Sadak Narayana And Other
CHELIMELA · Nizamabad · RERA P03100010341
SADAK NARAYANA AND OTHER is a plotted development at ARMOOR REVENUE VILLAGE, Armoor Mandal, Nizamabad District. Registered promoter CHELIMELA GANGADHAR is developing it on 6907.13 sq. m. across Survey Nos. 301/1 and 301/2, with 23 plots. Plot sizes range from 112.63–252.87 sq. m. The project is registered under TG-RERA P03100010341, with a filed completion undertaking of 02/11/2025.
01What we found
Read from TG-RERA filings, approvals, land and registration records and court records. A court case is counted only when the court record states this project's survey number with its village, or names the project.
02Check before you pay
10 items to check before you pay, 4 high - from the title chain, court records and approvals, each with what to ask the builder or your advocate. An item may not be a problem with the project: records can be incomplete.
Project at a glance
Project identity
| Field | Record |
|---|---|
| Registered project name | SADAK NARAYANA AND OTHER |
| Project type | Plotted development / tentative residential layout RERA record |
| Phase or registered portion | No separate phase is identified in the supplied record. RERA record |
| TG-RERA registration | P03100010341 |
| Registration validity | 02/11/2023 to 02/11/2025; certificate states a two-year validity. No extension is recorded in the supplied certificate. |
| Registered promoter | CHELIMELA GANGADHAR |
| RERA status | The filing identifies the project as “New Project.” Registration certificate details are stated above; a current registration-status verification is not included. RERA record |
Land and geographic identity
| Field | Record |
|---|---|
| Locality / revenue village | ARMOOR REVENUE VILLAGE; approval identifies ARMOOR Revenue Village. RERA record |
| Mandal / district / PIN | ARMOOR Mandal; Nizamabad District; 503224 RERA record |
| Project survey numbers | Survey Nos. 301/1 and 301/2 Land records |
| Registered site extent | 6907.13 sq. m. Land records |
| Net / total area | Net area 6907.13 sq. m.; total area 6907.13 sq. m. Land records |
| Boundaries | North: Canal; South, East and West: Others Land Land records |
Development identity
| Field | Record |
|---|---|
| Sanctioning authority | Armoor Municipality / Municipal Corporation, as named in the filed tentative layout approval |
| Principal layout approval | Tentative Layout Plan No. 0010/LO/3069/2023, approved 02 November 2023; associated application No. 010085/LO/DTCP/3069/0025/2023 |
| Plots | 23 plots stated in the approval; the filed layout drawing’s plot schedule also states 23. Layout record |
| Approved built-up area | Not applicable to this plotted layout; no building built-up area is identified in the supplied project record. RERA record |
| Buildings, floors and parking levels | No buildings, floor configuration or parking levels are identified in the supplied record. Document index |
Offering and status
| Field | Record |
|---|---|
| Offering | Plots; the layout drawing provides plot sizes for 23 plots. RERA record Layout record |
| Booked / available counts | Not disclosed in the supplied project data. |
| Filed completion undertaking | 02/11/2025 |
| Construction / development stage | A current physical-progress or independently verified site-inspection report is not supplied. |
| Occupancy / completion certificate | No occupancy or completion certificate is supplied; this is a plotted-layout project, and no building-specific OC scope is identified. |
The project story
SADAK NARAYANA AND OTHER is presented in the TG-RERA record as a plotted residential layout at Armoor Revenue Village, Armoor Mandal, Nizamabad District, over Survey Nos. 301/1 and 301/2. The filing identifies 23 plots on a site of 6907.13 sq. m. RERA record Land records Layout record
The filed tentative layout approval describes land reserved for roads, park/open space, utilities and social infrastructure, alongside the plotted area. It requires infrastructure and other works to be carried out and identifies areas to be handed over to the Municipality before release of the tentative layout. These are approval conditions, not evidence that the works or handovers have been completed.
Master plan, architecture & building design
This is a plotted layout rather than a multi-storey building project. The filed drawing provides the following land-use statement for the net layout area of 6907.13 sq. m.; the areas and percentages below are drawing-derived values. Layout record
| Layout use | Area | Share of net layout area |
|---|---|---|
| Plots | 3354.68 sq. m. | 48.57% |
| Roads | 2688.51 sq. m. | 38.92% |
| Parks / open space | 621.70 sq. m. | 9.00% |
| Utilities | 69.10 sq. m. | 1.00% |
| Social infrastructure | 173.13 sq. m. | 2.51% |
| Amenities | 0.00 sq. m. | 0.00% |
The tentative approval separately identifies the park/open-space, roads, utilities and plotted-area allocations and describes the utilities reservation as including items such as a water reservoir. It also specifies that roads are to remain open for neighbouring-site access.
No building arrangement, building footprint, floor configuration, lifts or building-level circulation design is disclosed in the supplied evidence. The filed approval is a tentative layout approval.
Homes, configurations & floor plans
The offering is plots, not apartments. The layout drawing states 23 plots, with plot sizes read by software from the drawing’s schedule; the source notes that the measurements should be checked against the drawing. These are not apartment saleable or carpet-area figures. Layout record
| Plot-size band | Number of plots |
|---|---|
| 100–150 sq. yd. (84–125 sq. m.) | 8 |
| 150–200 sq. yd. (125–167 sq. m.) | 11 |
| 200–250 sq. yd. (167–209 sq. m.) | 3 |
| 300–400 sq. yd. (251–334 sq. m.) | 1 |
The software-read plot-size range is 112.63–252.87 sq. m. (134.7–302.4 sq. yd.), with a median of 139.0 sq. m. (166.2 sq. yd.). Two plots are listed at 117.43 sq. m. each. The layout record states that the sum of plot areas matches the drawing’s plotted-area statement. Layout record
The supplied floor-plan set consists of two layout sheets and contains no flat plans. No booked/available plot count, plot-wise allocation status, or current inventory list is supplied. Floor plans Layout record
Parking & vehicle circulation
No resident or visitor parking count, parking allocation schedule, accessible parking provision, vehicle-entry arrangement or EV-charging provision is identified in the supplied project record. The supplied evidence does not establish parking spaces or exclusive parking rights for individual plots. Document index
Amenities, recreation & open spaces
The RERA amenities list marks certain layout infrastructure as available; the supplied record does not establish that these entries have been independently inspected or confirmed complete. The tentative layout approval also requires infrastructure and handovers as conditions of the layout. RERA amenities
| Description / size | Park/open-space reservation: 621.70 sq. m. (9.00% of net layout area) in the drawing; approval states 0 Acer 6.15 Gts, 744 Sq. Yds (9%). |
|---|---|
| Evidence source | Layout record |
| Declared progress / verified status | Amenity list marks Green Strip/TOT LOT/Park “YES” and 100%; independent completion verification not supplied. |
| Description / size | No separate size disclosed in the supplied amenities record. |
|---|---|
| Evidence source | RERA amenities |
| Declared progress / verified status | 0% recorded; no independent verification supplied. |
| Description / size | Reserved site: 173.13 sq. m. (2.51% of net layout area). |
|---|---|
| Evidence source | Layout record |
| Declared progress / verified status | Reservation is shown; completed facility is not established. |
| Description / size | No size or facility details supplied. |
|---|---|
| Evidence source | RERA amenities |
| Declared progress / verified status | 0% recorded. |
| Description / size | No separate amenity area is shown in the drawing’s land-use statement. |
|---|---|
| Evidence source | Layout record |
| Declared progress / verified status | Drawing records 0.00 sq. m. for amenities. |
Utilities, building services & safety
The RERA amenities record marks the following infrastructure categories “YES” at 100%: internal roads and footpaths; water supply; sewerage (chamber, lines, septic tank, STP); storm-water drains; treatment and disposal of sewage and sullage water; solid-waste management and disposal; water conservation/rainwater harvesting; street lighting; and electrical meter room/sub-station/receiving station. These are filed status entries, not independent confirmation of completion. RERA amenities
The tentative approval lists a water reservoir, septic tank, sewerage treatment plant, electric transformer, solid-waste management, underground drainage lines, overhead tank and rainwater-harvesting pits among the infrastructure and utility items. It directs the applicant to carry out infrastructure and amenities works and identifies utility land for handover to the Municipality. The supplied record does not give capacities or establish completion of these systems.
Energy management and fire protection/fire-safety requirements are recorded at 0% in the amenities list. No lift, accessibility, CCTV or other security-system details are supplied. RERA amenities
Location, access & connectivity
The registered location is ARMOOR REVENUE VILLAGE, Armoor Mandal, Nizamabad District, Telangana, PIN 503224; the layout approval also identifies Armoor Revenue Village. RERA record
The project record identifies a canal along the northern boundary and “Others Land” along the other three boundaries. The layout approval requires roads to be kept open for access to neighbouring sites. The nearest sampled Outer Ring Road interchange is recorded as approximately 131.6 km away; the supplied evidence provides no other measured connectivity distances, public-transport details or travel-time claims. Land records Location record
Developer & development status
The TG-RERA registration certificate names CHELIMELA GANGADHAR as promoter; the Form B declaration identifies him as an authorized signatory for the promoter. The record does not specify a legal-entity type, corporate registration number, registered office, or official website/contact details. Corporate record
The filed Form B undertaking states a project completion date of 2nd November 2025, while the registration certificate states validity through 02/11/2025. These are distinct recorded dates: registration validity is not itself evidence of project completion. No extension, current construction-progress report or completion/occupancy certificate is included in the supplied documents.
Approvals, official records & documents
| Supplied evidence | FORM C; registration P03100010341; project SADAK NARAYANA AND OTHER |
|---|---|
| Scope / note | Certificate states validity 02/11/2023–02/11/2025. |
| Supplied evidence | Approval No. 0010/LO/3069/2023, dated 02 November 2023; application No. 010085/LO/DTCP/3069/0025/2023 |
|---|---|
| Scope / note | Armoor Municipality / Municipal Corporation; Survey Nos. 301/1 and 301/2; 23 plots. Approval expressly says it is not proof of title. |
| Supplied evidence | Form B dated 17/09/2025 |
|---|---|
| Scope / note | Declares the land free from encumbrances and undertakes completion by 2nd November 2025. |
| Supplied evidence | Two layout sheets; plot schedule and land-use statement Layout record |
|---|---|
| Scope / note | Plot count and plot sizes are drawing-derived; sizes are noted as needing verification against the drawing. |
| Supplied evidence | Not supplied |
|---|---|
| Scope / note | No building-specific certificate or scope is identified in the supplied evidence. |
Project at a glance
Project identity
Registered project name: SADAK NARAYANA AND OTHER
Project type: Plotted development / tentative residential layout
Phase or registered portion: No separate phase is identified in the supplied record.
TG-RERA registration: P03100010341
Registration validity: 02/11/2023 to 02/11/2025; certificate states a two-year validity. No extension is recorded in the supplied certificate.
Registered promoter: CHELIMELA GANGADHAR
RERA status: The filing identifies the project as “New Project.” Registration certificate details are stated above; a current registration-status verification is not included.
Land and geographic identity
Locality / revenue village: ARMOOR REVENUE VILLAGE; approval identifies ARMOOR Revenue Village.
Mandal / district / PIN: ARMOOR Mandal; Nizamabad District; 503224
Project survey numbers: Survey Nos. 301/1 and 301/2
Registered site extent: 6907.13 sq. m.
Net / total area: Net area 6907.13 sq. m.; total area 6907.13 sq. m.
Boundaries: North: Canal; South, East and West: Others Land
Development identity
Sanctioning authority: Armoor Municipality / Municipal Corporation, as named in the filed tentative layout approval
Principal layout approval: Tentative Layout Plan No. 0010/LO/3069/2023, approved 02 November 2023; associated application No. 010085/LO/DTCP/3069/0025/2023
Plots: 23 plots stated in the approval; the filed layout drawing’s plot schedule also states 23.
Approved built-up area: Not applicable to this plotted layout; no building built-up area is identified in the supplied project record.
Buildings, floors and parking levels: No buildings, floor configuration or parking levels are identified in the supplied record.
Offering and status
Offering: Plots; the layout drawing provides plot sizes for 23 plots.
Booked / available counts: Not disclosed in the supplied project data.
Filed completion undertaking: 02/11/2025
Construction / development stage: A current physical-progress or independently verified site-inspection report is not supplied.
Occupancy / completion certificate: No occupancy or completion certificate is supplied; this is a plotted-layout project, and no building-specific OC scope is identified.
The project story
SADAK NARAYANA AND OTHER is presented in the TG-RERA record as a plotted residential layout at Armoor Revenue Village, Armoor Mandal, Nizamabad District, over Survey Nos. 301/1 and 301/2. The filing identifies 23 plots on a site of 6907.13 sq. m.
The filed tentative layout approval describes land reserved for roads, park/open space, utilities and social infrastructure, alongside the plotted area. It requires infrastructure and other works to be carried out and identifies areas to be handed over to the Municipality before release of the tentative layout. These are approval conditions, not evidence that the works or handovers have been completed.
Master plan, architecture & building design
This is a plotted layout rather than a multi-storey building project. The filed drawing provides the following land-use statement for the net layout area of 6907.13 sq. m.; the areas and percentages below are drawing-derived values.
| Layout use | Area | Share of net layout area |
|---|---|---|
| Plots | 3354.68 sq. m. | 48.57% |
| Roads | 2688.51 sq. m. | 38.92% |
| Parks / open space | 621.70 sq. m. | 9.00% |
| Utilities | 69.10 sq. m. | 1.00% |
| Social infrastructure | 173.13 sq. m. | 2.51% |
| Amenities | 0.00 sq. m. | 0.00% |
The tentative approval separately identifies the park/open-space, roads, utilities and plotted-area allocations and describes the utilities reservation as including items such as a water reservoir. It also specifies that roads are to remain open for neighbouring-site access.
No building arrangement, building footprint, floor configuration, lifts or building-level circulation design is disclosed in the supplied evidence. The filed approval is a tentative layout approval.
Homes, configurations & floor plans
The offering is plots, not apartments. The layout drawing states 23 plots, with plot sizes read by software from the drawing’s schedule; the source notes that the measurements should be checked against the drawing. These are not apartment saleable or carpet-area figures.
100–150 sq. yd. (84–125 sq. m.): 8
150–200 sq. yd. (125–167 sq. m.): 11
200–250 sq. yd. (167–209 sq. m.): 3
300–400 sq. yd. (251–334 sq. m.): 1
The software-read plot-size range is 112.63–252.87 sq. m. (134.7–302.4 sq. yd.), with a median of 139.0 sq. m. (166.2 sq. yd.). Two plots are listed at 117.43 sq. m. each. The layout record states that the sum of plot areas matches the drawing’s plotted-area statement.
The supplied floor-plan set consists of two layout sheets and contains no flat plans. No booked/available plot count, plot-wise allocation status, or current inventory list is supplied.
Parking & vehicle circulation
No resident or visitor parking count, parking allocation schedule, accessible parking provision, vehicle-entry arrangement or EV-charging provision is identified in the supplied project record. The supplied evidence does not establish parking spaces or exclusive parking rights for individual plots.
Amenities, recreation & open spaces
The RERA amenities list marks certain layout infrastructure as available; the supplied record does not establish that these entries have been independently inspected or confirmed complete. The tentative layout approval also requires infrastructure and handovers as conditions of the layout.
| Description / size | Park/open-space reservation: 621.70 sq. m. (9.00% of net layout area) in the drawing; approval states 0 Acer 6.15 Gts, 744 Sq. Yds (9%). |
|---|---|
| Declared progress / verified status | Amenity list marks Green Strip/TOT LOT/Park “YES” and 100%; independent completion verification not supplied. |
| Description / size | No separate size disclosed in the supplied amenities record. |
|---|---|
| Declared progress / verified status | 0% recorded; no independent verification supplied. |
| Description / size | Reserved site: 173.13 sq. m. (2.51% of net layout area). |
|---|---|
| Declared progress / verified status | Reservation is shown; completed facility is not established. |
| Description / size | No size or facility details supplied. |
|---|---|
| Declared progress / verified status | 0% recorded. |
| Description / size | No separate amenity area is shown in the drawing’s land-use statement. |
|---|---|
| Declared progress / verified status | Drawing records 0.00 sq. m. for amenities. |
Utilities, building services & safety
The RERA amenities record marks the following infrastructure categories “YES” at 100%: internal roads and footpaths; water supply; sewerage (chamber, lines, septic tank, STP); storm-water drains; treatment and disposal of sewage and sullage water; solid-waste management and disposal; water conservation/rainwater harvesting; street lighting; and electrical meter room/sub-station/receiving station. These are filed status entries, not independent confirmation of completion.
The tentative approval lists a water reservoir, septic tank, sewerage treatment plant, electric transformer, solid-waste management, underground drainage lines, overhead tank and rainwater-harvesting pits among the infrastructure and utility items. It directs the applicant to carry out infrastructure and amenities works and identifies utility land for handover to the Municipality. The supplied record does not give capacities or establish completion of these systems.
Energy management and fire protection/fire-safety requirements are recorded at 0% in the amenities list. No lift, accessibility, CCTV or other security-system details are supplied.
Location, access & connectivity
The registered location is ARMOOR REVENUE VILLAGE, Armoor Mandal, Nizamabad District, Telangana, PIN 503224; the layout approval also identifies Armoor Revenue Village.
The project record identifies a canal along the northern boundary and “Others Land” along the other three boundaries. The layout approval requires roads to be kept open for access to neighbouring sites. The nearest sampled Outer Ring Road interchange is recorded as approximately 131.6 km away; the supplied evidence provides no other measured connectivity distances, public-transport details or travel-time claims.
Developer & development status
The TG-RERA registration certificate names CHELIMELA GANGADHAR as promoter; the Form B declaration identifies him as an authorized signatory for the promoter. The record does not specify a legal-entity type, corporate registration number, registered office, or official website/contact details.
The filed Form B undertaking states a project completion date of 2nd November 2025, while the registration certificate states validity through 02/11/2025. These are distinct recorded dates: registration validity is not itself evidence of project completion. No extension, current construction-progress report or completion/occupancy certificate is included in the supplied documents.
Approvals, official records & documents
| Supplied evidence | FORM C; registration P03100010341; project SADAK NARAYANA AND OTHER |
|---|---|
| Scope / note | Certificate states validity 02/11/2023–02/11/2025. |
| Supplied evidence | Approval No. 0010/LO/3069/2023, dated 02 November 2023; application No. 010085/LO/DTCP/3069/0025/2023 |
|---|---|
| Scope / note | Armoor Municipality / Municipal Corporation; Survey Nos. 301/1 and 301/2; 23 plots. Approval expressly says it is not proof of title. |
| Supplied evidence | Form B dated 17/09/2025 |
|---|---|
| Scope / note | Declares the land free from encumbrances and undertakes completion by 2nd November 2025. |
| Supplied evidence | Two layout sheets; plot schedule and land-use statement |
|---|---|
| Scope / note | Plot count and plot sizes are drawing-derived; sizes are noted as needing verification against the drawing. |
| Supplied evidence | Not supplied |
|---|---|
| Scope / note | No building-specific certificate or scope is identified in the supplied evidence. |
Frequently asked questions
Is SADAK NARAYANA AND OTHER registered with Telangana RERA?
Yes. SADAK NARAYANA AND OTHER is registered with the Telangana Real Estate Regulatory Authority as P03100010341; the registration status is New Project.
Who is the developer of SADAK NARAYANA AND OTHER?
The promoter named in the RERA registration is CHELIMELA.
Where is SADAK NARAYANA AND OTHER located?
SADAK NARAYANA AND OTHER is in ARMOOR REVENUE VILLAGE, ARMOOR, Nizamabad, Telangana (503224).
When will SADAK NARAYANA AND OTHER be completed?
The promoter's proposed date of completion filed with RERA is 02/11/2025. This is the promoter's declaration, not a guarantee.