Sign in

English County

GREENHOMEFARMSANDRESORTSPRIVATELIMITED · Rangareddy · RERA P02400001290

ENGLISH COUNTY is a plotted development in Shamshabad / Pedda Thupra, Shamshabad mandal, Ranga Reddy district, developed by registered promoter GREENHOMEFARMSANDRESORTSPRIVATELIMITED. The TG-RERA record lists a total land area of 113165.29 sq.m and a net area of 105886.54 sq.m; no tower or block count, floor configuration, plot count, or plot-size range is disclosed. The registered offering is residential plots. It is registered under TG-RERA **P02400001290**, issued 19/10/2019, and the promoter’s Form B declares completion by **30 APRIL 2025**.

01What we found

Period endedTG-RERA registration ran to 30 Apr 2025 - check its extension on TG-RERA
16documents on file - each fact links to its page
0court cases on this project's land in the court records searched
9items to check - 4 high

Read from TG-RERA filings, approvals, land and registration records and court records. A court case is counted only when the court record states this project's survey number with its village, or names the project.

02Check before you pay

9 items to check before you pay, 4 high - from the title chain, court records and approvals, each with what to ask the builder or your advocate. An item may not be a problem with the project: records can be incomplete.

Sign in to see each item and what to do

1. Project at a glance

Project identity

ItemRecord
Registered project nameENGLISH COUNTY
Project typePlotted development / residential open-plotted layout RERA record
Phase / registered portionNo separate phase designation is disclosed; the registration covers the listed surveys
TG-RERA registrationP02400001290; issued 19/10/2019 under section 5
Registration validity19/10/2019–30/04/2025, stated as five years; the supplied certificate records no extension
Registered promoterGREENHOMEFARMSANDRESORTSPRIVATELIMITED
RERA status in supplied recordRegistration period ended 30/04/2025; current post-expiry status is not disclosed

Land and geographic identity

ItemRecord
LocalityShamshabad / Pedda Thupra RERA record
Revenue villagePedda Thupra (also rendered “pedda thupra” in the registration record and “Peddatopra” in the HMDA intimation) RERA record
MandalShamshabad RERA record
DistrictRanga Reddy RERA record
PIN500004 RERA record
All project survey numbers in the registration85, 86, 90, 91, 106, 107, 108, 109, 110, 111, 112, 113 and 114
SubdivisionsNo project-specific subdivision schedule is disclosed in the registration record; cadastral records include subdivisions, but do not establish which subdivision rows correspond to the project’s holdings Cadastral map
Registered site extentThe RERA record lists 113165.29 sq.m total area and 105886.54 sq.m net area; the difference is recorded as 7278.75 sq.m affected by road widening/FTL/nala widening RERA filing
Layout area in HMDA intimation1,05,886.54 Sq. Mt.
BoundariesEast: neighbours’ land; west: plots; north: plots; south: neighbours’ land RERA filing

Development identity

ItemRecord
Authority named in RERA project informationGHMC RERA filing
Principal authority document suppliedHMDA Planning Department intimation for application 018132/SMD/LT/U6/HMDA/10122018, dated application 10/12/2018; it describes itself as an intimation to pay charges and meet precedent conditions, and expressly says it is not approval of the proposal or permission for development Approvals record
Approved built-up area66749.53 sq.m is recorded in the RERA filing’s built-up area details; the supplied materials do not establish this as a final HMDA-approved built-up area RERA filing
Building / block count and floor configurationNot disclosed; this is a plotted layout, and no building or floor schedule is supplied Document index
Parking levels / sanctioned parking countNot disclosed in the supplied project records Document index
Layout land-use figuresPlots: 66749.53 sq.m; roads: 27937.48 sq.m; parks/open space: 8406.37 sq.m; social infrastructure: 2793.15 sq.m; amenities: 0.00 sq.m. These are drawing-derived figures and the plot/area reading should be checked against the layout drawing Layout record

Offering and status

ItemRecord
Offered productResidential plots; no RERA-filed plot count, individual plot schedule, or RERA-filed plot-size range is supplied RERA record Document index
Booked / available countsNot disclosed in the supplied records Document index
Construction / development stageNo independent site-progress evidence is supplied. RERA registration certificate status alone does not establish physical completion Document index
Completion deadlinePromoter Form B declares completion by 30 APRIL 2025
Registration expiry30/04/2025; separate from the completion undertaking
Occupancy / completion certificateNot supplied; OC/CC status is not established Document index

2. The project story

ENGLISH COUNTY is registered as a plotted residential development in the Pedda Thupra area of Shamshabad, Ranga Reddy district. The registered land identity spans survey numbers 85, 86, 90, 91, 106 and 107–114. The RERA filing records 113165.29 sq.m as total site area, with 105886.54 sq.m as net area after the stated affected area. RERA record RERA filing

The supplied layout-derived area statement allocates land to plots, roads, parks/open space and social infrastructure. The layout drawing itself was not machine-read into a complete plot schedule: no plot count or plot-size schedule can therefore be confirmed here. Layout record

The promoter’s Form B declares a completion undertaking of 30 April 2025. The supplied record contains no site inspection or independently verified progress figure, and no occupancy/completion certificate. Accordingly, this overview cannot establish whether the layout’s works are complete or whether any portion has been certified complete. Document index

3. Master plan, architecture & building design

This is a plotted layout, not a tower or apartment scheme in the supplied records. The layout-derived land-use statement reports 66749.53 sq.m for plots, 27937.48 sq.m for roads, 8406.37 sq.m for parks/open space and 2793.15 sq.m for social infrastructure, with 0.00 sq.m shown for amenity area. The figures are software-read from the layout drawing’s area statement and should be verified against the drawing. Layout record

The HMDA intimation refers to a residential open-plotted draft layout and specifies 30 mtrs road width; it is an intimation with charges and precedent conditions, not a final layout approval or development permission. No building arrangement, plot-by-plot dimensions, final sanctioned layout plan, or approved building design is established by the supplied materials. Document index

4. Homes, configurations & floor plans

The registered offering is plotted development. No RERA-filed unit-type count, plot inventory, plot-size bands, booked/available figures, or saleable-area schedule is present in the supplied evidence. The available layout sheets were not successfully measured for individual plot sizes. RERA record Document index Layout record

The developer-site/vendor materials list plot-size claims, but these are not used here as RERA-filed offering details. Promoter website

5. Parking & vehicle circulation

The supplied RERA and HMDA materials do not establish the number or allocation of resident, visitor, accessible, or other parking spaces, or any parking-level arrangement. The layout area statement identifies 27937.48 sq.m of roads; the HMDA intimation refers to 30 mtrs road width and says the applicant is to form the BT road before release of draft layout plans. Neither item establishes completed roads or individual plot parking rights. Layout record

6. Amenities, recreation & open spaces

FacilityDescription / sizeEvidence sourceDeclared progress / verified status
Parks / open space8406.37 sq.m; layout-derived area statementLayout recordArea allocation shown; completion not verified
Roads27937.48 sq.m; HMDA intimation also refers to 30 mtrs road widthLayout recordArea/condition recorded; delivery not verified
Social infrastructure2793.15 sq.mLayout recordArea allocation shown; facility type and completion not established
Community buildingsListed in the RERA amenities record without an “available” value or descriptionRERA amenitiesProgress shown as 0%; no completion evidence supplied
Green strip / tot lot / parkListed as available “YES” in the RERA amenities record; no size or completion evidence suppliedRERA amenitiesFiling entry only; independently verified completion not established

The developer-site/vendor materials mention additional recreational and community features, but they are not treated as RERA-filed or delivered amenities in this overview. Promoter website

7. Utilities, building services & safety

The RERA amenities record lists water supply, sewerage (chamber, lines, septic tank and STP), storm-water drains, street lighting, solid-waste management, rainwater harvesting, energy management, and an electrical meter room/sub-station/receiving station as “YES” where a value is supplied. The record shows 0% progress for the listed amenities; it does not establish that the services are complete or operating. RERA amenities

The HMDA intimation states that the applicant shall provide an STP and septic tank to standard specification, follow fire-service department norms, and form the BT road before release of draft layout plans. It also states that HMWS&SB and T.S. Transco are not to provide permanent connections until an occupancy certificate from the sanctioning authority is produced. These are recorded conditions, not proof of completion or statutory compliance.

No supplied project evidence establishes water-source capacity, storage capacity, STP capacity, reuse arrangements, electrical backup capacity, fire-system design or approvals, waste-processing details, security systems, or accessibility provisions. RERA amenities Document index

8. Location, access & connectivity

The registered location is Pedda Thupra, Shamshabad, Ranga Reddy, PIN 500004. The supplied cadastral geocode identifies the parcel centroid as 17.32220, 78.64565. RERA record Location record

The location data identifies the nearest sampled Outer Ring Road interchange at approximately 2.7 km. Location record The supplied evidence does not provide a verified project approach-road route, public-transport service details, or measured distances to other landmarks. Location record

9. Developer & development status

The registered promoter is GREENHOMEFARMSANDRESORTSPRIVATELIMITED, identified as a company/public limited entity in the project data. The registration certificate gives the promoter office as Village Bapuji Nagar, Mandal Musheerabad, District Hyderabad, PIN 500004. RERA record Corporate record

The Form B declaration names GREEN HOME FARMS&RESORTS PVT.LTD and states a completion undertaking of 30 April 2025. It also contains declarations concerning project funds, audits, pending approvals and nondiscrimination. These are promoter declarations, not independent confirmation of performance or completion.

No extension is recorded in the supplied registration certificate, and no site-verified progress or occupancy/completion certificate is supplied. The current RERA registration status after its recorded validity end date is not established by the evidence provided. Document index

10. Approvals, official records & documents

RecordWhat it establishes in the supplied evidence
TG-RERA Form C, P02400001290Registration of ENGLISH COUNTY under section 5, issued 19/10/2019 and stated valid through 30/04/2025; certificate includes the separate-account condition.
HMDA Planning Department intimation, application 018132/SMD/LT/U6/HMDA/10122018Intimation concerning charges and precedent conditions for a residential open-plotted draft layout; expressly not approval or permission for development.
Promoter Form BPromoter declaration, dated 30 April 2019, including the 30 April 2025 completion undertaking and other statutory declarations.
Layout drawing and derived area statementTwo layout sheets are recorded; the area statement is drawing-derived, while individual plot count and sizes are not established. Layout record
Occupancy/completion certificateNot present in the supplied project documents. Document index

The supplied records do not establish a final approved layout plan, an approval release following satisfaction of the HMDA intimation’s conditions, or an occupancy/completion certificate.

Frequently asked questions

Is ENGLISH COUNTY registered with Telangana RERA?

Yes. ENGLISH COUNTY is registered with the Telangana Real Estate Regulatory Authority as P02400001290; the registration status is New Project.

Who is the developer of ENGLISH COUNTY?

The promoter named in the RERA registration is GREENHOMEFARMSANDRESORTSPRIVATELIMITED.

Where is ENGLISH COUNTY located?

ENGLISH COUNTY is in Shamshabad, pedda thupra, Rangareddy, Telangana (500004).

When will ENGLISH COUNTY be completed?

The promoter's proposed date of completion filed with RERA is 30/04/2025. This is the promoter's declaration, not a guarantee.

More projects in Pedda Thupra