VAISHNAVI s MIYAPUR is a residential apartment project in Miyapur / Maqta Mahaboobpet, Serilingampally, Ranga Reddy. The registered promoter is VAISHNAVI ESTATES PRIVATE LIMITED. The TG-RERA record lists a site extent of 3,170.12 sq. m., one building and 76 proposed 3BHK units, each with a saleable area of 100.12 sq. m.; the revised permit describes 2 Cellars + 1 Stilt + 10 Floors. The project is registered under TG-RERA P02400008740, with proposed completion on 25 November 2027.

More from Vaishnavi Estates Pvt Ltd · 3 projects →

01What we found

RegisteredTG-RERA - valid till 25 Jul 2027
22documents on file - each fact links to its page
19court cases on this project's land (survey 44, Makutha)
7items to check - 3 high

Read from TG-RERA filings, approvals, land and registration records and court records. A court case is counted only when the court record states this project's survey number with its village, or names the project.

02Check before you pay

7 items to check before you pay, 3 high - from the title chain, court records and approvals, each with what to ask the builder or your advocate. An item may not be a problem with the project: records can be incomplete.

Sign in to see each item and what to do

1. Project at a glance

Project identity

FieldProject record
Registered project nameVAISHNAVI s MIYAPUR RERA record
Project typeResidential apartment project RERA record
Phase / registered portionPhase not separately identified in the supplied record; the registered site is on Plot Nos. 41–49 RERA filing
TG-RERA registrationP02400008740 RERA record
Registration validity6 September 2024 to 25 July 2027, subject to any extension by TG-RERA
RERA statusRegistered; registration status is not the same as construction completion or an occupancy certificate RERA record
Registered promoterVAISHNAVI ESTATES PRIVATE LIMITED, a company RERA record Corporate record

Land and geographic identity

FieldProject record
LocalityMiyapur / Maqta Mahaboobpet RERA record
Revenue villageMakutha in the TG-RERA project record; the filed building permit identifies Maktha Mahaboobpet RERA record
Mandal / district / PINSerilingampally / Ranga Reddy / 500049 RERA record
Project survey number and subdivisionSy. No. 44/3/2 PART RERA record
Site extent3,170.12 sq. m. recorded in the TG-RERA land details RERA filing
Boundaries in RERA recordEast: 40 feet road; West: 40 feet road; South: 40 feet road; North: Plot Nos. 40 and 50 RERA filing

Development identity

FieldProject record
Sanctioning authorityGreater Hyderabad Municipal Corporation (GHMC) Approvals record
Principal building permit2308/GHMC/SLP/2024-BP, dated 25 July 2024 Approvals record
Revised permit2416/GHMC/SWBP/SLP1/2025, dated 31 December 2025; the permit record identifies file 003989/GHMC/02070/SWBP/SLP1/2025-REV Approvals record
Approved built-up areaThe supplied RERA record lists 6,803.25 sq. m. as approved built-up area RERA filing. The revised permit extraction separately lists 12,774.90 sq. m. as net BUA after alteration and 18,801.64 sq. m. as gross BUA after alteration. These are distinct labels in the supplied documents.
Building countOne building in the RERA land details RERA filing
Sanctioned configurationThe revised permit is described as 2 Cellars + 1 Stilt + 10 Floors. The supplied drawing-extraction record also contains a 2C+STILT+5 UPPER FLOORS description.
Parking provisionThe revised permit extraction lists 122 car parking spaces, 5,170.44 sq. m. proposed parking area and 445.65 sq. m. proposed visitor-parking area. The permit material also lists total parking area as 5,616.09 sq. m..
UnitsTG-RERA record: 76 approved building units and 76 proposed units RERA filing RERA unit table. The revised permit extraction also records 76 dwelling units.

Offering and status

FieldProject record
RERA-filed configuration3BHK; 76 units RERA unit table
RERA-filed saleable area100.12 sq. m. per unit RERA unit table
Booked / available0 booked / 76 available in the portal data supplied; no as-of date is recorded, so counts are indicative rather than a current live inventory confirmation RERA unit table
Construction stageThe supplied RERA progress table reports 10% for water supply and 0% for the other listed development items; it does not provide a building-construction percentage or independent site-verification record RERA amenities
Completion datesThe RERA header gives proposed completion as 25 November 2027; the Form B declaration states a completion undertaking of 31 December 2027 RERA record
Occupancy certificateNo occupancy certificate is included in the supplied records. The GHMC permit requires completion notice and an occupancy certificate before occupation

2. The project story

  • VAISHNAVI s MIYAPUR is a registered residential apartment project on Plot Nos. 41–49 in Sy. No. 44/3/2 PART, at Miyapur in the Makutha / Maqta Mahaboobpet locality, Serilingampally Mandal, Ranga Reddy District. The registered site extent is 3,170.12 sq. m.; the RERA record identifies one building and 76 proposed dwelling units. RERA record RERA filing
  • The RERA-filed offering is 76 three-bedroom apartments, with a recorded saleable area of 100.12 sq. m. each. The available portal snapshot shows all 76 as available and none booked, but it has no stated capture date. RERA unit table
  • The project has a GHMC building permit and a later revised-permit record. Those approvals describe the sanctioned building configuration and conditions; they do not establish that construction is complete. The supplied project-progress data is limited: it gives percentages for listed infrastructure items, not an independently verified construction-stage assessment. No occupancy certificate is supplied. Approvals record RERA amenities

3. Master plan, architecture & building design

  • The filed project is an apartment development on a 3,170.12 sq. m. site in Sy. No. 44/3/2 PART, with one building recorded in the RERA land details. The drawing-related record describes a residential building and includes proposed coverage of 1,096.75 sq. m. (35%), alongside vacant-plot-area entries. RERA filing
  • The revised-permit material describes 2 cellars, 1 stilt and 10 floors, and lists a height of 29.9 m in its sanctioned parameters. It also contains other height fields, including “Height from GL: 35.95 m” and “Total Height 38.45 m”; the supplied record does not explain how those separate height labels relate.
  • The documents contain several separately labelled built-up-area figures: the RERA land details give 6,803.25 sq. m. as approved built-up area; the revised drawing extraction lists 6,080.05 sq. m. as total proposed BUA excluding parking and also as including parking; and the revised-permit parameters list 12,774.90 sq. m. net BUA and 18,801.64 sq. m. gross BUA after alteration. These labels should not be treated as interchangeable. RERA filing
  • The supplied material identifies driveways, road widths, cellar and stilt parking, two tot-lots, a transformer, STP, generator room, sump, AC plant, garbage house and rainwater-harvesting/percolation features. It does not provide a complete floor-by-floor architectural description, flat count per floor, lift count or detailed circulation schedule.

4. Homes, configurations & floor plans

  • The TG-RERA unit record lists 76 3BHK apartments, with a saleable area of 100.12 sq. m. each. The portal snapshot reports 0 booked and 76 available, without an as-of date. RERA unit table
ConfigurationUnitsBookedAvailableRERA saleable areaMeasured carpet areaLoading (if supplied)
3BHK76076100.12 sq. m.81.0–98.9 sq. m.; median 96.1 sq. m. (software-measured from drawings)Not supplied
  • The drawing-based carpet measurements are software measurements, not RERA-filed carpet-area disclosures, and are marked as needing review. Carpet area is not the same as saleable area: the supplied measurement note says saleable area also counts the home’s share of common areas. No loading figure is supplied. Floor plans RERA unit details
  • A measured example on the 10th-floor plan shows three bedrooms, a kitchen, three toilets, a sit-out and a utility area. The drawing extraction marks the utility area as excluded from carpet area; measurements should be checked against the approved drawing. RERA unit details

5. Parking & vehicle circulation

  • The revised permit extraction records 122 car parking spaces, with 5,170.44 sq. m. proposed parking area and 445.65 sq. m. proposed visitor parking area. It also lists 3,832.47 sq. m. as required parking area. The separate permit parameters include a 5,616.09 sq. m. total parking-area figure.
  • The building is described as having two cellars and a stilt level; the GHMC conditions state that cellars and stilts approved for parking are to be used exclusively for vehicle parking. The material identifies a 3.00 m-wide vehicular ramp. It does not establish unit-specific parking allocation or exclusive ownership of any drawn bay.

6. Amenities, recreation & open spaces

The RERA progress schedule records the following facilities and infrastructure items. “YES” indicates an availability entry in that schedule, not independent verification of completion; the percentage is the schedule’s reported progress. RERA amenities

Tot-lot / recreational open space
Description / sizeRevised drawing extraction lists Tot-lot 1: 141.95 sq. m. and Tot-lot 2: 113.90 sq. m.
Evidence sourceGHMC revised-permit drawing extraction
Declared progress / verified statusRERA schedule: Green Strip/TOT LOT/Park “YES,” 0%; not independently verified complete RERA amenities
Green strip
Description / sizePeripheral greenery is referenced in the permit conditions; no area is supplied
Evidence sourceFiled drawing/permit material
Declared progress / verified statusRERA schedule: included with Green Strip/TOT LOT/Park, “YES,” 0%; not independently verified complete RERA amenities
Internal roads and footpaths
Description / sizeNo dimensions or progress details beyond the drawing’s stated road/driveway widths
Evidence sourceFiled drawing/permit material
Declared progress / verified statusRERA schedule: 0% RERA amenities
Community buildings
Description / sizeNo facility description or size supplied
Evidence sourceRERA progress schedule
Declared progress / verified status0% RERA amenities

7. Utilities, building services & safety

Water
What the supplied record statesThe permit material lists water supply, an underground static storage tank of 25,000 litres and a terrace tank of 25,000 litres. The RERA progress schedule records water supply as “YES” at 10%.
Evidence / statusRERA amenities
Sewerage and drainage
What the supplied record statesSTP is listed in the drawing-derived facilities; the revised permit requires storm-water drainage and services/utilities as per plans submitted to GHMC. The RERA schedule records sewerage and treatment/disposal at 0%.
Evidence / statusRERA amenities
Rainwater
What the supplied record statesRainwater harvesting and percolation features are listed. One permit extraction states 8 rainwater-harvesting pits; an earlier drawing extraction lists 10.
Electrical
What the supplied record statesTransformer space, transformer and generator room are listed. The permit conditions require transformer space and refer to electrical and life-safety installations; no generator capacity or backup duration is supplied.
Lifts
What the supplied record statesA lift and a fire-escape lift are listed in the drawing-derived facilities; number, capacity and service-lift provision are not stated.
Fire and life safety
What the supplied record statesFire-fighting installation is listed; the revised permit states that an occupancy Fire NOC is to be obtained before an occupancy certificate. No Fire NOC or occupancy certificate is included in the supplied documents.
Waste and construction safety
What the supplied record statesGarbage house is listed. Permit conditions address construction and demolition waste and dust-monitoring measures. No operational waste-management progress is independently verified.
EV charging and digital infrastructure
What the supplied record statesThe revised-permit conditions require EV-charging infrastructure and address building connectivity infrastructure and common access to digital services; completion evidence is not supplied.
Accessibility
What the supplied record statesNo project-specific accessible-circulation layout or facility details are supplied in the records reviewed for this overview.

8. Location, access & connectivity

  • The project’s RERA location is Makutha, Serilingampally, Ranga Reddy, 500049, in the Miyapur locality. The project site is identified as Sy. No. 44/3/2 PART. RERA record
  • The filed drawing material references roads and internal driveways, including 12.00 m roads and driveways of 7.00 m, 5.40 m, 5.00 m and 4.50 m. A supplied location record lists HITEC City at 1.9 km as a connectivity anchor; no route or measurement methodology is provided. Location record

9. Developer & development status

  • The registered legal promoter is VAISHNAVI ESTATES PRIVATE LIMITED, a company, with GSTIN 36AABCV5601J1ZD. The supplied promoter address is Nandana Vanam, Vengalrao Nagar, Maktha Mahabubpet, Miyapur, Serilingampally, Ranga Reddy, 500049. RERA record Corporate record Parties record
  • The RERA Form B declaration states that the promoter holds development rights and undertakes to complete the project by 31 December 2027. The project header separately records proposed completion as 25 November 2027. Registration validity ends on 25 July 2027, subject to extension by the Authority; this validity date is distinct from the declared completion dates. RERA record
  • No construction completion percentage, independent site inspection, or occupancy certificate is supplied. The portal’s reported infrastructure progress is limited to the itemised percentages shown above. RERA amenities

10. Approvals, official records & documents

RecordSupplied evidence
TG-RERA registrationForm C registration certificate for P02400008740, project VAISHNAVI s MIYAPUR; validity stated as 6 September 2024 to 25 July 2027
GHMC building permit2308/GHMC/SLP/2024-BP, dated 25 July 2024 Approvals record
Revised GHMC permit2416/GHMC/SWBP/SLP1/2025, dated 31 December 2025; file 003989/GHMC/02070/SWBP/SLP1/2025-REV Approvals record
Layout/drawing materialDrawing and plan material filed under document 481072, identifying plots 41–49 and Sy. No. 44/3/2 PART
Revised floor-plan materialRevised-plan extraction filed under document 650370
Promoter declarationForm B declaration dated 20 August 2024, including the promoter’s development-rights and completion-date declarations
Occupancy/completion recordNo occupancy or completion certificate is included in the supplied evidence. GHMC permit conditions require completion notice and an occupancy certificate before occupation

Frequently asked questions

Is VAISHNAVI s MIYAPUR registered with Telangana RERA?

Yes. VAISHNAVI s MIYAPUR is registered with the Telangana Real Estate Regulatory Authority as P02400008740; the registration status is New Project.

Who is the developer of VAISHNAVI s MIYAPUR?

The promoter named in the RERA registration is VAISHNAVI ESTATES PRIVATE LIMITED.

Where is VAISHNAVI s MIYAPUR located?

VAISHNAVI s MIYAPUR is in MIYAPUR, Makutha, Serilingampally, Rangareddy, Telangana (500049).

When will VAISHNAVI s MIYAPUR be completed?

The promoter's proposed date of completion filed with RERA is 25/11/2027. This is the promoter's declaration, not a guarantee.

More projects in Makutha