Vaibhavis Vistaara
VAIBHAVI GREEN FIELDS · Rangareddy · RERA P02400007798
VAIBHAVIS VISTAARA is a plotted development at Pedda Thupra, Shamshabad Mandal, Ranga Reddy District. The registered promoter is VAIBHAVI GREEN FIELDS. The project covers a total site area of 50,709.62 sq. m in Survey Nos. 106/P and 114/P and is an open residential layout; the supplied records do not establish a complete plot count or plot-size configurations. It is registered with TG-RERA under P02400007798, with proposed completion recorded as 30/11/2026.
01What we found
Read from TG-RERA filings, approvals, land and registration records and court records. A court case is counted only when the court record states this project's survey number with its village, or names the project.
02Check before you pay
8 items to check before you pay, 3 high - from the title chain, court records and approvals, each with what to ask the builder or your advocate. An item may not be a problem with the project: records can be incomplete.
1. Project at a glance
Project identity
| Item | Project record |
|---|---|
| Registered project name | VAIBHAVIS VISTAARA RERA record |
| Project type | Plotted development / open residential layout RERA record |
| Phase or registered portion | A single registered project is identified; a separate phase name or phase boundary is not disclosed. RERA record |
| TG-RERA registration | P02400007798 RERA record |
| Registration validity | 1 March 2024–31 July 2026, unless extended by the Authority. This is the registration-validity period, not a statement of completion or occupancy status. RERA record |
| Registered promoter | VAIBHAVI GREEN FIELDS; the registration certificate names the promoter as Vaibhavi Green Fields. The project Form-B declaration refers to “M/s. VAIBHAVI GREEN FIELDS AND OTHERS.” RERA record |
| RERA status in supplied record | The project is registered. The certificate states its validity dates and requires quarterly updates; current RERA status beyond the supplied certificate is not established here. |
Land and geographic identity
| Item | Project record |
|---|---|
| Revenue village | Pedda Thupra; also rendered in project records as Peddatopra, Peddatoopra and pedda thupra. RERA record Land records |
| Locality | Pedda Thupra / Peddatopra, Shamshabad Mandal; HMDA approval describes the area as “Extended area of Erstwhile HUDA (HMDA).” RERA record |
| Mandal / district / PIN | Shamshabad / Ranga Reddy / 509325 RERA record RERA filing |
| Project survey numbers | 106/P and 114/P (also styled Sy. Nos. 106/P and 114/P in the approval documents). No further project subdivision is stated in the registration certificate or layout approval. RERA record Land records |
| Registered site extent | 50,709.62 sq. m total site area; 371.82 sq. m is identified as road-affected area; 50,337.80 sq. m net site area. RERA filing |
| Layout land-use figures | 29,348.23 sq. m plotted area; 15,240.68 sq. m layout roads; 4,488.92 sq. m park/open space; and 1,259.25 sq. m social infrastructure. These are figures stated in the layout approval record. |
| Boundaries filed with RERA | East: neighbours’ land; West: 9 MTS WIDE ROAD; North: neighbours’ land; South: neighbours’ land. RERA filing |
| Location reference | Cadastral parcel centroid: 17.15564501734732, 78.30520687252005. This is a parcel-centroid reference, not a surveyed project entrance location. Cadastral map Location record |
Development identity
| Item | Project record |
|---|---|
| Sanctioning authority | Hyderabad Metropolitan Development Authority (HMDA). The draft layout letter is addressed to the Peddatopra local authority for further action and plan release. Approvals record |
| Principal approval | HMDA layout approval 000148/LO/Plg/HMDA/2023, dated 09 August 2023. Approvals record |
| Application/file reference | 056634/SMD/LT/U6/HMDA/06092022 Approvals record |
| Approved built-up area | 29,348.23 sq. m is recorded in the RERA fields as “Approved Built up Area”; the layout drawing extraction identifies 29,348.23 sq. m as plotted area. These labels are retained as recorded; the figure is not treated here as a building floor-area measurement. RERA filing Layout record |
| Buildings, floors and parking levels | Not disclosed as building or floor configurations in the supplied evidence; this is a plotted layout, not an apartment-building proposal. |
| Plot count | The HMDA draft approval identifies plots 133 to 138 and 140 to 157 as mortgage plots (23 plots); a complete count of all sale plots is not established by the supplied records. |
| Parking provision | A separate parking-space count or parking allocation is not disclosed in the supplied records. |
Offering and status
| Item | Project record |
|---|---|
| Offering | Residential plots; plot-size bands and a complete plot schedule are not available in the supplied evidence. |
| Booked / available plots | Counts are not supplied. The layout extraction says the plot list is incomplete and contains no plot-size measurements. Layout record |
| Completion date | The header records proposed completion as 30/11/2026. The Form-B declaration’s extracted text contains an unclear completion-date string (“315 Suly 2026”); the exact declaration date is not reliably legible in the supplied extraction. RERA record |
| Development stage | RERA-filed amenity fields mark several infrastructure categories “YES,” but their reported progress values are 0 except internal roads and footpaths at 30. These are filed progress entries, not independently verified site-completion measurements. RERA amenities |
| Final layout / occupancy status | The supplied HMDA document is described as a draft layout and sets conditions for development and release of final layout plans. No final layout release or occupancy/completion certificate is provided in the supplied records. |
2. The project story
VAIBHAVIS VISTAARA is registered with TG-RERA as a plotted residential development on land identified in the registration and HMDA layout records as Survey Nos. 106/P and 114/P, at Pedda Thupra/Peddatopra village, Shamshabad Mandal, Ranga Reddy District. The layout approval describes an open layout: it is not an apartment or multi-tower scheme. RERA record
The project record describes a total site area of 50,709.62 sq. m, including 371.82 sq. m of road-affected land, and a net layout area of 50,337.80 sq. m. The HMDA draft approval identifies residential plot use and allocates areas for plots, internal roads, park/open space and social infrastructure. It also records a mortgage of specified plots to HMDA pending completion of layout infrastructure and release of the mortgage. RERA filing
The HMDA document is a draft layout approval, not evidence that all required works are complete or that final layout plans have been released. RERA-filed progress entries show internal roads and footpaths at 30 and several other listed infrastructure categories at 0; these figures are promoter-filed status entries and have not been independently verified as on-site progress. No final layout release or occupancy/completion certificate is included in the supplied documents. RERA amenities
3. Master plan, architecture & building design
This is a plotted layout, so the relevant design evidence concerns plot land use, roads and open areas rather than building plans, floor configurations or tower organization. The HMDA approval describes residential plot use and an open layout in Survey Nos. 106/P and 114/P. The approved net layout area is stated as 50,337.80 sq. m, following deduction of 371.82 sq. m for the road-affected area from the 50,709.62 sq. m total site area.
The layout records identify 29,348.23 sq. m as plotted area, 15,240.68 sq. m as layout-road area, 4,488.92 sq. m as park/open space, and 1,259.25 sq. m as social infrastructure. The layout drawing’s software-extracted land-use table separately labels 4,488.92 sq. m “Organized open space/park Area/Utility Area”; verify the drawing text and area statement directly before relying on that wording. Layout record
HMDA’s draft approval refers to roads of 9.00 m, 18 m and 30 m in the extracted approval records; the RERA boundary field describes the western boundary as a 9 MTS WIDE ROAD. The approval also requires roads to remain open for access to neighbouring sites and specifies infrastructure works. No apartment building count, building footprint, floors, lifts, stairs or parking levels are evidenced for this plotted project. RERA filing
The RERA field “Approved Built up Area” gives 29,348.23 sq. m, while the layout extraction identifies the same figure as plotted area. These labels are reported as filed; no separate building gross area, FSI-counted area, saleable area or carpet area is established for the layout. RERA filing Layout record
4. Homes, configurations & floor plans
The registered offering is plots, not flats or villas. The supplied records do not establish a complete plot inventory, plot-size bands, booked/available counts or plot-wise saleable areas. The layout extraction reports plots_complete: false and plots_with_size: 0; therefore no plot configuration table with counts or size ranges can be reliably presented. RERA record Layout record
The HMDA approval identifies plots 133 to 138 and 140 to 157 as the plots mortgaged to HMDA, but this is not a complete plot schedule or evidence of individual allotment status.
A RERA-filed allotment-letter document refers to a proposed plot, but the supplied summary does not provide a complete plot inventory or a verified plot-size schedule. The supplied floor-plan record concerns two drawings, with one scan pending and no measured plans; it does not establish home configurations or measured carpet areas for this plotted development. Floor plans
5. Parking & vehicle circulation
The supplied records do not give a count or allocation of resident, visitor or accessible parking spaces. They also do not identify parking bays as exclusive to any purchaser.
For vehicle circulation, the HMDA draft layout refers to internal layout roads, including a recorded road area of 15,240.68 sq. m, and requires roads to remain open for access to neighbouring sites. The approval extraction refers to road widths of 9.00 m, 18 m and 30 m; no specific driveway, ramp, pedestrian-separation or EV-charging design is evidenced in the supplied material.
6. Amenities, recreation & open spaces
The following table separates facilities listed in the HMDA draft approval from RERA-filed progress entries. Progress figures are the values entered in the supplied RERA amenities record; they are not independent site verification. RERA amenities
| Description / size | Layout records 4,488.92 sq. m as park/open space; the RERA amenities list includes “Green Strip/TOT LOT/Park.” |
|---|---|
| Evidence source | RERA amenities |
| Declared progress / verified status | RERA amenities entry marked “YES,” progress 0; not independently verified complete. |
| Description / size | Listed as a layout feature; no separate size or equipment schedule supplied. |
|---|---|
| Declared progress / verified status | No completion evidence supplied. |
| Description / size | 1,259.25 sq. m; the supplied layout record does not specify the facility or building use within this allocation. |
|---|---|
| Declared progress / verified status | Area is in the approval extraction; development or handover status is not established. |
| Description / size | Layout-road area 15,240.68 sq. m; HMDA approval requires roads and footpaths and road access to neighbouring sites. |
|---|---|
| Evidence source | RERA amenities |
| Declared progress / verified status | RERA amenities entry marked “YES,” progress 30; not independently verified complete. |
| Description / size | Required in the layout approval; no area or quantity provided. |
|---|---|
| Declared progress / verified status | No completion evidence supplied. |
| Description / size | Listed among the draft approval infrastructure requirements; no length or layout detail supplied. |
|---|---|
| Declared progress / verified status | No completion evidence supplied. |
| Description / size | Appears in the RERA amenities list; no facility description or size supplied. |
|---|---|
| Evidence source | RERA amenities |
| Declared progress / verified status | Progress 0; no completion evidence supplied. |
7. Utilities, building services & safety
The HMDA draft approval lists infrastructure requirements for the layout. These are approval conditions and proposed provisions; the supplied records do not establish that they have been completed or independently inspected.
| Evidence in the project record | A water sump is listed in the layout extraction. The HMDA conditions call for drinking-water connectivity and internal water-supply pipelines and an overhead tank. |
|---|---|
| Status limitation | No water source, storage capacity, treatment details or independently verified completion evidence supplied. |
| Evidence in the project record | The HMDA record refers to underground drainage and a common septic tank/STP; the RERA amenities list includes sewerage and storm-water drains. |
|---|---|
| Status limitation | No treatment capacity, reuse details or completion verification supplied. RERA amenities |
| Evidence in the project record | HMDA approval lists rainwater-harvesting pits and an underground storm-water drainage system. |
|---|---|
| Status limitation | No capacity or completion verification supplied. |
| Evidence in the project record | HMDA conditions list underground utility ducting, electrical supply lines, a transformer yard and LED street lighting. |
|---|---|
| Status limitation | No supply capacity, backup provision or completion verification supplied. |
| Evidence in the project record | HMDA conditions refer to space for waste disposal, source segregation and a bio-compost unit. |
|---|---|
| Status limitation | No capacity or operating-status evidence supplied. |
| Evidence in the project record | A fire-protection category appears in the RERA amenities list, with progress 0. |
|---|---|
| Status limitation | No project-specific fire-system design, clearance or completion evidence supplied. RERA amenities |
| Evidence in the project record | HMDA conditions refer to paved footpaths and keeping roads open for access. |
|---|---|
| Status limitation | No accessible-route or ramp details are supplied. |
8. Location, access & connectivity
The registered location is Pedda Thupra, Shamshabad Mandal, Ranga Reddy District, Telangana, PIN 509325, in Survey Nos. 106/P and 114/P. The HMDA approval identifies the site as Peddatopra village and places it in the extended area of erstwhile HUDA (HMDA). RERA record
The registered western boundary is a 9 MTS WIDE ROAD. The draft layout approval also references layout roads and a 30 Mts wide road affected-area dedication. A location dataset lists the nearest sampled Outer Ring Road interchange at approximately 15.6 km from the cadastral parcel reference; this is a measured dataset distance, not a travel-time estimate. RERA filing Location record
The supplied records do not provide public-transport details or distances to schools, hospitals, retail centres or other landmarks. The project’s cadastral reference is a parcel centroid, not a verified entrance or route point. Location record
9. Developer & development status
The registered promoter is VAIBHAVI GREEN FIELDS. The promoter is identified in the project data as a partnership; the supplied corporate record gives GSTIN 36AATFV8671M1ZZ. RERA record Corporate record Parties record
The RERA certificate lists the promoter address as Village: Phase – Ii, Mandal: Kukatpally, District: Medchal-Malkajgiri, Pin: 500072. The project’s own RERA address fields separately identify the project at Pedda Thupra, Shamshabad, Ranga Reddy, PIN 509325. No official promoter website or contact details are established in the supplied project records. RERA filing
The project header records proposed completion as 30/11/2026; Form B contains an unclear extracted completion-date string and should be checked against the signed document. The HMDA approval requires layout development works to be completed within three years and requires a requisition for release of mortgage plots/area. The available material does not establish completion of those works, release of the mortgage plots or issuance of final layout plans. RERA record
10. Approvals, official records & documents
| Supplied evidence | Certificate for P02400007798; validity stated as 1 March 2024–31 July 2026 unless extended. |
|---|---|
| What it establishes / limitation | Establishes project registration and certificate conditions; it is not a plot conveyance. |
| Supplied evidence | 000148/LO/Plg/HMDA/2023, dated 09 August 2023; application/file reference 056634/SMD/LT/U6/HMDA/06092022. |
|---|---|
| What it establishes / limitation | Supplied record describes a draft layout approval and conditions; it does not establish final layout release or completion of required works. |
| Supplied evidence | HMDA draft layout letter for Survey Nos. 106/P and 114/P, Peddatopra, extent 50,337.8 sq. m. |
|---|---|
| What it establishes / limitation | Records land-use areas, infrastructure requirements and HMDA mortgage conditions. |
| Supplied evidence | Document No. 2764/2023, dated 1 April 2023, covering 4,471.86 sq. m in plots 133 to 138 and 140 to 157, in favour of the Metropolitan Commissioner, HMDA. |
|---|---|
| What it establishes / limitation | The approval describes the mortgage as security for layout infrastructure and conditions; release evidence is not supplied. |
| Supplied evidence | Document No. 5398/2023, dated 7 July 2023, for 371.82 sq. m in the proposed 30 m road, stated as handed over to the local body. |
|---|---|
| What it establishes / limitation | The layout record cites the registered gift deed; no separate current local-body record is included. |
| Supplied evidence | Declaration by authorized signatory PATOLLA CHENNA REDDY, dated as extracted 3/St day of December 2023. |
|---|---|
| What it establishes / limitation | Contains promoter declarations about title, encumbrances, project completion and fund handling; the completion-date text is unclear in the extraction. |
| Supplied evidence | RERA-filed allotment-letter document for a proposed plot. |
|---|---|
| What it establishes / limitation | The supplied summary says an agreement for sale and later conveyance/sale deed are to be executed; the letter itself does not establish completed title transfer. |
| Supplied evidence | Partially completed RERA-form agreement for sale. |
|---|---|
| What it establishes / limitation | Allottee, plot particulars, price and RERA registration number are blank in the supplied extraction. |
| Supplied evidence | Not provided in the supplied documents. |
|---|---|
| What it establishes / limitation | The supplied evidence does not establish final layout release or an occupancy/completion certificate. |
1. Project at a glance
Project identity
Registered project name: VAIBHAVIS VISTAARA
Project type: Plotted development / open residential layout
Phase or registered portion: A single registered project is identified; a separate phase name or phase boundary is not disclosed.
TG-RERA registration: P02400007798
Registration validity: 1 March 2024–31 July 2026, unless extended by the Authority. This is the registration-validity period, not a statement of completion or occupancy status.
Registered promoter: VAIBHAVI GREEN FIELDS; the registration certificate names the promoter as Vaibhavi Green Fields. The project Form-B declaration refers to “M/s. VAIBHAVI GREEN FIELDS AND OTHERS.”
RERA status in supplied record: The project is registered. The certificate states its validity dates and requires quarterly updates; current RERA status beyond the supplied certificate is not established here.
Land and geographic identity
Revenue village: Pedda Thupra; also rendered in project records as Peddatopra, Peddatoopra and pedda thupra.
Locality: Pedda Thupra / Peddatopra, Shamshabad Mandal; HMDA approval describes the area as “Extended area of Erstwhile HUDA (HMDA).”
Mandal / district / PIN: Shamshabad / Ranga Reddy / 509325
Project survey numbers: 106/P and 114/P (also styled Sy. Nos. 106/P and 114/P in the approval documents). No further project subdivision is stated in the registration certificate or layout approval.
Registered site extent: 50,709.62 sq. m total site area; 371.82 sq. m is identified as road-affected area; 50,337.80 sq. m net site area.
Layout land-use figures: 29,348.23 sq. m plotted area; 15,240.68 sq. m layout roads; 4,488.92 sq. m park/open space; and 1,259.25 sq. m social infrastructure. These are figures stated in the layout approval record.
Boundaries filed with RERA: East: neighbours’ land; West: 9 MTS WIDE ROAD; North: neighbours’ land; South: neighbours’ land.
Location reference: Cadastral parcel centroid: 17.15564501734732, 78.30520687252005. This is a parcel-centroid reference, not a surveyed project entrance location.
Development identity
Sanctioning authority: Hyderabad Metropolitan Development Authority (HMDA). The draft layout letter is addressed to the Peddatopra local authority for further action and plan release.
Principal approval: HMDA layout approval 000148/LO/Plg/HMDA/2023, dated 09 August 2023.
Application/file reference: 056634/SMD/LT/U6/HMDA/06092022
Approved built-up area: 29,348.23 sq. m is recorded in the RERA fields as “Approved Built up Area”; the layout drawing extraction identifies 29,348.23 sq. m as plotted area. These labels are retained as recorded; the figure is not treated here as a building floor-area measurement.
Buildings, floors and parking levels: Not disclosed as building or floor configurations in the supplied evidence; this is a plotted layout, not an apartment-building proposal.
Plot count: The HMDA draft approval identifies plots 133 to 138 and 140 to 157 as mortgage plots (23 plots); a complete count of all sale plots is not established by the supplied records.
Parking provision: A separate parking-space count or parking allocation is not disclosed in the supplied records.
Offering and status
Offering: Residential plots; plot-size bands and a complete plot schedule are not available in the supplied evidence.
Booked / available plots: Counts are not supplied. The layout extraction says the plot list is incomplete and contains no plot-size measurements.
Completion date: The header records proposed completion as 30/11/2026. The Form-B declaration’s extracted text contains an unclear completion-date string (“315 Suly 2026”); the exact declaration date is not reliably legible in the supplied extraction.
Development stage: RERA-filed amenity fields mark several infrastructure categories “YES,” but their reported progress values are 0 except internal roads and footpaths at 30. These are filed progress entries, not independently verified site-completion measurements.
Final layout / occupancy status: The supplied HMDA document is described as a draft layout and sets conditions for development and release of final layout plans. No final layout release or occupancy/completion certificate is provided in the supplied records.
2. The project story
VAIBHAVIS VISTAARA is registered with TG-RERA as a plotted residential development on land identified in the registration and HMDA layout records as Survey Nos. 106/P and 114/P, at Pedda Thupra/Peddatopra village, Shamshabad Mandal, Ranga Reddy District. The layout approval describes an open layout: it is not an apartment or multi-tower scheme.
The project record describes a total site area of 50,709.62 sq. m, including 371.82 sq. m of road-affected land, and a net layout area of 50,337.80 sq. m. The HMDA draft approval identifies residential plot use and allocates areas for plots, internal roads, park/open space and social infrastructure. It also records a mortgage of specified plots to HMDA pending completion of layout infrastructure and release of the mortgage.
The HMDA document is a draft layout approval, not evidence that all required works are complete or that final layout plans have been released. RERA-filed progress entries show internal roads and footpaths at 30 and several other listed infrastructure categories at 0; these figures are promoter-filed status entries and have not been independently verified as on-site progress. No final layout release or occupancy/completion certificate is included in the supplied documents.
3. Master plan, architecture & building design
This is a plotted layout, so the relevant design evidence concerns plot land use, roads and open areas rather than building plans, floor configurations or tower organization. The HMDA approval describes residential plot use and an open layout in Survey Nos. 106/P and 114/P. The approved net layout area is stated as 50,337.80 sq. m, following deduction of 371.82 sq. m for the road-affected area from the 50,709.62 sq. m total site area.
The layout records identify 29,348.23 sq. m as plotted area, 15,240.68 sq. m as layout-road area, 4,488.92 sq. m as park/open space, and 1,259.25 sq. m as social infrastructure. The layout drawing’s software-extracted land-use table separately labels 4,488.92 sq. m “Organized open space/park Area/Utility Area”; verify the drawing text and area statement directly before relying on that wording.
HMDA’s draft approval refers to roads of 9.00 m, 18 m and 30 m in the extracted approval records; the RERA boundary field describes the western boundary as a 9 MTS WIDE ROAD. The approval also requires roads to remain open for access to neighbouring sites and specifies infrastructure works. No apartment building count, building footprint, floors, lifts, stairs or parking levels are evidenced for this plotted project.
The RERA field “Approved Built up Area” gives 29,348.23 sq. m, while the layout extraction identifies the same figure as plotted area. These labels are reported as filed; no separate building gross area, FSI-counted area, saleable area or carpet area is established for the layout.
4. Homes, configurations & floor plans
The registered offering is plots, not flats or villas. The supplied records do not establish a complete plot inventory, plot-size bands, booked/available counts or plot-wise saleable areas. The layout extraction reports plots_complete: false and plots_with_size: 0; therefore no plot configuration table with counts or size ranges can be reliably presented.
The HMDA approval identifies plots 133 to 138 and 140 to 157 as the plots mortgaged to HMDA, but this is not a complete plot schedule or evidence of individual allotment status.
A RERA-filed allotment-letter document refers to a proposed plot, but the supplied summary does not provide a complete plot inventory or a verified plot-size schedule. The supplied floor-plan record concerns two drawings, with one scan pending and no measured plans; it does not establish home configurations or measured carpet areas for this plotted development.
5. Parking & vehicle circulation
The supplied records do not give a count or allocation of resident, visitor or accessible parking spaces. They also do not identify parking bays as exclusive to any purchaser.
For vehicle circulation, the HMDA draft layout refers to internal layout roads, including a recorded road area of 15,240.68 sq. m, and requires roads to remain open for access to neighbouring sites. The approval extraction refers to road widths of 9.00 m, 18 m and 30 m; no specific driveway, ramp, pedestrian-separation or EV-charging design is evidenced in the supplied material.
6. Amenities, recreation & open spaces
The following table separates facilities listed in the HMDA draft approval from RERA-filed progress entries. Progress figures are the values entered in the supplied RERA amenities record; they are not independent site verification.
| Description / size | Layout records 4,488.92 sq. m as park/open space; the RERA amenities list includes “Green Strip/TOT LOT/Park.” |
|---|---|
| Declared progress / verified status | RERA amenities entry marked “YES,” progress 0; not independently verified complete. |
| Description / size | Listed as a layout feature; no separate size or equipment schedule supplied. |
|---|---|
| Declared progress / verified status | No completion evidence supplied. |
| Description / size | 1,259.25 sq. m; the supplied layout record does not specify the facility or building use within this allocation. |
|---|---|
| Declared progress / verified status | Area is in the approval extraction; development or handover status is not established. |
| Description / size | Layout-road area 15,240.68 sq. m; HMDA approval requires roads and footpaths and road access to neighbouring sites. |
|---|---|
| Declared progress / verified status | RERA amenities entry marked “YES,” progress 30; not independently verified complete. |
| Description / size | Required in the layout approval; no area or quantity provided. |
|---|---|
| Declared progress / verified status | No completion evidence supplied. |
| Description / size | Listed among the draft approval infrastructure requirements; no length or layout detail supplied. |
|---|---|
| Declared progress / verified status | No completion evidence supplied. |
| Description / size | Appears in the RERA amenities list; no facility description or size supplied. |
|---|---|
| Declared progress / verified status | Progress 0; no completion evidence supplied. |
7. Utilities, building services & safety
The HMDA draft approval lists infrastructure requirements for the layout. These are approval conditions and proposed provisions; the supplied records do not establish that they have been completed or independently inspected.
| Evidence in the project record | A water sump is listed in the layout extraction. The HMDA conditions call for drinking-water connectivity and internal water-supply pipelines and an overhead tank. |
|---|---|
| Status limitation | No water source, storage capacity, treatment details or independently verified completion evidence supplied. |
| Evidence in the project record | The HMDA record refers to underground drainage and a common septic tank/STP; the RERA amenities list includes sewerage and storm-water drains. |
|---|---|
| Status limitation | No treatment capacity, reuse details or completion verification supplied. |
| Evidence in the project record | HMDA approval lists rainwater-harvesting pits and an underground storm-water drainage system. |
|---|---|
| Status limitation | No capacity or completion verification supplied. |
| Evidence in the project record | HMDA conditions list underground utility ducting, electrical supply lines, a transformer yard and LED street lighting. |
|---|---|
| Status limitation | No supply capacity, backup provision or completion verification supplied. |
| Evidence in the project record | HMDA conditions refer to space for waste disposal, source segregation and a bio-compost unit. |
|---|---|
| Status limitation | No capacity or operating-status evidence supplied. |
| Evidence in the project record | A fire-protection category appears in the RERA amenities list, with progress 0. |
|---|---|
| Status limitation | No project-specific fire-system design, clearance or completion evidence supplied. |
| Evidence in the project record | HMDA conditions refer to paved footpaths and keeping roads open for access. |
|---|---|
| Status limitation | No accessible-route or ramp details are supplied. |
8. Location, access & connectivity
The registered location is Pedda Thupra, Shamshabad Mandal, Ranga Reddy District, Telangana, PIN 509325, in Survey Nos. 106/P and 114/P. The HMDA approval identifies the site as Peddatopra village and places it in the extended area of erstwhile HUDA (HMDA).
The registered western boundary is a 9 MTS WIDE ROAD. The draft layout approval also references layout roads and a 30 Mts wide road affected-area dedication. A location dataset lists the nearest sampled Outer Ring Road interchange at approximately 15.6 km from the cadastral parcel reference; this is a measured dataset distance, not a travel-time estimate.
The supplied records do not provide public-transport details or distances to schools, hospitals, retail centres or other landmarks. The project’s cadastral reference is a parcel centroid, not a verified entrance or route point.
9. Developer & development status
The registered promoter is VAIBHAVI GREEN FIELDS. The promoter is identified in the project data as a partnership; the supplied corporate record gives GSTIN 36AATFV8671M1ZZ.
The RERA certificate lists the promoter address as Village: Phase – Ii, Mandal: Kukatpally, District: Medchal-Malkajgiri, Pin: 500072. The project’s own RERA address fields separately identify the project at Pedda Thupra, Shamshabad, Ranga Reddy, PIN 509325. No official promoter website or contact details are established in the supplied project records.
The project header records proposed completion as 30/11/2026; Form B contains an unclear extracted completion-date string and should be checked against the signed document. The HMDA approval requires layout development works to be completed within three years and requires a requisition for release of mortgage plots/area. The available material does not establish completion of those works, release of the mortgage plots or issuance of final layout plans.
10. Approvals, official records & documents
| Supplied evidence | Certificate for P02400007798; validity stated as 1 March 2024–31 July 2026 unless extended. |
|---|---|
| What it establishes / limitation | Establishes project registration and certificate conditions; it is not a plot conveyance. |
| Supplied evidence | 000148/LO/Plg/HMDA/2023, dated 09 August 2023; application/file reference 056634/SMD/LT/U6/HMDA/06092022. |
|---|---|
| What it establishes / limitation | Supplied record describes a draft layout approval and conditions; it does not establish final layout release or completion of required works. |
| Supplied evidence | HMDA draft layout letter for Survey Nos. 106/P and 114/P, Peddatopra, extent 50,337.8 sq. m. |
|---|---|
| What it establishes / limitation | Records land-use areas, infrastructure requirements and HMDA mortgage conditions. |
| Supplied evidence | Document No. 2764/2023, dated 1 April 2023, covering 4,471.86 sq. m in plots 133 to 138 and 140 to 157, in favour of the Metropolitan Commissioner, HMDA. |
|---|---|
| What it establishes / limitation | The approval describes the mortgage as security for layout infrastructure and conditions; release evidence is not supplied. |
| Supplied evidence | Document No. 5398/2023, dated 7 July 2023, for 371.82 sq. m in the proposed 30 m road, stated as handed over to the local body. |
|---|---|
| What it establishes / limitation | The layout record cites the registered gift deed; no separate current local-body record is included. |
| Supplied evidence | Declaration by authorized signatory PATOLLA CHENNA REDDY, dated as extracted 3/St day of December 2023. |
|---|---|
| What it establishes / limitation | Contains promoter declarations about title, encumbrances, project completion and fund handling; the completion-date text is unclear in the extraction. |
| Supplied evidence | RERA-filed allotment-letter document for a proposed plot. |
|---|---|
| What it establishes / limitation | The supplied summary says an agreement for sale and later conveyance/sale deed are to be executed; the letter itself does not establish completed title transfer. |
| Supplied evidence | Partially completed RERA-form agreement for sale. |
|---|---|
| What it establishes / limitation | Allottee, plot particulars, price and RERA registration number are blank in the supplied extraction. |
| Supplied evidence | Not provided in the supplied documents. |
|---|---|
| What it establishes / limitation | The supplied evidence does not establish final layout release or an occupancy/completion certificate. |
Frequently asked questions
Is VAIBHAVIS VISTAARA registered with Telangana RERA?
Yes. VAIBHAVIS VISTAARA is registered with the Telangana Real Estate Regulatory Authority as P02400007798; the registration status is New Project.
Who is the developer of VAIBHAVIS VISTAARA?
The promoter named in the RERA registration is VAIBHAVI GREEN FIELDS.
Where is VAIBHAVIS VISTAARA located?
VAIBHAVIS VISTAARA is in Pedda Thupra, Shamshabad, Rangareddy, Telangana (509325).
When will VAIBHAVIS VISTAARA be completed?
The promoter's proposed date of completion filed with RERA is 30/11/2026. This is the promoter's declaration, not a guarantee.
More projects in Pedda Thupra