Armoor City

PARIJATHA HOMES & DEVELOPERS PVT LTD · Nizamabad · RERA P03100005460

ARMOOR CITY is a residential apartment project at Perkit Village, ARMOOR Mandal, Nizamabad District, developed by the registered promoter PARIJATHA HOMES & DEVELOPERS PVT LTD. The project covers 8703.02 sq. m and comprises 2 buildings, Blocks A and B, each with 1 Ground + 5 upper floors. The RERA filing records 242 homes: 158 2BHK units of 99.87 sq. m saleable area each and 84 3BHK units of 117.52 sq. m saleable area each. Its TG-RERA registration is P03100005460; the promoter’s Form B declaration undertakes completion by 18 October 2028.

More from Parijatha Homes & Developers Pvt Ltd · 5 projects →

01What we found

Period endedTG-RERA registration ran to 18 Oct 2025 - check its extension on TG-RERA
19documents on file - each fact links to its page
0court cases on this project's land in the court records searched
11items to check - 5 high

Read from TG-RERA filings, approvals, land and registration records and court records. A court case is counted only when the court record states this project's survey number with its village, or names the project.

02Check before you pay

11 items to check before you pay, 5 high - from the title chain, court records and approvals, each with what to ask the builder or your advocate. An item may not be a problem with the project: records can be incomplete.

Sign in to see each item and what to do

1. Project at a glance

Project identity

ItemProject record
Registered project nameARMOOR CITY RERA record
Project typeResidential apartment project RERA record
Phase / registered portionNo phase name or separate phase identifier disclosed; the building approval identifies Blocks A and B.
TG-RERA registrationP03100005460
Registration validity7 December 2022 to 18 October 2025, unless extended by the Authority. The supplied certificate records no extension. Registration validity is separate from the completion undertaking.
Registered promoterPARIJATHA HOMES & DEVELOPERS PVT LTD RERA record
RERA status in supplied recordThe registration certificate is supplied; it states the validity dates above. A current portal status beyond that recorded validity is not established by the supplied material.

Land and geographic identity

ItemProject record
Locality / revenue villagePerkit Village (also rendered “PERKIT VILLAGE”); project identity lists Perkit. RERA record Land records
MandalARMOOR in the project identity; the building-approval extraction states “Perkit&Kotarmoor.” RERA record
District / PINNizamabad / 503223 RERA record
Project survey numbers315/1, 315/2, 316/2, 316/4 RERA record Land records
Additional survey references in the building approval60, 61/PART, 62, 63/PART are also listed in the approval. Their relationship to the four project-identity survey numbers is not further described here.
Registered site extent8703.02 sq. m RERA filing
Total / net area and road-affected areaRERA land details report total area 8703.02 sq. m, affected area 0, and net area 8703.02 sq. m. The approval extraction separately lists site area 8703.02, road-affected area 8703.02, and net area 8703.02; the approval also refers to a road-affected portion being surrendered. RERA filing
Boundaries in RERA filingEast: ROAD; west, north and south: OTHERS LAND. RERA filing

Development identity

ItemProject record
Sanctioning authorityBuilding approval filed as issued by Armoor Municipality/ Municipal Corporation; the RERA record identifies DTCP as the authority for plan approval. Approvals record
Principal approval0008/BP/3069/2022, approved 18 October 2022. The approval extraction also identifies file number 003554/BP/DTCP/3069/0013/2021. Approvals record
Approved built-up area31,636.20 sq. m in the RERA project fields. RERA filing
Buildings2 in the RERA land record; the filed building approval identifies Block A and Block B. RERA filing
Sanctioned height / floorsEach block is described as 1 Ground + 5 upper floors, with height 17.99 m.
Basement, stilt, podium or parking levelsNot disclosed in the supplied approval extraction.
UnitsThe RERA filing records 242 units across the two buildings. The supplied approval extraction does not state an approved unit total. RERA unit table

Offering and status

ItemProject record
RERA-filed configurations2BHK: 158 units, saleable area 99.87 sq. m each; 3BHK: 84 units, saleable area 117.52 sq. m each. RERA unit table RERA unit details
Portal booking / availability snapshot0 booked / 242 available in the supplied portal-derived counts; no as-of date is provided, so counts are indicative, not a current sales confirmation. RERA unit table RERA unit details
Construction stageNo independently verified site-progress measurement is supplied. The project is described in the RERA record as “New Project”; construction status must not be inferred from registration or the approval alone. RERA record
Completion datesThe building approval lists construction commencement before 18 April 2023 and completion before 18 October 2025. The promoter’s Form B declaration undertakes completion by 18 October 2028.
Occupancy / completion certificateNo occupancy or completion certificate is included in the supplied documents. The building approval says an occupancy certificate is compulsory before occupation.

2. The project story

ARMOOR CITY is recorded with TG-RERA as a residential apartment development at Perkit Village, Armoor Mandal, Nizamabad District. The registered land identity covers survey numbers 315/1, 315/2, 316/2 and 316/4, with the building approval also listing 60, 61/PART, 62 and 63/PART. The RERA land entry gives a site extent of 8703.02 sq. m. RERA record Land records

The building-construction approval describes two residential blocks, A and B, each with ground and five upper floors, and gives a height of 17.99 m per block. The RERA filing records 242 homes: 158 two-bedroom units and 84 three-bedroom units. No separate phase or tower-by-tower unit allocation is given in the supplied material. RERA unit table RERA unit details

The approval’s stated completion deadline is 18 October 2025; the promoter’s Form B declaration separately states a completion undertaking of 18 October 2028. These are reported as distinct record entries, not as evidence of actual progress. The supplied pack contains no independent construction inspection, verified completion percentage, or occupancy certificate.

3. Master plan, architecture & building design

The RERA record identifies a total and net land area of 8703.02 sq. m, and an approved built-up area of 31,636.20 sq. m. The building-approval extraction records a ground-floor area of 2,514.72 sq. m and two residential blocks, each approved at ground plus five upper floors and 17.99 m high. These are distinct reported area measures; no FSI-counted area is supplied. RERA filing

The approval extraction identifies a tot-lot of 889.05 sq. m, 14 rain-water-harvesting percolation pits, and space for a transformer. It also includes conditions for peripheral tree planting and greenery, fencing and maintaining the tot-lot, a garbage house, and rain-water harvesting. These are approval requirements or recorded provisions, not confirmation that the works have been completed.

The supplied approval extraction does not provide a detailed floor-plan description of apartment distribution, flats per floor, entrances, lifts, stairs, internal circulation, or parking levels. The layout-plan item appears in the RERA document list, but no extracted plan content is supplied for describing its arrangement.

4. Homes, configurations & floor plans

The RERA filing lists two configurations and 242 units in total. Saleable areas below are RERA-filed; carpet-area figures are software measurements from the drawing identified as document 269141, not RERA disclosures. RERA unit table RERA unit details

ConfigurationUnitsBookedAvailable*RERA saleable areaMeasured carpet area**Loading (if supplied)
2BHK158015899.87 sq. m66.0–87.0 sq. m; median 67.0 sq. m33%
3BHK84084117.52 sq. m96.9 sq. m18%

\* Portal-derived counts are indicative: the supplied record has no count as-of date. RERA unit table \** Software-measured carpet area from drawing geometry; it requires review against the drawing. Carpet area is not the same as saleable area, which includes a home’s share of common areas. The supplied material does not provide a separately verified balcony/utility area total or a legally agreed loading calculation. Floor plans RERA unit details

The measured 2BHK sample covers 63 flat designs; the 3BHK measurement covers 1 design. The drawing extraction shows living, kitchen, dining, bedrooms, toilets and utility/balcony spaces in the cited examples, but does not establish that every unit has the same dimensions or arrangement. Floor plans RERA unit details

A 1BHK measurement is also present in the drawing data: six designs measured, with carpet area 61.2 sq. m (median; range 61.2 sq. m). It is not listed as a configuration in the supplied TG-RERA unit filing, so it is not included in the RERA offering table. Floor plans RERA unit details

5. Parking & vehicle circulation

The supplied RERA amenity record lists internal roads and footpaths but does not state parking-space counts or identify basement, stilt, podium, surface or mechanical parking. RERA amenities

A third-party vendor record lists “Open Parking” and “Covered Parking,” and gives Open Parking (230 sqm), Covered Parking (230 units). This is a vendor-reported claim, not a sanctioned parking schedule or evidence of parking allocation to a particular home. Promoter website

The documents supplied do not establish visitor or accessible parking, ramps or vehicle-entry arrangements, pedestrian separation, EV charging, or exclusive parking rights for an individual allottee. A buyer should obtain the project’s sanctioned parking plan and the proposed agreement/allotment terms for the specific unit.

6. Amenities, recreation & open spaces

The TG-RERA amenity record marks the following project provisions as available in the filing, while showing 0% progress for each listed item. The building approval also specifies a tot-lot and rain-water-harvesting pits. These records do not independently verify delivery or completion. RERA amenities

FacilityDescription / sizeEvidence sourceDeclared progress / verified status
Internal roads and footpathsSize not statedRERA amenity recordListed “YES”; 0%; completion not independently verified
Green strip / tot-lot / parkApproval records a tot-lot of 889.05 sq. m; also requires greenery and a fenced tot-lotRERA amenity record; building approvalListed “YES”; 0%; approval requirement is not proof of delivery
Community buildingsSize and facilities not statedRERA amenity recordListed “YES”; 0%; completion not independently verified
Street lightingDetails not statedRERA amenity recordListed “YES”; 0%; completion not independently verified
Water conservation / rain-water harvestingApproval specifies 14 percolation pitsRERA amenity record; building approvalListed “YES”; 0%; installation not independently verified
Open and recreational spaceAggregate area not stated in the amenity recordRERA amenity recordListed “YES”; 0%; completion not independently verified

The supplied material does not identify a clubhouse, indoor recreation facilities, or named sports facilities. RERA amenities Document index

7. Utilities, building services & safety

The RERA amenity record lists water supply; sewerage (chambers, lines, septic tank, STP); storm-water drains; treatment and disposal of sewage and sullage water; solid-waste management and disposal; energy management; fire protection and fire safety; and an electrical meter room, sub-station or receiving station. Each item shown in the supplied amenity record has 0% progress. It does not provide capacities, system specifications, or independent completion evidence. RERA amenities

The building approval specifies 14 rain-water-harvesting percolation pits, space for a transformer, and a garbage house. It also states that structural-safety and fire-safety requirements are the responsibility of the owner, builder/developer, architect and structural engineer, and requires an occupancy certificate before occupation. These approval conditions do not, by themselves, establish that systems have been installed, tested, or certified.

The supplied evidence does not state water source or storage capacity, STP capacity or treated-water reuse, backup-power arrangements, lift count or capacity, fire-system specifications, escape-stair details, CCTV/security arrangements, waste-segregation arrangements, or accessible routes and facilities. RERA amenities

8. Location, access & connectivity

The registered project location is Perkit Village, Armoor Mandal, Nizamabad District, Telangana, PIN 503223. The RERA filing records the east boundary as a road and the other three boundaries as other land. RERA record RERA filing RERA filing

The building approval refers to an 18M road width and includes a condition concerning the site abutting an 18M road. The supplied location data gives a cadastral parcel-centroid coordinate of 17.415275719570207, 78.35458902767974, and lists Financial District (Nanakramguda) at 1.2 km as a connectivity anchor. The evidence does not establish a travel time, route, or public-transport connection. Location record

9. Developer & development status

The registered promoter is PARIJATHA HOMES & DEVELOPERS PVT LTD, a company, with GSTIN 36AACCP8348R1ZK. The supplied corporate record lists CIN U70102AP2002PTC38310. RERA record Corporate record

The project declaration is signed by THATIPAMULA NARESH KUMAR, identified as the promoter’s authorised signatory. The building approval names the company as the landowners’ DAGPA holder and applicant representative.

The promoter’s Form B declaration states that the project would be completed by 18 October 2028 and includes declarations concerning project funds, accounts and approvals. That is a promoter declaration, not independent confirmation of construction progress or completion. The project’s registration certificate records validity through 18 October 2025; the supplied pack does not include an extension order or an occupancy/completion certificate.

10. Approvals, official records & documents

TG-RERA registration certificate
What the supplied document establishesForm C records ARMOOR CITY, registration P03100005460, issued 7 December 2022, with validity through 18 October 2025 unless extended by the Authority
Building-construction approval
What the supplied document establishesApproval 0008/BP/3069/2022, dated 18 October 2022, for Blocks A and B; includes the building and site particulars and conditions including occupancy certification before occupation
Building-approval file number
What the supplied document establishes003554/BP/DTCP/3069/0013/2021
Project Form B declaration
What the supplied document establishesPromoter declaration dated 21 October 2022, including completion undertaking of 18 October 2028
Layout plan document entry
What the supplied document establishesA layout-plan item is listed, but the supplied extraction contains no plan content for review
Occupancy / completion certificate
What the supplied document establishesNot present in the supplied document set
ReferenceDocument index
Additional identifiers in the building-approval file
What the supplied document establishesContractor’s all-risk policy 431190/44/2023/307; notarised affidavit 6148/2022; payment reference TS/7583/2021; S.R.O. reference BK-1, CS No. 6291/2022

The approval document’s displayed validity is through 12 October 2028; the supplied material does not include a later approval-status verification.

Frequently asked questions

Is ARMOOR CITY registered with Telangana RERA?

Yes. ARMOOR CITY is registered with the Telangana Real Estate Regulatory Authority as P03100005460; the registration status is New Project.

Who is the developer of ARMOOR CITY?

The promoter named in the RERA registration is PARIJATHA HOMES & DEVELOPERS PVT LTD.

Where is ARMOOR CITY located?

ARMOOR CITY is in PERKIT VILLAGE, ARMOOR, Nizamabad, Telangana (503223).

When will ARMOOR CITY be completed?

The promoter's proposed date of completion filed with RERA is 18/10/2025. This is the promoter's declaration, not a guarantee.