E Emerald
EMERALD CONSTRUCTIONS · Rangareddy · RERA P02400000274
E EMERALD is a residential plotted development in Manorabad and 562 Raipole, Manchal (part) Mandal, Ranga Reddy District, developed by registered promoter Emerald Constructions. The approved layout has a total site area of 106990.52 sqm and a net layout area of 101899.53 sqm; the drawing-derived, incomplete plot list identifies at least 329 residential plots, with sizes ranging from 149.0 sqm to 521.0 sqm. The project is registered with TG-RERA as P02400000274, with a proposed completion date of 05/11/2020.
More from Emerald Constructions · 4 projects →
01What we found
Read from TG-RERA filings, approvals, land and registration records and court records. A court case is counted only when the court record states this project's survey number with its village, or names the project.
02Check before you pay
10 items to check before you pay, 4 high - from the title chain, court records and approvals, each with what to ask the builder or your advocate. An item may not be a problem with the project: records can be incomplete.
1. Project at a glance
Project identity
| Field | Project record |
|---|---|
| Registered name | E EMERALD RERA record |
| Project type | Plotted development; the filed drawing describes an open residential layout. RERA record |
| Registered portion / phase | The registration identifies the project as E EMERALD; a distinct phase or separately registered portion is not disclosed. |
| TG-RERA registration | P02400000274 |
| Registration validity | 04/02/2019 to 05/11/2020; the supplied certificate says it is not extended. Registration validity is distinct from the completion date. |
| Registered promoter | Emerald Constructions; the RERA record also identifies the project as E-EMERALD. |
| RERA status | Listed as On-Going Project in the project record. RERA record |
| Entity type | Partnership in the RERA project information. Parties record |
Land and geographic identity
| Field | Project record |
|---|---|
| Locality / site identity | Manorabad and 562 Raipole; the RERA registration certificate describes the location as “MANORABAD, 562 RAIPOLE, at Ibrahimpatnam, Ibrahimpatnam.” |
| Revenue villages named in the record | Manorabad and Raipole. The filed drawing identifies Survey Nos. 5, 6 and 7 in Manorabad and Survey No. 562 in Raipole. |
| Mandal | The filed layout documents state Manchal (part); the RERA header records Ibrahimpatnam. RERA record |
| District / PIN | Ranga Reddy; 501565. |
| Project survey numbers | 5, 6, 7 (Manorabad), and 562 (Raipole). Subdivisions are not specified in these project identity and approval records. |
| Registered site extent | A project-level registered site extent is not stated in the supplied registration certificate. |
| Layout drawing areas | Draft layout: 106990.52 SQ.MT. gross plot area; 101899.48 SQ.MT. net area; 5091.05 SQ.MT. road-widening area. |
| Final layout letter area | 1,01,899.53 Sqm. |
| Boundaries | East: neighbours’ land; west: neighbours’ land; north: Janaharsha; south: government land. RERA filing |
Development identity
| Field | Project record |
|---|---|
| Sanctioning authority | Hyderabad Metropolitan Development Authority (HMDA). |
| Principal layout approval | 000085/LO/Plg/HMDA/2017; final layout letter dated 02 December, 2021. |
| Draft layout reference | 000711/SMD/LT/U6/HMDA/17042017, dated 06-11-2017. |
| Approved built-up area | Not disclosed in the supplied project record. The development is a plotted layout, not a building scheme with a stated approved built-up area. RERA record |
| Building / floor configuration | Not disclosed; individual dwelling-house building permissions are to be considered separately under the final layout letter. |
| Layout character | Residential open-plot layout. |
| Layout land-use split | Software-read from the approved layout drawing: plots 61,451.7 sqm; roads 29,752.86 sqm; parks/open space 8,147.31 sqm; social infrastructure 2,547.75 sqm; amenities 0.0 sqm. These are drawing-derived figures and should be checked against the drawing. Layout record |
| Unit count | The drawing-derived plot list identifies at least 329 plots; the plot list is incomplete, so this is not a confirmed total. Layout record |
Offering and status
| Field | Project record |
|---|---|
| Unit type | Residential plots. RERA record |
| RERA-filed saleable size range / inventory | A complete RERA unit-wise inventory and saleable-size schedule is not supplied. |
| Drawing-derived plot sizes | Software-read plot sizes range from 149.0 sqm to 521.0 sqm; median 167.0 sqm. The drawing-derived list is incomplete. Layout record |
| Booked / available | Not disclosed in the supplied project evidence. |
| Construction / development stage | The project header reports 80% completeness; this is a recorded project figure, not an independent site inspection. RERA record |
| Completion dates | Promoter-declared completion date: 05/11/2020; revised proposed completion date also 05/11/2020. RERA record |
| Occupancy / completion certificate | No project completion or occupancy certificate is identified in the supplied documents. The final layout letter is not an occupancy or completion certificate. Document index |
2. The project story
E EMERALD is a residential open-plot layout registered with TG-RERA as P02400000274, covering land identified in the filed layout documents as Survey Nos. 5, 6 and 7 in Manorabad, and Survey No. 562 in Raipole, Ranga Reddy District. The layout documentation describes the locality as the extended area of erstwhile HUDA/HMDA and identifies Manchal (part) Mandal; the RERA header records Ibrahimpatnam Mandal. RERA record
HMDA’s final layout letter concerns residential building sites within an open-plot layout. It states that individual building permission is to be considered separately and limits the sanctioned building use to residential dwelling houses. The project record does not provide a building-by-building construction schedule or identify completed homes.
The project header records 80% completeness, while the promoter’s Form B declares a completion date of 05-11-2020. These are record statements; no independent site verification or completion/occupancy certificate is included in the supplied evidence. RERA record Document index
3. Master plan, architecture & building design
This is a plotted layout rather than a multi-storey building project. The filed draft drawing identifies a residential open layout over Survey Nos. 5, 6 and 7 (Manorabad) and 562 (Raipole), with an abutting road width of 15.24 and a 100' Wide Road also noted on the drawing.
The approved-layout drawing analysis records a net layout area of 101899.53 sqm and a total site area of 106990.52 sqm. The land-use figures read from the drawing are:
| Layout component | Drawing-derived area | Share of net layout area |
|---|---|---|
| Plots | 61,451.7 sqm | 60.3% |
| Roads | 29,752.86 sqm | 29.2% |
| Parks / open space | 8,147.31 sqm | 8.0% |
| Social infrastructure | 2,547.75 sqm | 2.5% |
| Amenities | 0.0 sqm | 0.0% |
These figures are software-read from the drawing’s area statement; the plot list is incomplete and the figures should be verified against the approved drawing. The final layout letter records that roads and open spaces were handed over to the Local Authority through registered gift deeds 32498/19 and 32499/19 dated 07-11-2019. It also records relinquishment deeds 14857/21 and 14858/21 dated 06/09/2021 concerning mortgaged plots. Layout record
The drawing marks plots 113 to 139, 165 to 168, 275 to 278, and 292 to 300 as mortgage-area plots, described there as Total 40 plots. The final layout letter records the later relinquishment deeds for mortgaged plots.
The drawing-derived plot list records at least 329 plots, but is incomplete. Among the 118 plots for which sizes were read, the recorded range is 149.0–521.0 sqm, with a median of 167.0 sqm. Layout record
4. Homes, configurations & floor plans
The registered offering is plotted development, so the unit type is residential plot rather than apartment configuration. A complete RERA-filed plot inventory, plot-by-plot saleable areas, or booked/available schedule is not included in the supplied evidence. RERA record Document index
| Configuration | Units | Booked | Available | RERA saleable area | Measured carpet area | Loading (if supplied) |
|---|---|---|---|---|---|---|
| Residential plots | At least 329 in the drawing-derived, incomplete plot list | Not disclosed | Not disclosed | Not disclosed | Not applicable | Not disclosed |
Software-read plot sizes range from 149.0 sqm to 521.0 sqm; the median is 167.0 sqm. The drawing-derived list includes size bands of 74 plots at 150–200 sq yd, 10 at 200–250 sq yd, 6 at 250–300 sq yd, 20 at 300–400 sq yd, 4 at 400–500 sq yd and 4 at 500–1000 sq yd. These counts are based on the incomplete drawing list and are not a complete RERA inventory. Layout record
The supplied floor-plan records contain no measured dwelling floor plans; one drawing remains pending scan and two contain no flats. No room configuration or dwelling carpet area can therefore be reported. Floor plans
5. Parking & vehicle circulation
The supplied evidence does not establish sanctioned parking-space counts, visitor or accessible parking, individual plot parking allocations, or a parking-allotment arrangement. The layout drawing identifies internal roads and road widths, but does not establish exclusive parking rights for any buyer.
6. Amenities, recreation & open spaces
The HMDA final layout letter lists civic amenities and assigns maintenance responsibilities to the Local Authority. The RERA amenities record marks some layout infrastructure at 100% and leaves other listed items at 0%; these entries are recorded progress fields, not independent verification of delivery. RERA amenities
| Description / size | Drawing-derived parks/open-space area: 8,147.31 sqm. |
|---|---|
| Evidence source | Layout record RERA amenities |
| Declared progress / verified status | RERA amenities record: YES, 100%; independent completion verification not supplied. |
| Description / size | Drawing-derived road area: 29,752.86 sqm. |
|---|---|
| Evidence source | Layout record RERA amenities |
| Declared progress / verified status | RERA amenities record: YES, 100%; final letter says roads were taken over by the Local Authority. |
| Description / size | No size or quantity stated. |
|---|---|
| Evidence source | RERA amenities |
| Declared progress / verified status | RERA amenities record: YES, 100%; independent completion verification not supplied. |
| Description / size | Drawing-derived area: 2,547.75 sqm; specific facility or use is not identified. |
|---|---|
| Evidence source | Layout record |
| Declared progress / verified status | Specific facility and delivery status not established. |
| Description / size | No size or description supplied. |
|---|---|
| Evidence source | RERA amenities |
| Declared progress / verified status | RERA amenities record: 0%. |
| Description / size | Listed in third-party vendor material; no sanctioned count or RERA-filed allocation is supplied. |
|---|---|
| Evidence source | Promoter website |
| Declared progress / verified status | Marketing/vendor claim only; delivery not verified. |
| Description / size | Listed in third-party vendor material; no size supplied there. |
|---|---|
| Evidence source | Promoter website |
| Declared progress / verified status | Marketing/vendor claim; drawing separately records park/open-space area above. |
7. Utilities, building services & safety
The HMDA final layout letter describes the layout as provided with water supply, sewerage and drainage disposal systems, street lighting, rain water harvesting structure and other civic amenities. It assigns proper and effective maintenance of these services to the Local Authority. This is a statement in the approval letter, not independent confirmation of present operation or capacity.
The RERA amenities record shows Water Supply, Sewerage (Chamber, Lines, Septic Tank, STP), Storm Water Drains, Treatment and Disposal of Sewage and Sullage Water, and Solid Waste Management and Disposal at 0%; it marks Water Conservation, Rain water Harvesting at 100%. No capacities, water source, treatment specification, reuse details, electrical service plan, backup power, security system, accessibility provisions or fire-safety system are established in the supplied project documents. RERA amenities
The final layout letter requires a minimum vertical and horizontal safety distance of 3m (10’0”) between a building and high-tension electricity lines when individual residential building permissions are considered. It does not itself establish project-wide fire or building-safety compliance.
8. Location, access & connectivity
The official project records identify the site as Manorabad and Survey No. 562 Raipole, within Ranga Reddy District, PIN 501565. The filed layout drawing describes the locality as the extended area of erstwhile HUDA/HMDA and identifies Manchal (part) Mandal; the RERA header records Ibrahimpatnam Mandal. RERA record
The layout drawing notes an abutting road width of 15.24 and a 100' Wide Road. A supplied location record gives the nearest sampled Outer Ring Road interchange as approximately 24.5 km from the cadastral parcel centroid. Location record
No public-transport routes or additional independently verified nearby landmarks are supplied in the project evidence.
9. Developer & development status
The registered promoter is Emerald Constructions, identified as a partnership in the RERA project information. The supplied project record names S. Durga Reddy as authorized signatory; the Form B declaration is dated 31" December, 2018 and describes him as promoter or duly authorized representative of E-EMERALD. Parties record
The RERA header records the project at 80% completeness and gives 05/11/2020 as both proposed and revised proposed completion date. The Form B also declares completion by 05-11-2020. These are recorded/promoter-declared statements; a site inspection, current construction update, or completion/occupancy certificate is not included in the supplied evidence. RERA record Document index
10. Approvals, official records & documents
| Identifier / date | P02400000274; issued 04/02/2019; valid to 05/11/2020 |
|---|---|
| What it establishes in the supplied material | Registration of E EMERALD under section 5, with the stated validity and certificate conditions. |
| Identifier / date | 000711/SMD/LT/U6/HMDA/17042017; dated 06-11-2017 |
|---|---|
| What it establishes in the supplied material | Proposed residential open-plot layout drawing identifying the project surveys and draft area information. |
| Identifier / date | 000085/LO/Plg/HMDA/2017; dated 02 December, 2021 |
|---|---|
| What it establishes in the supplied material | Final residential open-plot layout permission for the stated site and surveys, with conditions and references to transferred roads/open spaces and relinquished mortgaged plots. |
| Identifier / date | 32498/19 and 32499/19, dated 07-11-2019 |
|---|---|
| What it establishes in the supplied material | The final layout letter says roads and open spaces were taken over by the Local Authority under these deeds. |
| Identifier / date | 14857/21 and 14858/21, dated 06/09/2021 |
|---|---|
| What it establishes in the supplied material | The final layout letter says relinquishment deeds concerning mortgaged plots were executed. |
| Identifier / date | 31" December, 2018 |
|---|---|
| What it establishes in the supplied material | Promoter declaration concerning title, encumbrances, completion date, project funds and other undertakings. |
The supplied documents do not include an occupancy or completion certificate, a building-by-building dwelling approval, a complete RERA-filed plot inventory, or a current project progress certificate. The HMDA final layout letter states that individual building permission is to be considered separately. Document index
1. Project at a glance
Project identity
Registered name: E EMERALD
Project type: Plotted development; the filed drawing describes an open residential layout.
Registered portion / phase: The registration identifies the project as E EMERALD; a distinct phase or separately registered portion is not disclosed.
TG-RERA registration: P02400000274
Registration validity: 04/02/2019 to 05/11/2020; the supplied certificate says it is not extended. Registration validity is distinct from the completion date.
Registered promoter: Emerald Constructions; the RERA record also identifies the project as E-EMERALD.
RERA status: Listed as On-Going Project in the project record.
Entity type: Partnership in the RERA project information.
Land and geographic identity
Locality / site identity: Manorabad and 562 Raipole; the RERA registration certificate describes the location as “MANORABAD, 562 RAIPOLE, at Ibrahimpatnam, Ibrahimpatnam.”
Revenue villages named in the record: Manorabad and Raipole. The filed drawing identifies Survey Nos. 5, 6 and 7 in Manorabad and Survey No. 562 in Raipole.
Mandal: The filed layout documents state Manchal (part); the RERA header records Ibrahimpatnam.
District / PIN: Ranga Reddy; 501565.
Project survey numbers: 5, 6, 7 (Manorabad), and 562 (Raipole). Subdivisions are not specified in these project identity and approval records.
Registered site extent: A project-level registered site extent is not stated in the supplied registration certificate.
Layout drawing areas: Draft layout: 106990.52 SQ.MT. gross plot area; 101899.48 SQ.MT. net area; 5091.05 SQ.MT. road-widening area.
Final layout letter area: 1,01,899.53 Sqm.
Boundaries: East: neighbours’ land; west: neighbours’ land; north: Janaharsha; south: government land.
Development identity
Sanctioning authority: Hyderabad Metropolitan Development Authority (HMDA).
Principal layout approval: 000085/LO/Plg/HMDA/2017; final layout letter dated 02 December, 2021.
Draft layout reference: 000711/SMD/LT/U6/HMDA/17042017, dated 06-11-2017.
Approved built-up area: Not disclosed in the supplied project record. The development is a plotted layout, not a building scheme with a stated approved built-up area.
Building / floor configuration: Not disclosed; individual dwelling-house building permissions are to be considered separately under the final layout letter.
Layout character: Residential open-plot layout.
Layout land-use split: Software-read from the approved layout drawing: plots 61,451.7 sqm; roads 29,752.86 sqm; parks/open space 8,147.31 sqm; social infrastructure 2,547.75 sqm; amenities 0.0 sqm. These are drawing-derived figures and should be checked against the drawing.
Unit count: The drawing-derived plot list identifies at least 329 plots; the plot list is incomplete, so this is not a confirmed total.
Offering and status
Unit type: Residential plots.
RERA-filed saleable size range / inventory: A complete RERA unit-wise inventory and saleable-size schedule is not supplied.
Drawing-derived plot sizes: Software-read plot sizes range from 149.0 sqm to 521.0 sqm; median 167.0 sqm. The drawing-derived list is incomplete.
Booked / available: Not disclosed in the supplied project evidence.
Construction / development stage: The project header reports 80% completeness; this is a recorded project figure, not an independent site inspection.
Completion dates: Promoter-declared completion date: 05/11/2020; revised proposed completion date also 05/11/2020.
Occupancy / completion certificate: No project completion or occupancy certificate is identified in the supplied documents. The final layout letter is not an occupancy or completion certificate.
2. The project story
E EMERALD is a residential open-plot layout registered with TG-RERA as P02400000274, covering land identified in the filed layout documents as Survey Nos. 5, 6 and 7 in Manorabad, and Survey No. 562 in Raipole, Ranga Reddy District. The layout documentation describes the locality as the extended area of erstwhile HUDA/HMDA and identifies Manchal (part) Mandal; the RERA header records Ibrahimpatnam Mandal.
HMDA’s final layout letter concerns residential building sites within an open-plot layout. It states that individual building permission is to be considered separately and limits the sanctioned building use to residential dwelling houses. The project record does not provide a building-by-building construction schedule or identify completed homes.
The project header records 80% completeness, while the promoter’s Form B declares a completion date of 05-11-2020. These are record statements; no independent site verification or completion/occupancy certificate is included in the supplied evidence.
3. Master plan, architecture & building design
This is a plotted layout rather than a multi-storey building project. The filed draft drawing identifies a residential open layout over Survey Nos. 5, 6 and 7 (Manorabad) and 562 (Raipole), with an abutting road width of 15.24 and a 100' Wide Road also noted on the drawing.
The approved-layout drawing analysis records a net layout area of 101899.53 sqm and a total site area of 106990.52 sqm. The land-use figures read from the drawing are:
| Layout component | Drawing-derived area | Share of net layout area |
|---|---|---|
| Plots | 61,451.7 sqm | 60.3% |
| Roads | 29,752.86 sqm | 29.2% |
| Parks / open space | 8,147.31 sqm | 8.0% |
| Social infrastructure | 2,547.75 sqm | 2.5% |
| Amenities | 0.0 sqm | 0.0% |
These figures are software-read from the drawing’s area statement; the plot list is incomplete and the figures should be verified against the approved drawing. The final layout letter records that roads and open spaces were handed over to the Local Authority through registered gift deeds 32498/19 and 32499/19 dated 07-11-2019. It also records relinquishment deeds 14857/21 and 14858/21 dated 06/09/2021 concerning mortgaged plots.
The drawing marks plots 113 to 139, 165 to 168, 275 to 278, and 292 to 300 as mortgage-area plots, described there as Total 40 plots. The final layout letter records the later relinquishment deeds for mortgaged plots.
The drawing-derived plot list records at least 329 plots, but is incomplete. Among the 118 plots for which sizes were read, the recorded range is 149.0–521.0 sqm, with a median of 167.0 sqm.
4. Homes, configurations & floor plans
The registered offering is plotted development, so the unit type is residential plot rather than apartment configuration. A complete RERA-filed plot inventory, plot-by-plot saleable areas, or booked/available schedule is not included in the supplied evidence.
| Configuration | Units | Booked | Available | RERA saleable area | Measured carpet area | Loading (if supplied) |
|---|---|---|---|---|---|---|
| Residential plots | At least 329 in the drawing-derived, incomplete plot list | Not disclosed | Not disclosed | Not disclosed | Not applicable | Not disclosed |
Software-read plot sizes range from 149.0 sqm to 521.0 sqm; the median is 167.0 sqm. The drawing-derived list includes size bands of 74 plots at 150–200 sq yd, 10 at 200–250 sq yd, 6 at 250–300 sq yd, 20 at 300–400 sq yd, 4 at 400–500 sq yd and 4 at 500–1000 sq yd. These counts are based on the incomplete drawing list and are not a complete RERA inventory.
The supplied floor-plan records contain no measured dwelling floor plans; one drawing remains pending scan and two contain no flats. No room configuration or dwelling carpet area can therefore be reported.
5. Parking & vehicle circulation
The supplied evidence does not establish sanctioned parking-space counts, visitor or accessible parking, individual plot parking allocations, or a parking-allotment arrangement. The layout drawing identifies internal roads and road widths, but does not establish exclusive parking rights for any buyer.
6. Amenities, recreation & open spaces
The HMDA final layout letter lists civic amenities and assigns maintenance responsibilities to the Local Authority. The RERA amenities record marks some layout infrastructure at 100% and leaves other listed items at 0%; these entries are recorded progress fields, not independent verification of delivery.
| Facility | Description / size | Evidence source | Declared progress / verified status |
|---|---|---|---|
| Green strip / tot lot / park | Drawing-derived parks/open-space area: 8,147.31 sqm. | RERA amenities record: YES, 100%; independent completion verification not supplied. | |
| Internal roads and footpaths | Drawing-derived road area: 29,752.86 sqm. | RERA amenities record: YES, 100%; final letter says roads were taken over by the Local Authority. | |
| Street lighting | No size or quantity stated. | RERA amenities record: YES, 100%; independent completion verification not supplied. | |
| Social infrastructure | Drawing-derived area: 2,547.75 sqm; specific facility or use is not identified. | Specific facility and delivery status not established. | |
| Community buildings | No size or description supplied. | RERA amenities record: 0%. | |
| Visitor parking | Listed in third-party vendor material; no sanctioned count or RERA-filed allocation is supplied. | Marketing/vendor claim only; delivery not verified. | |
| Large green area | Listed in third-party vendor material; no size supplied there. | Marketing/vendor claim; drawing separately records park/open-space area above. |
7. Utilities, building services & safety
The HMDA final layout letter describes the layout as provided with water supply, sewerage and drainage disposal systems, street lighting, rain water harvesting structure and other civic amenities. It assigns proper and effective maintenance of these services to the Local Authority. This is a statement in the approval letter, not independent confirmation of present operation or capacity.
The RERA amenities record shows Water Supply, Sewerage (Chamber, Lines, Septic Tank, STP), Storm Water Drains, Treatment and Disposal of Sewage and Sullage Water, and Solid Waste Management and Disposal at 0%; it marks Water Conservation, Rain water Harvesting at 100%. No capacities, water source, treatment specification, reuse details, electrical service plan, backup power, security system, accessibility provisions or fire-safety system are established in the supplied project documents.
The final layout letter requires a minimum vertical and horizontal safety distance of 3m (10’0”) between a building and high-tension electricity lines when individual residential building permissions are considered. It does not itself establish project-wide fire or building-safety compliance.
8. Location, access & connectivity
The official project records identify the site as Manorabad and Survey No. 562 Raipole, within Ranga Reddy District, PIN 501565. The filed layout drawing describes the locality as the extended area of erstwhile HUDA/HMDA and identifies Manchal (part) Mandal; the RERA header records Ibrahimpatnam Mandal.
The layout drawing notes an abutting road width of 15.24 and a 100' Wide Road. A supplied location record gives the nearest sampled Outer Ring Road interchange as approximately 24.5 km from the cadastral parcel centroid.
No public-transport routes or additional independently verified nearby landmarks are supplied in the project evidence.
9. Developer & development status
The registered promoter is Emerald Constructions, identified as a partnership in the RERA project information. The supplied project record names S. Durga Reddy as authorized signatory; the Form B declaration is dated 31" December, 2018 and describes him as promoter or duly authorized representative of E-EMERALD.
The RERA header records the project at 80% completeness and gives 05/11/2020 as both proposed and revised proposed completion date. The Form B also declares completion by 05-11-2020. These are recorded/promoter-declared statements; a site inspection, current construction update, or completion/occupancy certificate is not included in the supplied evidence.
10. Approvals, official records & documents
| Identifier / date | P02400000274; issued 04/02/2019; valid to 05/11/2020 |
|---|---|
| What it establishes in the supplied material | Registration of E EMERALD under section 5, with the stated validity and certificate conditions. |
| Identifier / date | 000711/SMD/LT/U6/HMDA/17042017; dated 06-11-2017 |
|---|---|
| What it establishes in the supplied material | Proposed residential open-plot layout drawing identifying the project surveys and draft area information. |
| Identifier / date | 000085/LO/Plg/HMDA/2017; dated 02 December, 2021 |
|---|---|
| What it establishes in the supplied material | Final residential open-plot layout permission for the stated site and surveys, with conditions and references to transferred roads/open spaces and relinquished mortgaged plots. |
| Identifier / date | 32498/19 and 32499/19, dated 07-11-2019 |
|---|---|
| What it establishes in the supplied material | The final layout letter says roads and open spaces were taken over by the Local Authority under these deeds. |
| Identifier / date | 14857/21 and 14858/21, dated 06/09/2021 |
|---|---|
| What it establishes in the supplied material | The final layout letter says relinquishment deeds concerning mortgaged plots were executed. |
| Identifier / date | 31" December, 2018 |
|---|---|
| What it establishes in the supplied material | Promoter declaration concerning title, encumbrances, completion date, project funds and other undertakings. |
The supplied documents do not include an occupancy or completion certificate, a building-by-building dwelling approval, a complete RERA-filed plot inventory, or a current project progress certificate. The HMDA final layout letter states that individual building permission is to be considered separately.
Frequently asked questions
Is E EMERALD registered with Telangana RERA?
Yes. E EMERALD is registered with the Telangana Real Estate Regulatory Authority as P02400000274; the registration status is On-Going Project.
Who is the developer of E EMERALD?
The promoter named in the RERA registration is EMERALD CONSTRUCTIONS.
Where is E EMERALD located?
E EMERALD is in RAIPOLE, Ibrahimpatnam, Rangareddy, Telangana (501565).
When will E EMERALD be completed?
The promoter's proposed date of completion filed with RERA is 05/11/2020. This is the promoter's declaration, not a guarantee.