Arr Developer2

PISU GANGAREDDY AND OTHERS · Nizamabad · RERA P03100009641

ARR DEVELOPER2 is a plotted development in NIZAMABAD, ARMOOR, Nizamabad district. The registered promoter is PISU GANGAREDDY AND OTHERS. The project covers 57,024.85 sq.m. and has 134 plots, with plot sizes of 143.78–508.2 sq.m.; buildings and floors are not disclosed. Its TG-RERA registration is P03100009641, and its proposed completion date is 30/11/2026.

01What we found

Period endedTG-RERA registration ran to 6 Mar 2026 - check its extension on TG-RERA
24documents on file - each fact links to its page
0court cases on this project's land in the court records searched
6items to check - 3 high

Read from TG-RERA filings, approvals, land and registration records and court records. A court case is counted only when the court record states this project's survey number with its village, or names the project.

02Check before you pay

6 items to check before you pay, 3 high - from the title chain, court records and approvals, each with what to ask the builder or your advocate. An item may not be a problem with the project: records can be incomplete.

Sign in to see each item and what to do

Kotha Armur, Armoor, Nizamabad · geocoded — approximate.

1. Project at a glance

Project identity

ItemRecord
Registered project nameARR DEVELOPER2 RERA record
Project type / phasePlotted development; the registration identifies a new project. A phase or separately registered portion is not disclosed. RERA record RERA filing
TG-RERA registrationP03100009641 RERA record
Registration validity06/03/2024–06/03/2026. This is the registration validity stated on the certificate, not the project completion date. RERA record
Registered promoterPISU GANGAREDDY AND OTHERS RERA record RERA filing
RERA status in the supplied recordRegistered; the certificate states a two-year validity through 06/03/2026. No later extension or updated registration status is supplied.

Land and geographic identity

ItemRecord
LocalityNIZAMABAD RERA record
Revenue village(s)Kotha Armur in the TG-RERA record; the layout approval describes Perkit&Kotarmoor Revenue Village, and the stamped layout plan identifies Perkit (V). RERA record
MandalARMOOR RERA record
District / PINNizamabad / 503224 RERA record
Project survey numbers70, 71, 72, 73, 74, 75, 76, 77, 78, 79, 82, 106, 118, 119, 120, 121, 122, 123, 124, 125, 126, 127, 128, 129, 130, 131, 132, 133, 134, 135, 136, 137, 138, 139, 140, 141, 142, 143, 144, 145, 150, 151, 152, 172. No subdivisions are specified in the registration’s project survey-number list.
Registered site extent57,024.85 sq.m. in the RERA land details. The approved-layout document also states 14 Acer 3.65 Gts and 68,203 Sq. Yds. RERA filing
Net / total areaRERA land details state net area 57,024.85 sq.m. and total area 57,024.85 sq.m. The layout-plan area statement lists total net layout as 57,024.87 sq.m. RERA filing
BoundariesEast, West, North and South: “OTHERS LAND.” RERA filing

Development identity

ItemRecord
Sanctioning authorityArmoor Municipality/Municipal Corporation, as named on the tentative layout approval.
Principal approvalTentative layout plan 0018/LO/3069/2024, approved 06 March, 2024. Approvals record
Earlier plan referenceLayout plan G1/1001/2022-23, approved 23-05-2023; application TS/035727/2023. Approvals record
Approved built-up areaNot applicable as a stated building figure in the supplied plan: the layout approval records total proposed built-up area, with and without parking, as 0.00.
Buildings / floorsNot disclosed; this is a plotted layout, not a building or apartment project.
Plot count134 plots in the layout record.
Roads and reserved landLayout plan states road area 19,087.68 sq.m. (33.47%), organized open space/park 5,201.12 sq.m. (9.12%), social infrastructure 1,439.07 sq.m. (2.52%), and utility area 570.52 sq.m. (1.00%).
ParkingThe layout approval states proposed parking 0 and common parking area 0.00.
Authority-mortgaged plots4,758.55 sq.m. is shown as mortgage area; the approval lists Plot Nos. 3, 8, 39, 40, 38, 51, 50, 58, 130, 128, 110, 127, 111, 112, 83, 84, 70, 71, 68, 67, 66 and 12. RERA filing

Offering and status

ItemRecord
Unit typePlots; the layout schedule identifies 134 plots. RERA record
Plot-size rangeSoftware-read from the approved layout drawing: 143.78–508.2 sq.m. (172.0–607.8 sq.yd.); the drawing-derived figures should be checked against the drawing. Layout record
Booked / available countsNot disclosed in the supplied project evidence. RERA filing
Construction / development stageNo independently verified site-progress evidence is supplied. The RERA filing has 80% completeness as a data-completeness indicator, not a construction-progress measurement. RERA record
Completion datesThe RERA project information gives proposed completion as 30/11/2026. The Form B declaration states an undertaking to complete by 06.03.2026; the tentative layout approval requires infrastructure and amenities within two years of 06 March, 2024, i.e. by 06 March, 2026, subject to its stated extension provision. RERA record
Occupancy / completion certificateNot applicable as a building-level status in the supplied plotted-layout record; no final layout release or completion certificate is supplied.

2. The project story

  • ARR DEVELOPER2 is a registered plotted-layout project in the Armoor area of Nizamabad district. The RERA certificate locates it at Kotha Armur, while the layout approval identifies the site as Perkit&Kotarmoor Revenue Village and the layout plan labels Perkit village. The registered land schedule covers 44 survey numbers, from Survey No. 70 through 172 as listed above; no sub-division numbers are given in that project schedule.
  • The filed layout describes 134 plots within a site recorded as 57,024.85 sq.m. It allocates land to plots, roads, park/open space, social infrastructure and utilities. The supplied layout approval is for a tentative layout and places responsibility for completing roads, drainage, water and other infrastructure on the layout owner/developer. The RERA record gives a proposed completion date of 30/11/2026; no site inspection or independently verified construction-progress record is supplied, so physical completion cannot be assessed here. RERA record

3. Master plan, architecture & building design

  • The approved drawing is a plotted layout rather than a building plan. Its area statement allocates 30,726.48 sq.m. (53.88%) to plotted area, 19,087.68 sq.m. (33.47%) to roads, 5,201.12 sq.m. (9.12%) to organized open space/park, 1,439.07 sq.m. (2.52%) to social infrastructure and 570.52 sq.m. (1.00%) to utilities. It reports no amenity area, buffer-zone area, green-belt area or common-parking area. The plan’s stated total net layout is 57,024.87 sq.m.
  • The layout drawing identifies road widths of 10.00 MT, 12.00M, 18.00 MT, 33.00 MT, 33.00 MT WIDE EXISTING and 55'0" WIDE EXISTING. The tentative approval also describes roads of 18 metres and above and requires roads to remain open for access to neighbouring sites.
  • The approval reserves 4,758.55 sq.m. of plotted land as mortgage area for the municipality; the approval lists the mortgaged plot numbers in the development-identity table above. The supplied record does not describe building footprints, floors, tower arrangements, or residential/commercial building areas.

4. Homes, configurations & floor plans

  • The offering is plots, not apartments or villas. The layout drawing’s plot schedule gives 134 plots; software-measured areas range from 143.78 sq.m. (172.0 sq.yd.) to 508.2 sq.m. (607.8 sq.yd.), with a median of 183.95 sq.m. (220.0 sq.yd.). These are drawing-derived readings, not RERA-filed saleable-area measurements. Layout record
Plot-size band (sq.yd.)Plot-size band (sq.m.)Plots
150–200125–1678
200–250167–20982
250–300209–2517
300–400251–33413
400–500334–41822
500–1000418–8362
  • The supplied floor-plan data contains two layout sheets and no apartment floor plans with measurable flats. No plot-wise booked/available inventory, individual plot dimensions, or allottee-specific saleable areas are supplied. Floor plans Layout record

5. Parking & vehicle circulation

The layout plan states proposed number of parkings: 0 and common parking area: 0.00. No resident or visitor parking count, accessible parking, vehicle ramp, or individual plot parking allocation is disclosed. The drawing identifies internal roads and road widths, but the supplied evidence does not establish a separate pedestrian network or a legally exclusive parking entitlement for any plot.

6. Amenities, recreation & open spaces

The tentative layout approval lists infrastructure and amenities to be provided, while the RERA amenity fields show no reported progress percentage above 0. These percentages are filed status entries, not independent verification of physical condition. RERA amenities

Organized open space / park
Description / size5,201.12 sq.m.; 9.12% of layout area
Evidence sourceApproved layout plan
Declared progress / verified statusRERA amenity field lists Green Strip/TOT LOT/Park as “YES” with 0% progress; no independent completion verification supplied. RERA amenities
Social infrastructure
Description / size1,439.07 sq.m.; 2.52%
Evidence sourceApproved layout plan
Declared progress / verified statusReserved in layout; no facility type, progress detail or independent completion verification supplied.
Community buildings
Description / sizeSize and type not specified
Evidence sourceRERA amenity field RERA amenities
Declared progress / verified statusProgress recorded as 0%; completion not verified.
Recreational open space
Description / sizeIncluded in the layout’s park/open-space provision
Evidence sourceApproved layout plan
Declared progress / verified statusRERA amenity field says available “YES”; progress recorded as 0%; completion not verified. RERA amenities

7. Utilities, building services & safety

  • The tentative layout approval identifies the following planned infrastructure: water reservoir, septic tank, sewerage treatment plant, electric transformer, solid-waste management, storm-water drains, underground drainage lines, common septic tank/STP, internal water-supply pipelines, overhead tank, street lights, avenue plantation, park development and rainwater-harvesting pits. These are approval requirements or proposed facilities in the supplied record; no capacities, commissioning records or independent completion evidence are provided.
  • The RERA amenity fields include water supply, sewerage, storm-water drains, sewage/sullage treatment and disposal, solid-waste management, rainwater harvesting, energy management, fire protection and safety, and an electrical meter room/substation/receiving station. Their listed progress is 0% where a percentage is supplied; the data does not establish that these facilities have been installed or are operational. RERA amenities

8. Location, access & connectivity

  • The project’s RERA location is Kotha Armur, Armoor, Nizamabad, Telangana, PIN 503224. The layout approval identifies the revenue location as Perkit&Kotarmoor Revenue Village, and the layout plan identifies Perkit village. The parcel centroid supplied for Survey No. 71 is 18.79059, 78.32074; it is a cadastral centroid, not a verified project entrance coordinate. RERA record Cadastral map
  • The nearest sampled Outer Ring Road interchange is listed at approximately 130.1 km. No other measured access distances, public-transport details, or travel-time estimates are supplied. Location record

9. Developer & development status

  • The registered promoter is PISU GANGAREDDY AND OTHERS, recorded as organization type “Others”; the legal entity form and corporate registration identifiers are not established in the supplied material. The promoter address in the RERA fields is VTC Kolipaka, Perkit, Nizamabad, Armoor, Nizamabad, Telangana, 503224. No official website or project contact details are supplied. RERA record RERA filing Parties record
  • A RERA-filed Form B declaration dated 31 AUG 2024, made by Pisu Gangareddy as the representative of ARR DEVELOPER 2, states that the project land has legal title, declares it free from encumbrances, and undertakes completion by 06.03.2026. These are promoter declarations. The supplied RERA project-information record separately states a proposed completion date of 30/11/2026; no site-progress verification or subsequent completion/extension record is supplied here. RERA record

10. Approvals, official records & documents

TG-RERA registration
Supplied evidenceForm C certificate P03100009641, valid 06/03/2024 through 06/03/2026.
Scope / noteARR DEVELOPER2, plotted project.
Layout approval
Supplied evidenceTentative layout approval 0018/LO/3069/2024, dated 06 March, 2024, issued by Armoor Municipality/Municipal Corporation.
Scope / noteCovers 134 plots and states infrastructure, open-space, road, utility, mortgage and development conditions.
Earlier layout-plan record
Supplied evidenceStamped layout plan G1/1001/2022-23, dated 23-05-2023; application TS/035727/2023.
Scope / notePlan drawing for the project survey schedule.
Promoter declaration
Supplied evidenceForm B affidavit dated 31 AUG 2024.
Scope / notePromoter declaration and completion undertaking; not an independent title verification.
Final layout release / completion
Supplied evidenceNot supplied. Document index
Scope / noteThe supplied approval is described as tentative; no final layout release or infrastructure-completion certificate is included.
Building / occupancy certificates
Supplied evidenceNot supplied. Document index
Scope / noteNo building count or building-level occupancy certificate is recorded for this plotted-layout evidence set.

Frequently asked questions

Is ARR DEVELOPER2 registered with Telangana RERA?

Yes. ARR DEVELOPER2 is registered with the Telangana Real Estate Regulatory Authority as P03100009641; the registration status is New Project.

Who is the developer of ARR DEVELOPER2?

The promoter named in the RERA registration is PISU GANGAREDDY AND OTHERS.

Where is ARR DEVELOPER2 located?

ARR DEVELOPER2 is in NIZAMABAD, Kotha Armur, ARMOOR, Telangana (503224).

When will ARR DEVELOPER2 be completed?

The promoter's proposed date of completion filed with RERA is 30/11/2026. This is the promoter's declaration, not a guarantee.