S.S.AARKA is a residential apartment project in Mallapur, Uppal Mandal, Medchal-Malkajgiri district. The registered promoter is S.S.CONSTRUCTIONS. The project has a site area of 602.01 sq m and one residential building with 1 stilt + 5 upper floors and 20 apartments: 15 “DOUBLE BEDROOM” units with filed saleable area 94.17 m² each and 5 “SINGLE BEDROOM” units with filed saleable area 55.76 m² each. It is registered under TG-RERA P02200004259, and the Form B declaration states a 24-month completion period.
01What we found
Read from TG-RERA filings, approvals, land and registration records and court records. A court case is counted only when the court record states this project's survey number with its village, or names the project.
02Check before you pay
10 items to check before you pay, 4 high - from the title chain, court records and approvals, each with what to ask the builder or your advocate. An item may not be a problem with the project: records can be incomplete.
1. Project at a glance
Project identity
| Field | Record |
|---|---|
| Registered project name | S.S.AARKA RERA record |
| Project type | Residential apartment project RERA record |
| Phase / registered portion | Not separately identified in the supplied registration record; it covers the project recorded under this registration number. |
| TG-RERA registration | P02200004259 |
| Registration validity | 14 March 2022–31 December 2023; the certificate records that registration may be extended by the Authority, but the supplied certificate says “extended: false.” This is registration validity, not an occupancy certificate or a construction-status statement. |
| Registered promoter | S.S.CONSTRUCTIONS; recorded as a proprietorship. RERA record RERA filing |
| RERA status | The supplied certificate records a grant of registration under section 5. Its stated validity ended on 31 December 2023; no extension is evidenced in the supplied record. |
Land and geographic identity
| Field | Record |
|---|---|
| Locality / revenue village | Mallapur; the building-permit record also identifies Uday Nagar. RERA record RERA filing |
| Mandal / district / PIN | Uppal / Medchal-Malkajgiri / 500076. RERA record |
| Project survey numbers | 87, 88, 89, 910 and 92, as listed in the RERA certificate and permit. The RERA land-details field writes this as “87,88,89,910 AND 92.” RERA filing |
| Plot identifiers | “60 EAST PART, 60 WEST PART AND 61” on the RERA certificate; the land-details field specifies “60 EAST PART, 60 WEST PART AND 61 A.” RERA filing |
| Site area | Total area 602.01 sq m; road-affected area 18.81 sq m; net area 580.77 sq m, as recorded in the RERA land details and building-permit extraction. RERA filing |
| Boundaries | East: Plot No 61B; west: road; north: 53 and 54A; south: road. RERA filing |
Development identity
| Field | Record |
|---|---|
| Sanctioning authority | Greater Hyderabad Municipal Corporation (GHMC). |
| Principal building permit | 2/C1/12131/2020, approved 18 January 2021. The permit also lists file no. 2/C1/09202/2020. Approvals record |
| Approved building | One residential building, identified in the permit as Building A-1. |
| Sanctioned floors and height | 1 stilt + 5 upper floors; height 14.95 m. The permit records stilt parking at one level. |
| Approved built-up area | 1,438.05 m². This is the sanctioned-plan figure, not a carpet or saleable-area figure. |
| Building / unit count | The RERA land-details field lists 1 total building unit and 1 proposed building unit. The RERA unit filing lists 20 apartments. RERA filing RERA unit table |
| Parking provision in permit | Stilt parking: 1 level, 289.47 m²; the occupancy certificate lists parking area 289.5 m². Neither record supplies a parking-space count. |
Offering and status
| Field | Record |
|---|---|
| RERA-filed configurations | 15 “DOUBLE BEDROOM” units (normalised as 2BHK), each with filed saleable area 94.17 m²; 5 “SINGLE BEDROOM” units (normalised as 1BHK), each with filed saleable area 55.76 m². RERA unit table RERA unit details |
| Booked / available | The supplied TG-RERA unit record shows 0 booked and 15 available 2BHK units, and 0 booked and 5 available 1BHK units. These counts are indicative: the record has no as-of date. RERA unit table RERA unit details |
| Construction stage | GHMC issued an occupancy certificate for the Mallapur residential building, with completion date recorded as 5 July 2024 and certificate date 24 October 2024. The certificate identifies the building by the owners’ names rather than by the S.S.AARKA project name. |
| Completion commitment in RERA filing | The Form B declaration dated 23 November 2021 states a 24-month completion period. The registration certificate gives its own validity dates, shown above. |
| Occupancy certificate status and scope | An occupancy certificate is supplied for a GHMC residential building at Mallapur, on survey numbers 87, 88, 89, 91 and 92, associated with building permit 2/C1/12131/2020. The supplied record does not expressly identify that certificate as covering every part of the registered S.S.AARKA project. |
2. The project story
S.S.AARKA is registered with TG-RERA as a residential apartment project in Mallapur, Uppal Mandal, Medchal-Malkajgiri district. The registration record describes the land using survey numbers 87, 88, 89, 910 and 92, and the project’s plotted identifiers as 60 East Part, 60 West Part and 61/61A. RERA record RERA filing
The GHMC permit records one residential building, Building A-1, comprising a stilt and five upper floors, with 20 apartments in the RERA unit filing: 15 two-bedroom and 5 one-bedroom units. The RERA filing reports none booked at the time captured, but does not provide an as-of date. RERA unit table
A GHMC occupancy certificate is included for a residential building at Mallapur with the corresponding building-permit number. It records completion on 5 July 2024 and an occupancy-certificate date of 24 October 2024. The supplied material does not explicitly state that this certificate covers the entire registered project portion, so its project-wide or unit-specific scope cannot be confirmed from this record alone.
3. Master plan, architecture & building design
The GHMC building-permit extraction describes a single residential building, Building A-1, on a site of 602.01 m², with a net area of 580.77 m² and 18.81 m² recorded as road-affected. The sanctioned residential built-up area is 1,438.05 m²; the permit gives a height of 14.95 m and a configuration of 1 stilt + 5 upper floors.
The permit records a 289.47 m² stilt parking level and the occupancy certificate records 289.5 m² parking area. The supplied drawing information does not establish apartment counts per floor, flat-level orientation, lift or stair arrangements, building footprint, internal circulation, or the location and dimensions of open spaces.
The GHMC permit lists a tot-lot area of 0 m² and requires a tot-lot to be fenced and maintained as greenery before issue of the occupancy certificate. It also records 30 trees and 4 RWHPs. These are permit-recorded requirements or figures; the supplied material does not independently verify their installation or current condition.
The occupancy-certificate extraction records a site-building floor area of 1,571.08 m², alongside the sanctioned-plan floor area of 1,438.05 m². These are both reproduced as certificate entries; the supplied evidence does not provide a verified area reconciliation.
4. Homes, configurations & floor plans
The RERA unit filing records 20 apartments across two configurations. Its saleable-area figures are RERA-filed figures. The supplied floor-plan measurement record reports that no apartment drawing was measured, so there are no software-measured carpet areas or room dimensions to report. RERA unit table RERA unit details Floor plans
| Configuration | Units | Booked | Available | RERA saleable area | Measured carpet area | Loading (if supplied) |
|---|---|---|---|---|---|---|
| 1BHK (filed as “SINGLE BEDROOM”) | 5 | 0 | 5 | 55.76 m² | Not measured in supplied drawing record | Not supplied |
| 2BHK (filed as “DOUBLE BEDROOM”) | 15 | 0 | 15 | 94.17 m² | Not measured in supplied drawing record | Not supplied |
The supplied floor-plan record lists two drawings, but says no flats were measured; accordingly, it does not support a drawing-based description of room sizes, balconies, utilities, or typical floor arrangements. Carpet area and saleable area are distinct measurements: the supplied RERA figures are saleable areas, and no measured carpet-area figure is available here. Floor plans RERA unit details
5. Parking & vehicle circulation
The GHMC building permit records 1 stilt parking level measuring 289.47 m²; the occupancy-certificate extraction records parking area of 289.5 m². The permit says the cellar and stilts approved for parking must be used exclusively for vehicle parking, without partition walls or rolling shutters.
No parking-space count, resident/visitor allocation, accessible parking provision, two-wheeler count, EV charging provision, ramp or driveway details, or legally documented unit-wise parking allocation is supplied. A parking-area figure does not establish an individual buyer’s exclusive parking entitlement.
6. Amenities, recreation & open spaces
The GHMC permit and TG-RERA amenity record list site facilities and infrastructure, but the supplied RERA amenity entries show 0% progress for each listed item. “Available: YES” in a filing is a recorded declaration, not independent confirmation of completion. The occupancy certificate lists rainwater harvesting; it does not independently confirm the other facilities below. RERA amenities
| Description / size | Permit lists tot-lot area 0 m²; it also requires a fenced tot-lot maintained as greenery before occupancy-certificate issue. |
|---|---|
| Evidence source | RERA amenities |
| Declared progress / verified status | RERA amenity record: 0%; installation or present condition not independently verified. |
| Description / size | Permit lists 30 trees and requires a peripheral strip of greenery. |
|---|---|
| Declared progress / verified status | Listed in permit; present planting/condition not independently verified. |
| Description / size | Listed in the RERA amenity record; no size or specification supplied. |
|---|---|
| Evidence source | RERA amenities |
| Declared progress / verified status | 0%; completion not independently verified. |
| Description / size | Marked “YES” in the RERA amenity record; source and capacity not supplied. |
|---|---|
| Evidence source | RERA amenities |
| Declared progress / verified status | Declared in filing; progress 0%; not independently verified. |
| Description / size | Sewerage and treatment/disposal are listed in the RERA amenity record; no capacity or technical details supplied. |
|---|---|
| Evidence source | RERA amenities |
| Declared progress / verified status | Sewerage entry marked “YES”; progress entries 0%; not independently verified. |
| Description / size | Listed in the RERA amenity record. |
|---|---|
| Evidence source | RERA amenities |
| Declared progress / verified status | Marked “YES”; progress 0%; not independently verified. |
| Description / size | Permit lists 4 RWHPs; the occupancy-certificate extraction lists rainwater harvesting. |
|---|---|
| Declared progress / verified status | Included in permit and OC record; current operation not independently verified. |
| Description / size | Listed and marked “YES” in the RERA amenity record; permit requires space for a transformer. |
|---|---|
| Evidence source | RERA amenities |
| Declared progress / verified status | Declared/listed; progress 0%; installation not independently verified. |
| Description / size | Listed in the RERA amenity record; permit also requires a garbage house within the premises. |
|---|---|
| Evidence source | RERA amenities |
| Declared progress / verified status | RERA progress 0%; not independently verified. |
| Description / size | Listed in the RERA amenity record without supplied dimensions or capacities. |
|---|---|
| Evidence source | RERA amenities |
| Declared progress / verified status | Each shows 0% progress; completion not independently verified. |
7. Utilities, building services & safety
The RERA amenity filing marks water supply, sewerage, storm-water drainage, rainwater harvesting, and an electrical meter room/substation/receiving station as available, while reporting 0% progress for those entries. The GHMC permit lists 4 RWHPs, requires rainwater harvesting, a transformer space and an on-site garbage house, and the occupancy certificate lists rainwater harvesting. The supplied material does not give water sources, storage or treatment capacity, STP capacity, reuse arrangements, power-backup details, or service-provider information. RERA amenities
For safety, the GHMC permit requires an occupancy Fire NOC from the Director (EV&DM) before issue of the occupancy certificate, and requires minimum separation from high- and low-tension electrical lines. The supplied material does not include the Fire NOC or provide details of installed fire systems, escape stairs, fire access, lift capacity, CCTV, access control, or accessibility features. The occupancy certificate records the building as fit for occupation; that entry alone does not establish the presence or operational status of every service or system.
8. Location, access & connectivity
The registered location is Mallapur, Uppal Mandal, Medchal-Malkajgiri district, Telangana, PIN 500076. The building-permit record identifies the locality as Uday Nagar, Mallapur. Project boundaries recorded in the RERA land details include roads to the west and south. RERA record RERA filing
A supplied connectivity record gives the nearest sampled Outer Ring Road interchange at approximately 48.2 km. This is a recorded approximate distance; the supplied information does not identify the interchange or provide a route, travel time, public-transport details, or other verified connectivity measurements. Location record
9. Developer & development status
The registered promoter is S.S.CONSTRUCTIONS, recorded as a proprietorship, with Sreenivas Akula listed as proprietor and authorised signatory. The corporate identifier is masked in the supplied record as xxxxxx291N. The supplied promoter address is recorded in the project fields as Road No. 25, Block No. 13 and Uday Nagar, Mallapur, Uppal, Medchal-Malkajgiri, PIN 500076; no official website or contact details are supplied. RERA record RERA filing Parties record
The Form B affidavit dated 23 November 2021, signed by AKULA SREENIVAS as promoter or duly authorised person, declares a 24-month completion period and makes the listed project-account, audit, pending-approval and allottee-related declarations. These are promoter declarations in the filed document.
GHMC’s supplied occupancy certificate records completion on 5 July 2024 and is dated 24 October 2024. The certificate is for a Mallapur residential building on survey numbers 87, 88, 89, 91 and 92, and cites building permit 2/C1/12131/2020. The supplied records do not state that it covers all registered S.S.AARKA units or identify individual units covered by it.
10. Approvals, official records & documents
| Identifier / date | P02200004259, issued 14 March 2022; validity to 31 December 2023 |
|---|---|
| What the supplied record establishes | FORM C records registration of S.S.AARKA to S.S.CONSTRUCTIONS and states the registration validity dates. |
| Identifier / date | 2/C1/12131/2020, approved 18 January 2021; file no. 2/C1/09202/2020 |
|---|---|
| What the supplied record establishes | Permit extraction describes a residential Building A-1, 1 stilt + 5 upper floors, on survey numbers 87, 88, 89, 910 and 92. |
| Identifier / date | 3249/GHMC/LBN/2024-OC, dated 24 October 2024; application no. 007451/GHMC/3513/LBN2/2024-OC |
|---|---|
| What the supplied record establishes | Certificate extraction records completion date 5 July 2024 for a Mallapur residential building and cites the building permit. |
| Identifier / date | Dated 1 November 2021 |
|---|---|
| What the supplied record establishes | Advocate T. Bhaskar Rao’s report describes the proposed project land and the title/development-right basis stated in that report. |
| Identifier / date | Doc. no. 3686/2021, dated 11 June 2021 |
|---|---|
| What the supplied record establishes | Filed title-report material describes development rights for 720 sq. yds. in Uday Nagar, Mallapur. |
| Identifier / date | Dated 23 November 2021 |
|---|---|
| What the supplied record establishes | Promoter declaration includes the stated title basis and 24-month completion commitment. |
| Identifier / date | Drawing record 200658, page 1 |
|---|---|
| What the supplied record establishes | A RERA-filed layout-plan record is supplied, but its extraction is unavailable; detailed drawing-derived layout features cannot be described from the supplied material. |
1. Project at a glance
Project identity
Registered project name: S.S.AARKA
Project type: Residential apartment project
Phase / registered portion: Not separately identified in the supplied registration record; it covers the project recorded under this registration number.
TG-RERA registration: P02200004259
Registration validity: 14 March 2022–31 December 2023; the certificate records that registration may be extended by the Authority, but the supplied certificate says “extended: false.” This is registration validity, not an occupancy certificate or a construction-status statement.
Registered promoter: S.S.CONSTRUCTIONS; recorded as a proprietorship.
RERA status: The supplied certificate records a grant of registration under section 5. Its stated validity ended on 31 December 2023; no extension is evidenced in the supplied record.
Land and geographic identity
Locality / revenue village: Mallapur; the building-permit record also identifies Uday Nagar.
Mandal / district / PIN: Uppal / Medchal-Malkajgiri / 500076.
Project survey numbers: 87, 88, 89, 910 and 92, as listed in the RERA certificate and permit. The RERA land-details field writes this as “87,88,89,910 AND 92.”
Plot identifiers: “60 EAST PART, 60 WEST PART AND 61” on the RERA certificate; the land-details field specifies “60 EAST PART, 60 WEST PART AND 61 A.”
Site area: Total area 602.01 sq m; road-affected area 18.81 sq m; net area 580.77 sq m, as recorded in the RERA land details and building-permit extraction.
Boundaries: East: Plot No 61B; west: road; north: 53 and 54A; south: road.
Development identity
Sanctioning authority: Greater Hyderabad Municipal Corporation (GHMC).
Principal building permit: 2/C1/12131/2020, approved 18 January 2021. The permit also lists file no. 2/C1/09202/2020.
Approved building: One residential building, identified in the permit as Building A-1.
Sanctioned floors and height: 1 stilt + 5 upper floors; height 14.95 m. The permit records stilt parking at one level.
Approved built-up area: 1,438.05 m². This is the sanctioned-plan figure, not a carpet or saleable-area figure.
Building / unit count: The RERA land-details field lists 1 total building unit and 1 proposed building unit. The RERA unit filing lists 20 apartments.
Parking provision in permit: Stilt parking: 1 level, 289.47 m²; the occupancy certificate lists parking area 289.5 m². Neither record supplies a parking-space count.
Offering and status
RERA-filed configurations: 15 “DOUBLE BEDROOM” units (normalised as 2BHK), each with filed saleable area 94.17 m²; 5 “SINGLE BEDROOM” units (normalised as 1BHK), each with filed saleable area 55.76 m².
Booked / available: The supplied TG-RERA unit record shows 0 booked and 15 available 2BHK units, and 0 booked and 5 available 1BHK units. These counts are indicative: the record has no as-of date.
Construction stage: GHMC issued an occupancy certificate for the Mallapur residential building, with completion date recorded as 5 July 2024 and certificate date 24 October 2024. The certificate identifies the building by the owners’ names rather than by the S.S.AARKA project name.
Completion commitment in RERA filing: The Form B declaration dated 23 November 2021 states a 24-month completion period. The registration certificate gives its own validity dates, shown above.
Occupancy certificate status and scope: An occupancy certificate is supplied for a GHMC residential building at Mallapur, on survey numbers 87, 88, 89, 91 and 92, associated with building permit 2/C1/12131/2020. The supplied record does not expressly identify that certificate as covering every part of the registered S.S.AARKA project.
2. The project story
S.S.AARKA is registered with TG-RERA as a residential apartment project in Mallapur, Uppal Mandal, Medchal-Malkajgiri district. The registration record describes the land using survey numbers 87, 88, 89, 910 and 92, and the project’s plotted identifiers as 60 East Part, 60 West Part and 61/61A.
The GHMC permit records one residential building, Building A-1, comprising a stilt and five upper floors, with 20 apartments in the RERA unit filing: 15 two-bedroom and 5 one-bedroom units. The RERA filing reports none booked at the time captured, but does not provide an as-of date.
A GHMC occupancy certificate is included for a residential building at Mallapur with the corresponding building-permit number. It records completion on 5 July 2024 and an occupancy-certificate date of 24 October 2024. The supplied material does not explicitly state that this certificate covers the entire registered project portion, so its project-wide or unit-specific scope cannot be confirmed from this record alone.
3. Master plan, architecture & building design
The GHMC building-permit extraction describes a single residential building, Building A-1, on a site of 602.01 m², with a net area of 580.77 m² and 18.81 m² recorded as road-affected. The sanctioned residential built-up area is 1,438.05 m²; the permit gives a height of 14.95 m and a configuration of 1 stilt + 5 upper floors.
The permit records a 289.47 m² stilt parking level and the occupancy certificate records 289.5 m² parking area. The supplied drawing information does not establish apartment counts per floor, flat-level orientation, lift or stair arrangements, building footprint, internal circulation, or the location and dimensions of open spaces.
The GHMC permit lists a tot-lot area of 0 m² and requires a tot-lot to be fenced and maintained as greenery before issue of the occupancy certificate. It also records 30 trees and 4 RWHPs. These are permit-recorded requirements or figures; the supplied material does not independently verify their installation or current condition.
The occupancy-certificate extraction records a site-building floor area of 1,571.08 m², alongside the sanctioned-plan floor area of 1,438.05 m². These are both reproduced as certificate entries; the supplied evidence does not provide a verified area reconciliation.
4. Homes, configurations & floor plans
The RERA unit filing records 20 apartments across two configurations. Its saleable-area figures are RERA-filed figures. The supplied floor-plan measurement record reports that no apartment drawing was measured, so there are no software-measured carpet areas or room dimensions to report.
| Configuration | Units | Booked | Available | RERA saleable area | Measured carpet area | Loading (if supplied) |
|---|---|---|---|---|---|---|
| 1BHK (filed as “SINGLE BEDROOM”) | 5 | 0 | 5 | 55.76 m² | Not measured in supplied drawing record | Not supplied |
| 2BHK (filed as “DOUBLE BEDROOM”) | 15 | 0 | 15 | 94.17 m² | Not measured in supplied drawing record | Not supplied |
The supplied floor-plan record lists two drawings, but says no flats were measured; accordingly, it does not support a drawing-based description of room sizes, balconies, utilities, or typical floor arrangements. Carpet area and saleable area are distinct measurements: the supplied RERA figures are saleable areas, and no measured carpet-area figure is available here.
5. Parking & vehicle circulation
The GHMC building permit records 1 stilt parking level measuring 289.47 m²; the occupancy-certificate extraction records parking area of 289.5 m². The permit says the cellar and stilts approved for parking must be used exclusively for vehicle parking, without partition walls or rolling shutters.
No parking-space count, resident/visitor allocation, accessible parking provision, two-wheeler count, EV charging provision, ramp or driveway details, or legally documented unit-wise parking allocation is supplied. A parking-area figure does not establish an individual buyer’s exclusive parking entitlement.
6. Amenities, recreation & open spaces
The GHMC permit and TG-RERA amenity record list site facilities and infrastructure, but the supplied RERA amenity entries show 0% progress for each listed item. “Available: YES” in a filing is a recorded declaration, not independent confirmation of completion. The occupancy certificate lists rainwater harvesting; it does not independently confirm the other facilities below.
| Description / size | Permit lists tot-lot area 0 m²; it also requires a fenced tot-lot maintained as greenery before occupancy-certificate issue. |
|---|---|
| Declared progress / verified status | RERA amenity record: 0%; installation or present condition not independently verified. |
| Description / size | Permit lists 30 trees and requires a peripheral strip of greenery. |
|---|---|
| Declared progress / verified status | Listed in permit; present planting/condition not independently verified. |
| Description / size | Listed in the RERA amenity record; no size or specification supplied. |
|---|---|
| Declared progress / verified status | 0%; completion not independently verified. |
| Description / size | Marked “YES” in the RERA amenity record; source and capacity not supplied. |
|---|---|
| Declared progress / verified status | Declared in filing; progress 0%; not independently verified. |
| Description / size | Sewerage and treatment/disposal are listed in the RERA amenity record; no capacity or technical details supplied. |
|---|---|
| Declared progress / verified status | Sewerage entry marked “YES”; progress entries 0%; not independently verified. |
| Description / size | Listed in the RERA amenity record. |
|---|---|
| Declared progress / verified status | Marked “YES”; progress 0%; not independently verified. |
| Description / size | Permit lists 4 RWHPs; the occupancy-certificate extraction lists rainwater harvesting. |
|---|---|
| Declared progress / verified status | Included in permit and OC record; current operation not independently verified. |
| Description / size | Listed and marked “YES” in the RERA amenity record; permit requires space for a transformer. |
|---|---|
| Declared progress / verified status | Declared/listed; progress 0%; installation not independently verified. |
| Description / size | Listed in the RERA amenity record; permit also requires a garbage house within the premises. |
|---|---|
| Declared progress / verified status | RERA progress 0%; not independently verified. |
| Description / size | Listed in the RERA amenity record without supplied dimensions or capacities. |
|---|---|
| Declared progress / verified status | Each shows 0% progress; completion not independently verified. |
7. Utilities, building services & safety
The RERA amenity filing marks water supply, sewerage, storm-water drainage, rainwater harvesting, and an electrical meter room/substation/receiving station as available, while reporting 0% progress for those entries. The GHMC permit lists 4 RWHPs, requires rainwater harvesting, a transformer space and an on-site garbage house, and the occupancy certificate lists rainwater harvesting. The supplied material does not give water sources, storage or treatment capacity, STP capacity, reuse arrangements, power-backup details, or service-provider information.
For safety, the GHMC permit requires an occupancy Fire NOC from the Director (EV&DM) before issue of the occupancy certificate, and requires minimum separation from high- and low-tension electrical lines. The supplied material does not include the Fire NOC or provide details of installed fire systems, escape stairs, fire access, lift capacity, CCTV, access control, or accessibility features. The occupancy certificate records the building as fit for occupation; that entry alone does not establish the presence or operational status of every service or system.
8. Location, access & connectivity
The registered location is Mallapur, Uppal Mandal, Medchal-Malkajgiri district, Telangana, PIN 500076. The building-permit record identifies the locality as Uday Nagar, Mallapur. Project boundaries recorded in the RERA land details include roads to the west and south.
A supplied connectivity record gives the nearest sampled Outer Ring Road interchange at approximately 48.2 km. This is a recorded approximate distance; the supplied information does not identify the interchange or provide a route, travel time, public-transport details, or other verified connectivity measurements.
9. Developer & development status
The registered promoter is S.S.CONSTRUCTIONS, recorded as a proprietorship, with Sreenivas Akula listed as proprietor and authorised signatory. The corporate identifier is masked in the supplied record as xxxxxx291N. The supplied promoter address is recorded in the project fields as Road No. 25, Block No. 13 and Uday Nagar, Mallapur, Uppal, Medchal-Malkajgiri, PIN 500076; no official website or contact details are supplied.
The Form B affidavit dated 23 November 2021, signed by AKULA SREENIVAS as promoter or duly authorised person, declares a 24-month completion period and makes the listed project-account, audit, pending-approval and allottee-related declarations. These are promoter declarations in the filed document.
GHMC’s supplied occupancy certificate records completion on 5 July 2024 and is dated 24 October 2024. The certificate is for a Mallapur residential building on survey numbers 87, 88, 89, 91 and 92, and cites building permit 2/C1/12131/2020. The supplied records do not state that it covers all registered S.S.AARKA units or identify individual units covered by it.
10. Approvals, official records & documents
| Identifier / date | P02200004259, issued 14 March 2022; validity to 31 December 2023 |
|---|---|
| What the supplied record establishes | FORM C records registration of S.S.AARKA to S.S.CONSTRUCTIONS and states the registration validity dates. |
| Identifier / date | 2/C1/12131/2020, approved 18 January 2021; file no. 2/C1/09202/2020 |
|---|---|
| What the supplied record establishes | Permit extraction describes a residential Building A-1, 1 stilt + 5 upper floors, on survey numbers 87, 88, 89, 910 and 92. |
| Identifier / date | 3249/GHMC/LBN/2024-OC, dated 24 October 2024; application no. 007451/GHMC/3513/LBN2/2024-OC |
|---|---|
| What the supplied record establishes | Certificate extraction records completion date 5 July 2024 for a Mallapur residential building and cites the building permit. |
| Identifier / date | Dated 1 November 2021 |
|---|---|
| What the supplied record establishes | Advocate T. Bhaskar Rao’s report describes the proposed project land and the title/development-right basis stated in that report. |
| Identifier / date | Doc. no. 3686/2021, dated 11 June 2021 |
|---|---|
| What the supplied record establishes | Filed title-report material describes development rights for 720 sq. yds. in Uday Nagar, Mallapur. |
| Identifier / date | Dated 23 November 2021 |
|---|---|
| What the supplied record establishes | Promoter declaration includes the stated title basis and 24-month completion commitment. |
| Identifier / date | Drawing record 200658, page 1 |
|---|---|
| What the supplied record establishes | A RERA-filed layout-plan record is supplied, but its extraction is unavailable; detailed drawing-derived layout features cannot be described from the supplied material. |
Frequently asked questions
Is S.S.AARKA registered with Telangana RERA?
Yes. S.S.AARKA is registered with the Telangana Real Estate Regulatory Authority as P02200004259; the registration status is New Project.
Who is the developer of S.S.AARKA?
The promoter named in the RERA registration is S.S.CONSTRUCTIONS.
Where is S.S.AARKA located?
S.S.AARKA is in Mallapur, Uppal, Medchal-Malkajgiri, Telangana (500076).
When will S.S.AARKA be completed?
The promoter's proposed date of completion filed with RERA is 31/12/2023. This is the promoter's declaration, not a guarantee.
More projects in Mallapur