Aerospace County Phase 3
GREEN CITY SAMARTH ESTATES & PROPERTIES LLP · Rangareddy · RERA P02400000426
Aerospace County Phase 3 is a plotted development in Ferozguda Village, Ibrahimpatnam Mandal, Ranga Reddy District. The registered promoter is GREEN CITY SAMARTH ESTATES & PROPERTIES LLP. The project covers a total site area of 84,781.84 sq.m and is a plotted layout; the supplied records do not state a plot count or plot-size configurations. Its TG-RERA registration number is P02400000426, and the proposed completion date is 31/05/2019.
More from Green City Samarth Estates & Properties LLP · 3 projects →
01What we found
Read from TG-RERA filings, approvals, land and registration records and court records. A court case is counted only when the court record states this project's survey number with its village, or names the project.
02Check before you pay
7 items to check before you pay, 4 high - from the title chain, court records and approvals, each with what to ask the builder or your advocate. An item may not be a problem with the project: records can be incomplete.
1. Project at a glance
Project identity
| Field | Record |
|---|---|
| Registered project name | Aerospace County Phase 3 |
| Project type | Plotted development / open-plot layout RERA record |
| Phase / registered portion | Phase 3; the certificate registers the named phase. The precise parcel-by-parcel phase boundary is not separately stated in the supplied record. Land records |
| TG-RERA registration | P02400000426, issued 12/03/2019; certificate validity ended 31/05/2019. The supplied record says no extension was recorded. |
| Registered promoter | GREEN CITY SAMARTH ESTATES & PROPERTIES LLP RERA record Corporate record |
| RERA status | Listed as an “On-Going Project”; registration validity and completion dates are separate matters, as shown below. RERA record |
Land and geographic identity
| Field | Record |
|---|---|
| Locality / revenue village | Ferozguda / Ferozguda Village RERA record |
| Mandal | Ibrahimpatnam |
| District | Ranga Reddy RERA record |
| PIN | 501506 RERA record |
| Project survey numbers and subdivisions | Survey Nos. 47/P, 48/P and 49/P; the HMDA draft layout describes these as Survey Nos. 47 PART, 48 PART and 49 PART. |
| Total site area | 84,781.84 sq.m |
| Road-affected area | 287.45 sq.m |
| Net site area | 84,494.39 sq.m |
| Boundaries | Not stated in the supplied RERA identity fields. RERA filing |
Development identity
| Field | Record |
|---|---|
| Sanctioning authority | Hyderabad Metropolitan Development Authority (HMDA) Approvals record |
| Principal approval | Draft layout permit 000132/LO/Plg/HMDA/2018, dated 04 July 2018 |
| Application number | 011602/SMD/LT/U6/HMDA/11052018 |
| Approved built-up area | 39,216.04 sq.m, as recorded in the RERA project fields; this is not identified there as a dwelling-area figure. RERA filing |
| Layout composition recorded in draft approval | Plotted area 39,216.04 sq.m; layout roads 36,405.63 sq.m; open space 2,115.33 sq.m. |
| Buildings / floors | Not applicable to the filed open-plot layout as described in the supplied approval; no building count or floor configuration is provided. |
| Parking | No project-wide parking-space count or parking-level arrangement is established by the supplied records. The approval identifies 36 plots mortgaged in favour of HMDA, not parking spaces. |
Offering and status
| Field | Record |
|---|---|
| Offered unit type | Plots; the supplied registration and layout records do not provide a plot-size range or total plot count. RERA record |
| Booked / available | Not disclosed in the supplied project data. RERA filing |
| Construction stage | RERA header lists “On-Going Project” and 70% completeness; this is a recorded progress figure, not an independently verified site inspection. RERA record |
| Proposed and revised completion | Both shown as 31/05/2019 in the RERA project header. RERA record |
| Promoter’s filed completion undertaking | Form B states completion on or before 30/04/2019. |
| Occupancy / completion certificate | No occupancy or completion certificate is included in the supplied records. The project is a plotted layout; the supplied HMDA document is a draft layout letter, not a final-layout or occupancy certificate. Document index |
2. The project story
Aerospace County Phase 3 is registered as a plotted-development project covering portions of Survey Nos. 47/P, 48/P and 49/P in Ferozguda Village, Ibrahimpatnam Mandal, Ranga Reddy District. The filed HMDA document describes a draft open-plot layout, with plots, internal layout roads and open space; it does not describe an apartment or multi-building scheme. RERA record
The draft approval records a total site area of 84,781.84 sq.m, including 287.45 sq.m affected by a proposed master-plan road, and a net site area of 84,494.39 sq.m. It identifies 39,216.04 sq.m as plotted area and 36,405.63 sq.m as layout-road area. The RERA header records 70% completeness, but the supplied material does not establish the physical completion of individual roads, plots or services through an independent site inspection. RERA record
The registration certificate’s validity ended on 31/05/2019. The project header gives the same date as its original and revised completion date. These are recorded registration and completion dates, respectively; neither is evidence that the layout was completed or that a completion certificate was issued. No such certificate is included in the supplied evidence. RERA record
3. Master plan, architecture & building design
This is a plotted layout, rather than a building project in the supplied approval record. HMDA’s draft layout letter records the following land allocation:
| Layout component | Area |
|---|---|
| Total site area | 84,781.84 sq.m |
| Master-plan road-affected area | 287.45 sq.m |
| Net site area | 84,494.39 sq.m |
| Plotted area | 39,216.04 sq.m |
| Layout-road area | 36,405.63 sq.m |
| Open space shown in the area schedule | 2,115.33 sq.m |
The same draft letter refers to open-space area of 6,754.13 sq.m (7.99%) in a handover condition, while its area schedule separately lists open space as 2,115.33 sq.m. The supplied record does not explain that distinction; the figures are reported here as recorded, without treating either as a completed or transferred area.
The draft letter specifies a 30 mtrs road width and states that roads and open spaces are to be transferred to the local body by registered gift deed before final layout release. It also lists development works and services, including internal water-supply pipelines, an overhead tank, electrical supply lines, street lights, a transformer, avenue plantation, park development, rainwater-harvesting pits, a common septic tank/STP and a utilities area. These are approval-record requirements or listed provisions; the supplied material does not establish their completion.
The approval record identifies 6036.35 sq.m in Plot Nos. 80 to 84, 109 to 118, 149 to 161 and 183 to 190 as mortgaged in favour of HMDA. It further states that mortgaged plots and areas are not to be sold, and that building construction in plots is not permitted until HMDA issues the final layout.
No building footprint, dwelling configuration, floor plans, building elevations, tower heights or apartment areas are provided. The three drawing files identified for floor-plan measurement are scans pending review, with zero measured plans; those records do not provide a basis for home or room measurements. Floor plans
4. Homes, configurations & floor plans
The RERA material describes a plotted project, but the supplied structured data does not give plot-size bands, plot-wise areas, a complete plot inventory, or booked and available plot counts. Accordingly, no plot configuration or inventory table can be populated from the evidence supplied. RERA record RERA filing
A partially completed allotment-letter format is filed, but its allottee, plot particulars, price and dates are blank. It is a form document, not evidence of an identified plot sale or completed transfer.
The supplied floor-plan set has three scans pending review and no measured plans. No software-measured carpet areas or room dimensions are available. Carpet-area and apartment saleable-area comparisons are therefore not applicable on the available evidence for this plotted layout. Floor plans
5. Parking & vehicle circulation
No sanctioned project-wide parking count, visitor or accessible parking provision, parking levels, EV-charging provision, or plot-wise parking allocation is established by the supplied RERA or HMDA records. The draft HMDA letter identifies 36 plots (Plot Nos. 80 to 84, 109 to 118, 149 to 161 and 183 to 190) mortgaged in favour of HMDA; these are plots, not parking spaces.
The approval requires roads to be opened for access to neighbouring sites and records a 30 mtrs road width. It does not provide a full internal-road schedule or establish completed vehicle circulation.
6. Amenities, recreation & open spaces
The table below separates HMDA-recorded approval provisions from project progress fields. The RERA amenity schedule reports some infrastructure at 99%; that is a recorded progress entry and is not independent verification of delivery. RERA amenities
| Description / size | Layout-road area 36,405.63 sq.m; draft letter specifies 30 mtrs road width. |
|---|---|
| Evidence source | HMDA draft layout letter; RERA amenity schedule RERA amenities |
| Declared progress / verified status | RERA amenity schedule: 99%; independent completion verification not supplied. |
| Description / size | Internal water-supply pipelines listed; no capacity stated. |
|---|---|
| Evidence source | HMDA draft layout letter; RERA amenity schedule RERA amenities |
| Declared progress / verified status | RERA amenity schedule: 99%; independent completion verification not supplied. |
| Description / size | Common septic tank / STP listed; no capacity stated. |
|---|---|
| Evidence source | HMDA draft layout letter; RERA amenity schedule RERA amenities |
| Declared progress / verified status | RERA amenity schedule: 99%; independent completion verification not supplied. |
| Description / size | Draft letter lists park development and avenue plantation; area schedule lists open space of 2,115.33 sq.m. |
|---|---|
| Evidence source | HMDA draft layout letter; RERA amenity schedule RERA amenities |
| Declared progress / verified status | RERA amenity schedule: 99%; independent completion verification not supplied. |
| Description / size | Street lights listed; no quantity or specification stated. |
|---|---|
| Evidence source | HMDA draft layout letter; RERA amenity schedule RERA amenities |
| Declared progress / verified status | RERA amenity schedule: 99%; independent completion verification not supplied. |
| Description / size | Rainwater-harvesting pits listed; no number or capacity stated. |
|---|---|
| Evidence source | HMDA draft layout letter; RERA amenity schedule RERA amenities |
| Declared progress / verified status | RERA amenity schedule: 99%; independent completion verification not supplied. |
| Description / size | Electrical supply lines and transformer listed. |
|---|---|
| Evidence source | HMDA draft layout letter; RERA amenity schedule RERA amenities |
| Declared progress / verified status | RERA amenity schedule records the electrical meter room / sub-station / receiving station at 99%; independent completion verification not supplied. |
| Description / size | 2,115.33 sq.m, shown as 2.50% in the draft letter; a separate handover condition refers to open-space area of 6,754.13 sq.m (7.99%). |
|---|---|
| Evidence source | HMDA draft layout letter |
| Declared progress / verified status | Approval-record figures; no evidence supplied of handover or completion. |
| Description / size | No clubhouse or indoor facility is established in the supplied approval records; the RERA amenity schedule records community buildings at 0%. RERA amenities |
|---|---|
| Evidence source | RERA amenity schedule |
| Declared progress / verified status | No completed facility verified in the supplied material. |
The RERA amenity schedule also records storm-water drains, sewage treatment/disposal, solid-waste management, energy management, fire protection and aggregate recreational open space at 0%. These are schedule entries, not a determination of whether a particular facility is required for this layout. RERA amenities
7. Utilities, building services & safety
HMDA’s draft layout letter lists internal water-supply pipelines, an overhead tank, electrical supply lines, street lights, a transformer, rainwater-harvesting pits and a common septic tank/STP. It does not state capacities, system specifications or independently verified commissioning status.
The RERA amenity schedule reports water supply, sewerage, street lighting and electrical meter room/sub-station/receiving station at 99%, and rainwater conservation/harvesting at 99%. It reports storm-water drains, treatment and disposal of sewage and sullage, solid-waste management, energy management and fire-protection/fire-safety requirements at 0%. These percentages are project-record entries and do not, by themselves, establish the physical condition or statutory compliance of the facilities. RERA amenities
No supplied record establishes water-source details, storage capacities, treated-water reuse, separate storm-water arrangements, backup power, EV charging, fire-system specifications, security systems, waste segregation arrangements or accessibility provisions. The project is filed as plotted development, and no building lift or building-level life-safety configuration is provided. RERA amenities
8. Location, access & connectivity
The registered project location is Ferozguda Village, Ibrahimpatnam Mandal, Ranga Reddy District, PIN 501506, covering Survey Nos. 47/P, 48/P and 49/P. The HMDA draft layout letter identifies a 30 mtrs road width and directs that the layout roads be opened for access to neighbouring sites. RERA record
The supplied location records list the following nearby points and distances from the project-location dataset: Location record
| Point | Recorded distance |
|---|---|
| Financial District (Nanakramguda) | 1.2 km |
| IndusInd Bank | 0.4 km |
| Unnamed bus station | 2.2 km |
| Manuu Polytechnic Hyderabad | 1.6 km |
| Sankaraya Eye Hospital | 1.6 km |
| ADP | 0.0 km |
| South India Shopping Mall | 2.6 km |
| Unnamed park | 1.2 km |
| Nanakramguda Government Primary School | 0.5 km |
These are distances in the supplied location dataset; no measurement method or public-transport service details are provided. The promoter’s website lists travel-time claims, but no travel times are stated here as verified connectivity facts. Location record Promoter website
9. Developer & development status
The registered promoter is GREEN CITY SAMARTH ESTATES & PROPERTIES LLP, identified as an LLP in the project record. The named partner and authorised signatory is Samarth Agarwal. Corporate record Parties record The supplied promoter address is Sai Durga Towers, Road No. 10, Ferozguda, Ranga Reddy, PIN 501506. Parties record
A Form B affidavit dated 30 November 2018, signed by Samarth Agarwal as authorised signatory, declares title, states that the land is free from encumbrances and undertakes completion by 30/04/2019. Those are promoter declarations in the filed affidavit.
The project header records 70% completeness and a proposed and revised completion date of 31/05/2019. The supplied material does not include an independent site-progress inspection or a completion/occupancy certificate. The TG-RERA certificate records registration through 31/05/2019; it does not itself evidence completion. RERA record
10. Approvals, official records & documents
| Identifier / date | P02400000426, issued 12/03/2019; valid to 31/05/2019 |
|---|---|
| What the supplied record establishes | Registers Aerospace County Phase 3 and lists conditions including agreement-for-sale, conveyance and separate-account requirements. |
| Identifier / date | 000132/LO/Plg/HMDA/2018, 04 July 2018; application 011602/SMD/LT/U6/HMDA/11052018 |
|---|---|
| What the supplied record establishes | Draft approval for an open-plot layout in Survey Nos. 47 PART, 48 PART and 49 PART, Ferozguda Village, Ibrahimpatnam Mandal. The letter includes conditions for infrastructure works, road/open-space transfer and final layout release. |
| Identifier / date | Document No. 12263/2018, 05/06/2018 |
|---|---|
| What the supplied record establishes | Identifies 6036.35 sq.m across specified plots as mortgaged in favour of HMDA. |
| Identifier / date | Document No. 12264/2018, 05/06/2018 |
|---|---|
| What the supplied record establishes | Cited for the 287.45 sq.m area affected by the proposed 30 mtrs road, in favour of the local body. |
| Identifier / date | Declaration dated 30 November 2018 |
|---|---|
| What the supplied record establishes | Contains promoter declarations concerning title, encumbrances, project-account obligations, pending approvals and completion undertaking. |
| Identifier / date | Not supplied |
|---|---|
| What the supplied record establishes | No such certificate is included in the reviewed project material. Document index |
The supplied HMDA document is described as a draft layout letter; the evidence pack does not include a final layout release. The listed infrastructure and handover requirements therefore remain approval-record provisions here, not verified completion claims.
1. Project at a glance
Project identity
Registered project name: Aerospace County Phase 3
Project type: Plotted development / open-plot layout
Phase / registered portion: Phase 3; the certificate registers the named phase. The precise parcel-by-parcel phase boundary is not separately stated in the supplied record.
TG-RERA registration: P02400000426, issued 12/03/2019; certificate validity ended 31/05/2019. The supplied record says no extension was recorded.
Registered promoter: GREEN CITY SAMARTH ESTATES & PROPERTIES LLP
RERA status: Listed as an “On-Going Project”; registration validity and completion dates are separate matters, as shown below.
Land and geographic identity
Locality / revenue village: Ferozguda / Ferozguda Village
Mandal: Ibrahimpatnam
District: Ranga Reddy
PIN: 501506
Project survey numbers and subdivisions: Survey Nos. 47/P, 48/P and 49/P; the HMDA draft layout describes these as Survey Nos. 47 PART, 48 PART and 49 PART.
Total site area: 84,781.84 sq.m
Road-affected area: 287.45 sq.m
Net site area: 84,494.39 sq.m
Boundaries: Not stated in the supplied RERA identity fields.
Development identity
Sanctioning authority: Hyderabad Metropolitan Development Authority (HMDA)
Principal approval: Draft layout permit 000132/LO/Plg/HMDA/2018, dated 04 July 2018
Application number: 011602/SMD/LT/U6/HMDA/11052018
Approved built-up area: 39,216.04 sq.m, as recorded in the RERA project fields; this is not identified there as a dwelling-area figure.
Layout composition recorded in draft approval: Plotted area 39,216.04 sq.m; layout roads 36,405.63 sq.m; open space 2,115.33 sq.m.
Buildings / floors: Not applicable to the filed open-plot layout as described in the supplied approval; no building count or floor configuration is provided.
Parking: No project-wide parking-space count or parking-level arrangement is established by the supplied records. The approval identifies 36 plots mortgaged in favour of HMDA, not parking spaces.
Offering and status
Offered unit type: Plots; the supplied registration and layout records do not provide a plot-size range or total plot count.
Booked / available: Not disclosed in the supplied project data.
Construction stage: RERA header lists “On-Going Project” and 70% completeness; this is a recorded progress figure, not an independently verified site inspection.
Proposed and revised completion: Both shown as 31/05/2019 in the RERA project header.
Promoter’s filed completion undertaking: Form B states completion on or before 30/04/2019.
Occupancy / completion certificate: No occupancy or completion certificate is included in the supplied records. The project is a plotted layout; the supplied HMDA document is a draft layout letter, not a final-layout or occupancy certificate.
2. The project story
Aerospace County Phase 3 is registered as a plotted-development project covering portions of Survey Nos. 47/P, 48/P and 49/P in Ferozguda Village, Ibrahimpatnam Mandal, Ranga Reddy District. The filed HMDA document describes a draft open-plot layout, with plots, internal layout roads and open space; it does not describe an apartment or multi-building scheme.
The draft approval records a total site area of 84,781.84 sq.m, including 287.45 sq.m affected by a proposed master-plan road, and a net site area of 84,494.39 sq.m. It identifies 39,216.04 sq.m as plotted area and 36,405.63 sq.m as layout-road area. The RERA header records 70% completeness, but the supplied material does not establish the physical completion of individual roads, plots or services through an independent site inspection.
The registration certificate’s validity ended on 31/05/2019. The project header gives the same date as its original and revised completion date. These are recorded registration and completion dates, respectively; neither is evidence that the layout was completed or that a completion certificate was issued. No such certificate is included in the supplied evidence.
3. Master plan, architecture & building design
This is a plotted layout, rather than a building project in the supplied approval record. HMDA’s draft layout letter records the following land allocation:
Total site area: 84,781.84 sq.m
Master-plan road-affected area: 287.45 sq.m
Net site area: 84,494.39 sq.m
Plotted area: 39,216.04 sq.m
Layout-road area: 36,405.63 sq.m
Open space shown in the area schedule: 2,115.33 sq.m
The same draft letter refers to open-space area of 6,754.13 sq.m (7.99%) in a handover condition, while its area schedule separately lists open space as 2,115.33 sq.m. The supplied record does not explain that distinction; the figures are reported here as recorded, without treating either as a completed or transferred area.
The draft letter specifies a 30 mtrs road width and states that roads and open spaces are to be transferred to the local body by registered gift deed before final layout release. It also lists development works and services, including internal water-supply pipelines, an overhead tank, electrical supply lines, street lights, a transformer, avenue plantation, park development, rainwater-harvesting pits, a common septic tank/STP and a utilities area. These are approval-record requirements or listed provisions; the supplied material does not establish their completion.
The approval record identifies 6036.35 sq.m in Plot Nos. 80 to 84, 109 to 118, 149 to 161 and 183 to 190 as mortgaged in favour of HMDA. It further states that mortgaged plots and areas are not to be sold, and that building construction in plots is not permitted until HMDA issues the final layout.
No building footprint, dwelling configuration, floor plans, building elevations, tower heights or apartment areas are provided. The three drawing files identified for floor-plan measurement are scans pending review, with zero measured plans; those records do not provide a basis for home or room measurements.
4. Homes, configurations & floor plans
The RERA material describes a plotted project, but the supplied structured data does not give plot-size bands, plot-wise areas, a complete plot inventory, or booked and available plot counts. Accordingly, no plot configuration or inventory table can be populated from the evidence supplied.
A partially completed allotment-letter format is filed, but its allottee, plot particulars, price and dates are blank. It is a form document, not evidence of an identified plot sale or completed transfer.
The supplied floor-plan set has three scans pending review and no measured plans. No software-measured carpet areas or room dimensions are available. Carpet-area and apartment saleable-area comparisons are therefore not applicable on the available evidence for this plotted layout.
5. Parking & vehicle circulation
No sanctioned project-wide parking count, visitor or accessible parking provision, parking levels, EV-charging provision, or plot-wise parking allocation is established by the supplied RERA or HMDA records. The draft HMDA letter identifies 36 plots (Plot Nos. 80 to 84, 109 to 118, 149 to 161 and 183 to 190) mortgaged in favour of HMDA; these are plots, not parking spaces.
The approval requires roads to be opened for access to neighbouring sites and records a 30 mtrs road width. It does not provide a full internal-road schedule or establish completed vehicle circulation.
6. Amenities, recreation & open spaces
The table below separates HMDA-recorded approval provisions from project progress fields. The RERA amenity schedule reports some infrastructure at 99%; that is a recorded progress entry and is not independent verification of delivery.
| Description / size | Layout-road area 36,405.63 sq.m; draft letter specifies 30 mtrs road width. |
|---|---|
| Evidence source | HMDA draft layout letter; RERA amenity schedule |
| Declared progress / verified status | RERA amenity schedule: 99%; independent completion verification not supplied. |
| Description / size | Internal water-supply pipelines listed; no capacity stated. |
|---|---|
| Evidence source | HMDA draft layout letter; RERA amenity schedule |
| Declared progress / verified status | RERA amenity schedule: 99%; independent completion verification not supplied. |
| Description / size | Common septic tank / STP listed; no capacity stated. |
|---|---|
| Evidence source | HMDA draft layout letter; RERA amenity schedule |
| Declared progress / verified status | RERA amenity schedule: 99%; independent completion verification not supplied. |
| Description / size | Draft letter lists park development and avenue plantation; area schedule lists open space of 2,115.33 sq.m. |
|---|---|
| Evidence source | HMDA draft layout letter; RERA amenity schedule |
| Declared progress / verified status | RERA amenity schedule: 99%; independent completion verification not supplied. |
| Description / size | Street lights listed; no quantity or specification stated. |
|---|---|
| Evidence source | HMDA draft layout letter; RERA amenity schedule |
| Declared progress / verified status | RERA amenity schedule: 99%; independent completion verification not supplied. |
| Description / size | Rainwater-harvesting pits listed; no number or capacity stated. |
|---|---|
| Evidence source | HMDA draft layout letter; RERA amenity schedule |
| Declared progress / verified status | RERA amenity schedule: 99%; independent completion verification not supplied. |
| Description / size | Electrical supply lines and transformer listed. |
|---|---|
| Evidence source | HMDA draft layout letter; RERA amenity schedule |
| Declared progress / verified status | RERA amenity schedule records the electrical meter room / sub-station / receiving station at 99%; independent completion verification not supplied. |
| Description / size | 2,115.33 sq.m, shown as 2.50% in the draft letter; a separate handover condition refers to open-space area of 6,754.13 sq.m (7.99%). |
|---|---|
| Evidence source | HMDA draft layout letter |
| Declared progress / verified status | Approval-record figures; no evidence supplied of handover or completion. |
| Description / size | No clubhouse or indoor facility is established in the supplied approval records; the RERA amenity schedule records community buildings at 0%. |
|---|---|
| Evidence source | RERA amenity schedule |
| Declared progress / verified status | No completed facility verified in the supplied material. |
The RERA amenity schedule also records storm-water drains, sewage treatment/disposal, solid-waste management, energy management, fire protection and aggregate recreational open space at 0%. These are schedule entries, not a determination of whether a particular facility is required for this layout.
7. Utilities, building services & safety
HMDA’s draft layout letter lists internal water-supply pipelines, an overhead tank, electrical supply lines, street lights, a transformer, rainwater-harvesting pits and a common septic tank/STP. It does not state capacities, system specifications or independently verified commissioning status.
The RERA amenity schedule reports water supply, sewerage, street lighting and electrical meter room/sub-station/receiving station at 99%, and rainwater conservation/harvesting at 99%. It reports storm-water drains, treatment and disposal of sewage and sullage, solid-waste management, energy management and fire-protection/fire-safety requirements at 0%. These percentages are project-record entries and do not, by themselves, establish the physical condition or statutory compliance of the facilities.
No supplied record establishes water-source details, storage capacities, treated-water reuse, separate storm-water arrangements, backup power, EV charging, fire-system specifications, security systems, waste segregation arrangements or accessibility provisions. The project is filed as plotted development, and no building lift or building-level life-safety configuration is provided.
8. Location, access & connectivity
The registered project location is Ferozguda Village, Ibrahimpatnam Mandal, Ranga Reddy District, PIN 501506, covering Survey Nos. 47/P, 48/P and 49/P. The HMDA draft layout letter identifies a 30 mtrs road width and directs that the layout roads be opened for access to neighbouring sites.
The supplied location records list the following nearby points and distances from the project-location dataset:
Financial District (Nanakramguda): 1.2 km
IndusInd Bank: 0.4 km
Unnamed bus station: 2.2 km
Manuu Polytechnic Hyderabad: 1.6 km
Sankaraya Eye Hospital: 1.6 km
ADP: 0.0 km
South India Shopping Mall: 2.6 km
Unnamed park: 1.2 km
Nanakramguda Government Primary School: 0.5 km
These are distances in the supplied location dataset; no measurement method or public-transport service details are provided. The promoter’s website lists travel-time claims, but no travel times are stated here as verified connectivity facts.
9. Developer & development status
The registered promoter is GREEN CITY SAMARTH ESTATES & PROPERTIES LLP, identified as an LLP in the project record. The named partner and authorised signatory is Samarth Agarwal. The supplied promoter address is Sai Durga Towers, Road No. 10, Ferozguda, Ranga Reddy, PIN 501506.
A Form B affidavit dated 30 November 2018, signed by Samarth Agarwal as authorised signatory, declares title, states that the land is free from encumbrances and undertakes completion by 30/04/2019. Those are promoter declarations in the filed affidavit.
The project header records 70% completeness and a proposed and revised completion date of 31/05/2019. The supplied material does not include an independent site-progress inspection or a completion/occupancy certificate. The TG-RERA certificate records registration through 31/05/2019; it does not itself evidence completion.
10. Approvals, official records & documents
| Identifier / date | P02400000426, issued 12/03/2019; valid to 31/05/2019 |
|---|---|
| What the supplied record establishes | Registers Aerospace County Phase 3 and lists conditions including agreement-for-sale, conveyance and separate-account requirements. |
| Identifier / date | 000132/LO/Plg/HMDA/2018, 04 July 2018; application 011602/SMD/LT/U6/HMDA/11052018 |
|---|---|
| What the supplied record establishes | Draft approval for an open-plot layout in Survey Nos. 47 PART, 48 PART and 49 PART, Ferozguda Village, Ibrahimpatnam Mandal. The letter includes conditions for infrastructure works, road/open-space transfer and final layout release. |
| Identifier / date | Document No. 12263/2018, 05/06/2018 |
|---|---|
| What the supplied record establishes | Identifies 6036.35 sq.m across specified plots as mortgaged in favour of HMDA. |
| Identifier / date | Document No. 12264/2018, 05/06/2018 |
|---|---|
| What the supplied record establishes | Cited for the 287.45 sq.m area affected by the proposed 30 mtrs road, in favour of the local body. |
| Identifier / date | Declaration dated 30 November 2018 |
|---|---|
| What the supplied record establishes | Contains promoter declarations concerning title, encumbrances, project-account obligations, pending approvals and completion undertaking. |
| Identifier / date | Not supplied |
|---|---|
| What the supplied record establishes | No such certificate is included in the reviewed project material. |
The supplied HMDA document is described as a draft layout letter; the evidence pack does not include a final layout release. The listed infrastructure and handover requirements therefore remain approval-record provisions here, not verified completion claims.
Other registrations of Aerospace County
Frequently asked questions
Is Aerospace County Phase 3 registered with Telangana RERA?
Yes. Aerospace County Phase 3 is registered with the Telangana Real Estate Regulatory Authority as P02400000426; the registration status is On-Going Project.
Who is the developer of Aerospace County Phase 3?
The promoter named in the RERA registration is GREEN CITY SAMARTH ESTATES & PROPERTIES LLP.
Where is Aerospace County Phase 3 located?
Aerospace County Phase 3 is in Ferozguda, Rangareddy, Telangana (501506).
When will Aerospace County Phase 3 be completed?
The promoter's proposed date of completion filed with RERA is 31/05/2019. This is the promoter's declaration, not a guarantee.