on its stated net layout area of 21,388.6 sq.m. It is a software-read drawing extraction, not a separate survey measurement; the drawing’s plot count and sizes are incomplete in the supplied extraction.
| Use | Area | Share of net layout area | Evidence |
|---|---|---|---|
| Plots | 14,749.57 sq.m | 69.0% | Software-read approved layout drawing |
| Roads | 4,386.01 sq.m | 20.5% | Software-read approved layout drawing |
| Parks / open space | 1,715.21 sq.m | 8.0% | Software-read approved layout drawing |
| Social infrastructure | 537.79 sq.m | 2.5% | Software-read approved layout drawing |
| Amenities | 0.00 sq.m | 0.0% | Software-read approved layout drawing |
The HMDA letter separately describes 537.79 sq.m as “Open space” and gives 0 for “Park”; its land-use fields also contain an illegible social-infrastructure value. The supplied evidence does not provide a complete, independently checked plot schedule or confirm the final release of the layout.
The letter describes the permission as a draft open-plot layout and records conditions including formation of BT roads, opening roads for neighbouring-site access, and transfer of specified roads, open space, utility and social-infrastructure areas to the local body by registered gift deed before final layout release. It also states that buildings are not to be constructed on plots until final layout release.
No tower, floor, apartment, building-footprint, lift or building-parking design information is applicable or disclosed for this plotted-layout project. The RERA-filed 14,749.57 sq.m “Approved Built up Area” is reported as filed; the available material does not explain it as a building-area measure.
4. Homes, configurations & floor plans
The registered offering is plotted development. The supplied RERA data does not disclose a plot count, plot-size schedule, booked/available inventory or plot-wise saleable areas. The layout extraction reports 14,749.57 sq.m as plotted area, but its plot-count and plot-size extraction is incomplete.
| Configuration | Units | Booked | Available | RERA saleable area | Measured carpet area | Loading (if supplied) |
|---|---|---|---|---|---|---|
| Plots | Not disclosed | Not disclosed | Not disclosed | Not disclosed plot-by-plot; layout drawing extraction records plotted area of 14,749.57 sq.m | Not applicable | Not supplied |
No apartment floor plans or apartment carpet-area measurements are supplied. The supplied drawing review lists two drawings, with one scan pending and no measured flat configuration; it does not establish plot dimensions or inventory.
5. Parking & vehicle circulation
No resident or visitor parking count, plot-wise parking allocation, accessible parking, mechanical parking or parking-level information is supplied. The HMDA approval instead records eight plots, Nos. 12–19, totalling 2,343.66 sq.m, mortgaged to HMDA as approval security; these are not evidence of buyer parking provision or plot allocation.
The approved layout letter requires roads to be opened for access to neighbouring sites and refers to BT-road formation before final layout release. The supplied material does not establish current road completion or give a complete internal-road width schedule.
6. Amenities, recreation & open spaces
The RERA amenity record includes facility labels and completion percentages. A “YES” entry with 100% is a RERA-filed status, not independent verification of delivery. Items listed at 0% are not represented below as completed.
| Facility | Description / size | Evidence source | Declared progress / verified status |
|---|---|---|---|
| Internal roads and footpaths | No size or quantity disclosed | RERA amenity record | RERA-listed at 100%; not independently verified |
| Green strip / tot lot / park | RERA drawing extraction records parks/open space of 1,715.21 sq.m; the HMDA letter separately records 537.79 sq.m as open space | Amenity record lists at 100%; physical delivery not independently verified | |
| Community buildings | No description or size supplied | RERA amenity record | 0% recorded |
| Aggregate recreational open space | No quantity in the RERA amenity record | RERA amenity record | 0% recorded |
The promoter’s website-listed amenities are not treated here as sanctioned or delivered facilities. The project’s layout and utility services are described in the next section.
7. Utilities, building services & safety
The HMDA draft layout letter lists the following as layout amenities/utilities: common septic tank / STP, internal water-supply pipelines, overhead tank, transformer, avenue plantation, park development, rainwater-harvesting pits, utilities area and social-infrastructure area. This is evidence that these items are specified in the filed approval material; it does not establish their construction or present operating status.
The RERA amenity record lists water supply, sewerage (chambers, lines, septic tank and STP), water conservation/rainwater harvesting, and an electrical meter room/sub-station/receiving station as 100%; it separately records storm-water drains, sewage/sullage treatment and disposal, solid-waste management, energy management and fire-safety requirements at 0%. These are RERA-filed status entries, not independent site verification or a finding of statutory compliance.
The supplied records do not specify water source or storage capacity, STP capacity or treated-water reuse, electrical-load or backup capacity, waste-management arrangements, security systems, accessibility features or fire-safety design details. No lift or building life-safety configuration is applicable to the plotted layout as described in the filed approval.
8. Location, access & connectivity
The RERA project identity places the site in FEROZGUDA, Ibrahimpatnam Mandal, Ranga Reddy District, PIN 501506; the HMDA layout letter calls it Ferozguda Revenue Village and identifies the survey land as 49/P and 50/P.
A location record gives the nearest sampled Outer Ring Road interchange at approximately 24.5 km. This is a supplied mapped distance; no travel time or route is provided.
The HMDA letter identifies a 100 ft wide Master plan road affecting 1,382.32 sq.m of the site and requires roads to be opened for access to neighbouring sites. The supplied records do not provide public-transport details or measured distances to other landmarks.
9. Developer & development status
The registered promoter is GREEN CITY SAMARTH ESTATES & PROPERTIES LLP, an LLP. The RERA record lists a masked corporate identifier ending 237F; the supplied certificate’s promoter-office field is incomplete, while the project-header address identifies Sai Durga Towers, Road no 10, FEROZGUDA, Ibrahimpatnam, Ranga Reddy, 501506.
The supplied promoter website is greencityestates.co.in. A promoter website is not itself a TG-RERA filing or proof of project progress.
The RERA header records the proposed completion date as 03/05/2022, and the registration certificate records validity from 25/11/2019 to 03/05/2022 without an extension entry. No current construction-progress report, final layout release, completion certificate or occupancy certificate is supplied, so the present development stage and completion status cannot be established from this evidence.
10. Approvals, official records & documents
TG-RERA registration: Form C registration certificate for AEROSPACE COUNTY PHASE 4, registration P02400001451, issued 25/11/2019 and valid through 03/05/2022 unless extended; no extension is recorded in the supplied certificate.
HMDA layout approval: Draft layout letter dated 04 May, 2019, approval 000106/LO/Plg/HMDA/2019, for open-plot development on Survey Nos. 49/P and 50/P at Ferozguda Village.
HMDA application reference: 015188/SMD/LT/U6/HMDA/12092018; the document records an application reference date of 01 October, 2018.
HMDA mortgage security: Registered mortgage deed 8829/2019, dated 22/03/2019, covering plots 12–19 and 2,343.66 sq.m, in favour of the Metropolitan Commissioner, HMDA.
Road-affected-area gift deed: Registered gift deed 8830/19, dated 22/03/2019, for 1,382.32 sq.m affected by the proposed 100 ft wide master-plan road, in favour of the Commissioner of Adibatla Municipality.
Local-body confirmation: Letter G/218 /MC/ADB/79/2019-20, dated 16.04.2019.
Completion / occupancy documentation: No completion certificate, occupancy certificate or final layout-release document is supplied.
The registration certificate and HMDA draft layout letter are the principal supplied project records for registration and layout approval. The detailed approval conditions are set out in the filed HMDA letter; this overview summarizes their project-design and development context.
Other registrations of Aerospace County
Frequently asked questions
Is AEROSPACE COUNTY PHASE 4 registered with Telangana RERA?
Yes. AEROSPACE COUNTY PHASE 4 is registered with the Telangana Real Estate Regulatory Authority as P02400001451; the registration status is New Project.
Who is the developer of AEROSPACE COUNTY PHASE 4?
The promoter named in the RERA registration is GREEN CITY SAMARTH ESTATES & PROPERTIES LLP.
Where is AEROSPACE COUNTY PHASE 4 located?
AEROSPACE COUNTY PHASE 4 is in FEROZGUDA, Ibrahimpatnam, Rangareddy, Telangana (501506).
When will AEROSPACE COUNTY PHASE 4 be completed?
The promoter's proposed date of completion filed with RERA is 03/05/2022. This is the promoter's declaration, not a guarantee.
More projects in Ibrahimpatnam