LORDVENs RNR SRINILAYAM
LORDVEN INFRA PRIVATE LIMITED · Medchal-Malkajgiri · RERA P02200008047
LORDVENs RNR SRINILAYAM is a residential apartment project in Pocharam, Ghatkesar Mandal, Medchal-Malkajgiri District, being developed by LORDVEN INFRA PRIVATE LIMITED. The registered site extent is 1,647.13 sq. m, with one residential block comprising a stilt and 5 upper floors. The RERA unit record lists 30 3BHK apartments, each with a saleable area of 120.0 sq. m. The project is registered under TG-RERA P02200008047, with a proposed completion date of 01/06/2025.
01What we found
Read from TG-RERA filings, approvals, land and registration records and court records. A court case is counted only when the court record states this project's survey number with its village, or names the project.
02Check before you pay
7 items to check before you pay, 5 high - from the title chain, court records and approvals, each with what to ask the builder or your advocate. An item may not be a problem with the project: records can be incomplete.
1. Project at a glance
Project identity
| Item | Project record |
|---|---|
| Registered project name | LORDVENs RNR SRINILAYAM RERA record |
| Project type | Residential apartment project RERA record RERA filing |
| Phase / registered portion | No separate phase name is disclosed. The registration identifies the project land at Survey No. 15/P, Pocharam. RERA record |
| TG-RERA registration | P02200008047; registration validity shown as 8 April 2024–1 June 2025. This is the registration period, not evidence of a completion certificate or current extension. RERA record Approvals record |
| Registered promoter | LORDVEN INFRA PRIVATE LIMITED, a private limited company. RERA record Corporate record |
| RERA status | Recorded as On-Going Project in the filing. RERA filing |
Land and geographic identity
| Item | Project record |
|---|---|
| Locality | Pocharam RERA record RERA filing |
| Revenue village | Pocharam RERA record RERA filing |
| Mandal / district / PIN | Ghatkesar / Medchal-Malkajgiri / 501301 RERA record RERA filing |
| Project survey number(s) | 15/P (registered project parcel); the building-permit document also refers to Survey Nos. 15 and 15/P. RERA record Land records |
| Registered site extent | 1,647.13 sq. m RERA filing Land records |
| Net / total area | RERA filing records total area 1,647.13 sq. m and net area 1,647.13 sq. m. RERA filing |
| Boundaries recorded in the filing | East: Neighbours Land; West: Neighbours Land; North: Neighbours and Open Land in Sy No 15; South: Road. RERA filing |
Development identity
| Item | Project record |
|---|---|
| Sanctioning authority | HMDA; the building permit order is delegated to Pocharam Municipality / Municipal Corporation. Approvals record |
| Principal approval | Building Permit Order 000487/BP/HMDA/0080/GHT/2022, approved 01 June 2022; proceedings No. 000872/BP/HMDA/GHT/2022. Approvals record |
| Building arrangement | One residential single block. |
| Sanctioned floors | Stilt + 5 upper floors. The permit also records building height of 20.35 mt. |
| Approved built-up area | The building-plan record states total built-up area 4,706.93 sq. m, total net BUA 3,846.10 sq. m, and net BUA residential 3,846.10 sq. m. These are separate figures as labelled in that record. |
| Parking shown in plan record | Proposed number of parkings: 33; Total parking: 30. The stilt is designated for parking. |
| Unit counts | 30 units in the RERA unit record; the RERA filing’s “Total Building Units (as per approved plan)” and “Proposed Building Units (as per agreement)” fields each state 1. The evidence does not explain the basis of those two “building units” fields. RERA unit table RERA filing |
Offering and status
| Item | Project record |
|---|---|
| Configuration | 3BHK; RERA-filed saleable area 120.0 sq. m. RERA unit table RERA unit details |
| Booked / available | 0 booked / 30 available in the portal-derived unit record; the record supplies no as-of date, so counts are indicative. RERA unit table RERA unit details |
| Construction stage | RERA records the project as ongoing. A supplied approval-document extraction says completion is not certified; no occupancy certificate is supplied in the reviewed records. RERA filing |
| Completion dates | Original and revised proposed completion date: 01/06/2025. The promoter’s Form B undertaking says completion within three years of permission, “by 1st JUNE, 2025.” RERA record RERA filing |
| Occupancy certificate status and scope | No OC is evidenced for the single building. The permit requires an OC before occupation; this is an approval condition, not proof of OC issuance. |
2. The project story
LORDVENs RNR SRINILAYAM is a residential apartment development at Pocharam, in Ghatkesar Mandal, Medchal-Malkajgiri District. The registered parcel is Survey No. 15/P, with the filing and building-permit material also referencing Survey No. 15. The recorded site extent is 1,647.13 sq. m. RERA record Land records
The approval material describes one residential block with a stilt and five upper floors. The RERA unit data lists 30 three-bedroom apartments, each with a filed saleable area of 120.0 sq. m; the portal-derived booking snapshot shows none booked and 30 available, without an as-of date. RERA unit table RERA unit details
The project is registered as ongoing, and the supplied permit extraction records that completion is not certified. The filed completion date is 01/06/2025; the reviewed evidence does not establish current site progress or an issued occupancy certificate. These should not be inferred from the RERA status or the promoter’s completion undertaking. RERA filing RERA record
3. Master plan, architecture & building design
The building-plan record describes a single residential block on a 1,647.13 sq. m plot, with a stilt and five upper floors. It records a proposed coverage area of 858.29 sq. m (52.11%), vacant plot area of 788.84 sq. m, total built-up area of 4,706.93 sq. m, and total net BUA of 3,846.10 sq. m. These figures are reported under their respective labels in the plan extraction; no FSI-counted area or carpet-area schedule is supplied.
The building permit records total built-up area 4,706.93 and proposed built-up area 3,846.10; it also identifies 616.51 sq. m as provided mortgage area. The permit material states that the stilt/cellar is for vehicle parking only and that no parking or construction is allowed in setback areas.
The permit requires construction according to the technically approved plans and references a minimum 4.5mts. for one entry and one exit in its conditions. The building-plan extraction also lists a 4.5M WIDE DRIVEWAY. Floor-by-floor layouts, flat distribution per floor, lift and stair details, and measured drawing geometry are not established by the supplied drawing data: of two drawing records, none is measured, one is pending scan, and one has no flats. Floor plans
4. Homes, configurations & floor plans
| Configuration | Units | Booked | Available | RERA saleable area | Measured carpet area | Loading (if supplied) |
|---|---|---|---|---|---|---|
| 3BHK | 30 | 0 | 30 | 120.0 sq. m | Not measured in the supplied floor-plan records | Not supplied |
The unit count, booking status and saleable area are from the TG-RERA-derived unit record; the booking figures have no stated as-of date. No software-measured carpet area or room dimensions are available in the supplied drawing data. RERA unit table RERA unit details Floor plans
5. Parking & vehicle circulation
The building-plan extraction records 33 proposed parkings and 30 total parking; it designates the stilt for parking. The permit material says the stilt/cellar is to be used exclusively for vehicle parking, without partition walls or rolling shutters, and prohibits parking or construction in setback areas. The approval record specifies a minimum 4.5mts. for one entry and one exit; the plan extraction separately identifies a 4.5M WIDE DRIVEWAY.
The evidence does not provide a parking schedule by apartment, resident or visitor category, accessible spaces, two-wheeler space counts, mechanical parking, EV charging, or a legally documented unit-specific parking allocation. The drawn or proposed parking count does not by itself establish a particular buyer’s exclusive parking entitlement.
6. Amenities, recreation & open spaces
The following facilities appear in the RERA amenities record and building-permit material. The RERA amenities record shows 0% progress for the listed items; it does not independently verify completion. RERA amenities
| Facility | Description / size | Evidence source | Declared progress / verified status |
|---|---|---|---|
| Internal Roads & Footpaths | No size supplied | RERA amenities | RERA amenities record: 0%; completion not independently verified |
| Green Strip/TOT LOT/Park | No size supplied | RERA amenities | Listed as available “YES”; record also shows 0% progress; completion not independently verified |
| Community Buildings | No size supplied | RERA amenities | RERA amenities record: 0%; completion not independently verified |
| Water Conservation, Rain water Harvesting | Rain-water-harvesting structures required in permit; no size supplied | RERA amenities | Listed as available “YES”; record shows 0% progress; completion not independently verified |
The vendor record lists additional amenities, including a swimming pool, gym, children’s play area and clubhouse; these are vendor-listed claims, not established here as sanctioned or delivered facilities. Promoter website
7. Utilities, building services & safety
The permit material specifies a separate underground static water storage tank of 25,000 Its. Capacity and a separate residential terrace tank of 25,000 Its. Capacity. It also lists water supply, drainage and sewerage disposal, a septic tank, and an STP; the RERA amenities record lists water supply and sewerage/STP-related facilities but shows 0% progress. No water source, treatment capacity, reuse scheme, or verified operating status is supplied. RERA amenities
The approval material lists an electrical transformer, generator, emergency lighting, electrical meter/substation/receiving-station provisions, garbage house, solid-waste management, rainwater harvesting, CCTV cameras and fire-safety items including fire extinguishers, hose reel, down corner and an automatic sprinkler system if the basement area exceeds 200 Sq.mts. The building-plan conditions also refer to fire-safety and electrical-fire-safety requirements. These are approval or filing provisions; the evidence does not establish their installation, capacities or operating status. RERA amenities
Lift numbers and capacities, accessible routes or ramps, storm-water system details, security staffing, and the extent of fire-service clearances are not disclosed in the supplied project records. RERA amenities Document index
8. Location, access & connectivity
The registered location is Pocharam, Pocharam Village, Ghatkesar Mandal, Medchal-Malkajgiri District, PIN 501301. The parcel-centroid geocode supplied for location is 17.43783, 78.64708. RERA record Location record
The location record lists these measured distances: Location record
| Destination / reference | Distance |
|---|---|
| Outer Ring Road (nearest sampled interchange, approx) | 3.7 km |
| Syndicate Bank | 2.8 km |
| Princeton Institute of Engineering & Technology For Women | 1.9 km |
| Shri Wazra Multi Speciality Hospitals | 1.8 km |
| Reliance Digital | 2.2 km |
| Park | 1.1 km |
The supplied connectivity list does not identify a public-transport service or a named approach-road route. The permit requires the approach road indicated in the plan to be developed and maintained as a black-topped road before release of the occupancy certificate; that condition is not evidence that the road works have been completed.
9. Developer & development status
The registered promoter is LORDVEN INFRA PRIVATE LIMITED, recorded as a company; its GSTIN is 36AADCL5500G1ZU. The promoter’s RERA address record is Rajamani Paradise, Vivekananda Nagar, Pocharam, Ghatkesar, Medchal-Malkajgiri, 501301. RERA record Corporate record Parties record
The project documents identify Venkateswara Rao Korapati as an authorised signatory/director. The Form B declaration dated 29 January 2024 states that the promoter would complete the project within three years of permission, by 1 June 2025, and includes promoter declarations concerning project funds, approvals and title. Those are promoter declarations, not independent verification of completion or title. Parties record
The RERA record describes the project as ongoing. The supplied approval extraction says completion is not certified, and no OC is present in the reviewed records. No independent construction-progress verification is supplied. RERA filing
10. Approvals, official records & documents
| Details | P02200008047; project LORDVENs RNR SRINILAYAM; promoter Lordven Infra Private Limited; stated validity 8 April 2024–1 June 2025 |
|---|---|
| Evidence | Approvals record |
| Details | HMDA Building Permit Order 000487/BP/HMDA/0080/GHT/2022, approved 01 June 2022; proceedings No. 000872/BP/HMDA/GHT/2022; delegated to Pocharam Municipality / Municipal Corporation |
|---|---|
| Evidence | Approvals record |
| Details | Application No. TS/002704/2022, dated 11-01-2022; plan record describes a single block, stilt plus five upper floors |
|---|---|
| Evidence | Approvals record |
| Details | Mortgage deed No. 4415/2022, dated 29 April, 2022; permit extraction describes 616.51 sq. m of built-up area mortgaged in favour of MC, HMDA |
|---|
| Details | Form B dated 29 January 2024, signed by Venkateswara Rao Korapati on behalf of the promoter; includes completion undertaking and RERA-related declarations |
|---|
| Details | No such certificate is supplied; the permit material requires an OC before occupation, and the approval extraction records completion as not certified |
|---|
| Details | Approval-related documents are filed, but the supplied records do not include a complete floor-by-floor plan set suitable for unit measurement |
|---|---|
| Evidence | Document index Floor plans |
The project overview reflects the supplied TG-RERA and filed approval records. The reviewed material does not establish an issued occupancy certificate or independently verified construction completion.
1. Project at a glance
Project identity
Registered project name: LORDVENs RNR SRINILAYAM
Project type: Residential apartment project
Phase / registered portion: No separate phase name is disclosed. The registration identifies the project land at Survey No. 15/P, Pocharam.
TG-RERA registration: P02200008047; registration validity shown as 8 April 2024–1 June 2025. This is the registration period, not evidence of a completion certificate or current extension.
Registered promoter: LORDVEN INFRA PRIVATE LIMITED, a private limited company.
RERA status: Recorded as On-Going Project in the filing.
Land and geographic identity
Locality: Pocharam
Revenue village: Pocharam
Mandal / district / PIN: Ghatkesar / Medchal-Malkajgiri / 501301
Project survey number(s): 15/P (registered project parcel); the building-permit document also refers to Survey Nos. 15 and 15/P.
Registered site extent: 1,647.13 sq. m
Net / total area: RERA filing records total area 1,647.13 sq. m and net area 1,647.13 sq. m.
Boundaries recorded in the filing: East: Neighbours Land; West: Neighbours Land; North: Neighbours and Open Land in Sy No 15; South: Road.
Development identity
Sanctioning authority: HMDA; the building permit order is delegated to Pocharam Municipality / Municipal Corporation.
Principal approval: Building Permit Order 000487/BP/HMDA/0080/GHT/2022, approved 01 June 2022; proceedings No. 000872/BP/HMDA/GHT/2022.
Building arrangement: One residential single block.
Sanctioned floors: Stilt + 5 upper floors. The permit also records building height of 20.35 mt.
Approved built-up area: The building-plan record states total built-up area 4,706.93 sq. m, total net BUA 3,846.10 sq. m, and net BUA residential 3,846.10 sq. m. These are separate figures as labelled in that record.
Parking shown in plan record: Proposed number of parkings: 33; Total parking: 30. The stilt is designated for parking.
Unit counts: 30 units in the RERA unit record; the RERA filing’s “Total Building Units (as per approved plan)” and “Proposed Building Units (as per agreement)” fields each state 1. The evidence does not explain the basis of those two “building units” fields.
Offering and status
Configuration: 3BHK; RERA-filed saleable area 120.0 sq. m.
Booked / available: 0 booked / 30 available in the portal-derived unit record; the record supplies no as-of date, so counts are indicative.
Construction stage: RERA records the project as ongoing. A supplied approval-document extraction says completion is not certified; no occupancy certificate is supplied in the reviewed records.
Completion dates: Original and revised proposed completion date: 01/06/2025. The promoter’s Form B undertaking says completion within three years of permission, “by 1st JUNE, 2025.”
Occupancy certificate status and scope: No OC is evidenced for the single building. The permit requires an OC before occupation; this is an approval condition, not proof of OC issuance.
2. The project story
LORDVENs RNR SRINILAYAM is a residential apartment development at Pocharam, in Ghatkesar Mandal, Medchal-Malkajgiri District. The registered parcel is Survey No. 15/P, with the filing and building-permit material also referencing Survey No. 15. The recorded site extent is 1,647.13 sq. m.
The approval material describes one residential block with a stilt and five upper floors. The RERA unit data lists 30 three-bedroom apartments, each with a filed saleable area of 120.0 sq. m; the portal-derived booking snapshot shows none booked and 30 available, without an as-of date.
The project is registered as ongoing, and the supplied permit extraction records that completion is not certified. The filed completion date is 01/06/2025; the reviewed evidence does not establish current site progress or an issued occupancy certificate. These should not be inferred from the RERA status or the promoter’s completion undertaking.
3. Master plan, architecture & building design
The building-plan record describes a single residential block on a 1,647.13 sq. m plot, with a stilt and five upper floors. It records a proposed coverage area of 858.29 sq. m (52.11%), vacant plot area of 788.84 sq. m, total built-up area of 4,706.93 sq. m, and total net BUA of 3,846.10 sq. m. These figures are reported under their respective labels in the plan extraction; no FSI-counted area or carpet-area schedule is supplied.
The building permit records total built-up area 4,706.93 and proposed built-up area 3,846.10; it also identifies 616.51 sq. m as provided mortgage area. The permit material states that the stilt/cellar is for vehicle parking only and that no parking or construction is allowed in setback areas.
The permit requires construction according to the technically approved plans and references a minimum 4.5mts. for one entry and one exit in its conditions. The building-plan extraction also lists a 4.5M WIDE DRIVEWAY. Floor-by-floor layouts, flat distribution per floor, lift and stair details, and measured drawing geometry are not established by the supplied drawing data: of two drawing records, none is measured, one is pending scan, and one has no flats.
4. Homes, configurations & floor plans
| Configuration | Units | Booked | Available | RERA saleable area | Measured carpet area | Loading (if supplied) |
|---|---|---|---|---|---|---|
| 3BHK | 30 | 0 | 30 | 120.0 sq. m | Not measured in the supplied floor-plan records | Not supplied |
The unit count, booking status and saleable area are from the TG-RERA-derived unit record; the booking figures have no stated as-of date. No software-measured carpet area or room dimensions are available in the supplied drawing data.
5. Parking & vehicle circulation
The building-plan extraction records 33 proposed parkings and 30 total parking; it designates the stilt for parking. The permit material says the stilt/cellar is to be used exclusively for vehicle parking, without partition walls or rolling shutters, and prohibits parking or construction in setback areas. The approval record specifies a minimum 4.5mts. for one entry and one exit; the plan extraction separately identifies a 4.5M WIDE DRIVEWAY.
The evidence does not provide a parking schedule by apartment, resident or visitor category, accessible spaces, two-wheeler space counts, mechanical parking, EV charging, or a legally documented unit-specific parking allocation. The drawn or proposed parking count does not by itself establish a particular buyer’s exclusive parking entitlement.
6. Amenities, recreation & open spaces
The following facilities appear in the RERA amenities record and building-permit material. The RERA amenities record shows 0% progress for the listed items; it does not independently verify completion.
| Facility | Description / size | Evidence source | Declared progress / verified status |
|---|---|---|---|
| Internal Roads & Footpaths | No size supplied | RERA amenities record: 0%; completion not independently verified | |
| Green Strip/TOT LOT/Park | No size supplied | Listed as available “YES”; record also shows 0% progress; completion not independently verified | |
| Community Buildings | No size supplied | RERA amenities record: 0%; completion not independently verified | |
| Water Conservation, Rain water Harvesting | Rain-water-harvesting structures required in permit; no size supplied | Listed as available “YES”; record shows 0% progress; completion not independently verified |
The vendor record lists additional amenities, including a swimming pool, gym, children’s play area and clubhouse; these are vendor-listed claims, not established here as sanctioned or delivered facilities.
7. Utilities, building services & safety
The permit material specifies a separate underground static water storage tank of 25,000 Its. Capacity and a separate residential terrace tank of 25,000 Its. Capacity. It also lists water supply, drainage and sewerage disposal, a septic tank, and an STP; the RERA amenities record lists water supply and sewerage/STP-related facilities but shows 0% progress. No water source, treatment capacity, reuse scheme, or verified operating status is supplied.
The approval material lists an electrical transformer, generator, emergency lighting, electrical meter/substation/receiving-station provisions, garbage house, solid-waste management, rainwater harvesting, CCTV cameras and fire-safety items including fire extinguishers, hose reel, down corner and an automatic sprinkler system if the basement area exceeds 200 Sq.mts. The building-plan conditions also refer to fire-safety and electrical-fire-safety requirements. These are approval or filing provisions; the evidence does not establish their installation, capacities or operating status.
Lift numbers and capacities, accessible routes or ramps, storm-water system details, security staffing, and the extent of fire-service clearances are not disclosed in the supplied project records.
8. Location, access & connectivity
The registered location is Pocharam, Pocharam Village, Ghatkesar Mandal, Medchal-Malkajgiri District, PIN 501301. The parcel-centroid geocode supplied for location is 17.43783, 78.64708.
The location record lists these measured distances:
Outer Ring Road (nearest sampled interchange, approx): 3.7 km
Syndicate Bank: 2.8 km
Princeton Institute of Engineering & Technology For Women: 1.9 km
Shri Wazra Multi Speciality Hospitals: 1.8 km
Reliance Digital: 2.2 km
Park: 1.1 km
The supplied connectivity list does not identify a public-transport service or a named approach-road route. The permit requires the approach road indicated in the plan to be developed and maintained as a black-topped road before release of the occupancy certificate; that condition is not evidence that the road works have been completed.
9. Developer & development status
The registered promoter is LORDVEN INFRA PRIVATE LIMITED, recorded as a company; its GSTIN is 36AADCL5500G1ZU. The promoter’s RERA address record is Rajamani Paradise, Vivekananda Nagar, Pocharam, Ghatkesar, Medchal-Malkajgiri, 501301.
The project documents identify Venkateswara Rao Korapati as an authorised signatory/director. The Form B declaration dated 29 January 2024 states that the promoter would complete the project within three years of permission, by 1 June 2025, and includes promoter declarations concerning project funds, approvals and title. Those are promoter declarations, not independent verification of completion or title.
The RERA record describes the project as ongoing. The supplied approval extraction says completion is not certified, and no OC is present in the reviewed records. No independent construction-progress verification is supplied.
10. Approvals, official records & documents
| Details | P02200008047; project LORDVENs RNR SRINILAYAM; promoter Lordven Infra Private Limited; stated validity 8 April 2024–1 June 2025 |
|---|
| Details | HMDA Building Permit Order 000487/BP/HMDA/0080/GHT/2022, approved 01 June 2022; proceedings No. 000872/BP/HMDA/GHT/2022; delegated to Pocharam Municipality / Municipal Corporation |
|---|
| Details | Application No. TS/002704/2022, dated 11-01-2022; plan record describes a single block, stilt plus five upper floors |
|---|
| Details | Mortgage deed No. 4415/2022, dated 29 April, 2022; permit extraction describes 616.51 sq. m of built-up area mortgaged in favour of MC, HMDA |
|---|
| Details | Form B dated 29 January 2024, signed by Venkateswara Rao Korapati on behalf of the promoter; includes completion undertaking and RERA-related declarations |
|---|
| Details | No such certificate is supplied; the permit material requires an OC before occupation, and the approval extraction records completion as not certified |
|---|
| Details | Approval-related documents are filed, but the supplied records do not include a complete floor-by-floor plan set suitable for unit measurement |
|---|
The project overview reflects the supplied TG-RERA and filed approval records. The reviewed material does not establish an issued occupancy certificate or independently verified construction completion.
Frequently asked questions
Is LORDVENs RNR SRINILAYAM registered with Telangana RERA?
Yes. LORDVENs RNR SRINILAYAM is registered with the Telangana Real Estate Regulatory Authority as P02200008047; the registration status is On-Going Project.
Who is the developer of LORDVENs RNR SRINILAYAM?
The promoter named in the RERA registration is LORDVEN INFRA PRIVATE LIMITED.
Where is LORDVENs RNR SRINILAYAM located?
LORDVENs RNR SRINILAYAM is in Pocharam, Ghatkesar, Medchal-Malkajgiri, Telangana (501301).
When will LORDVENs RNR SRINILAYAM be completed?
The promoter's proposed date of completion filed with RERA is 01/06/2025. This is the promoter's declaration, not a guarantee.