HARI HARA HEMADRI - BLOCK A is a residential apartment project in Bachupally, Bachupally mandal, Medchal-Malkajgiri district, developed by Mr./Ms. Srikanth Reddy Bommireddy. It has a land area of 452.83 sq m and one building with 1 Stilt + 5 upper floors. The project comprises 10 3BHK apartments, each with a RERA-filed saleable area of 150.96 sq m. Its TG-RERA registration number is P02200005628, and its proposed completion date is 31/12/2024.

01What we found

Period endedTG-RERA registration ran to 31 Dec 2024 - check its extension on TG-RERA
11documents on file - each fact links to its page
155court cases on this project's land (survey 28, 29, 30, Bachupally)
12items to check - 5 high

Read from TG-RERA filings, approvals, land and registration records and court records. A court case is counted only when the court record states this project's survey number with its village, or names the project.

02Check before you pay

12 items to check before you pay, 5 high - from the title chain, court records and approvals, each with what to ask the builder or your advocate. An item may not be a problem with the project: records can be incomplete.

Sign in to see each item and what to do

Bachupally, Bachupally, Medchal-Malkajgiri · geocoded — approximate.

1. Project at a glance

Project identity

FieldProject record
Registered project nameHARI HARA HEMADRI - BLOCK A RERA record
Project typeResidential apartment project RERA record RERA filing
Phase / registered portionBlock A; the registration is for this named portion. RERA record
TG-RERA registrationP02200005628
Registration validity06/01/2023 to 31/12/2024; the supplied certificate records no extension. Validity is distinct from the project’s completion deadline.
Registered promoterMr./Ms. Srikanth Reddy Bommireddy (certificate); the filed Form B names Bommireddy Srikanth Reddy.
RERA statusThe supplied record identifies the project as “New Project.” The certificate confirms registration; it does not establish current registration validity or completion. RERA record

Land and geographic identity

FieldProject record
Locality / revenue villageBachupally RERA filing
MandalBachupally in the project fields; the registration certificate states Nizampet. RERA filing
District / PINMedchal-Malkajgiri; 500090
Project survey numbersSurvey Nos. 28, 29 and 30; the RERA certificate lists “SY No 28”, “29” and “30.”
Plot identifiers in certificate189/Part, 194/A/Part, 195/A/Part, 195/Part, 188/A, 188
Registered site extent452.83 sq m in the RERA land details. RERA filing
Total / net land areaTotal 452.83 sq m; net 452.83 sq m; affected area recorded as 0 sq m. RERA filing
Boundaries (RERA filing)East: Plot No. 194A PART and 189PART; west: Plot No. 196 and 187A; north: Plot No. 194A, 195 and 195A; south: 30 Wide Road. RERA filing

Development identity

FieldProject record
Sanctioning authorityHyderabad Metropolitan Development Authority (HMDA); the approval document states that building plans are to be sanctioned and released by the Municipal Corporation/Municipality, with delegation to Nizampet Municipal Corporation. RERA filing
Principal approval005739/BP/HMDA/1118/MED/2022, approved 20 June 2022 Approvals record
Approved built-up area1,533.08 sq m RERA filing
Building countOne building/unit in the project fields; one block/tower in the RERA-derived unit summary. RERA filing RERA unit table
Sanctioned floor configuration1 Stilt + 5 upper floors
Parking levels / provisionStilt is required to be used exclusively for vehicle parking under the approval conditions. The supplied materials do not establish a sanctioned parking-space count.
Unit counts10 units in the RERA-derived unit record; the project field describing approved building units records 1, which is not a flat count. RERA unit table RERA filing

Offering and status

FieldProject record
RERA-filed configuration3BHK; filed saleable area 150.96 sq m per unit RERA unit table RERA filing
Booked / available0 booked and 10 available as last read from the TG-RERA portal; no as-of date is supplied, so counts are indicative. RERA unit table
Construction stageNot established by the supplied evidence; the RERA amenities record shows 0% for listed development works, but this is not independent site verification. RERA amenities
Completion datesForm B promoter declaration: 31/12/2023. RERA registration certificate: validity to 31/12/2024. The project header also records proposed completion as 31/12/2024. These are separate recorded dates. RERA record
Occupancy / completion certificateNo occupancy or completion certificate is supplied in the reviewed project documents; status is therefore not established. The HMDA approval says an occupancy certificate is compulsory before occupation. Document index

2. The project story

HARI HARA HEMADRI - BLOCK A is registered as a residential apartment project on land identified in the RERA record as Survey Nos. 28, 29 and 30, Bachupally, Medchal-Malkajgiri district. The certificate identifies plots 189/Part, 194/A/Part, 195/A/Part, 195/Part, 188/A and 188. The registered site extent is 452.83 sq m. RERA filing

The supplied HMDA technical approval describes a residential building of 1 Stilt + 5 upper floors, with approved built-up area of 1,533.08 sq m. The RERA unit record lists 10 3BHK apartments. No evidence supplied here independently verifies current construction progress, completion, or occupancy certification; the portal’s 0% entries for listed development works are filing data, not a site inspection. RERA unit table RERA amenities

3. Master plan, architecture & building design

The HMDA approval identifies one proposed residential building with 1 Stilt + 5 upper floors and approved built-up area of 1,533.08 sq m. It states a building height of 14.95 in the sanctioned parameters, without a unit shown in the supplied extraction.

The approval lists a minimum approach-road width of 4.5 metres and refers to the approach-road width as indicated in the plan. It also requires the stilt/cellar to be used exclusively for vehicle parking without partition walls or rolling shutters. The supplied materials do not provide a verified building footprint, floor-by-floor apartment arrangement, flats per floor, lift or stair details, or internal circulation plan.

The RERA filing gives the site’s total and net area as 452.83 sq m. The HMDA approval document separately states an extent of 452.66 sq m. The approved built-up area is 1,533.08 sq m; this is not the RERA-filed saleable area or software-measured carpet area. RERA filing RERA unit table Floor plans

4. Homes, configurations & floor plans

ConfigurationUnitsBookedAvailableRERA saleable areaMeasured carpet areaLoading (if supplied)
3BHK10010150.96 sq mMedian 88.7 sq m; range 88.5–91.4 sq m41%

RERA unit counts, booked/available figures and saleable area are from the supplied TG-RERA-derived unit record; the booking figures have no stated as-of date. Carpet-area figures are software measurements from the approved floor-plan drawing, not RERA-filed disclosures, and are marked as needing review. One of two drawings is recorded as measured; six 3BHK designs were measured. RERA unit table RERA unit details Floor plans

The measured drawing labels include a hall, kitchen, three bedrooms and three toilets. For the depicted flat, the extracted room dimensions include a hall of 4.01 × 5.82 m, kitchen of 2.77 × 3.5 m, and bedrooms of 3.0 × 3.5 m, 3.0 × 4.11 m and 3.61 × 5.0 m. These are drawing-derived measurements, not RERA disclosures. RERA unit details

The supplied record distinguishes saleable area from measured carpet area: saleable area is the RERA-filed figure, while the drawing-derived carpet measurement excludes areas outside the home’s usable floor area and does not represent the saleable figure. The supplied records do not give a separate balcony, utility or common-area measurement for this unit. RERA unit table Floor plans

5. Parking & vehicle circulation

The HMDA approval requires the stilt/cellar to be used exclusively for vehicle parking. The RERA record includes a mortgage-area entry of 137.17 sq m, but the supplied evidence does not establish an overall parking-space count, visitor or accessible spaces, parking allocation by apartment, or EV charging provision. RERA filing

The approval also records a minimum 4.5-metre approach-road width and refers to the approach road indicated in the plan. The detailed circulation drawing and the legal allocation of parking to individual units are not established by the available materials. A parking area shown or described in an approval does not, by itself, establish an exclusive unit entitlement.

6. Amenities, recreation & open spaces

The RERA amenities record lists 14 development-work categories. “YES” is recorded for water supply, sewerage and water conservation/rainwater harvesting; the listed progress values are 0%. These are project filing entries, not independent confirmation of completion. RERA amenities

FacilityDescription / sizeEvidence sourceDeclared progress / verified status
Internal roads and footpathsListed; no size disclosedRERA amenities0%; not independently verified
Green strip / tot lot / parkListed; no size disclosedRERA amenities0%; not independently verified
Community buildingsListed; no size disclosedRERA amenities0%; not independently verified
Aggregate recreational open spaceListed; no size disclosedRERA amenities0%; not independently verified

No clubhouse or indoor recreation facilities, sports facilities, quantities, or capacities are established in the supplied RERA amenities record. Vendor-listed amenity claims are not treated here as RERA-declared or delivered facilities. RERA amenities Promoter website

7. Utilities, building services & safety

The HMDA approval requires rainwater-harvesting structures, an STP, CCTV cameras, and a BT road before release of the occupancy certificate. It lists a transformer, garbage house, generator, and separate underground and terrace water tanks, each stated as 25,000 litres in the approval extraction. These are approval-document requirements or listed provisions; the supplied record does not establish that they have been installed or are operating.

The RERA amenities filing marks water supply, sewerage/STP and water conservation/rainwater harvesting as “YES,” while their recorded progress is 0%. The record does not provide water-source details, treatment capacity, power-backup capacity, lift specifications, fire-system details, accessible circulation, or waste-management operating arrangements. RERA amenities

The HMDA approval states that an occupancy certificate is compulsory before occupying a building. It also refers to fire-service norms among its cited standards, but the supplied material does not establish project-specific fire clearance or completion of fire/life-safety systems.

8. Location, access & connectivity

The registered location is Bachupally, with the RERA certificate giving locality as Bachupally, mandal as Nizampet, district as Medchal-Malkajgiri and PIN 500090. The RERA project fields identify Bachupally as both village and mandal. The HMDA approval names Nizampet Municipal Corporation as the locality/implementing municipal authority. RERA filing

The supplied location dataset lists nearby reference points with measured distances, including IndusInd Bank at 0.4 km, Nanakramguda Government Primary School at 0.5 km, the Financial District (Nanakramguda) and an unnamed park at 1.2 km, and an unnamed bus station at 2.2 km. These are dataset measurements; no travel times or route-specific access details are supplied. Location record

9. Developer & development status

The TG-RERA certificate names the promoter as Mr./Ms. Srikanth Reddy Bommireddy. The filed Form B is made by Bommireddy Srikanth Reddy and describes the promoter’s title basis and undertaking to complete by 31/12/2023. The available records do not identify the promoter’s legal entity type, corporate identification number, registered office, or official contact details. Corporate record

The project is registered as Block A, with one building and 10 3BHK units in the supplied RERA-derived unit record. The project record does not establish current construction progress or an occupancy certificate; those statuses should be confirmed against current authority and project records before purchase. RERA record RERA unit table Document index

10. Approvals, official records & documents

RecordWhat the supplied evidence establishes
TG-RERA registration certificate, P02200005628Form C records registration of HARI HARA HEMADRI - BLOCK A under section 5, valid 06/01/2023–31/12/2024. The supplied certificate records no extension.
HMDA building-construction approval 005739/BP/HMDA/1118/MED/2022, dated 20 June 2022Technical approval for a residential building of 1 Stilt + 5 upper floors, with approved built-up area 1,533.08 sq m and stated conditions.
HMDA approval mortgage reference 17407/2022, dated 13 June 2022The approval extraction records a simple mortgage of built-up area in favour of HMDA and identifies a mortgaged area in its approval details.
Form B promoter declaration, dated 26 August 2022Promoter declaration on title basis, encumbrances, separate-account obligations and completion undertaking of 31/12/2023.
Layout-plan and floor-plan filing recordsThe layout-plan record is not extracted; the building-floor-plan filing item is listed but not extracted. A floor-plan drawing record is available for software measurement, with one of two drawings measured and one scan pending. Document index Floor plans
Occupancy / completion certificateNone is supplied in the reviewed project documents. The HMDA approval requires an occupancy certificate before occupation. Document index

Other registrations of Hari Hara Hemadri

Frequently asked questions

Is HARI HARA HEMADRI - BLOCK A registered with Telangana RERA?

Yes. HARI HARA HEMADRI - BLOCK A is registered with the Telangana Real Estate Regulatory Authority as P02200005628; the registration status is New Project.

Who is the developer of HARI HARA HEMADRI - BLOCK A?

The promoter named in the RERA registration is SRIKANTH REDDY.

Where is HARI HARA HEMADRI - BLOCK A located?

HARI HARA HEMADRI - BLOCK A is in Bachupally, Medchal-Malkajgiri, Telangana (500090).

When will HARI HARA HEMADRI - BLOCK A be completed?

The promoter's proposed date of completion filed with RERA is 31/12/2024. This is the promoter's declaration, not a guarantee.