Vk Tranquil Abode
HARIKA CONSTRUCTIONS & DEVELOPERS · Medchal-Malkajgiri · RERA P02200009012
VK TRANQUIL ABODE is a residential apartment project in SIMHAPURI ESTATE, Bowrampet, Dundigal Gandimaisamma mandal, Medchal-Malkajgiri district. It is being developed by the registered promoter HARIKA CONSTRUCTIONS & DEVELOPERS, identified as a partnership. The project occupies 375.94 sq. m and comprises one residential building with 1 Stilt + 5 upper floors and 10 apartments: five 2BHK and five 3BHK. It is registered under TG-RERA number P02200009012, with completion declared by 05-JULY-2027.
More from Harika Constructions & Developers · 12 projects →
01What we found
Read from TG-RERA filings, approvals, land and registration records and court records. A court case is counted only when the court record states this project's survey number with its village, or names the project.
02Check before you pay
10 items to check before you pay, 2 high - from the title chain, court records and approvals, each with what to ask the builder or your advocate. An item may not be a problem with the project: records can be incomplete.
1. Project at a glance
Project identity
| Item | Project record |
|---|---|
| Registered name | VK TRANQUIL ABODE RERA record |
| Project type | Residential apartment project RERA record |
| Phase / registered portion | No separate phase is identified in the supplied record; the registration is for the project associated with Plot No. E-83, Survey No. 538 RERA record |
| TG-RERA registration | P02200009012 RERA record |
| Registration validity | 5 July 2024 to 5 July 2027, unless extended by the Authority; this is the registration-validity period, not the project completion date RERA record |
| Registered promoter | HARIKA CONSTRUCTIONS & DEVELOPERS, identified as a partnership RERA record RERA filing |
| RERA record status | The supplied TG-RERA record describes this as a “New Project”; the registration certificate is on file RERA record |
Land and geographic identity
| Item | Project record |
|---|---|
| Locality / plot | SIMHAPURI ESTATE; Plot No. E-83 RERA record Land records |
| Revenue village | Bowrampet RERA record Land records |
| Mandal | Dundigal Gandimaisamma RERA record Land records |
| District / PIN | Medchal-Malkajgiri / 500043 RERA record |
| Project survey number(s) | Survey No. 538; no subdivision is stated in the project identity record RERA record Land records |
| Registered site extent | 375.94 sq. m (RERA land record: total and net area both 375.94 sq. m) Land records RERA filing |
| Boundaries | North: 40 WIDE ROAD; East: 40 WIDE ROAD; South: PLOT NO E-84; West: PLOT NO E-85 RERA filing |
Development identity
| Item | Project record |
|---|---|
| Sanctioning authority | Building permit order identifies Dundigal Municipality / Municipal Corporation; the filed drawing identifies HMDA as authority/delegated-to authority Approvals record |
| Principal approval | 003849/BP/HMDA/0804/MED/2024, dated 05 July 2024 Approvals record |
| Building arrangement | One residential building; sanctioned configuration is 1 Stilt + 5 upper floors RERA record |
| Approved built-up area | 1,108.10 sq. m excluding parking; 1,329.70 sq. m including parking, as stated in the filed drawing. The building-permit order separately records total built-up area of 1,342.98 sq. m |
| Approved units / RERA-filed units | Drawing records 10 units; the RERA unit record also totals 10 units RERA unit table |
| Parking | Stilt is designated for vehicle parking; the drawing records 221.60 sq. m parking area. No parking-space count or individual allocation is established in the supplied records |
Offering and status
| Item | Project record |
|---|---|
| Configurations | 2BHK and 3BHK apartments RERA unit table |
| RERA-filed saleable areas | 2BHK: 105.91 sq. m; 3BHK: 148.65 sq. m RERA unit table |
| Booked / available | 2BHK: 0 booked / 5 available; 3BHK: 0 booked / 5 available. Counts are indicative: the portal record supplied has no as-of date RERA unit table |
| Construction stage | No independently verified site-progress percentage or construction-stage report is supplied. The building-permit order states completion is not certified |
| Promoter-declared completion | The Form B declaration undertakes completion by 05-JULY-2027 |
| Occupancy / completion certificate | No occupancy or completion certificate is supplied; the permit order records that completion is not certified and says an occupancy certificate is required before occupation |
2. The project story
VK TRANQUIL ABODE is a single-building residential apartment project registered for Plot No. E-83 in Survey No. 538, Bowrampet village, at SIMHAPURI ESTATE. The filed building permit and drawing describe one residential building with a stilt level and five upper floors, with a total of ten apartments in 2BHK and 3BHK configurations. RERA record Land records
The promoter’s Form B declaration gives a completion undertaking of 05-JULY-2027. That is a declared project timeline, not evidence that work has reached a particular stage. The supplied materials do not include independently verified construction progress, and the permit record states that completion has not been certified. No occupancy certificate is included.
3. Master plan, architecture & building design
The filed plan concerns one residential building on a 375.94 sq. m plot. It describes 1 Stilt + 5 upper floors, six floors in total as recorded in the drawing, and a building height of 15.00 MT. excluding the stilt floor; it also records a total height of 20.40mt. The drawing states 1,108.10 sq. m total proposed built-up area excluding parking, 1,329.70 sq. m including parking, 1,342.98 total BUA, 221.60 sq. m parking area and 154.32 vacant plot area. These are the drawing’s separate labels and are not interchangeable area measures. The approved building-permit order records 1,108.10 Sq.mts built-up area, 1,342.98 Sq.mts total built-up area and a simple mortgage of 115.52 Sq.mts of built-up area. The supplied permit and drawing identify a single building, not a multi-tower or multi-phase development.
The plan identifies a lift and staircase and shows typical floor plans; detailed circulation dimensions, floor-by-floor unit counts, landscape design, and a residential/common-area area breakdown are not established by the extracted information. The supplied record does not give a separately labelled FSI-counted area or carpet area for the whole building.
4. Homes, configurations & floor plans
RERA records ten apartments: five 2BHK and five 3BHK. RERA-filed saleable areas are shown below. The portal’s booked/available counts have no supplied as-of date and should be treated as indicative. RERA unit table
| Configuration | Units | Booked | Available | RERA saleable area | Measured carpet area | Loading (if supplied) |
|---|---|---|---|---|---|---|
| 2BHK | 5 | 0 | 5 | 105.91 sq. m | Software-measured median 64.2 sq. m; range 59.9–68.5 sq. m | 39% |
| 3BHK | 5 | 0 | 5 | 148.65 sq. m | Software-measured median 79.6 sq. m; range 79.1–80.1 sq. m | 46% |
Carpet-area figures and loading are software measurements from the filed floor-plan drawing, not RERA-filed area disclosures; the measurements are marked as needing review. RERA saleable area is a different measure and should not be read as carpet area. The supplied measurement record notes that saleable area includes the home’s share of common areas; balcony areas shown on plans are excluded from measured carpet area. Floor plans RERA unit details
The extracted drawing records a 2BHK plan with living, dining, kitchen, two bedrooms, toilets, balconies and a wash area; the described 3BHK plan has living/dining, kitchen, three bedrooms, toilets, balconies and a wash area. Room dimensions are drawing measurements, not RERA disclosures. RERA unit details
5. Parking & vehicle circulation
The sanctioned arrangement designates the stilt floor exclusively for vehicle parking, and the filed drawing records 221.60 sq. m of parking area. The permit order also states that parking or construction is not to be made in setback areas. No sanctioned parking-space count, visitor or accessible-space count, mechanical parking provision, ramp arrangement, EV charger count, or unit-specific parking allocation is established in the supplied project records. The vendor material lists covered car parking and “20 Car Parking” as marketing claims; those claims are not treated here as sanctioned or legally allocated parking provision. Promoter website
6. Amenities, recreation & open spaces
The supplied RERA amenities record lists 14 project components. It marks water supply, sewerage, green strip/TOT LOT/park, rainwater harvesting and an electrical meter room/sub-station/receiving station as “YES”; the listed progress percentages are 0. These are recorded declarations, not independently verified completed facilities. RERA amenities
| Facility | Description / size | Evidence source | Declared progress / verified status |
|---|---|---|---|
| Green strip / TOT LOT / park | No size supplied | RERA amenities record | “YES”; progress 0; completion not independently verified RERA amenities |
| Community buildings | No description or size supplied | RERA amenities record | Progress 0; no completion evidence supplied RERA amenities |
| Internal roads & footpaths | No dimensions supplied | RERA amenities record | Progress 0 RERA amenities |
| Street lighting | No quantity or specification supplied | RERA amenities record | Progress 0 RERA amenities |
Vendor material additionally lists a swimming pool, gym, clubhouse, indoor games, children’s play area, yoga areas and other features. These are marketing claims in the supplied vendor record; the project evidence supplied does not establish their sanction, size, delivery or completion. Promoter website
7. Utilities, building services & safety
The filed building-permit record lists an STP, transformer, garbage house and rainwater-harvesting structures. It also requires the applicant to provide an STP and rainwater harvesting structures, and to develop and maintain the approach road as a black-topped road before release of the occupancy certificate. The plan lists a septic tank, sump, lift, staircase, rainwater harvesting and percolation pit. These are plan/permit provisions or requirements, not evidence of completed installations.
The permit drawing includes conditions addressing fire safety and structural stability, electrical fire safety, sprinkler provision where basement area exceeds 200 sq. m, and electrical certification. It also includes an EV-charging-infrastructure condition for parking places in buildings. The supplied material does not establish installation, inspection, clearance or operational status of these systems.
The extracted records do not state water source or storage capacity, STP capacity or treated-water reuse arrangements, storm-water system specifications, backup-power capacity, lift capacity, CCTV coverage, waste-segregation arrangements, security staffing or accessible circulation provisions. The RERA amenities record marks water supply, sewerage, rainwater harvesting and an electrical meter room/sub-station/receiving station “YES,” but records progress as 0. RERA amenities
8. Location, access & connectivity
The registered project location is Plot No. E-83, Survey No. 538, SIMHAPURI ESTATE, Bowrampet village, Dundigal Gandimaisamma mandal, Medchal-Malkajgiri district, Telangana, PIN 500043. The filed drawing identifies 40-foot/12-metre-wide roads on the north and east boundaries; the RERA land record describes both as 40 WIDE ROAD. RERA record RERA filing
The supplied location record gives an approximate sampled distance of 11.1 km to the nearest sampled Outer Ring Road interchange. It does not supply public-transport routes or verified distances to other landmarks. Location record
9. Developer & development status
The registered promoter is HARIKA CONSTRUCTIONS & DEVELOPERS, identified in the RERA record as a partnership, with GSTIN 36AAHFH3062Q1ZY. The registered promoter address is recorded as NEW NAGOLE, ROAD NO 10/B, SIMHAPURI ESTATE, Dundigal Gandimaisamma, Medchal-Malkajgiri, Telangana, PIN 500043. The RERA certificate separately records the promoter address as Village: Nagole, Mandal: Uppal, District: Medchal-Malkajgiri, PIN 500068. RERA filing RERA filing Corporate record
The project is registered for one building and ten apartments. The promoter’s Form B declaration undertakes completion by 05-JULY-2027. No independently verified construction-stage or progress percentage is supplied, and no occupancy or completion certificate is on file in the supplied evidence. See project status above.
10. Approvals, official records & documents
| Record | Supplied evidence |
|---|---|
| TG-RERA registration | Form C certificate for VK TRANQUIL ABODE, registration P02200009012, valid 5 July 2024 to 5 July 2027 unless extended |
| Building permit / principal sanction | Order 003849/BP/HMDA/0804/MED/2024, dated 05 July 2024, for the residential building at Plot E-83, Survey No. 538, Bowrampet; issued in the name of Sri Nethi Srinivas |
| Building plan | Filed drawing describes one building with 1 stilt and 5 upper floors, ten units, and associated plan conditions |
| Title-related filing | Form B declaration and title-report materials are in the project file; the declaration states a title basis and the title documents describe a development arrangement |
| Occupancy/completion record | No certificate supplied; the building-permit record states completion is not certified and requires an occupancy certificate before occupation |
| Environmental clearance search | The supplied name-based promoter search reports no EC found in two searched districts; it is not a project-specific clearance determination Regulatory record |
The drawing and building-permit order are the available building-approval records for this overview. The supplied evidence does not establish a separate approved-layout record or a completed occupancy certificate.
1. Project at a glance
Project identity
Registered name: VK TRANQUIL ABODE
Project type: Residential apartment project
Phase / registered portion: No separate phase is identified in the supplied record; the registration is for the project associated with Plot No. E-83, Survey No. 538
TG-RERA registration: P02200009012
Registration validity: 5 July 2024 to 5 July 2027, unless extended by the Authority; this is the registration-validity period, not the project completion date
Registered promoter: HARIKA CONSTRUCTIONS & DEVELOPERS, identified as a partnership
RERA record status: The supplied TG-RERA record describes this as a “New Project”; the registration certificate is on file
Land and geographic identity
Locality / plot: SIMHAPURI ESTATE; Plot No. E-83
Revenue village: Bowrampet
Mandal: Dundigal Gandimaisamma
District / PIN: Medchal-Malkajgiri / 500043
Project survey number(s): Survey No. 538; no subdivision is stated in the project identity record
Registered site extent: 375.94 sq. m (RERA land record: total and net area both 375.94 sq. m)
Boundaries: North: 40 WIDE ROAD; East: 40 WIDE ROAD; South: PLOT NO E-84; West: PLOT NO E-85
Development identity
Sanctioning authority: Building permit order identifies Dundigal Municipality / Municipal Corporation; the filed drawing identifies HMDA as authority/delegated-to authority
Principal approval: 003849/BP/HMDA/0804/MED/2024, dated 05 July 2024
Building arrangement: One residential building; sanctioned configuration is 1 Stilt + 5 upper floors
Approved built-up area: 1,108.10 sq. m excluding parking; 1,329.70 sq. m including parking, as stated in the filed drawing. The building-permit order separately records total built-up area of 1,342.98 sq. m
Approved units / RERA-filed units: Drawing records 10 units; the RERA unit record also totals 10 units
Parking: Stilt is designated for vehicle parking; the drawing records 221.60 sq. m parking area. No parking-space count or individual allocation is established in the supplied records
Offering and status
Configurations: 2BHK and 3BHK apartments
RERA-filed saleable areas: 2BHK: 105.91 sq. m; 3BHK: 148.65 sq. m
Booked / available: 2BHK: 0 booked / 5 available; 3BHK: 0 booked / 5 available. Counts are indicative: the portal record supplied has no as-of date
Construction stage: No independently verified site-progress percentage or construction-stage report is supplied. The building-permit order states completion is not certified
Promoter-declared completion: The Form B declaration undertakes completion by 05-JULY-2027
Occupancy / completion certificate: No occupancy or completion certificate is supplied; the permit order records that completion is not certified and says an occupancy certificate is required before occupation
2. The project story
VK TRANQUIL ABODE is a single-building residential apartment project registered for Plot No. E-83 in Survey No. 538, Bowrampet village, at SIMHAPURI ESTATE. The filed building permit and drawing describe one residential building with a stilt level and five upper floors, with a total of ten apartments in 2BHK and 3BHK configurations.
The promoter’s Form B declaration gives a completion undertaking of 05-JULY-2027. That is a declared project timeline, not evidence that work has reached a particular stage. The supplied materials do not include independently verified construction progress, and the permit record states that completion has not been certified. No occupancy certificate is included.
3. Master plan, architecture & building design
The filed plan concerns one residential building on a 375.94 sq. m plot. It describes 1 Stilt + 5 upper floors, six floors in total as recorded in the drawing, and a building height of 15.00 MT. excluding the stilt floor; it also records a total height of 20.40mt. The drawing states 1,108.10 sq. m total proposed built-up area excluding parking, 1,329.70 sq. m including parking, 1,342.98 total BUA, 221.60 sq. m parking area and 154.32 vacant plot area. These are the drawing’s separate labels and are not interchangeable area measures. The approved building-permit order records 1,108.10 Sq.mts built-up area, 1,342.98 Sq.mts total built-up area and a simple mortgage of 115.52 Sq.mts of built-up area. The supplied permit and drawing identify a single building, not a multi-tower or multi-phase development.
The plan identifies a lift and staircase and shows typical floor plans; detailed circulation dimensions, floor-by-floor unit counts, landscape design, and a residential/common-area area breakdown are not established by the extracted information. The supplied record does not give a separately labelled FSI-counted area or carpet area for the whole building.
4. Homes, configurations & floor plans
RERA records ten apartments: five 2BHK and five 3BHK. RERA-filed saleable areas are shown below. The portal’s booked/available counts have no supplied as-of date and should be treated as indicative.
| Configuration | Units | Booked | Available | RERA saleable area | Measured carpet area | Loading (if supplied) |
|---|---|---|---|---|---|---|
| 2BHK | 5 | 0 | 5 | 105.91 sq. m | Software-measured median 64.2 sq. m; range 59.9–68.5 sq. m | 39% |
| 3BHK | 5 | 0 | 5 | 148.65 sq. m | Software-measured median 79.6 sq. m; range 79.1–80.1 sq. m | 46% |
Carpet-area figures and loading are software measurements from the filed floor-plan drawing, not RERA-filed area disclosures; the measurements are marked as needing review. RERA saleable area is a different measure and should not be read as carpet area. The supplied measurement record notes that saleable area includes the home’s share of common areas; balcony areas shown on plans are excluded from measured carpet area.
The extracted drawing records a 2BHK plan with living, dining, kitchen, two bedrooms, toilets, balconies and a wash area; the described 3BHK plan has living/dining, kitchen, three bedrooms, toilets, balconies and a wash area. Room dimensions are drawing measurements, not RERA disclosures.
5. Parking & vehicle circulation
The sanctioned arrangement designates the stilt floor exclusively for vehicle parking, and the filed drawing records 221.60 sq. m of parking area. The permit order also states that parking or construction is not to be made in setback areas. No sanctioned parking-space count, visitor or accessible-space count, mechanical parking provision, ramp arrangement, EV charger count, or unit-specific parking allocation is established in the supplied project records. The vendor material lists covered car parking and “20 Car Parking” as marketing claims; those claims are not treated here as sanctioned or legally allocated parking provision.
6. Amenities, recreation & open spaces
The supplied RERA amenities record lists 14 project components. It marks water supply, sewerage, green strip/TOT LOT/park, rainwater harvesting and an electrical meter room/sub-station/receiving station as “YES”; the listed progress percentages are 0. These are recorded declarations, not independently verified completed facilities.
| Facility | Description / size | Evidence source | Declared progress / verified status |
|---|---|---|---|
| Green strip / TOT LOT / park | No size supplied | RERA amenities record | “YES”; progress 0; completion not independently verified |
| Community buildings | No description or size supplied | RERA amenities record | Progress 0; no completion evidence supplied |
| Internal roads & footpaths | No dimensions supplied | RERA amenities record | Progress 0 |
| Street lighting | No quantity or specification supplied | RERA amenities record | Progress 0 |
Vendor material additionally lists a swimming pool, gym, clubhouse, indoor games, children’s play area, yoga areas and other features. These are marketing claims in the supplied vendor record; the project evidence supplied does not establish their sanction, size, delivery or completion.
7. Utilities, building services & safety
The filed building-permit record lists an STP, transformer, garbage house and rainwater-harvesting structures. It also requires the applicant to provide an STP and rainwater harvesting structures, and to develop and maintain the approach road as a black-topped road before release of the occupancy certificate. The plan lists a septic tank, sump, lift, staircase, rainwater harvesting and percolation pit. These are plan/permit provisions or requirements, not evidence of completed installations.
The permit drawing includes conditions addressing fire safety and structural stability, electrical fire safety, sprinkler provision where basement area exceeds 200 sq. m, and electrical certification. It also includes an EV-charging-infrastructure condition for parking places in buildings. The supplied material does not establish installation, inspection, clearance or operational status of these systems.
The extracted records do not state water source or storage capacity, STP capacity or treated-water reuse arrangements, storm-water system specifications, backup-power capacity, lift capacity, CCTV coverage, waste-segregation arrangements, security staffing or accessible circulation provisions. The RERA amenities record marks water supply, sewerage, rainwater harvesting and an electrical meter room/sub-station/receiving station “YES,” but records progress as 0.
8. Location, access & connectivity
The registered project location is Plot No. E-83, Survey No. 538, SIMHAPURI ESTATE, Bowrampet village, Dundigal Gandimaisamma mandal, Medchal-Malkajgiri district, Telangana, PIN 500043. The filed drawing identifies 40-foot/12-metre-wide roads on the north and east boundaries; the RERA land record describes both as 40 WIDE ROAD.
The supplied location record gives an approximate sampled distance of 11.1 km to the nearest sampled Outer Ring Road interchange. It does not supply public-transport routes or verified distances to other landmarks.
9. Developer & development status
The registered promoter is HARIKA CONSTRUCTIONS & DEVELOPERS, identified in the RERA record as a partnership, with GSTIN 36AAHFH3062Q1ZY. The registered promoter address is recorded as NEW NAGOLE, ROAD NO 10/B, SIMHAPURI ESTATE, Dundigal Gandimaisamma, Medchal-Malkajgiri, Telangana, PIN 500043. The RERA certificate separately records the promoter address as Village: Nagole, Mandal: Uppal, District: Medchal-Malkajgiri, PIN 500068.
The project is registered for one building and ten apartments. The promoter’s Form B declaration undertakes completion by 05-JULY-2027. No independently verified construction-stage or progress percentage is supplied, and no occupancy or completion certificate is on file in the supplied evidence. See project status above.
10. Approvals, official records & documents
TG-RERA registration: Form C certificate for VK TRANQUIL ABODE, registration P02200009012, valid 5 July 2024 to 5 July 2027 unless extended
Building permit / principal sanction: Order 003849/BP/HMDA/0804/MED/2024, dated 05 July 2024, for the residential building at Plot E-83, Survey No. 538, Bowrampet; issued in the name of Sri Nethi Srinivas
Building plan: Filed drawing describes one building with 1 stilt and 5 upper floors, ten units, and associated plan conditions
Title-related filing: Form B declaration and title-report materials are in the project file; the declaration states a title basis and the title documents describe a development arrangement
Occupancy/completion record: No certificate supplied; the building-permit record states completion is not certified and requires an occupancy certificate before occupation
Environmental clearance search: The supplied name-based promoter search reports no EC found in two searched districts; it is not a project-specific clearance determination
The drawing and building-permit order are the available building-approval records for this overview. The supplied evidence does not establish a separate approved-layout record or a completed occupancy certificate.
Frequently asked questions
Is VK TRANQUIL ABODE registered with Telangana RERA?
Yes. VK TRANQUIL ABODE is registered with the Telangana Real Estate Regulatory Authority as P02200009012; the registration status is New Project.
Who is the developer of VK TRANQUIL ABODE?
The promoter named in the RERA registration is HARIKA CONSTRUCTIONS & DEVELOPERS.
Where is VK TRANQUIL ABODE located?
VK TRANQUIL ABODE is in SIMHAPURI ESTATE, Bowrampet, Dundigal Gandimaisamma, Medchal-Malkajgiri, Telangana (500043).
When will VK TRANQUIL ABODE be completed?
The promoter's proposed date of completion filed with RERA is 05/11/2027. This is the promoter's declaration, not a guarantee.
More projects in Bowrampet