JBs PRISTINE CITY PHASE-2

JB WESTREN PROJECTS · Vikarabad · RERA P02100009607

JBs PRISTINE CITY PHASE-2 is a plotted development in Dhannaram, Vikarabad Mandal, Vikarabad District. The registered promoter is JB WESTREN PROJECTS. The RERA-filed site extent is 118852.16 sq.m, with 379 open residential plots; no tower, block, floor or home-configuration details are provided. The project is registered under TG-RERA number P02100009607, with a proposed completion date of 20-07-2026.

More from Jb Westren Projects · 2 projects →

01What we found

Period endedTG-RERA registration ran to 20 Jul 2026 - check its extension on TG-RERA
32documents on file - each fact links to its page
0court cases on this project's land in the court records searched
9items to check - 4 high

Read from TG-RERA filings, approvals, land and registration records and court records. A court case is counted only when the court record states this project's survey number with its village, or names the project.

02Check before you pay

9 items to check before you pay, 4 high - from the title chain, court records and approvals, each with what to ask the builder or your advocate. An item may not be a problem with the project: records can be incomplete.

Sign in to see each item and what to do

Dannaram, Vikarabad, Vikarabad · geocoded — approximate.

1. Project at a glance

Project identity

FieldProject record
Registered project nameJBs PRISTINE CITY PHASE-2 RERA record
Project type / registered portionPlotted development; Phase-2 RERA record
TG-RERA registrationP02100009607 RERA record
Registration validity20 July 2024 to 20 July 2026, unless extended by the Authority Approvals record
Registered promoterJB WESTREN PROJECTS (also rendered “Jb Westren Projects” on the certificate) RERA record Corporate record
RERA status in supplied recordNew Project; registration certificate supplied. Certificate validity ended 20 July 2026; no extension record is supplied. RERA record

Land and geographic identity

FieldProject record
LocalityDhannaram / DHANNARAM RERA record
Revenue villageDhannaram Revenue Village (also spelled Dannaram in the RERA record) RERA record
Mandal / district / PINVikarabad / Vikarabad / 501101 RERA record
Project survey numbers256, 230, 253, 260/P and 255/P
Subdivisions appearing in a filed layout drawing254/A/1, 254/B/2, 260/E/1 and 260/E/2, in addition to 256, 230, 253 and 255/PART; these are listed on the supplied layout drawing.
RERA-filed site extent118852.16 sq.m total and net area, with affected area recorded as 00 sq.m RERA filing Land records
BoundariesNot disclosed in the supplied RERA land record. Land records

Development identity

FieldProject record
Sanctioning authorityVikarabad Municipality / Municipal Corporation Approvals record
Principal tentative layout approval0036/LO/3042/2024, dated 20 July 2024; application 005419/LO/DTCP/3042/0024/2022 Approvals record
Other layout-plan reference in the filed materialG/TPO/570/2019, dated 01-04-2022; permit TS/022275/2022 Approvals record
Approved built-up areaThe supplied layout record lists proposed coverage and net built-up area as 0.00; this is a plotted-layout approval, not a building plan.
Plots379 plots are stated in the tentative approval; the drawing-based schedule also records 379 plots. Layout record
Buildings / floors / parking levelsNot applicable to the supplied plotted-layout records; no building-floor configuration or parking-level schedule is provided.

Offering and status

FieldProject record
OfferingOpen residential plots; the supplied RERA records do not provide a plot-by-plot booked/available inventory.
Drawing-derived plot schedule379 plots; software-extracted plot sizes range from 102.38 sq.m to 425.0 sq.m (smallest 122.4 sq.yd, largest 508.3 sq.yd). Layout record
Construction stageNo independently verified site progress or RERA progress percentage is supplied. The approval requires infrastructure and amenities to be completed within two years of 20 July 2024.
Completion datesForm B declares completion by 20-07-2026; the tentative approval also sets the infrastructure/amenities period to 20 July, 2026.
Occupancy / completion certificateNo OC or completion certificate is supplied; the documents concern a tentative plotted-layout approval. Document index

2. The project story

JBs PRISTINE CITY PHASE-2 is registered as a plotted development at Dhannaram Revenue Village in Vikarabad Mandal and District. The RERA certificate identifies the project land by surveys 256, 230, 253, 260/P and 255/P. The filed tentative layout approval describes a residential layout with 379 plots; it is not a building or apartment scheme.

The layout drawing organizes land into plotted sites, roads, open space/park, social infrastructure and utility land. The RERA filing reports a total/net site area of 118852.16 sq.m, while the drawing’s own area statement identifies 64,519.68 sq.m as plotted area and 36,937.02 sq.m as road area. These are drawing-based layout allocations, not a statement of construction progress. Land records Layout record

The promoter’s Form B declares a completion target of 20-07-2026. The tentative approval likewise requires infrastructure and amenities to be completed by 20 July 2026. The supplied evidence does not establish the present on-site completion stage or independently verify delivery of the layout works.

3. Master plan, architecture & building design

The submitted plan is a proposed residential layout with open plots, not a building design. No tower or block count, building footprint, floor configuration, building height, lift/stair arrangement, apartment circulation or approved building area is established by the supplied records.

The filed drawing-derived land-use schedule reports:

Layout componentAreaShare shown in drawing
Plotted area64,519.68 sq.m55.53%
Road area36,937.02 sq.m31.79%
Organized open space / park10,462.06 sq.m9.00%
Social infrastructure area3,009.40 sq.m2.59%
Utility area1,255.12 sq.m1.08%
Amenity area0.00 sq.m0.00%
Common parking area0.00 sq.m0.00%

These are figures read from the layout drawing; the drawing records two layout sheets, and the plot schedule is software-extracted. Layout record

The tentative approval records an area of 29 Acer 14.73 Gts (142146 Sq. Yds) and describes 379 plots. Its land-use table states 9% open space, 2.59% social infrastructure, 1.08% utilities, 31.79% roads and 55.53% plotted area. The approval also requires the developer to form roads, storm-water drains, underground drainage, water-supply pipelines and tank, electrical lines and streetlights, avenue planting, park development and rainwater-harvesting pits. These are approval requirements; the supplied material does not independently establish their completion.

4. Homes, configurations & floor plans

This is a plotted project, so the offering is plots rather than apartment configurations. The RERA-filed material does not supply a plot-wise booked/available count or an inventory table.

Plot informationSupplied figure
Plot count379
Smallest software-measured plot102.38 sq.m (122.4 sq.yd)
Median software-measured plot153.29 sq.m (183.3 sq.yd)
Largest software-measured plot425.0 sq.m (508.3 sq.yd)

The count and size schedule were extracted from the approved layout drawing; the data notes that plot areas sum to the plotted area in the drawing’s area statement. These are drawing-derived measurements, not a RERA-filed plot-by-plot saleable-area schedule. Layout record

The two supplied drawings are layout sheets; no home floor plans or carpet-area measurements are available. Floor plans

5. Parking & vehicle circulation

The layout drawing records 0.00 common parking area and the tentative approval does not establish a separate parking-space count or parking allocation. No resident/visitor parking schedule, parking levels, ramps, EV charging provision or exclusive plot parking arrangement is supplied.

The approval identifies internal roads as part of the layout and requires roads to remain open for neighbouring-site access. It lists roads of 18 mts and above among sanctioned parameters; the supplied drawing also labels road widths including 9.14 m, 12.19 m and 18.28 m.

6. Amenities, recreation & open spaces

The RERA-filed layout approval sets out infrastructure and facilities to be provided; its amenity checklist records items as available/YES with progress percentages shown as 0. The supplied record does not independently confirm completed facilities. RERA amenities

Park / organized open space
Description / size10,462.06 sq.m in the drawing-derived area schedule; approval states 9% open space. Layout record
Evidence sourceFiled layout drawing and tentative approval
Declared progress / verified statusRequired/reserved; completion not independently verified.
Social infrastructure
Description / size3,009.40 sq.m; approval states 2.59%. Layout record
Evidence sourceFiled layout drawing and tentative approval
Declared progress / verified statusReserved; no specific facility or delivery status established.
Green strip / tot lot / park
Description / sizeListed in the RERA amenity checklist. RERA amenities
Evidence sourceRERA amenity checklist
Declared progress / verified statusListed; progress shown as 0; completion not independently verified.
Community buildings
Description / sizeListed in the RERA amenity checklist. RERA amenities
Evidence sourceRERA amenity checklist
Declared progress / verified statusListed; progress shown as 0; size and completion status not supplied.
Park development and avenue plantation
Description / sizeRequired by the tentative approval.
Evidence sourceTentative layout approval
Declared progress / verified statusApproval requirement; completion not independently verified.
Promoter-marketed facilities
Description / sizeClubhouse, swimming pool, gym, children’s play area, security and covered car parking are listed in vendor material. Promoter website
Evidence sourceThird-party/vendor material, not established as RERA-sanctioned or delivered
Declared progress / verified statusMarketing claims; no RERA-filed size, progress or independent completion verification supplied.

7. Utilities, building services & safety

The tentative approval requires layout infrastructure including a water reservoir, assured water source, internal water-supply pipelines and overhead tank; septic tank/common STP and underground drainage; storm-water drains; electrical supply lines, transformer and streetlights; solid-waste management; and rainwater-harvesting pits. These are approval conditions, not evidence of completed installations.

The RERA amenity checklist lists water supply, sewerage, storm-water drains, sewage and sullage treatment/disposal, solid-waste management, rainwater harvesting, energy management, fire-protection and fire-safety requirements, and an electrical meter room/sub-station/receiving station. Progress percentages shown in the supplied checklist are 0; capacities and independent completion verification are not supplied. RERA amenities

No building-level lift, fire-escape, backup-power or accessibility design is provided for this plotted layout. The supplied evidence does not establish the operational status or capacity of the proposed utility systems.

8. Location, access & connectivity

The registered location is Dannaram/Dhannaram, Vikarabad Mandal, Vikarabad District, Telangana, PIN 501101. The RERA certificate identifies the village and survey numbers; the cadastral parcel record gives a centroid of 17.34785, 77.92983. Cadastral map

The supplied location data lists the nearest sampled Outer Ring Road interchange at approximately 40.5 km. Location record Vendor material separately advertises proximity and travel times to Vikarabad Railway Station, local offices, Ananthagiri Hills, Appa Junction, the Financial District and the international airport; those are promoter/third-party claims and are not measured or verified in the supplied official project records. Promoter website

9. Developer & development status

The registered promoter is JB WESTREN PROJECTS, identified in the RERA filing as a partnership. Its supplied address is Kamala Nagar, Dhannaram, Vikarabad, Vikarabad, 501101. The RERA records name Suskandla Anil Kumar as authorized signatory. Corporate record Parties record

The promoter’s Form B, dated 09-06-2025, is an affidavit by Suskandla Anil Kumar. It declares that the project land is free from encumbrances, states a completion target of 20-07-2026, and records the promoter’s title and development-rights assertions and project obligations. These are promoter declarations, not independent verification of title or completion.

No current construction-progress percentage, plot booking/availability breakdown or independent site-completion report is supplied. The registration certificate states a validity period from 20/07/2024 to 20/07/2026; no extension document is included. RERA record

10. Approvals, official records & documents

RecordSupplied evidence
TG-RERA registrationForm C certificate for P02100009607, JBs PRISTINE CITY PHASE-2, promoter Jb Westren Projects; validity 20/07/2024–20/07/2026.
Principal layout approvalTentative residential layout approval 0036/LO/3042/2024, dated 20 July 2024, by Vikarabad Municipality / Municipal Corporation; application 005419/LO/DTCP/3042/0024/2022.
Other filed layout-plan referenceG/TPO/570/2019, dated 01-04-2022; permit TS/022275/2022.
Title and promoter declarationsForm B affidavit dated 09-06-2025; title-search report filed as document 559286; development agreement-cum-GPA and title deeds appear among the filed documents. Document index
Layout drawingTwo-sheet layout drawing, document 542782, with plotted-area and land-use schedule. Layout record
Mortgage / reserved plotsTentative approval identifies mortgage deed 3372/2024, dated 03 July 2024, covering specified plots in favour of Vikarabad Municipality / Municipal Corporation.
Completion / occupancy recordNo completion certificate or occupancy certificate is supplied. Document index

The tentative approval states that layout approval is not proof of land title and requires infrastructure works and release of mortgaged plots in accordance with its conditions. This overview records the approval and filed evidence; it does not establish the status of those works or the release of the mortgage.

Other registrations of JBs PRISTINE CITY

Frequently asked questions

Is JBs PRISTINE CITY PHASE-2 registered with Telangana RERA?

Yes. JBs PRISTINE CITY PHASE-2 is registered with the Telangana Real Estate Regulatory Authority as P02100009607; the registration status is New Project.

Who is the developer of JBs PRISTINE CITY PHASE-2?

The promoter named in the RERA registration is JB WESTREN PROJECTS.

Where is JBs PRISTINE CITY PHASE-2 located?

JBs PRISTINE CITY PHASE-2 is in DHANNARAM, Dannaram, Vikarabad, Telangana (501101).

When will JBs PRISTINE CITY PHASE-2 be completed?

The promoter's proposed date of completion filed with RERA is 30/11/2026. This is the promoter's declaration, not a guarantee.