Sign in

Vihari

SRI GAYATHRI DEVELOPERS · Sangareddy · RERA P01100006838

VIHARI is a residential apartment project in AMEENAPUR, AMEENPUR Mandal, Sangareddy District, developed by registered promoter SRI GAYATHRI DEVELOPERS. The project occupies 511.71 sq. m and comprises one proposed building with 1 Stilt + 5 upper floors and 10 3BHK homes, each with a saleable area of 159.79 m². It is registered under TG-RERA number P01100006838, with proposed completion listed as 30/11/2026.

01What we found

Period endedTG-RERA registration ran to 30 Jun 2026 - check its extension on TG-RERA
23documents on file - each fact links to its page
0court cases on this project's land in the court records searched
9items to check - 4 high

Read from TG-RERA filings, approvals, land and registration records and court records. A court case is counted only when the court record states this project's survey number with its village, or names the project.

02Check before you pay

9 items to check before you pay, 4 high - from the title chain, court records and approvals, each with what to ask the builder or your advocate. An item may not be a problem with the project: records can be incomplete.

Sign in to see each item and what to do

1. Project at a glance

Project identity

FieldProject record
Registered project nameVIHARI RERA record
Project type / phaseResidential apartment project; phase or separately registered portion is not disclosed. RERA record RERA filing
TG-RERA registrationP01100006838; certificate issued 01/09/2023, valid from 01/09/2023 to 30/06/2026. The certificate records no extension. Registration validity is distinct from the completion date and from occupancy certification.
Registered promoterSRI GAYATHRI DEVELOPERS; partnership. RERA filing Corporate record
RERA statusThe supplied record identifies the project as New Project. The registration certificate’s stated validity ended 30/06/2026; no subsequent extension or current registration status is supplied. RERA filing

Land and geographic identity

FieldProject record
Locality / revenue villageSY NO 618/E / AMEENAPUR. The registration certificate describes the locality as “AMEENAPUR, AMEENPUR.” RERA record RERA filing
Mandal / district / PINAMEENPUR, Sangareddy, 502032. RERA record
Project survey number(s)618/E. RERA record Land records
Registered site extent511.71 sq. m; total area and net area are each recorded as 511.71 sq. m, with road-affected area recorded as 0. RERA filing
Boundaries in project recordEast: 30 FEET WIDE ROAD; West: PART OF SY NO 618E; North: NEIGHBOURS PLOT; South: PART OF SY NO 618E. RERA filing

Development identity

FieldProject record
Sanctioning authorityAMEENPUR Municipality/Municipal Corporation. Approvals record
Principal building approval0078/BP/3121/2023, approved 30 June, 2023; file number 005822/BP/DTCP/3121/0059/2023. Approvals record
Building configurationOne proposed residential apartment building; sanctioned as 1 Stilt + 5 upper floors. The approval records height 14.95 m.
Approved area figuresSite area 511.71 m²; residential upper-floor area 1,151.95 m²; stilt area 216.01 m². These are approval-document figures, not a carpet-area disclosure.
Units10 units in the TG-RERA filing; the approved-plan record also states that the number of units sanctioned must not be increased without prior approval. RERA unit table
Parking levels / provisionStilt is recorded in the sanction. The approval conditions say approved cellar and stilt areas for parking are to be used exclusively for vehicle parking, but the supplied extracted floor configuration identifies only a stilt and gives no parking-space count.

Offering and status

FieldProject record
Filed configuration and saleable area3BHK, 159.79 m² saleable area; 10 units. RERA unit table
Booked / available0 booked; 10 available as last read from the TG-RERA portal; no as-of date is supplied, so these counts are indicative. RERA unit table
Completion datesThe building approval records completion before 30 June, 2026; the Form B declaration also undertakes completion by 30.06.2026. The RERA header separately lists proposed completion as 30/11/2026. These dates are reproduced as recorded; their difference is for the relevant review sections to assess. RERA record
Construction stageNo independently verified site-progress or construction-stage information is supplied. The amenity progress entries provided record 0% for the listed items. RERA amenities
Occupancy / completion certificateNo occupancy or completion certificate is supplied. The building approval states that an occupancy certificate is compulsory before occupation. Document index

2. The project story

VIHARI is registered as a residential apartment project on land identified in the project record as Survey No. 618/E, in revenue village AMEENAPUR, Ameenpur Mandal, Sangareddy District. The registered site extent is 511.71 sq. m. RERA record RERA filing

The building approval describes one proposed apartment building with a stilt and five upper floors. The RERA filing lists ten 3BHK units, all shown as available in the portal snapshot, although that snapshot has no recorded as-of date. RERA unit table

The available material establishes the sanctioned design and the promoter’s completion undertaking, but does not establish actual construction progress or that any part of the building is completed or occupancy-certified. The approval specifies that an occupancy certificate must be obtained before occupation.

3. Master plan, architecture & building design

  • The sanctioned building record describes a single proposed residential building on a 511.71 m² site, with 1 Stilt + 5 upper floors and a stated height of 14.95 m. It records 1,151.95 m² for residential upper floors and 216.01 m² for the stilt. The supplied extracts do not provide a building footprint, floor-by-floor unit arrangement, number of flats per floor, lift or stair details, internal circulation, or a site-wide layout plan.
  • The project record lists a layout permit number 1, dated 23/05/2023. The layout-plan document slot is present, but the supplied record does not include an extracted layout drawing or layout details. Approvals record Document index
  • The approved plan records three rainwater-harvesting structures (RWHPs) and requires a transformer space. It also includes conditions for peripheral greenery and a tot-lot, but the supplied material does not give their dimensions.

4. Homes, configurations & floor plans

  • The TG-RERA filing records ten 3BHK units, with saleable area of 159.79 m² each; the portal snapshot shows none booked and ten available, with no as-of date supplied. RERA unit table RERA unit details
  • Floor-plan measurements below are software-measured from the supplied drawing record, not RERA-filed carpet-area disclosures. The drawing-derived 3BHK measurements cover two designs and range from 96.5 m² to 118.2 m², with a median of 107.4 m². The measurement record flags these figures as requiring review. Saleable area and measured carpet area are different measures; the supplied drawing record notes that saleable area includes a share of common areas. Floor plans RERA unit details
ConfigurationUnitsBookedAvailableRERA saleable areaMeasured carpet areaLoading (if supplied)
3BHK10010159.79 m²96.5–118.2 m²; median 107.4 m², software-measured from drawings33% (drawing-measurement record)

The drawing-derived sample for a 3BHK identifies bedrooms, living/dining, a drawing room, kitchen, wash area and toilets. These are drawing-based measurements, not independent measurements of a constructed unit; the supplied material does not establish unit orientation or balcony dimensions. RERA unit details

5. Parking & vehicle circulation

  • The building approval records a stilt and says approved cellar and stilt areas for parking must be used exclusively for vehicle parking, without partition walls or rolling shutters. However, the supplied extracts do not establish the number or dimensions of parking spaces, any visitor or accessible parking, parking allocation to individual units, or a basement/cellar level in the extracted building-floor configuration.
  • The project’s amenity data lists car parking as a promoter-marketed feature, but no parking count or unit-specific parking entitlement is provided in the supplied record. A parking facility listing does not establish an exclusive allocation. Promoter website

6. Amenities, recreation & open spaces

The RERA amenity record includes the facilities below. It records “YES” for a green strip/tot-lot/park and rainwater harvesting, but reports 0% progress for each listed item. These entries indicate recorded provision/status, not independent confirmation that facilities have been delivered. RERA amenities

FacilityDescription / sizeEvidence sourceDeclared progress / verified status
Green strip / tot-lot / parkListed as available: YES; no size suppliedRERA amenity record; building approval condition0% in amenity record; completion not independently verified RERA amenities
Aggregate recreational open spaceListed; no area suppliedRERA amenity record0%; completion not independently verified RERA amenities
Rainwater harvestingListed as available: YES; approval records 3 RWHPsRERA amenity record; building approval0% in amenity record; completion not independently verified RERA amenities
Swimming poolNo size suppliedPromoter-marketed vendor listingNo RERA progress or independent completion evidence supplied Promoter website
Children’s play areaNo size suppliedPromoter-marketed vendor listingNo RERA progress or independent completion evidence supplied Promoter website
GymnasiumNo size suppliedPromoter-marketed vendor listingNo RERA progress or independent completion evidence supplied Promoter website
Badminton courtNo size suppliedPromoter-marketed vendor listingNo RERA progress or independent completion evidence supplied Promoter website
Jogging trackNo size suppliedPromoter-marketed vendor listingNo RERA progress or independent completion evidence supplied Promoter website
Skating rinkNo size suppliedPromoter-marketed vendor listingNo RERA progress or independent completion evidence supplied Promoter website
Party hallNo size suppliedPromoter-marketed vendor listingNo RERA progress or independent completion evidence supplied Promoter website

7. Utilities, building services & safety

  • The RERA amenity record lists water supply, sewerage (including chambers, lines, septic tank and STP), storm-water drains, street lighting, sewage and sullage treatment/disposal, solid-waste management, energy management, fire protection and fire safety, and an electrical meter room/sub-station/receiving station. It marks the electrical meter room/sub-station/receiving station YES and records 0% progress for the listed items. No capacities, technical designs, or independent completion evidence are supplied. RERA amenities
  • The approval records three rainwater-harvesting structures and requires space for a transformer, a garbage house within the premises, and tree planting along the site periphery and front. It also requires a completion notice and occupancy certificate before occupation, and says public water and electricity connections will be provided only on production of an occupancy certificate. These are approval conditions; the supplied material does not verify implementation.
  • No lift specifications, emergency-power or EV-charging details, security systems, accessibility provisions, or fire-system equipment and capacities are disclosed in the supplied material. Document index RERA amenities

8. Location, access & connectivity

  • The registered location is AMEENAPUR, Ameenpur Mandal, Sangareddy District, PIN 502032, on Survey No. 618/E; the project record gives the east boundary as a 30 FEET WIDE ROAD. RERA record RERA filing
  • A parcel-centroid location record lists the nearest sampled Outer Ring Road interchange at approximately 8.4 km. This is a supplied mapped-distance estimate, not a travel-time claim. No official approach-road route or public-transport distance record is supplied. Location record

9. Developer & development status

  • The registered promoter is SRI GAYATHRI DEVELOPERS, identified as a partnership; its GSTIN is 36AEXFS9741K1ZX. The supplied RERA filing lists RAMA RAO TELAPROLU as authorized signatory and ANJANI PARA as partner. Corporate record RERA filing Parties record
  • The RERA registration certificate gives the promoter-office address as Village: Madina Guda, Mandal: Serilingampally, District: Ranga Reddy, Pin: 500049. The project record does not supply an official contact number or website.
  • The RERA Form B declaration dated 11 July 2023 states that the promoter undertook to complete the project by 30.06.2026. The registration certificate states validity through 30/06/2026 and records no extension; the project header separately lists proposed completion as 30/11/2026. No construction-progress certification or occupancy certificate is supplied. RERA record

10. Approvals, official records & documents

TG-RERA registration certificate
DetailsVIHARI; registration P01100006838; issued 01/09/2023, valid to 30/06/2026; certificate records no extension
Building approval
DetailsApproval for building construction 0078/BP/3121/2023, dated 30 June, 2023, issued by Ameenpur Municipality/Municipal Corporation; file number 005822/BP/DTCP/3121/0059/2023
Layout permit
DetailsPermit number 1, dated 23/05/2023, recorded in the building-approval document
Layout-plan document
DetailsRERA filing has a layout-plan document slot, but the supplied record contains no extracted layout drawing
EvidenceDocument index
Form B declaration
DetailsPromoter declaration dated 11 July 2023, including a completion undertaking of 30.06.2026
Occupancy/completion certificate
DetailsNone supplied; the building approval states an occupancy certificate is compulsory before occupation
EvidenceDocument index

Frequently asked questions

Is VIHARI registered with Telangana RERA?

Yes. VIHARI is registered with the Telangana Real Estate Regulatory Authority as P01100006838; the registration status is New Project.

Who is the developer of VIHARI?

The promoter named in the RERA registration is SRI GAYATHRI DEVELOPERS.

Where is VIHARI located?

VIHARI is in SY NO 618/E, AMEENAPUR, AMEENPUR, Sangareddy, Telangana (502032).

When will VIHARI be completed?

The promoter's proposed date of completion filed with RERA is 30/11/2026. This is the promoter's declaration, not a guarantee.

More projects in Ameenapur