SUNRISE ONE is a residential apartment project in Yapral, Alwal mandal, Medchal-Malkajgiri district. The registered promoter developing it is SASYAA INFRA PROJECTS PRIVATE LIMITED. The project covers 445.92 sq. m and comprises one building with 1 Stilt + 5 upper floors and 10 3BHK apartments. It is registered with TG-RERA under P02200002784, and the proposed completion date in the RERA project fields is 11/04/2027.
01What we found
Read from TG-RERA filings, approvals, land and registration records and court records. A court case is counted only when the court record states this project's survey number with its village, or names the project.
02Check before you pay
8 items to check before you pay, 4 high - from the title chain, court records and approvals, each with what to ask the builder or your advocate. An item may not be a problem with the project: records can be incomplete.
1. Project at a glance
Project identity
| Item | Record |
|---|---|
| Registered project name | SUNRISE ONE RERA record |
| Project type | Residential apartment project RERA record |
| Phase / registered portion | One registered building, identified in the GHMC permit as BLDG-1; the available record does not give a separate phase name. |
| TG-RERA registration | P02200002784, Form C; granted under section 5. |
| Registration validity | 30/04/2021 to 11/12/2026; the certificate says five years and notes extension is subject to the Act and rules. This is the registration period, not the project completion date or an occupancy certificate. |
| Registered promoter | SASYAA INFRA PROJECTS PRIVATE LIMITED RERA record |
| RERA status in supplied record | Registration certificate issued; the supplied record shows no extension. |
Land and geographic identity
| Item | Record |
|---|---|
| Locality / revenue village | Yapral; the GHMC permit identifies the locality as YAPRAL (Circle 17). RERA record |
| Mandal / district / PIN | Alwal / Medchal-Malkajgiri / 500087 RERA record RERA filing |
| Project survey numbers and subdivisions | Survey Nos. 123P and 129 P in the RERA identity; the building permit describes them as 123 PART and 129 PART. RERA record |
| Plot numbers | 36, 37, 38 RERA filing |
| Registered site extent | 445.92 sq. m RERA filing |
| Total / net land area | RERA-filed total area 445.92 sq. m and net area 445.92 sq. m. RERA filing |
| Boundaries | North: 123 P; South: ROAD; East: ROAD; West: PLOT NO 39. RERA filing |
Development identity
| Item | Record |
|---|---|
| Sanctioning authority | Greater Hyderabad Municipal Corporation (GHMC) Approvals record |
| Principal approval | Building permit approval no. 2/C28/12474/2020, dated 11 December, 2020; the permit also lists file no. 2/C28/12204/2020. Approvals record |
| Approved built-up area | RERA fields report 1,459.78 sq. m; the GHMC permit extraction separately reports residential built-up area 1,216.50 m². These are distinct recorded figures; the available material does not reconcile their scope or definitions. RERA filing |
| Building count and sanctioned floors | One building; GHMC permit identifies BLDG-1 with 1 Stilt + 5 upper floors and a stated height of 14.9 m. |
| Parking levels | Stilt is shown in the sanctioned floor configuration. A parking-space count, allocation schedule and detailed vehicle-circulation plan are not established by the supplied extracts. |
| Approved versus RERA-declared units | RERA fields report 1 total building unit and 1 proposed building unit. The unit inventory reports 10 apartments; the supplied extracts do not explain the different “building unit” and apartment counts. RERA filing RERA unit table |
Offering and status
| Item | Record |
|---|---|
| Unit type | 3BHK apartments; the RERA inventory lists 10 units. RERA unit table |
| RERA-filed saleable area | 140.28 sq. m per unit. RERA unit table |
| Booked / available | 2 booked; 8 available, as last read from the TG-RERA portal. The portal record supplies no as-of date, so the counts are indicative. RERA unit table |
| Promoter-declared completion undertaking | 11/12/2026 in the Form B declaration. |
| Proposed completion date in RERA project fields | 11/04/2027. RERA filing |
| GHMC permit completion date | Permit records construction to be completed before 11 December, 2026. |
| Construction stage | No project construction-progress percentage or independently verified site-stage evidence is supplied. Document index RERA amenities |
| Occupancy / completion certificate | No occupancy or completion certificate is included in the supplied project records; the GHMC permit states that an occupancy certificate is compulsory before occupation. Document index |
2. The project story
SUNRISE ONE is a single-building residential apartment project on plot numbers 36, 37 and 38 in Yapral, Alwal mandal, Medchal-Malkajgiri district. Its project land is identified in the RERA record as Survey Nos. 123P and 129 P; the GHMC permit uses the descriptions 123 PART and 129 PART. The filed site extent is 445.92 sq. m. RERA record RERA filing
The GHMC permit describes one residential building, BLDG-1, with 1 Stilt + 5 upper floors. The RERA unit inventory lists ten 3BHK apartments, with two booked and eight available in a portal snapshot for which no as-of date is provided. The promoter’s Form B declaration undertakes completion by 11/12/2026; the project fields separately state a proposed completion date of 11/04/2027. No construction-progress figure or occupancy/completion certificate is supplied, so the record does not establish how much work is complete or that any portion is ready for occupation. RERA unit table RERA filing Document index RERA amenities
3. Master plan, architecture & building design
The GHMC building permit is for one residential building, BLDG-1, on a stated site area of 445.92 m², with 1 Stilt + 5 upper floors and a stated height of 14.9 m. The permit extraction records a residential built-up area of 1,216.50 m² and commercial area of 0.00. The RERA fields separately report approved built-up area of 1,459.78 sq. m; the supplied material does not define or reconcile the measurement scopes, so these figures are retained as separately labelled records. RERA filing
The GHMC permit lists front, rear and both side setbacks as 2.5 each, without a unit stated in the supplied extraction. It records 12.0 road width, also without a unit stated in that extraction. The permit’s sanctioned parameters include a 79.62 m² tot-lot and 20 Trees.
The available material does not establish the complete floor-by-floor apartment arrangement, number of flats per floor, lift or stair configuration, building footprint, internal circulation, or a full approved drawing set. One extracted floor-plan record identifies a SECOND FLOOR PLAN, but the supplied data does not provide enough drawing detail to describe the building layout as a whole. Document index
4. Homes, configurations & floor plans
The TG-RERA inventory records ten 3BHK apartments, with two booked and eight available in a portal snapshot with no stated as-of date. Its saleable-area entry is 140.28 sq. m per unit. The table’s measured carpet figures come from software measurement of the approved floor-plan drawing, not from the RERA filing; the measurement record says the drawing measurements need review. RERA unit table RERA unit details Floor plans
| Configuration | Units | Booked | Available | RERA saleable area | Measured carpet area | Loading (if supplied) |
|---|---|---|---|---|---|---|
| 3BHK | 10 | 2 | 8 | 140.28 sq. m | Software-measured range: 99.9–105.9 sq. m; median 102.6 sq. m | 27% (software-derived drawing record) |
The software-measured carpet range is based on 4 measured flat designs from document 157153. The supplied drawing extract for one flat lists a hall, kitchen, three bedrooms and two toilets; its room dimensions are recorded in the drawing-measurement data, but the extract does not establish that those dimensions apply identically to every apartment. RERA unit details Floor plans
Carpet area is the usable internal floor area measured from the drawing geometry; saleable area is the RERA-filed area and is not interchangeable with the software-measured carpet area. The supplied records do not provide a separately measured balcony or utility area. The 27% loading is the software-derived figure; no project-specific breakdown of common-area loading is supplied. Floor plans RERA unit details
5. Parking & vehicle circulation
The sanctioned building configuration includes a stilt level, but the supplied permit extract and RERA fields do not establish the number of car or two-wheeler spaces, whether spaces are resident or visitor spaces, an accessible-space provision, or unit-wise parking allocations. No parking layout, ramp details, internal driveway arrangement, EV-charging provision or pedestrian/vehicle separation details are provided in the reviewed extracts. RERA filing Document index
6. Amenities, recreation & open spaces
The GHMC permit specifies a tot-lot and trees; the TG-RERA amenities record lists several project works and services with progress values of 0%. Those entries indicate recorded availability declarations or project provisions, not independently verified completion. RERA amenities
| Facility | Description / size | Evidence source | Declared progress / verified status |
|---|---|---|---|
| Tot-lot | 79.62 m²; permit says it is to be fenced and maintained as greenery before issue of the occupancy certificate. | GHMC permit | Sanctioned condition; completion not verified. |
| Trees | 20 Trees | GHMC permit | Permit parameter; planting and maintenance not verified. |
| Green strip / tot-lot / park | Listed as available in the RERA amenities record. | TG-RERA amenities | Recorded progress 0%; completion not verified. RERA amenities |
The supplied project records do not list a project-specific clubhouse, gym, swimming pool or other indoor recreation facility. Vendor-listed amenities are not used here as evidence of RERA-filed or sanctioned project facilities. RERA amenities Promoter website
7. Utilities, building services & safety
| Evidence in the project record | Listed as available in the RERA amenities record. |
|---|---|
| Status / limitation | Recorded progress 0%; no source, storage capacity or treatment details supplied. RERA amenities |
| Evidence in the project record | Sewerage (chambers, lines, septic tank, STP) is listed as available. Storm-water drains and treatment/disposal of sewage and sullage water are also listed. |
|---|---|
| Status / limitation | RERA amenities record shows 0% progress; the supplied material does not establish installed capacity, reuse arrangements or completion. RERA amenities |
| Evidence in the project record | Rainwater harvesting is listed as available in the RERA amenities record; the GHMC permit requires a rainwater-harvesting structure (percolation pit). |
|---|---|
| Status / limitation | Provision is recorded; installation and operation are not independently verified. RERA amenities |
| Evidence in the project record | RERA amenities list energy management and an electrical meter room, sub-station or receiving station as available. GHMC requires transformer space within the site. |
|---|---|
| Status / limitation | Recorded progress 0% for the listed amenities; no supply capacity, backup system or completion evidence is supplied. RERA amenities |
| Evidence in the project record | Fire protection and fire-safety requirements appear in the RERA amenities list. |
|---|---|
| Status / limitation | Recorded progress 0%; no project-specific system details or clearance evidence supplied. RERA amenities |
| Evidence in the project record | GHMC requires a garbage house within the premises; solid-waste management and disposal appear in the RERA amenities list. |
|---|---|
| Status / limitation | Requirement/listing is not evidence of completed installation or operating arrangements. RERA amenities |
| Evidence in the project record | No project-specific lift count or capacity, CCTV, access-control, ramp or accessible-circulation details are established in the supplied RERA and permit extracts. |
|---|---|
| Status / limitation | Not established by the reviewed project records. Document index RERA amenities |
8. Location, access & connectivity
The registered project location is Yapral, Alwal mandal, Medchal-Malkajgiri district, PIN 500087. The GHMC permit places the site in YAPRAL (Circle 17). RERA record
The supplied location data identifies the nearest sampled Outer Ring Road interchange at approximately 4.3 km. No project-specific public-transport routes, approach-road measurements or verified travel times are supplied. Location record
9. Developer & development status
The registered promoter is SASYAA INFRA PROJECTS PRIVATE LIMITED, identified in the project record as a company. The RERA registration certificate names the same promoter. The supplied corporate records identify Ravi Kumar Sembeti and Sallangula Prashanthi as the company’s subscribers and directors; project records identify Ravi Kumar Sembeti as authorized signatory and Prashanthi Sallangula as director. RERA record Corporate record
The registration certificate gives the promoter office as Village BHOLAKPUR, Mandal Musheerabad, District Hyderabad, PIN 500080. This is the certificate’s stated promoter-office location, distinct from the project site location. No official promoter website or contact details are supplied.
The Form B affidavit, dated 12/03/2021, is made by Ravi Kumar Sembeti as authorized signatory and declares a completion undertaking of 11/12/2026. The RERA project fields state a proposed completion date of 11/04/2027. No construction-progress update or occupancy/completion certificate is included in the supplied record. RERA filing Document index RERA amenities
10. Approvals, official records & documents
| Identifier / date | P02200002784, issued 30/04/2021 |
|---|---|
| What the supplied record establishes | Form C registration for SUNRISE ONE, valid through 11/12/2026 unless extended under the applicable provisions; the certificate includes a separate-account condition. |
| Identifier / date | Approval no. 2/C28/12474/2020; file no. 2/C28/12204/2020; dated 11 December, 2020 |
|---|---|
| What the supplied record establishes | Permission for BLDG-1 at Survey Nos. 123 PART and 129 PART, Yapral; the permit states that permission does not confer ownership rights. |
| Identifier / date | 5397/MP2/PLG/HUDA/2004 |
|---|---|
| What the supplied record establishes | Appears as a layout/subdivision number in the GHMC permit extraction; the supplied records do not include a separate approved-layout plan for review. |
| Identifier / date | Dated 12/03/2021 |
|---|---|
| What the supplied record establishes | Promoter-authorized signatory’s project declaration, including the stated completion undertaking. |
| Identifier / date | Title report dated 25-03-2021; supporting documents include 157156, 157157, 157158, 157159, 157160, 157162, 157164 and 157165 |
|---|---|
| What the supplied record establishes | Available RERA-filed title-related materials; their substantive title review is addressed in the Land & Title section. Document index |
| Identifier / date | Not supplied |
|---|---|
| What the supplied record establishes | No certificate is included in the reviewed project documents. The GHMC permit states that an occupancy certificate is compulsory before occupation. Document index |
1. Project at a glance
Project identity
Registered project name: SUNRISE ONE
Project type: Residential apartment project
Phase / registered portion: One registered building, identified in the GHMC permit as BLDG-1; the available record does not give a separate phase name.
TG-RERA registration: P02200002784, Form C; granted under section 5.
Registration validity: 30/04/2021 to 11/12/2026; the certificate says five years and notes extension is subject to the Act and rules. This is the registration period, not the project completion date or an occupancy certificate.
Registered promoter: SASYAA INFRA PROJECTS PRIVATE LIMITED
RERA status in supplied record: Registration certificate issued; the supplied record shows no extension.
Land and geographic identity
Locality / revenue village: Yapral; the GHMC permit identifies the locality as YAPRAL (Circle 17).
Mandal / district / PIN: Alwal / Medchal-Malkajgiri / 500087
Project survey numbers and subdivisions: Survey Nos. 123P and 129 P in the RERA identity; the building permit describes them as 123 PART and 129 PART.
Plot numbers: 36, 37, 38
Registered site extent: 445.92 sq. m
Total / net land area: RERA-filed total area 445.92 sq. m and net area 445.92 sq. m.
Boundaries: North: 123 P; South: ROAD; East: ROAD; West: PLOT NO 39.
Development identity
Sanctioning authority: Greater Hyderabad Municipal Corporation (GHMC)
Principal approval: Building permit approval no. 2/C28/12474/2020, dated 11 December, 2020; the permit also lists file no. 2/C28/12204/2020.
Approved built-up area: RERA fields report 1,459.78 sq. m; the GHMC permit extraction separately reports residential built-up area 1,216.50 m². These are distinct recorded figures; the available material does not reconcile their scope or definitions.
Building count and sanctioned floors: One building; GHMC permit identifies BLDG-1 with 1 Stilt + 5 upper floors and a stated height of 14.9 m.
Parking levels: Stilt is shown in the sanctioned floor configuration. A parking-space count, allocation schedule and detailed vehicle-circulation plan are not established by the supplied extracts.
Approved versus RERA-declared units: RERA fields report 1 total building unit and 1 proposed building unit. The unit inventory reports 10 apartments; the supplied extracts do not explain the different “building unit” and apartment counts.
Offering and status
Unit type: 3BHK apartments; the RERA inventory lists 10 units.
RERA-filed saleable area: 140.28 sq. m per unit.
Booked / available: 2 booked; 8 available, as last read from the TG-RERA portal. The portal record supplies no as-of date, so the counts are indicative.
Promoter-declared completion undertaking: 11/12/2026 in the Form B declaration.
Proposed completion date in RERA project fields: 11/04/2027.
GHMC permit completion date: Permit records construction to be completed before 11 December, 2026.
Construction stage: No project construction-progress percentage or independently verified site-stage evidence is supplied.
Occupancy / completion certificate: No occupancy or completion certificate is included in the supplied project records; the GHMC permit states that an occupancy certificate is compulsory before occupation.
2. The project story
SUNRISE ONE is a single-building residential apartment project on plot numbers 36, 37 and 38 in Yapral, Alwal mandal, Medchal-Malkajgiri district. Its project land is identified in the RERA record as Survey Nos. 123P and 129 P; the GHMC permit uses the descriptions 123 PART and 129 PART. The filed site extent is 445.92 sq. m.
The GHMC permit describes one residential building, BLDG-1, with 1 Stilt + 5 upper floors. The RERA unit inventory lists ten 3BHK apartments, with two booked and eight available in a portal snapshot for which no as-of date is provided. The promoter’s Form B declaration undertakes completion by 11/12/2026; the project fields separately state a proposed completion date of 11/04/2027. No construction-progress figure or occupancy/completion certificate is supplied, so the record does not establish how much work is complete or that any portion is ready for occupation.
3. Master plan, architecture & building design
The GHMC building permit is for one residential building, BLDG-1, on a stated site area of 445.92 m², with 1 Stilt + 5 upper floors and a stated height of 14.9 m. The permit extraction records a residential built-up area of 1,216.50 m² and commercial area of 0.00. The RERA fields separately report approved built-up area of 1,459.78 sq. m; the supplied material does not define or reconcile the measurement scopes, so these figures are retained as separately labelled records.
The GHMC permit lists front, rear and both side setbacks as 2.5 each, without a unit stated in the supplied extraction. It records 12.0 road width, also without a unit stated in that extraction. The permit’s sanctioned parameters include a 79.62 m² tot-lot and 20 Trees.
The available material does not establish the complete floor-by-floor apartment arrangement, number of flats per floor, lift or stair configuration, building footprint, internal circulation, or a full approved drawing set. One extracted floor-plan record identifies a SECOND FLOOR PLAN, but the supplied data does not provide enough drawing detail to describe the building layout as a whole.
4. Homes, configurations & floor plans
The TG-RERA inventory records ten 3BHK apartments, with two booked and eight available in a portal snapshot with no stated as-of date. Its saleable-area entry is 140.28 sq. m per unit. The table’s measured carpet figures come from software measurement of the approved floor-plan drawing, not from the RERA filing; the measurement record says the drawing measurements need review.
| Configuration | Units | Booked | Available | RERA saleable area | Measured carpet area | Loading (if supplied) |
|---|---|---|---|---|---|---|
| 3BHK | 10 | 2 | 8 | 140.28 sq. m | Software-measured range: 99.9–105.9 sq. m; median 102.6 sq. m | 27% (software-derived drawing record) |
The software-measured carpet range is based on 4 measured flat designs from document 157153. The supplied drawing extract for one flat lists a hall, kitchen, three bedrooms and two toilets; its room dimensions are recorded in the drawing-measurement data, but the extract does not establish that those dimensions apply identically to every apartment.
Carpet area is the usable internal floor area measured from the drawing geometry; saleable area is the RERA-filed area and is not interchangeable with the software-measured carpet area. The supplied records do not provide a separately measured balcony or utility area. The 27% loading is the software-derived figure; no project-specific breakdown of common-area loading is supplied.
5. Parking & vehicle circulation
The sanctioned building configuration includes a stilt level, but the supplied permit extract and RERA fields do not establish the number of car or two-wheeler spaces, whether spaces are resident or visitor spaces, an accessible-space provision, or unit-wise parking allocations. No parking layout, ramp details, internal driveway arrangement, EV-charging provision or pedestrian/vehicle separation details are provided in the reviewed extracts.
6. Amenities, recreation & open spaces
The GHMC permit specifies a tot-lot and trees; the TG-RERA amenities record lists several project works and services with progress values of 0%. Those entries indicate recorded availability declarations or project provisions, not independently verified completion.
| Facility | Description / size | Evidence source | Declared progress / verified status |
|---|---|---|---|
| Tot-lot | 79.62 m²; permit says it is to be fenced and maintained as greenery before issue of the occupancy certificate. | GHMC permit | Sanctioned condition; completion not verified. |
| Trees | 20 Trees | GHMC permit | Permit parameter; planting and maintenance not verified. |
| Green strip / tot-lot / park | Listed as available in the RERA amenities record. | TG-RERA amenities | Recorded progress 0%; completion not verified. |
The supplied project records do not list a project-specific clubhouse, gym, swimming pool or other indoor recreation facility. Vendor-listed amenities are not used here as evidence of RERA-filed or sanctioned project facilities.
7. Utilities, building services & safety
| Evidence in the project record | Listed as available in the RERA amenities record. |
|---|---|
| Status / limitation | Recorded progress 0%; no source, storage capacity or treatment details supplied. |
| Evidence in the project record | Sewerage (chambers, lines, septic tank, STP) is listed as available. Storm-water drains and treatment/disposal of sewage and sullage water are also listed. |
|---|---|
| Status / limitation | RERA amenities record shows 0% progress; the supplied material does not establish installed capacity, reuse arrangements or completion. |
| Evidence in the project record | Rainwater harvesting is listed as available in the RERA amenities record; the GHMC permit requires a rainwater-harvesting structure (percolation pit). |
|---|---|
| Status / limitation | Provision is recorded; installation and operation are not independently verified. |
| Evidence in the project record | RERA amenities list energy management and an electrical meter room, sub-station or receiving station as available. GHMC requires transformer space within the site. |
|---|---|
| Status / limitation | Recorded progress 0% for the listed amenities; no supply capacity, backup system or completion evidence is supplied. |
| Evidence in the project record | Fire protection and fire-safety requirements appear in the RERA amenities list. |
|---|---|
| Status / limitation | Recorded progress 0%; no project-specific system details or clearance evidence supplied. |
| Evidence in the project record | GHMC requires a garbage house within the premises; solid-waste management and disposal appear in the RERA amenities list. |
|---|---|
| Status / limitation | Requirement/listing is not evidence of completed installation or operating arrangements. |
| Evidence in the project record | No project-specific lift count or capacity, CCTV, access-control, ramp or accessible-circulation details are established in the supplied RERA and permit extracts. |
|---|---|
| Status / limitation | Not established by the reviewed project records. |
8. Location, access & connectivity
The registered project location is Yapral, Alwal mandal, Medchal-Malkajgiri district, PIN 500087. The GHMC permit places the site in YAPRAL (Circle 17).
The supplied location data identifies the nearest sampled Outer Ring Road interchange at approximately 4.3 km. No project-specific public-transport routes, approach-road measurements or verified travel times are supplied.
9. Developer & development status
The registered promoter is SASYAA INFRA PROJECTS PRIVATE LIMITED, identified in the project record as a company. The RERA registration certificate names the same promoter. The supplied corporate records identify Ravi Kumar Sembeti and Sallangula Prashanthi as the company’s subscribers and directors; project records identify Ravi Kumar Sembeti as authorized signatory and Prashanthi Sallangula as director.
The registration certificate gives the promoter office as Village BHOLAKPUR, Mandal Musheerabad, District Hyderabad, PIN 500080. This is the certificate’s stated promoter-office location, distinct from the project site location. No official promoter website or contact details are supplied.
The Form B affidavit, dated 12/03/2021, is made by Ravi Kumar Sembeti as authorized signatory and declares a completion undertaking of 11/12/2026. The RERA project fields state a proposed completion date of 11/04/2027. No construction-progress update or occupancy/completion certificate is included in the supplied record.
10. Approvals, official records & documents
| Identifier / date | P02200002784, issued 30/04/2021 |
|---|---|
| What the supplied record establishes | Form C registration for SUNRISE ONE, valid through 11/12/2026 unless extended under the applicable provisions; the certificate includes a separate-account condition. |
| Identifier / date | Approval no. 2/C28/12474/2020; file no. 2/C28/12204/2020; dated 11 December, 2020 |
|---|---|
| What the supplied record establishes | Permission for BLDG-1 at Survey Nos. 123 PART and 129 PART, Yapral; the permit states that permission does not confer ownership rights. |
| Identifier / date | 5397/MP2/PLG/HUDA/2004 |
|---|---|
| What the supplied record establishes | Appears as a layout/subdivision number in the GHMC permit extraction; the supplied records do not include a separate approved-layout plan for review. |
| Identifier / date | Dated 12/03/2021 |
|---|---|
| What the supplied record establishes | Promoter-authorized signatory’s project declaration, including the stated completion undertaking. |
| Identifier / date | Title report dated 25-03-2021; supporting documents include 157156, 157157, 157158, 157159, 157160, 157162, 157164 and 157165 |
|---|---|
| What the supplied record establishes | Available RERA-filed title-related materials; their substantive title review is addressed in the Land & Title section. |
| Identifier / date | Not supplied |
|---|---|
| What the supplied record establishes | No certificate is included in the reviewed project documents. The GHMC permit states that an occupancy certificate is compulsory before occupation. |
Frequently asked questions
Is SUNRISE ONE registered with Telangana RERA?
Yes. SUNRISE ONE is registered with the Telangana Real Estate Regulatory Authority as P02200002784; the registration status is New Project.
Who is the developer of SUNRISE ONE?
The promoter named in the RERA registration is SASYAA INFRA PROJECTS PRIVATE LIMITED.
Where is SUNRISE ONE located?
SUNRISE ONE is in YAPRAL, Alwal, Medchal-Malkajgiri, Telangana (500087).
When will SUNRISE ONE be completed?
The promoter's proposed date of completion filed with RERA is 11/04/2027. This is the promoter's declaration, not a guarantee.
More projects in Yapral