V.R.INFRA.VIKYATH ICONIA.2
V.R.INFRA · Medchal-Malkajgiri · RERA P02200008716
V.R.INFRA.VIKYATH ICONIA.2 is a residential apartment project in Sai Krishnaja Hills, Bachupally mandal, Medchal-Malkajgiri district, developed by registered promoter V.R.Infra / V.R.INFRA. The project is on 1052.84 sqmts of land and comprises one building with 1 Stilt + 5 upper floors and 10 homes, filed as “DOUBLE” and normalised as 2BHK. It is registered under TG-RERA number P02200008716, with a proposed completion date of 30/11/2026.
More from V R Infra · 6 projects →
01What we found
Read from TG-RERA filings, approvals, land and registration records and court records. A court case is counted only when the court record states this project's survey number with its village, or names the project.
02Check before you pay
8 items to check before you pay, 3 high - from the title chain, court records and approvals, each with what to ask the builder or your advocate. An item may not be a problem with the project: records can be incomplete.
1. Project at a glance
Project identity
| Item | Project record |
|---|---|
| Registered name | V.R.INFRA.VIKYATH ICONIA.2 RERA record |
| Project type / phase | Residential apartment project; the registration covers the building on the stated site. A separate phase name or phase number is not disclosed. RERA record |
| TG-RERA registration | P02200008716; registration certificate records validity from 18/06/2024 to 31/07/2026, unless extended by the Authority. RERA record |
| Registered promoter | V.R.Infra / V.R.INFRA; entity type recorded as partnership. RERA record Corporate record |
| RERA status | On-going project in the project record. RERA record |
| Completion deadline | RERA record gives 30/11/2026 as the proposed and revised proposed completion date. Registration validity and the completion deadline are separate entries. RERA record |
| Occupancy status | An occupancy certificate is on file for the residential building at Plot Nos. 111/PART and 112/PART, Bachupally; certificate scope and details are indexed below. |
Land and geographic identity
| Item | Project record |
|---|---|
| Locality | Sai Krishnaja Hills RERA record RERA filing |
| Revenue village | Bachupally RERA record Land records |
| Mandal / district / PIN | Bachupally / Medchal-Malkajgiri / 500090 RERA record |
| Survey numbers | Sy. Nos. 300 PART, 302 and 309 PART RERA record Land records |
| Plot identifiers | Plot Nos. 111/PART and 112/PART RERA filing |
| Registered site extent | 312.10 Sq. Mt. in the building-permit documents; RERA land details separately record total area and net area as 1052.84 sqmts. RERA filing |
| Boundaries recorded in RERA land details | North: “OPEN TO SKY AND REMAINING PART IN FIFTH FLOOR”; South: “OPEN TO SKY”; East: “OPEN TO SKY AND REMAINING PART IN FIFTH FLOOR”; West: “OPEN TO SKY”. RERA filing |
Development identity
| Item | Project record |
|---|---|
| Sanctioning authority / principal permit | Building Permit Order 004399/BP/HMDA/0944/MED/2024, dated 18 June, 2024; issued by Nizampet Municipal Corporation and based on HMDA proceedings. |
| Approved land area in permit | 312.10 Sq. Mt. |
| Approved built-up area | Permit extraction records 868.10 Sq.mts built-up area and 1,052.84 Sq.mts total built-up area; these are distinct figures as stated in the plan extraction. |
| Building count / configuration | One residential building, 1 Stilt + 5 upper floors. The plan describes the fifth floor as a TDR floor. |
| Building height | The occupancy certificate records 14.95 metres as sanctioned and completion-plan height. |
| Parking | Stilt is designated for vehicle parking in the permit. The plan extraction records 163.90 as parking area; the occupancy certificate records 173.62 as parking area in sq. mts. |
| Unit count | 10 units in the RERA unit record; the filed plan extraction also states 10 units. RERA unit table |
Offering and status
| Item | Project record |
|---|---|
| RERA-filed configuration | DOUBLE; normalised as 2BHK. RERA unit details [unit_types] |
| RERA-filed saleable area | 53.41 sq. m. per unit. [unit_types] |
| Booked / available | 0 booked / 10 available, as last read from the TG-RERA portal; the portal record supplies no as-of date, so counts are indicative. RERA unit table |
| Declared completion | 30/11/2026 proposed and revised proposed date in the project record. RERA record |
| Occupancy certificate | Certificate 020003/CMC/01504/SWOC/QTB2/2026, dated 07/08/2026, for the residential building at Plot Nos. 111/PART and 112/PART. |
2. The project story
V.R.INFRA.VIKYATH ICONIA.2 is recorded as a residential apartment project in Sai Krishnaja Hills, Bachupally village, Bachupally mandal, Medchal-Malkajgiri district. Its identified site is in Sy. Nos. 300 PART, 302 and 309 PART, on Plot Nos. 111/PART and 112/PART. The RERA filing records 10 homes in one building; the filed configuration is “DOUBLE,” normalised in the project data as 2BHK. RERA record Land records [unit_types]
The building permit describes a stilt level and five upper floors. An occupancy certificate is on file for the residential building, certifying it fit for occupation; see the certificate scope and recorded completion details in sections 1 and 10. The RERA project record nevertheless identifies the project as on-going and carries a proposed completion date of 30/11/2026. These are separate records of project status and certificate scope; no independent site inspection or construction-progress measurement is supplied here. RERA record
3. Master plan, architecture & building design
The filed building-permit plan is for one residential building on a stated plot area of 312.10 sq.m. It describes the development as “Stilt+4 Floors+ 5th Floor (TDR Floor)” and the building-permit order as 1 Stilt + 5 upper floors. The plan extraction records 868.10 as net built-up area, 1,052.84 as total built-up area, 163.90 as parking area, and a total height of 20.40mt.; the occupancy certificate separately records a sanctioned and completion-plan height of 14.95 metres. These figures are reproduced as recorded in their respective documents, not recomputed.
The plan lists a 12.00 MT WIDE road and a 4.50m Wide DRIVEWAY. It also records setbacks and balcony widths, but the supplied extraction does not provide a complete floor-by-floor apartment arrangement, flats per floor, or measured building footprint.
The permit extraction lists rainwater harvesting, septic tank, sump, lift and STP. The building-permit order also specifies that the stilt/cellar is for parking, and that construction is to follow the sanctioned plan. These are plan/document disclosures, not independent verification that each facility has been installed or is operating.
4. Homes, configurations & floor plans
| Configuration | Units | Booked | Available | RERA saleable area | Measured carpet area | Loading (if supplied) |
|---|---|---|---|---|---|---|
| 2BHK (filed as “DOUBLE”) | 10 | 0 | 10 | 53.41 sq. m. | Not established from the supplied drawing measurements | Not supplied |
RERA-filed unit counts, booking figures and saleable area are from the project’s unit record; booking figures have no stated as-of date. RERA unit details [unit_types] RERA unit table
The supplied floor-plan review says two drawings were measured, but records no measured flat design for the 2BHK configuration. Accordingly, no drawing-based carpet area or room dimensions can be reported. Software-measured carpet area, where available, would be drawing-derived and not a RERA disclosure; it is distinct from saleable area, which can include a home’s share of common areas. Floor plans
5. Parking & vehicle circulation
The building permit designates the stilt for vehicle parking and states that it is to be used exclusively for parking. The plan extraction lists 163.90 as parking area, while the occupancy certificate lists 173.62 sq. mts as parking area in both its sanctioned-plan and completion-plan fields. The supplied material does not establish the number of parking bays, visitor or accessible spaces, a resident allocation schedule, or an exclusive parking right for any unit.
The plan shows a 4.50m Wide DRIVEWAY and identifies a 12.00 MT WIDE road. No ramp arrangement, pedestrian separation, mechanical parking system, or EV-charging installation status is established by the supplied project evidence. The plan lists EV charging infrastructure as a requirement; that does not establish installation or operation.
6. Amenities, recreation & open spaces
The project’s RERA amenity record lists 15 items. Every percentage shown in that record is 0; these entries therefore describe the filing’s availability/progress fields, not independently verified completion. RERA amenities
| Facility | Description / size | Evidence source | Declared progress / verified status |
|---|---|---|---|
| Green strip / TOT LOT / park | Size not supplied | RERA amenity record RERA amenities | Available field says YES; progress 0%; not independently verified |
| Community buildings | Size or facility details not supplied | RERA amenity record RERA amenities | Progress 0%; no completion verification supplied |
| Water conservation / rainwater harvesting | Size not supplied | RERA amenity record; permit RERA amenities | Available field says YES; progress 0%; permit requires rainwater-harvesting structures |
| Solid-waste management and disposal | Details not supplied | RERA amenity record RERA amenities | Available field says YES; progress 0%; not independently verified |
| Energy management | Details not supplied | RERA amenity record RERA amenities | Available field says YES; progress 0%; not independently verified |
| CCTV cameras | Details not supplied | RERA amenity record RERA amenities | Available field says YES; progress 0%; not independently verified |
No project-filed clubhouse, indoor recreation, or sports facility details are supplied in the RERA amenity record. The facilities listed on third-party vendor pages are not used here as confirmed project provisions.
7. Utilities, building services & safety
The RERA amenity record marks water supply, sewerage, storm-water drains, treatment and disposal of sewage/sullage, water conservation/rainwater harvesting, energy management, fire protection, electrical meter room/sub-station/receiving station, and solid-waste management as available; each recorded progress percentage is 0%. These are filing entries, not evidence of completed or operational services. RERA amenities
The building-plan material lists an STP, septic tank, sump and rainwater harvesting. The permit requires provision for a transformer and garbage house, and the occupancy certificate records one rainwater-harvesting pit in both sanctioned and completion-plan fields. The supplied documents do not state water-source or storage capacities, STP capacity, reuse quantities, backup-power capacity, lift capacity or count, or the installed fire-system specification.
The permit includes fire-safety and structural-stability conditions and refers to sprinkler provision where the specified basement-area condition applies. No independent fire-clearance certificate, safety-system commissioning record, or accessibility plan is supplied. The drawing/permit statements alone do not establish statutory compliance or completed installation.
8. Location, access & connectivity
The official project location is Sai Krishnaja Hills, Bachupally village and mandal, Medchal-Malkajgiri district, PIN 500090. The building permit identifies Plot Nos. 111/PART and 112/PART in Sy. Nos. 300 PART, 302 and 309 PART. RERA record RERA filing
The filed plan identifies a 12.00 MT WIDE road and a 4.50m Wide DRIVEWAY. The supplied location record lists HITEC City at 8.8 km; it does not give a measurement method or route. No public-transport details or other independently sourced connectivity distances are supplied in the project location record. Location record
9. Developer & development status
The registered promoter is V.R.Infra / V.R.INFRA, recorded as a partnership, with GSTIN 36AARFV4531C1Z3. The RERA record lists its address as Venkat Nivas, Widia Colony, Sai Krishnaja Hills, Bachupally, Medchal-Malkajgiri, PIN 500090. The TG-RERA certificate gives a registered-office address of Village Miyapur, Mandal Serilingampally, District Ranga Reddy, PIN 500049. Corporate record Parties record
The project record gives a proposed and revised completion date of 30/11/2026. The RERA Form B document extracts supplied here include declarations with a 31-07-2026 completion undertaking, but those extracts are identified as referring to “VIKYATH ICONIA.1,” not this project’s registered name; they are not treated here as this project’s completion declaration. RERA record
The registered project has one building and 10 units in its filed unit record. The RERA project status is “On-Going Project”; an occupancy certificate for the building is also on file. The supplied material does not provide an independently verified site-progress percentage. RERA record RERA unit table
10. Approvals, official records & documents
| Record | Details |
|---|---|
| TG-RERA registration | Form C certificate for V.R.INFRA.VIKYATH ICONIA.2, registration P02200008716; certificate states validity from 18/06/2024 to 31/07/2026, unless extended. |
| Building permit | Nizampet Municipal Corporation Building Permit Order 004399/BP/HMDA/0944/MED/2024, dated 18 June, 2024, for Plot Nos. 111/PART and 112/PART in Sy. Nos. 300 PART, 302 and 309 PART, Bachupally. |
| Approved-plan document | HMDA plan document identifies a proposed residential apartment building and records the site, floor configuration, area fields, driveway and listed services. |
| Occupancy certificate | Cyberabad Municipal Corporation certificate 020003/CMC/01504/SWOC/QTB2/2026, dated 07/08/2026, for the residential building on Plot Nos. 111/PART and 112/PART. It records completion date 01/05/2026, completion-plan built-up area 907.74 sq. metres, and total deviated built-up area 39.64. |
| Title-report / permit copy | The supplied document extraction describes a building-permit order for the project site and records a simple mortgage of 10% of built-up area in favour of MC, HMDA. |
| Project registration and filed unit record | Project name, registration number, promoter, site identifiers and filed unit configuration/count are reflected in the TG-RERA project record. RERA record Land records [unit_types] |
1. Project at a glance
Project identity
Registered name: V.R.INFRA.VIKYATH ICONIA.2
Project type / phase: Residential apartment project; the registration covers the building on the stated site. A separate phase name or phase number is not disclosed.
TG-RERA registration: P02200008716; registration certificate records validity from 18/06/2024 to 31/07/2026, unless extended by the Authority.
Registered promoter: V.R.Infra / V.R.INFRA; entity type recorded as partnership.
RERA status: On-going project in the project record.
Completion deadline: RERA record gives 30/11/2026 as the proposed and revised proposed completion date. Registration validity and the completion deadline are separate entries.
Occupancy status: An occupancy certificate is on file for the residential building at Plot Nos. 111/PART and 112/PART, Bachupally; certificate scope and details are indexed below.
Land and geographic identity
Locality: Sai Krishnaja Hills
Revenue village: Bachupally
Mandal / district / PIN: Bachupally / Medchal-Malkajgiri / 500090
Survey numbers: Sy. Nos. 300 PART, 302 and 309 PART
Plot identifiers: Plot Nos. 111/PART and 112/PART
Registered site extent: 312.10 Sq. Mt. in the building-permit documents; RERA land details separately record total area and net area as 1052.84 sqmts.
Boundaries recorded in RERA land details: North: “OPEN TO SKY AND REMAINING PART IN FIFTH FLOOR”; South: “OPEN TO SKY”; East: “OPEN TO SKY AND REMAINING PART IN FIFTH FLOOR”; West: “OPEN TO SKY”.
Development identity
Sanctioning authority / principal permit: Building Permit Order 004399/BP/HMDA/0944/MED/2024, dated 18 June, 2024; issued by Nizampet Municipal Corporation and based on HMDA proceedings.
Approved land area in permit: 312.10 Sq. Mt.
Approved built-up area: Permit extraction records 868.10 Sq.mts built-up area and 1,052.84 Sq.mts total built-up area; these are distinct figures as stated in the plan extraction.
Building count / configuration: One residential building, 1 Stilt + 5 upper floors. The plan describes the fifth floor as a TDR floor.
Building height: The occupancy certificate records 14.95 metres as sanctioned and completion-plan height.
Parking: Stilt is designated for vehicle parking in the permit. The plan extraction records 163.90 as parking area; the occupancy certificate records 173.62 as parking area in sq. mts.
Unit count: 10 units in the RERA unit record; the filed plan extraction also states 10 units.
Offering and status
RERA-filed configuration: DOUBLE; normalised as 2BHK. [unit_types]
RERA-filed saleable area: 53.41 sq. m. per unit. [unit_types]
Booked / available: 0 booked / 10 available, as last read from the TG-RERA portal; the portal record supplies no as-of date, so counts are indicative.
Declared completion: 30/11/2026 proposed and revised proposed date in the project record.
Occupancy certificate: Certificate 020003/CMC/01504/SWOC/QTB2/2026, dated 07/08/2026, for the residential building at Plot Nos. 111/PART and 112/PART.
2. The project story
V.R.INFRA.VIKYATH ICONIA.2 is recorded as a residential apartment project in Sai Krishnaja Hills, Bachupally village, Bachupally mandal, Medchal-Malkajgiri district. Its identified site is in Sy. Nos. 300 PART, 302 and 309 PART, on Plot Nos. 111/PART and 112/PART. The RERA filing records 10 homes in one building; the filed configuration is “DOUBLE,” normalised in the project data as 2BHK. [unit_types]
The building permit describes a stilt level and five upper floors. An occupancy certificate is on file for the residential building, certifying it fit for occupation; see the certificate scope and recorded completion details in sections 1 and 10. The RERA project record nevertheless identifies the project as on-going and carries a proposed completion date of 30/11/2026. These are separate records of project status and certificate scope; no independent site inspection or construction-progress measurement is supplied here.
3. Master plan, architecture & building design
The filed building-permit plan is for one residential building on a stated plot area of 312.10 sq.m. It describes the development as “Stilt+4 Floors+ 5th Floor (TDR Floor)” and the building-permit order as 1 Stilt + 5 upper floors. The plan extraction records 868.10 as net built-up area, 1,052.84 as total built-up area, 163.90 as parking area, and a total height of 20.40mt.; the occupancy certificate separately records a sanctioned and completion-plan height of 14.95 metres. These figures are reproduced as recorded in their respective documents, not recomputed.
The plan lists a 12.00 MT WIDE road and a 4.50m Wide DRIVEWAY. It also records setbacks and balcony widths, but the supplied extraction does not provide a complete floor-by-floor apartment arrangement, flats per floor, or measured building footprint.
The permit extraction lists rainwater harvesting, septic tank, sump, lift and STP. The building-permit order also specifies that the stilt/cellar is for parking, and that construction is to follow the sanctioned plan. These are plan/document disclosures, not independent verification that each facility has been installed or is operating.
4. Homes, configurations & floor plans
| Configuration | Units | Booked | Available | RERA saleable area | Measured carpet area | Loading (if supplied) |
|---|---|---|---|---|---|---|
| 2BHK (filed as “DOUBLE”) | 10 | 0 | 10 | 53.41 sq. m. | Not established from the supplied drawing measurements | Not supplied |
RERA-filed unit counts, booking figures and saleable area are from the project’s unit record; booking figures have no stated as-of date. [unit_types]
The supplied floor-plan review says two drawings were measured, but records no measured flat design for the 2BHK configuration. Accordingly, no drawing-based carpet area or room dimensions can be reported. Software-measured carpet area, where available, would be drawing-derived and not a RERA disclosure; it is distinct from saleable area, which can include a home’s share of common areas.
5. Parking & vehicle circulation
The building permit designates the stilt for vehicle parking and states that it is to be used exclusively for parking. The plan extraction lists 163.90 as parking area, while the occupancy certificate lists 173.62 sq. mts as parking area in both its sanctioned-plan and completion-plan fields. The supplied material does not establish the number of parking bays, visitor or accessible spaces, a resident allocation schedule, or an exclusive parking right for any unit.
The plan shows a 4.50m Wide DRIVEWAY and identifies a 12.00 MT WIDE road. No ramp arrangement, pedestrian separation, mechanical parking system, or EV-charging installation status is established by the supplied project evidence. The plan lists EV charging infrastructure as a requirement; that does not establish installation or operation.
6. Amenities, recreation & open spaces
The project’s RERA amenity record lists 15 items. Every percentage shown in that record is 0; these entries therefore describe the filing’s availability/progress fields, not independently verified completion.
| Facility | Description / size | Evidence source | Declared progress / verified status |
|---|---|---|---|
| Green strip / TOT LOT / park | Size not supplied | RERA amenity record | Available field says YES; progress 0%; not independently verified |
| Community buildings | Size or facility details not supplied | RERA amenity record | Progress 0%; no completion verification supplied |
| Water conservation / rainwater harvesting | Size not supplied | RERA amenity record; permit | Available field says YES; progress 0%; permit requires rainwater-harvesting structures |
| Solid-waste management and disposal | Details not supplied | RERA amenity record | Available field says YES; progress 0%; not independently verified |
| Energy management | Details not supplied | RERA amenity record | Available field says YES; progress 0%; not independently verified |
| CCTV cameras | Details not supplied | RERA amenity record | Available field says YES; progress 0%; not independently verified |
No project-filed clubhouse, indoor recreation, or sports facility details are supplied in the RERA amenity record. The facilities listed on third-party vendor pages are not used here as confirmed project provisions.
7. Utilities, building services & safety
The RERA amenity record marks water supply, sewerage, storm-water drains, treatment and disposal of sewage/sullage, water conservation/rainwater harvesting, energy management, fire protection, electrical meter room/sub-station/receiving station, and solid-waste management as available; each recorded progress percentage is 0%. These are filing entries, not evidence of completed or operational services.
The building-plan material lists an STP, septic tank, sump and rainwater harvesting. The permit requires provision for a transformer and garbage house, and the occupancy certificate records one rainwater-harvesting pit in both sanctioned and completion-plan fields. The supplied documents do not state water-source or storage capacities, STP capacity, reuse quantities, backup-power capacity, lift capacity or count, or the installed fire-system specification.
The permit includes fire-safety and structural-stability conditions and refers to sprinkler provision where the specified basement-area condition applies. No independent fire-clearance certificate, safety-system commissioning record, or accessibility plan is supplied. The drawing/permit statements alone do not establish statutory compliance or completed installation.
8. Location, access & connectivity
The official project location is Sai Krishnaja Hills, Bachupally village and mandal, Medchal-Malkajgiri district, PIN 500090. The building permit identifies Plot Nos. 111/PART and 112/PART in Sy. Nos. 300 PART, 302 and 309 PART.
The filed plan identifies a 12.00 MT WIDE road and a 4.50m Wide DRIVEWAY. The supplied location record lists HITEC City at 8.8 km; it does not give a measurement method or route. No public-transport details or other independently sourced connectivity distances are supplied in the project location record.
9. Developer & development status
The registered promoter is V.R.Infra / V.R.INFRA, recorded as a partnership, with GSTIN 36AARFV4531C1Z3. The RERA record lists its address as Venkat Nivas, Widia Colony, Sai Krishnaja Hills, Bachupally, Medchal-Malkajgiri, PIN 500090. The TG-RERA certificate gives a registered-office address of Village Miyapur, Mandal Serilingampally, District Ranga Reddy, PIN 500049.
The project record gives a proposed and revised completion date of 30/11/2026. The RERA Form B document extracts supplied here include declarations with a 31-07-2026 completion undertaking, but those extracts are identified as referring to “VIKYATH ICONIA.1,” not this project’s registered name; they are not treated here as this project’s completion declaration.
The registered project has one building and 10 units in its filed unit record. The RERA project status is “On-Going Project”; an occupancy certificate for the building is also on file. The supplied material does not provide an independently verified site-progress percentage.
10. Approvals, official records & documents
TG-RERA registration: Form C certificate for V.R.INFRA.VIKYATH ICONIA.2, registration P02200008716; certificate states validity from 18/06/2024 to 31/07/2026, unless extended.
Building permit: Nizampet Municipal Corporation Building Permit Order 004399/BP/HMDA/0944/MED/2024, dated 18 June, 2024, for Plot Nos. 111/PART and 112/PART in Sy. Nos. 300 PART, 302 and 309 PART, Bachupally.
Approved-plan document: HMDA plan document identifies a proposed residential apartment building and records the site, floor configuration, area fields, driveway and listed services.
Occupancy certificate: Cyberabad Municipal Corporation certificate 020003/CMC/01504/SWOC/QTB2/2026, dated 07/08/2026, for the residential building on Plot Nos. 111/PART and 112/PART. It records completion date 01/05/2026, completion-plan built-up area 907.74 sq. metres, and total deviated built-up area 39.64.
Title-report / permit copy: The supplied document extraction describes a building-permit order for the project site and records a simple mortgage of 10% of built-up area in favour of MC, HMDA.
Project registration and filed unit record: Project name, registration number, promoter, site identifiers and filed unit configuration/count are reflected in the TG-RERA project record. [unit_types]
Frequently asked questions
Is V.R.INFRA.VIKYATH ICONIA.2 registered with Telangana RERA?
Yes. V.R.INFRA.VIKYATH ICONIA.2 is registered with the Telangana Real Estate Regulatory Authority as P02200008716; the registration status is On-Going Project.
Who is the developer of V.R.INFRA.VIKYATH ICONIA.2?
The promoter named in the RERA registration is V.R.INFRA.
Where is V.R.INFRA.VIKYATH ICONIA.2 located?
V.R.INFRA.VIKYATH ICONIA.2 is in sai krishnaja hills, Bachupally, Medchal-Malkajgiri, Telangana (500090).
When will V.R.INFRA.VIKYATH ICONIA.2 be completed?
The promoter's proposed date of completion filed with RERA is 30/11/2026. This is the promoter's declaration, not a guarantee.