Hari Hara Hemadri - Block B
SRIKANTH REDDY · Medchal-Malkajgiri · RERA P02200005540
HARI HARA HEMADRI - BLOCK B is a residential apartment project in Bachupally, Bachupally Mandal, Medchal-Malkajgiri district. The registered promoter is Srikanth Reddy Bommireddy. The project records 458.33 sq. metres of land, one building with 1 Stilt + 5 upper floors, and 10 apartments: 5 double-bedroom and 5 triple-bedroom units. It is registered under TG-RERA P02200005540, with proposed completion on 31/12/2024.
01What we found
Read from TG-RERA filings, approvals, land and registration records and court records. A court case is counted only when the court record states this project's survey number with its village, or names the project.
02Check before you pay
12 items to check before you pay, 5 high - from the title chain, court records and approvals, each with what to ask the builder or your advocate. An item may not be a problem with the project: records can be incomplete.
1. Project at a glance
Project identity
| Item | TG-RERA record |
|---|---|
| Registered project name | HARI HARA HEMADRI - BLOCK B RERA record |
| Project type | Residential apartment project RERA record |
| Registered portion / phase | Block B; the registration and approval records supplied identify this block. Further phase detail is not disclosed. RERA record |
| TG-RERA registration | P02200005540; granted in Form C under section 5. |
| Registration validity | 20/12/2022 to 31/12/2024; the certificate records no extension. This is registration validity, not a completion or occupancy certificate. |
| Registered promoter | Srikanth Reddy Bommireddy (also named in project documents as Bommireddy Srikanth Reddy). |
| RERA status | New Project in the supplied project record. The registration certificate’s stated validity ended on 31/12/2024; current registration status is not established by the supplied record. RERA record |
Land and geographic identity
| Item | TG-RERA record |
|---|---|
| Locality / revenue village | Bachupally; project records identify Bachupally Village. RERA record RERA filing |
| Mandal | Bachupally in project and approval details; the RERA certificate also records “NIZAMPET.” RERA record |
| District / PIN | Medchal-Malkajgiri / 500090. RERA record RERA filing |
| Project survey numbers | SY No. 28, 29 and 30; no project subdivision is supplied. RERA record |
| Plot numbers / registered site extent | Plot Nos. 194/A/Part, 195/A/Part and 195/Part; the RERA land record states 458.33 sq. metres total and net area. RERA filing |
| Boundaries | North: 30 wide road; South: Plot Nos. 194 A Part, 195 Part, 195 A Part; East: Plot No. 194 A Part; West: Plot No. 196. RERA filing |
| Extent shown in HMDA technical approval | 381.60 sq. metres. |
Development identity
| Item | Record |
|---|---|
| Sanctioning authority / principal approval | Hyderabad Metropolitan Development Authority (HMDA); approval no. 005797/BP/HMDA/1127/MED/2022, dated 20 June 2022. The approval records delegation to Nizampet Municipal Corporation for building-plan sanction and release. Approvals record |
| Approved built-up area | 1,334.11 sq. metres, stated in the filed project details and HMDA technical approval. The approval also separately lists “Proposed Built-up Area 1,102.75”; the supplied record does not explain the relationship between those figures. RERA filing |
| Building / block count | One building / block is recorded. RERA unit table |
| Sanctioned floor configuration | 1 Stilt + 5 upper floors. Building height is stated as 14.95 in the HMDA approval; the unit for height is not specified in the supplied extraction. |
| Parking levels / provision | Stilt is recorded; parking count and allocation are not disclosed in the supplied records. RERA filing |
| Units | 10 RERA-listed apartments: 5 double-bedroom and 5 triple-bedroom units. The land record separately states one total building unit, which is not identified as the apartment count. RERA unit table RERA unit table RERA filing |
Offering and status
| Item | Record |
|---|---|
| Configurations | 2BHK (filed as “DOUBLE BEDROOM”) and 3BHK (filed as “TRIPLE BEDROOM”). RERA unit table RERA unit table |
| RERA saleable area | 2BHK: 118.45 sq. metres; 3BHK: 148.64 sq. metres. RERA unit table RERA unit table |
| Booked / available | 0 booked and 5 available in each configuration (10 available total), as last read from the TG-RERA portal; no as-of date is attached, so counts are indicative. RERA unit table |
| Construction stage | RERA project record reports 90% completeness, with no stated measurement date or independent site verification. RERA record |
| Completion dates | Form B promoter declaration: 31/12/2023; RERA project record: proposed completion 31/12/2024. No revised completion approval is supplied. RERA record |
| Occupancy / completion certificate | No occupancy certificate or completion certificate is included in the supplied records. Certificate status and scope by tower or phase are therefore unverified. Document index Approvals record |
2. The project story
HARI HARA HEMADRI - BLOCK B is registered as a residential apartment project on Plot Nos. 194/A/Part, 195/A/Part and 195/Part in Bachupally Village, covering SY Nos. 28, 29 and 30. The registration identifies a single building/block, and the HMDA technical approval describes a residential building of 1 Stilt + 5 upper floors.
The RERA filing lists ten apartments—five 2BHK and five 3BHK—and records all ten as available with none booked, based on a portal reading without an as-of date. The project record reports 90% completeness; this is a recorded project-status figure, not an independent inspection finding. RERA unit table RERA record
The promoter’s Form B declaration undertakes completion by 31/12/2023, while the RERA project record states 31/12/2024 as the proposed completion date. Registration validity is separately stated as ending 31/12/2024, and the certificate records no extension. The supplied material does not establish that the project, any tower, or common facilities have received an occupancy or completion certificate. RERA record
3. Master plan, architecture & building design
The RERA-filed site extent is 458.33 sq. metres, with the same figure stated as net area and no recorded area affected by road widening, FTL or nala widening. The HMDA technical approval separately describes an extent of 381.60 sq. metres. RERA filing
The approval identifies one residential building with 1 Stilt + 5 upper floors and lists a building height of 14.95 (unit not specified in the supplied extraction). The project filing gives approved built-up area as 1,334.11 sq. metres. The HMDA approval also lists “Proposed Built-up Area 1,102.75”; the supplied documents do not define the two area labels or show a drawing-level reconciliation. RERA filing
The approval extraction does not provide a sufficiently detailed drawing description to establish the building footprint, flats per floor, number or position of lifts and stairs, entrances, internal circulation, landscaping, open-space distribution, or residential/common-area breakdown. A RERA filing row describes a typical floor plan on drawing document 277219, but only one of three drawings is reported as measured and two scans remain pending. Floor plans
4. Homes, configurations & floor plans
The TG-RERA filing records apartment counts and saleable areas. Drawing-based carpet-area measurements are software measurements, not RERA-filed disclosures; they are flagged for review and should be checked against the underlying drawings. The supplied measurement record says saleable area includes the home’s share of common areas and is larger than measured carpet area. RERA unit table RERA unit details Floor plans
| Configuration | Units | Booked | Available | RERA saleable area | Measured carpet area | Loading (if supplied) |
|---|---|---|---|---|---|---|
| 2BHK (filed as “DOUBLE BEDROOM”) | 5 | 0 | 5 | 118.45 sq. metres | Software-measured median 87.0 sq. metres; range 78.9–87.8 sq. metres | 27% |
| 3BHK (filed as “TRIPLE BEDROOM”) | 5 | 0 | 5 | 148.64 sq. metres | Software-measured median 90.0 sq. metres; range 84.2–90.1 sq. metres | 39% |
The drawing extraction for one 2BHK flat labels a living/dining area, kitchen, two bedrooms, toilet and wash area; for one 3BHK flat it labels a living/dining area, kitchen, three bedrooms, two toilets and a balcony labelled “1.60 M. WIDE BALC.” These are drawing-derived details, not a complete verified schedule of every unit.
5. Parking & vehicle circulation
The HMDA approval describes a stilt level, but the supplied records do not state the sanctioned number of car or two-wheeler spaces, visitor or accessible parking, parking layout, ramp arrangement, or internal vehicle circulation. No unit-specific parking allocation or exclusive ownership arrangement is established by the available material. RERA filing
The approval records a simple mortgage of 10% of built-up area in favour of MC, HMDA, identified as 122.82 sq. metres under registered document 17408/2022. This is a mortgage record, not a count or allocation of parking spaces.
6. Amenities, recreation & open spaces
The RERA amenities schedule records the following project infrastructure and facilities. Its listed progress is 0% for each item; that is the filed status and is not independently verified. No facility is established here as completed. RERA amenities
| Facility | Description / size | Evidence source | Declared progress / verified status |
|---|---|---|---|
| Internal roads and footpaths | Size not stated | RERA amenities schedule RERA amenities | 0%; not independently verified |
| Water supply | Availability marked “YES”; source and capacity not stated | RERA amenities schedule RERA amenities | 0%; not independently verified |
| Sewerage | “Sewerage (Chamber, Lines, Septic Tank, STP)” marked “YES”; capacity and system details not stated | RERA amenities schedule RERA amenities | 0%; not independently verified |
| Storm-water drains | Size and details not stated | RERA amenities schedule RERA amenities | 0%; not independently verified |
| Green strip / tot lot / park | Area and facilities not stated | RERA amenities schedule RERA amenities | 0%; not independently verified |
| Street lighting | Details not stated | RERA amenities schedule RERA amenities | 0%; not independently verified |
| Community buildings | Type, size and capacity not stated | RERA amenities schedule RERA amenities | 0%; not independently verified |
| Sewage and sullage treatment/disposal | System and capacity not stated | RERA amenities schedule RERA amenities | 0%; not independently verified |
| Solid-waste management and disposal | Details not stated | RERA amenities schedule RERA amenities | 0%; not independently verified |
| Water conservation / rainwater harvesting | HMDA approval requires rainwater-harvesting structures; size and capacity not stated | RERA amenities schedule RERA amenities | 0% in amenities schedule; not independently verified |
| Energy management | Details not stated | RERA amenities schedule RERA amenities | 0%; not independently verified |
| Fire protection and fire-safety requirements | Systems and details not stated | RERA amenities schedule RERA amenities | 0%; not independently verified |
| Electrical meter room / sub-station / receiving station | Details not stated | RERA amenities schedule RERA amenities | 0%; not independently verified |
| Recreational open space | Aggregate area not stated | RERA amenities schedule RERA amenities | 0%; not independently verified |
7. Utilities, building services & safety
The RERA amenities schedule marks water supply, sewerage (including chambers, lines, septic tank and STP), and water conservation/rainwater harvesting as available or included, but lists 0% progress for each and gives no source, storage, treatment, capacity or completion evidence. HMDA’s technical approval requires rainwater-harvesting structures. RERA amenities
The schedule also lists storm-water drainage, sewage and sullage treatment/disposal, solid-waste management, energy management, fire-protection and fire-safety requirements, and an electrical meter room/sub-station/receiving station. It does not provide system specifications, capacities, clearances, or verified completion status. Lift and power-backup details are not established in the RERA project documents supplied for this Overview. RERA amenities Document index
8. Location, access & connectivity
The registered project location is Bachupally, Medchal-Malkajgiri district, Telangana, PIN 500090; project and approval documents identify Bachupally Village and Bachupally Mandal. The approval record also uses “Nizampet Municipal Corporation” as locality and records Nizampet in the RERA certificate’s mandal field. RERA record RERA filing
The HMDA approval specifies a 4.5-metre road width. The supplied project record gives boundary references to a “30 wide road” on the north and neighboring plot numbers on the other sides; the units for “30 wide” are not stated in that field. No verified public-transport route, approach-road description or measured distance to landmarks is supplied in the RERA location record. RERA filing Location record
9. Developer & development status
The TG-RERA certificate names the promoter as Srikanth Reddy Bommireddy; the Form B affidavit identifies Bommireddy Srikanth Reddy as promoter, and the HMDA approval identifies Sri Bommi Reddy Srikanth Reddy as owner and applicant. The legal entity type, corporate registration identifiers, registered office, and official contact or website are not disclosed in the supplied project records. Corporate record
The project record reports 90% completeness, without an independent inspection date. The promoter’s Form B undertaking gives 31/12/2023 as the completion date; the RERA project record gives 31/12/2024 as proposed completion. The registration certificate states validity through 31/12/2024 and records no extension. No occupancy or completion certificate is supplied, so certificate status for Block B is unverified. RERA record Document index
10. Approvals, official records & documents
| Record | Supplied evidence |
|---|---|
| TG-RERA registration | Form C certificate for HARI HARA HEMADRI - BLOCK B, P02200005540, issued 20/12/2022; validity stated through 31/12/2024, with no extension recorded. |
| Principal building approval | HMDA technical approval no. 005797/BP/HMDA/1127/MED/2022, dated 20 June 2022, for a residential building of 1 Stilt + 5 upper floors. The approval states that building plans are to be sanctioned and released by the Municipal Corporation/Municipality and identifies Nizampet Municipal Corporation as delegated authority. |
| Commencement / building-plan record | Document 265948 is filed under “Commencement Certificates for each building in each phase” and extracts an HMDA building-construction technical approval. A separate final municipal building-plan sanction is not included in the supplied extracts. |
| Title and promoter declaration | Form B affidavit dated August 2022 by Bommireddy Srikanth Reddy, including the promoter’s title and encumbrance declarations and completion undertaking. |
| Floor-plan drawing record | Document 277219 is cited for typical floor-plan measurements; the supplied drawing-status record says three drawings total, one measured and two scans pending. Floor plans |
| Occupancy / completion certificate | Not present in the supplied project documents; certificate status is unverified. Document index |
| Layout plan | A layout-plan filing entry exists, but no extracted plan content is supplied. Approvals record Document index |
1. Project at a glance
Project identity
Registered project name: HARI HARA HEMADRI - BLOCK B
Project type: Residential apartment project
Registered portion / phase: Block B; the registration and approval records supplied identify this block. Further phase detail is not disclosed.
TG-RERA registration: P02200005540; granted in Form C under section 5.
Registration validity: 20/12/2022 to 31/12/2024; the certificate records no extension. This is registration validity, not a completion or occupancy certificate.
Registered promoter: Srikanth Reddy Bommireddy (also named in project documents as Bommireddy Srikanth Reddy).
RERA status: New Project in the supplied project record. The registration certificate’s stated validity ended on 31/12/2024; current registration status is not established by the supplied record.
Land and geographic identity
Locality / revenue village: Bachupally; project records identify Bachupally Village.
Mandal: Bachupally in project and approval details; the RERA certificate also records “NIZAMPET.”
District / PIN: Medchal-Malkajgiri / 500090.
Project survey numbers: SY No. 28, 29 and 30; no project subdivision is supplied.
Plot numbers / registered site extent: Plot Nos. 194/A/Part, 195/A/Part and 195/Part; the RERA land record states 458.33 sq. metres total and net area.
Boundaries: North: 30 wide road; South: Plot Nos. 194 A Part, 195 Part, 195 A Part; East: Plot No. 194 A Part; West: Plot No. 196.
Extent shown in HMDA technical approval: 381.60 sq. metres.
Development identity
Sanctioning authority / principal approval: Hyderabad Metropolitan Development Authority (HMDA); approval no. 005797/BP/HMDA/1127/MED/2022, dated 20 June 2022. The approval records delegation to Nizampet Municipal Corporation for building-plan sanction and release.
Approved built-up area: 1,334.11 sq. metres, stated in the filed project details and HMDA technical approval. The approval also separately lists “Proposed Built-up Area 1,102.75”; the supplied record does not explain the relationship between those figures.
Building / block count: One building / block is recorded.
Sanctioned floor configuration: 1 Stilt + 5 upper floors. Building height is stated as 14.95 in the HMDA approval; the unit for height is not specified in the supplied extraction.
Parking levels / provision: Stilt is recorded; parking count and allocation are not disclosed in the supplied records.
Units: 10 RERA-listed apartments: 5 double-bedroom and 5 triple-bedroom units. The land record separately states one total building unit, which is not identified as the apartment count.
Offering and status
Configurations: 2BHK (filed as “DOUBLE BEDROOM”) and 3BHK (filed as “TRIPLE BEDROOM”).
RERA saleable area: 2BHK: 118.45 sq. metres; 3BHK: 148.64 sq. metres.
Booked / available: 0 booked and 5 available in each configuration (10 available total), as last read from the TG-RERA portal; no as-of date is attached, so counts are indicative.
Construction stage: RERA project record reports 90% completeness, with no stated measurement date or independent site verification.
Completion dates: Form B promoter declaration: 31/12/2023; RERA project record: proposed completion 31/12/2024. No revised completion approval is supplied.
Occupancy / completion certificate: No occupancy certificate or completion certificate is included in the supplied records. Certificate status and scope by tower or phase are therefore unverified.
2. The project story
HARI HARA HEMADRI - BLOCK B is registered as a residential apartment project on Plot Nos. 194/A/Part, 195/A/Part and 195/Part in Bachupally Village, covering SY Nos. 28, 29 and 30. The registration identifies a single building/block, and the HMDA technical approval describes a residential building of 1 Stilt + 5 upper floors.
The RERA filing lists ten apartments—five 2BHK and five 3BHK—and records all ten as available with none booked, based on a portal reading without an as-of date. The project record reports 90% completeness; this is a recorded project-status figure, not an independent inspection finding.
The promoter’s Form B declaration undertakes completion by 31/12/2023, while the RERA project record states 31/12/2024 as the proposed completion date. Registration validity is separately stated as ending 31/12/2024, and the certificate records no extension. The supplied material does not establish that the project, any tower, or common facilities have received an occupancy or completion certificate.
3. Master plan, architecture & building design
The RERA-filed site extent is 458.33 sq. metres, with the same figure stated as net area and no recorded area affected by road widening, FTL or nala widening. The HMDA technical approval separately describes an extent of 381.60 sq. metres.
The approval identifies one residential building with 1 Stilt + 5 upper floors and lists a building height of 14.95 (unit not specified in the supplied extraction). The project filing gives approved built-up area as 1,334.11 sq. metres. The HMDA approval also lists “Proposed Built-up Area 1,102.75”; the supplied documents do not define the two area labels or show a drawing-level reconciliation.
The approval extraction does not provide a sufficiently detailed drawing description to establish the building footprint, flats per floor, number or position of lifts and stairs, entrances, internal circulation, landscaping, open-space distribution, or residential/common-area breakdown. A RERA filing row describes a typical floor plan on drawing document 277219, but only one of three drawings is reported as measured and two scans remain pending.
4. Homes, configurations & floor plans
The TG-RERA filing records apartment counts and saleable areas. Drawing-based carpet-area measurements are software measurements, not RERA-filed disclosures; they are flagged for review and should be checked against the underlying drawings. The supplied measurement record says saleable area includes the home’s share of common areas and is larger than measured carpet area.
| Configuration | Units | Booked | Available | RERA saleable area | Measured carpet area | Loading (if supplied) |
|---|---|---|---|---|---|---|
| 2BHK (filed as “DOUBLE BEDROOM”) | 5 | 0 | 5 | 118.45 sq. metres | Software-measured median 87.0 sq. metres; range 78.9–87.8 sq. metres | 27% |
| 3BHK (filed as “TRIPLE BEDROOM”) | 5 | 0 | 5 | 148.64 sq. metres | Software-measured median 90.0 sq. metres; range 84.2–90.1 sq. metres | 39% |
The drawing extraction for one 2BHK flat labels a living/dining area, kitchen, two bedrooms, toilet and wash area; for one 3BHK flat it labels a living/dining area, kitchen, three bedrooms, two toilets and a balcony labelled “1.60 M. WIDE BALC.” These are drawing-derived details, not a complete verified schedule of every unit.
5. Parking & vehicle circulation
The HMDA approval describes a stilt level, but the supplied records do not state the sanctioned number of car or two-wheeler spaces, visitor or accessible parking, parking layout, ramp arrangement, or internal vehicle circulation. No unit-specific parking allocation or exclusive ownership arrangement is established by the available material.
The approval records a simple mortgage of 10% of built-up area in favour of MC, HMDA, identified as 122.82 sq. metres under registered document 17408/2022. This is a mortgage record, not a count or allocation of parking spaces.
6. Amenities, recreation & open spaces
The RERA amenities schedule records the following project infrastructure and facilities. Its listed progress is 0% for each item; that is the filed status and is not independently verified. No facility is established here as completed.
| Facility | Description / size | Evidence source | Declared progress / verified status |
|---|---|---|---|
| Internal roads and footpaths | Size not stated | RERA amenities schedule | 0%; not independently verified |
| Water supply | Availability marked “YES”; source and capacity not stated | RERA amenities schedule | 0%; not independently verified |
| Sewerage | “Sewerage (Chamber, Lines, Septic Tank, STP)” marked “YES”; capacity and system details not stated | RERA amenities schedule | 0%; not independently verified |
| Storm-water drains | Size and details not stated | RERA amenities schedule | 0%; not independently verified |
| Green strip / tot lot / park | Area and facilities not stated | RERA amenities schedule | 0%; not independently verified |
| Street lighting | Details not stated | RERA amenities schedule | 0%; not independently verified |
| Community buildings | Type, size and capacity not stated | RERA amenities schedule | 0%; not independently verified |
| Sewage and sullage treatment/disposal | System and capacity not stated | RERA amenities schedule | 0%; not independently verified |
| Solid-waste management and disposal | Details not stated | RERA amenities schedule | 0%; not independently verified |
| Water conservation / rainwater harvesting | HMDA approval requires rainwater-harvesting structures; size and capacity not stated | RERA amenities schedule | 0% in amenities schedule; not independently verified |
| Energy management | Details not stated | RERA amenities schedule | 0%; not independently verified |
| Fire protection and fire-safety requirements | Systems and details not stated | RERA amenities schedule | 0%; not independently verified |
| Electrical meter room / sub-station / receiving station | Details not stated | RERA amenities schedule | 0%; not independently verified |
| Recreational open space | Aggregate area not stated | RERA amenities schedule | 0%; not independently verified |
7. Utilities, building services & safety
The RERA amenities schedule marks water supply, sewerage (including chambers, lines, septic tank and STP), and water conservation/rainwater harvesting as available or included, but lists 0% progress for each and gives no source, storage, treatment, capacity or completion evidence. HMDA’s technical approval requires rainwater-harvesting structures.
The schedule also lists storm-water drainage, sewage and sullage treatment/disposal, solid-waste management, energy management, fire-protection and fire-safety requirements, and an electrical meter room/sub-station/receiving station. It does not provide system specifications, capacities, clearances, or verified completion status. Lift and power-backup details are not established in the RERA project documents supplied for this Overview.
8. Location, access & connectivity
The registered project location is Bachupally, Medchal-Malkajgiri district, Telangana, PIN 500090; project and approval documents identify Bachupally Village and Bachupally Mandal. The approval record also uses “Nizampet Municipal Corporation” as locality and records Nizampet in the RERA certificate’s mandal field.
The HMDA approval specifies a 4.5-metre road width. The supplied project record gives boundary references to a “30 wide road” on the north and neighboring plot numbers on the other sides; the units for “30 wide” are not stated in that field. No verified public-transport route, approach-road description or measured distance to landmarks is supplied in the RERA location record.
9. Developer & development status
The TG-RERA certificate names the promoter as Srikanth Reddy Bommireddy; the Form B affidavit identifies Bommireddy Srikanth Reddy as promoter, and the HMDA approval identifies Sri Bommi Reddy Srikanth Reddy as owner and applicant. The legal entity type, corporate registration identifiers, registered office, and official contact or website are not disclosed in the supplied project records.
The project record reports 90% completeness, without an independent inspection date. The promoter’s Form B undertaking gives 31/12/2023 as the completion date; the RERA project record gives 31/12/2024 as proposed completion. The registration certificate states validity through 31/12/2024 and records no extension. No occupancy or completion certificate is supplied, so certificate status for Block B is unverified.
10. Approvals, official records & documents
TG-RERA registration: Form C certificate for HARI HARA HEMADRI - BLOCK B, P02200005540, issued 20/12/2022; validity stated through 31/12/2024, with no extension recorded.
Principal building approval: HMDA technical approval no. 005797/BP/HMDA/1127/MED/2022, dated 20 June 2022, for a residential building of 1 Stilt + 5 upper floors. The approval states that building plans are to be sanctioned and released by the Municipal Corporation/Municipality and identifies Nizampet Municipal Corporation as delegated authority.
Commencement / building-plan record: Document 265948 is filed under “Commencement Certificates for each building in each phase” and extracts an HMDA building-construction technical approval. A separate final municipal building-plan sanction is not included in the supplied extracts.
Title and promoter declaration: Form B affidavit dated August 2022 by Bommireddy Srikanth Reddy, including the promoter’s title and encumbrance declarations and completion undertaking.
Floor-plan drawing record: Document 277219 is cited for typical floor-plan measurements; the supplied drawing-status record says three drawings total, one measured and two scans pending.
Occupancy / completion certificate: Not present in the supplied project documents; certificate status is unverified.
Layout plan: A layout-plan filing entry exists, but no extracted plan content is supplied.
Other registrations of Hari Hara Hemadri
Frequently asked questions
Is HARI HARA HEMADRI - BLOCK B registered with Telangana RERA?
Yes. HARI HARA HEMADRI - BLOCK B is registered with the Telangana Real Estate Regulatory Authority as P02200005540; the registration status is New Project.
Who is the developer of HARI HARA HEMADRI - BLOCK B?
The promoter named in the RERA registration is SRIKANTH REDDY.
Where is HARI HARA HEMADRI - BLOCK B located?
HARI HARA HEMADRI - BLOCK B is in Bachupally, Medchal-Malkajgiri, Telangana (500090).
When will HARI HARA HEMADRI - BLOCK B be completed?
The promoter's proposed date of completion filed with RERA is 31/12/2024. This is the promoter's declaration, not a guarantee.
More projects in Bachupally