Sign in

Sr Adith Reddy Enclave Block B

SR HOMES · Sangareddy · RERA P01100009971

SR ADITH REDDY ENCLAVE BLOCK B is a residential apartment building in Ameenapur, Ameenpur, Sangareddy. The registered promoter developing it is SR HOMES. The project is on a 715.02 sq.m site and comprises one building with 1 Stilt + 5 Floors and 20 2BHK homes. It is registered under TG-RERA registration P01100009971, with proposed completion by 18/07/2028.

More from Sr Homes · 18 projects →

01What we found

RegisteredTG-RERA - valid till 18 Jul 2028
23documents on file - each fact links to its page
0court cases on this project's land in the court records searched
8items to check - 3 high

Read from TG-RERA filings, approvals, land and registration records and court records. A court case is counted only when the court record states this project's survey number with its village, or names the project.

02Check before you pay

8 items to check before you pay, 3 high - from the title chain, court records and approvals, each with what to ask the builder or your advocate. An item may not be a problem with the project: records can be incomplete.

Sign in to see each item and what to do

Photo from housing.com

1. Project at a glance

Project identity

ItemProject record
Registered project nameSR ADITH REDDY ENCLAVE BLOCK B RERA record
Project type / phaseResidential apartment building; the registered portion is identified as Block B. RERA record
TG-RERA registrationP01100009971; valid 18 July 2025–18 July 2028. Registration validity is not the same as the stated construction completion date. RERA record
Registered promoterSR HOMES. RERA record Corporate record
RERA statusRegistered; listed as a New Project. RERA record Approvals record

Land and geographic identity

ItemProject record
LocalityAmeenpur / Ameenapur. The registration certificate states AMEENAPUR, AMEENPUR.
Revenue villageAMEENAPUR in the project identity and registration record; the filed building-permit documents refer to Ameenpur Village. RERA record
Mandal / district / PINAMEENPUR, Sangareddy, 502032. RERA record
Project survey number(s)Survey No. 106; no project subdivision is specified in the RERA land particulars. RERA record RERA filing
Filed site extent715.02 sq.m total and net plot area; the filed plan records 0 sq.m road-affected and 0 sq.m nala-widening area. RERA filing
BoundariesNorth: OTHERS LAND; South: OTHERS LAND; East: OTHERS LAND; West: ROAD. RERA filing
Cadastral contextThe cadastral record supplied is for the whole of Survey No. 106, with an extent of 69583.76 sq.m; it is not the project site extent. Cadastral map

Development identity

ItemProject record
Sanctioning authority / approvalBuilding-permit documents identify HMDA as the technical approving authority and Ameenpur Municipality as the issuing/delegated authority. Principal file number: 001987/HMDA/00584/SWBP/SKP2/2025; approval date: 18/07/2025. Approvals record
Permit number shown on municipality order0153/HMDA/SWBP/2025. Approvals record
Approved building arrangementOne residential building, described as 1 Stilt + 5 Floors.
Approved built-up areaThe filed plan states 1941.3 sq.m total proposed BUA excluding parking and 2336.58 sq.m including parking; the same plan’s sanctioned-parameters list separately states gross BUA 2384.56 sq.m, net BUA 1941.30 sq.m, and net parking area 395.28 sq.m.
Units20 units in the filed sanctioned plan; the TG-RERA unit record also lists 20. RERA unit table
ParkingThe filed plan states 10.00 Car Parking Spaces and 395.28 sq.m parking area.
HeightThe filed plan lists building height 17.85 m and total height 20.25 m; it also lists “Building height permissible 15.00m; proposed 17.85m.”

Offering and status

ItemProject record
RERA-filed configuration2BHK, 20 units; RERA-filed saleable area 117.29 sq.m per unit. RERA unit table RERA unit details
Booked / available0 booked / 20 available, as last read from the TG-RERA portal; the supplied record has no as-of date, so these counts are indicative. RERA unit table RERA unit details
Construction stageListed as a new project; no independently verified construction-progress record is supplied here. RERA record Document index
Completion dateThe Form B declaration undertakes completion by 18/07/2028; the building-permit order also states construction is to be completed before 18/07/2028.
Occupancy / completion certificateNo completion or occupancy certificate is supplied in the reviewed project documents; the building-permit material requires an occupancy certificate before occupation.
Registration validity18/07/2025 to 18/07/2028; this is the RERA registration period, separately stated from the completion undertaking.

2. The project story

The RERA-registered project is a residential apartment development on a filed 715.02 sq.m site in Survey No. 106, in Ameenapur/Ameenpur, Sangareddy district. The approved building-permit documents describe one building with a stilt level and five floors, with a sanctioned count of 20 units. RERA record RERA filing

The TG-RERA unit record lists 20 two-bedroom units, with 0 booked and 20 available in the portal data supplied; that count has no as-of date. The project is registered, but the supplied material does not establish its current on-site construction progress or independently verify completion of any facilities. The promoter’s Form B undertaking and building-permit order both state a completion date of 18/07/2028. No occupancy or completion certificate is supplied. RERA unit details

3. Master plan, architecture & building design

The filed plan shows one residential building on a gross and net plot area of 715.02 sq.m, with proposed coverage of 395.28 sq.m (55.00%) and vacant plot area of 316.86 sq.m. It describes the building as Stilt + 5 Floors and lists 1941.3 sq.m proposed BUA excluding parking and 2336.58 sq.m including parking. Its separate sanctioned-parameters list records gross BUA 2384.56 sq.m, net BUA 1941.30 sq.m, and net parking area 395.28 sq.m; these are the plan’s recorded area labels and are not interchangeable measures.

The floor-area schedule in the filed plan gives 395.28 sq.m for the stilt floor and 388.26 sq.m net BUA for each of the first through fifth floors; terrace BUA is listed as 12.88 sq.m. The plan lists the site as 23.7m wide and 30.17m deep.

The approval documents provide front, rear and side setbacks and state that the stilt/parking area is to be used for parking. The supplied extracts do not provide a complete, independently checked account of flat-by-flat floor distribution, lifts, stairs, circulation, landscaping design or common-area layout.

4. Homes, configurations & floor plans

The TG-RERA unit record lists 20 2BHK homes, each with a filed saleable area of 117.29 sq.m. Booked and available counts are portal figures without an as-of date. RERA unit details RERA unit table

ConfigurationUnitsBookedAvailableRERA saleable areaMeasured carpet areaLoading (if supplied)
2BHK20020117.29 sq.mNot supplied for the RERA-filed 2BHK configurationNot supplied

Software measurement of a floor-plan drawing identified 3BHK designs, with a measured carpet-area range of 104.1–108.0 sq.m and median 106.1 sq.m across four measured designs. These are drawing-based software measurements, marked as needing review; 3BHK is not listed in the supplied TG-RERA configuration record. The drawings are not a RERA disclosure, and the supplied measurement set does not establish those designs as the registered offering. Floor plans RERA unit details

Saleable area and carpet area are different measures: the supplied drawing data notes that saleable area includes a share of common areas, while carpet measurement is from drawing geometry. The supplied evidence does not provide a verified loading figure or a measured carpet area for the RERA-filed 2BHK units. Floor plans RERA unit details

5. Parking & vehicle circulation

The filed building plan records 10.00 Car Parking Spaces and 395.28 sq.m parking area, with the stilt floor identified in the building configuration. The permit conditions state that the approved stilt/parking area is to be used exclusively for vehicle parking.

The supplied plan does not establish visitor or accessible parking counts, a parking-allocation arrangement for individual units, or a verified two-wheeler count. No exclusive ownership or allocation of a particular bay is established by the information reviewed here. The HMDA permit extract also includes a condition that parking places be provided with electric-vehicle charging infrastructure; evidence of installation or capacity is not supplied.

6. Amenities, recreation & open spaces

The following are facilities stated in the filed plan, permit conditions or TG-RERA amenity record. Percentages are the figures reported in the supplied amenities data, not independent site verification. RERA amenities

FacilityDescription / sizeEvidence sourceDeclared progress / verified status
Tot-lot / green stripTot-lot required by permit; green strip/tot-lot/park listed at 80% in the amenity recordRERA amenities80% reported in the amenity data; not independently verified
Tree planting30 trees stated in the permit extract; permit conditions require peripheral plantingStated in permit record; planting not independently verified
Rainwater harvesting2 rainwater-harvesting pits stated in the permit extract; rainwater-harvesting amenity listed at 80%RERA amenities80% reported in the amenity data; not independently verified
Water supplyListed as available at 100% in the amenity recordRERA amenitiesReported at 100%; not independently verified
SewerageChambers, lines, septic tank and STP listed; sewerage amenity reported at 100%RERA amenitiesReported at 100%; not independently verified
Electrical meter room / sub-station / receiving stationListed at 80% in the amenity record; transformer space required in permitRERA amenities80% reported; not independently verified
Internal roads and footpathsAmenity record reports 0%RERA amenitiesReported at 0%
Storm-water drainsAmenity record reports 0%RERA amenitiesReported at 0%
Street lightingAmenity record reports 0%RERA amenitiesReported at 0%
Community buildingsAmenity record reports 0%RERA amenitiesReported at 0%
Sewage/sullage treatment and disposalAmenity record reports 0% for this separate itemRERA amenitiesReported at 0%
Solid-waste management and disposalAmenity record reports 0%RERA amenitiesReported at 0%
Fire protection and fire-safety requirementsAmenity record reports 0%RERA amenitiesReported at 0%
Aggregate recreational open spaceAmenity record reports 0%RERA amenitiesReported at 0%

7. Utilities, building services & safety

The filed permit material lists a transformer space, garbage house, rainwater-harvesting structures, septic tank and STP among the project utilities or conditions. It also requires an occupancy certificate before occupation and states that fire/life-safety provisions are the responsibility of the owner, builder/developer and technical professionals. These are permit-record statements and conditions; they do not establish that the systems are installed, commissioned or independently verified.

The supplied documents do not state water-source or storage capacities, STP capacity or reuse arrangements, electrical backup capacity, lift number or capacity, CCTV/security arrangements, accessible routes, or fire-system specifications. The HMDA permit extract includes an EV-charging-infrastructure condition for parking places, but no installation status or capacity is supplied.

8. Location, access & connectivity

The registered location is AMEENAPUR, AMEENPUR, Sangareddy, 502032; the filed building-permit documents identify Ameenpur Village, Ameenpur Mandal, Sangareddy district. The project record gives a cadastral-parcel centroid of 17.52587116374659, 78.33948761635529. Location record

The supplied location data lists the nearest sampled Outer Ring Road interchange at approximately 8.4 km. No approach-road route, public-transport detail or other independently measured landmark distances are supplied in the project-location record. Location record

9. Developer & development status

The registered promoter is SR HOMES, identified in the RERA filing as a Partnership; its GSTIN is 36AFEFS7525M1ZG. The supplied record does not establish the firm’s registered office or provide official contact details. Corporate record RERA filing

The promoter’s Form B declaration, signed by authorized signatory K Chinna Saireddy, undertakes completion by 18/07/2028. The building-permit documents identify Kalagotla Chinna Saireddy as SR HOMES’ representative. Current construction progress is not independently verified in the supplied evidence, and no occupancy or completion certificate is supplied.

10. Approvals, official records & documents

RecordSupplied evidence
TG-RERA registrationForm C certificate for SR ADITH REDDY ENCLAVE BLOCK B, registration P01100009971, valid 18/07/2025–18/07/2028.
Principal building permitFile 001987/HMDA/00584/SWBP/SKP2/2025, dated 18/07/2025; the filed permit extract also gives approval number 0153/HMDA/SWBP/2025.
Filed planRERA-filed layout/approval-plan document 584266, showing the proposed residential building and plan particulars.
Building-permit documentsAmeenpur Municipality permit order 584269 and HMDA building-permit order 584270; the extracts state a stilt-plus-five-floor building and require an occupancy certificate before occupation.
Title and encumbrance documentsAdvocate title search report 586553; title documents 584278–584289; encumbrance statements 584291 and 706582. Document index Land records
Completion / occupancy evidenceNo completion certificate or occupancy certificate is included in the supplied project documents.

Other registrations of Sr Adith Reddy Enclave

Frequently asked questions

Is SR ADITH REDDY ENCLAVE BLOCK B registered with Telangana RERA?

Yes. SR ADITH REDDY ENCLAVE BLOCK B is registered with the Telangana Real Estate Regulatory Authority as P01100009971; the registration status is New Project.

Who is the developer of SR ADITH REDDY ENCLAVE BLOCK B?

The promoter named in the RERA registration is SR HOMES.

Where is SR ADITH REDDY ENCLAVE BLOCK B located?

SR ADITH REDDY ENCLAVE BLOCK B is in AMEENPUR, AMEENAPUR, Sangareddy, Telangana (502032).

When will SR ADITH REDDY ENCLAVE BLOCK B be completed?

The promoter's proposed date of completion filed with RERA is 18/11/2028. This is the promoter's declaration, not a guarantee.

More projects in Ameenapur