Sign in

Tsr Prestige

TSR BUILDERS · Mahabubnagar · RERA P01400001949

TSR PRESTIGE is a residential apartment project in Rajendranagar, Mahabubnagar Urban Mandal, Mahabubnagar District, developed by the registered promoter TSR BUILDERS. It is recorded on a site of 820.24 m² with one building comprising 1 Stilt + 5 upper floors and 20 2BHK units, each with a RERA-filed saleable area of 96.76 m². Its TG-RERA registration number is P01400001949, and its proposed completion date is 29 August 2024.

01What we found

Period endedTG-RERA registration ran to 29 Aug 2024 - check its extension on TG-RERA
13documents on file - each fact links to its page
0court cases on this project's land in the court records searched
8items to check - 3 high

Read from TG-RERA filings, approvals, land and registration records and court records. A court case is counted only when the court record states this project's survey number with its village, or names the project.

02Check before you pay

8 items to check before you pay, 3 high - from the title chain, court records and approvals, each with what to ask the builder or your advocate. An item may not be a problem with the project: records can be incomplete.

Sign in to see each item and what to do

1. Project at a glance

Project identity

ItemProject record
Registered project nameTSR PRESTIGE RERA record
Project typeResidential apartment project; registered phase or separately identified portion: not disclosed RERA record RERA filing
TG-RERA registrationP01400001949; registered 6 July 2020 to 29 August 2024. The certificate records a four-year validity period; no extension is recorded in the supplied registration evidence. RERA record
Registered promoterTSR BUILDERS; the registration certificate renders the name “Tsr Builders.” RERA record
RERA statusListed as “On-Going Project.” Registration validity ended on 29 August 2024; that date is separate from the completion date and does not itself establish whether an occupancy certificate has been issued. RERA record RERA filing

Land and geographic identity

ItemProject record
Locality / revenue villageRajendranagar; the building-permit extraction describes the location as New Town, Rajendra Nagar, Mahabubnagar. Revenue village is recorded as Rajendranagar. RERA record RERA filing
Mandal / district / PINMahabubnagar Urban / Mahabubnagar / 509001 RERA record RERA filing
Survey number(s) and subdivisionsNot disclosed in the supplied project identity, land record or extracted building-permit record. RERA filing Land records
Building-permit site extent820.24 m² total site area; 71.84 m² road-affected area; net area stated as 748.41 m² in the permit.
RERA land recordTotal area 820.24 m²; affected area 71.84 m²; net area 748.40 m². Land records
Boundaries recorded in RERAEast: ROAD WIDTH 9; West: ROAD WIDTH 9; North: OTHER LAND; South: OTHER LAND. Land records

Development identity

ItemProject record
Sanctioning authorityMahaboobnagar Special Municipality Approvals record
Principal building approvalBuilding Permit Order No. 3063/W38/2018/3633, approved 29 August 2019 Approvals record
Other number on permitLayout / Sub Divn. No. G1/BA/4914/247/77
Approved built-up area2,355.11 m² in the RERA project information. The building-permit extraction separately records “Area (m2): 1,935.25”; the supplied record does not label that figure as approved built-up area. RERA filing
Building and floorsOne building; permit: 1 Stilt + 5 upper floors, height 14.5 m. RERA record
Parking levelsPermit says stilt parking is approved and must be used exclusively for vehicle parking. A cellar is mentioned in a general condition; the supplied extracted floor configuration identifies stilt, not a cellar level.
Unit count20 units in the RERA unit record. The building-permit extraction does not state a sanctioned unit count for comparison. RERA unit table

Offering and status

ItemProject record
Configuration2BHK; 20 units recorded, with 0 booked and 20 available in the portal data. Booking counts have no supplied as-of date and are indicative. RERA unit table
RERA-filed saleable area96.76 m² per 2BHK unit (also recorded as 1,042 sq ft in the normalized unit record). RERA unit table
Construction stageThe project record gives 80% completeness; this is a recorded progress figure, not an independent site inspection. RERA record
Completion datesProposed and revised proposed completion date: 29 August 2024. The building permit separately states construction to be completed before 29 August 2025. RERA record RERA filing
Occupancy / completion certificateNo occupancy or completion certificate is included in the supplied documents; certificate status is not established. The permit says an occupancy certificate is compulsory before occupation. Document index

2. The project story

TSR PRESTIGE is recorded with TG-RERA as a residential apartment project in Rajendranagar, Mahabubnagar Urban, Mahabubnagar. The permit describes a single residential building for the landowners, represented by TSR BUILDERS as DAGPA holder, configured as one stilt level plus five upper floors. RERA record RERA filing

The RERA unit record lists 20 two-bedroom apartments, with a filed saleable area of 96.76 m² per unit. Portal counts show all 20 as available and none booked, but the record has no as-of date. RERA unit table

The project record reports 80% completeness. That figure is not accompanied here by an independent site verification or a dated progress certificate. The RERA-recorded proposed completion date was 29 August 2024; the registration certificate runs to the same date, and the supplied file does not establish whether an occupancy or completion certificate has since been issued. RERA record Document index

3. Master plan, architecture & building design

The recorded development is one residential building on a site stated as 820.24 m², with a road-affected area of 71.84 m². The RERA land record gives the net area as 748.40 m²; the building-permit extraction gives 748.41 m². The building-permit extraction identifies the building as 1 Stilt + 5 upper floors, 14.5 m high, and records 2,355.11 m² as approved built-up area in the RERA project information. Land records RERA filing

The permit also records a building “Area (m2)” of 1,935.25 and a stilt area of 406.21 m². These are separately labelled permit figures; the supplied material does not define the 1,935.25 m² figure as FSI-counted area, gross built-up area, or another area category.

The permit lists front, rear and side setbacks of 3.04 m, 3.51 m, 3.54 m and 3.51 m respectively. It requires a tot-lot to be fenced and maintained as greenery before an occupancy certificate is issued, and requires space for a transformer. Detailed floor plans are not available for measurement: both supplied drawings are scans pending measurement. No supported details are available here for flats per floor, lifts, stairs, circulation or the residential/common-area split. Floor plans

4. Homes, configurations & floor plans

ConfigurationUnitsBookedAvailableRERA saleable areaMeasured carpet areaLoading (if supplied)
2BHK2002096.76 m² (1,042 sq ft in the normalized record)Not measured; two drawing scans are pending measurementNot supplied

RERA unit table RERA unit details Floor plans

The 96.76 m² figure is the RERA-filed saleable area, not a measured carpet-area figure. The supplied floor-plan scans have not been software-measured, so room dimensions, balcony or utility areas, and carpet area cannot be reported from those drawings. The portal’s booked and available counts are indicative because no count date is supplied. RERA unit table Floor plans

5. Parking & vehicle circulation

The building permit states that stilt space approved for parking is to be used exclusively for vehicle parking. It also refers to cellar parking in a general condition, but the extracted sanctioned floor configuration does not identify a cellar level. No sanctioned parking-space count, visitor or accessible-space allocation, ramp or driveway arrangement, EV provision, or unit-specific parking allocation is available in the supplied evidence. A mortgage area of 194.39 m² is recorded; the supplied information does not identify this as parking allocation. RERA filing Land records

6. Amenities, recreation & open spaces

The RERA amenity record supplies progress percentages and some availability entries. “Available: YES” is a record entry, not independent verification that a facility is complete or operational.

FacilityDescription / sizeEvidence sourceDeclared progress / verified status
Green Strip / TOT LOT / ParkTot-lot/green area; no size suppliedRERA amenity record; building-permit condition0% recorded; permit requires fencing and maintenance as greenery before OC. Completion not independently verified. RERA amenities
Community buildingsNo size suppliedRERA amenity record0% recorded. RERA amenities
Internal roads & footpathsNo dimensions suppliedRERA amenity record0% recorded. RERA amenities
Street lightingNo details suppliedRERA amenity record0% recorded. RERA amenities
Visitor parkingNo count or allocation suppliedThird-party vendor listingListed in marketing material; not established as sanctioned or delivered. Promoter website
Clubhouse, gym, swimming pool, children’s play area, indoor games, walking trackNo sizes or capacities suppliedThird-party vendor listingListed in marketing material; not established in the supplied RERA amenity record as sanctioned or delivered. Promoter website

7. Utilities, building services & safety

ServiceEvidence in the supplied record
WaterRERA amenity record marks water supply “YES” and records 10% progress. A vendor listing describes corporation and borewell supply, but this is a third-party claim, not a RERA-filed specification. RERA amenities Promoter website
Sewerage and drainageRERA records sewerage (chambers, lines, septic tank, STP) as “YES” with 0% progress; treatment and disposal of sewage and sullage water is recorded at 0%. Storm-water drains are recorded at 0%. RERA amenities
Rainwater harvestingRERA records water conservation/rainwater harvesting as “YES” with 0% progress. The building permit lists a rainwater-harvesting percolation pit. RERA amenities
Electrical and backupRERA records an electrical meter room/sub-station/receiving station as “YES” with 0% progress and a generator as “YES” with 0% progress. The permit requires space for a transformer. RERA amenities
Fire and life safetyRERA records fire protection and fire-safety requirements at 0% progress. No system specifications or clearance certificate are included in the supplied evidence. RERA amenities
WasteSolid-waste management and disposal is recorded at 0%. The permit lists a garbage house. RERA amenities
Lifts, accessibility and securityNo verified lift count, capacity, accessible route, CCTV or access-control details are supplied by the RERA extracts or permit. Vendor listings mention lifts, security and CCTV, but do not establish sanctioned or delivered provision. Document index Promoter website

8. Location, access & connectivity

The registered location is Rajendranagar, Mahabubnagar Urban Mandal, Mahabubnagar District, PIN 509001. The building-permit extraction further describes the site as New Town, Rajendra Nagar, Mahabubnagar. The recorded site boundaries are roads of width 9 on the east and west, and other land to the north and south. RERA record RERA filing Land records

A supplied location record gives the Financial District (Nanakramguda) as an anchor 1.2 km away. The evidence does not supply an approach-road route, public-transport details or measured distances to other landmarks. Location record

9. Developer & development status

The registered promoter is TSR BUILDERS, recorded as a partnership. The listed partners are GIRIDHAR SIMHADRI, THRIPURANTHAKA REDDY and VEERAMREDDY SREEDHARA REDDY; RAMA KRISHNA BOPPENAPALLY is listed as authorized signatory. The supplied identity data does not provide a verified corporate registration identifier, official website or contact details. RERA record RERA filing Parties record

The building permit names TSR BUILDERS as DAGPA holder, representing B. Ram Mohan Reddy and three others. The RERA landowner record names B. Ram Mohan Reddy, B.V. Narsimha Reddy, B. Vijeyender Reddy and Subhadramma under area-share agreements. Parties record Land records

The RERA record states 80% completeness and a proposed completion date of 29 August 2024. The permit records construction completion before 29 August 2025. These are recorded dates and progress information; no supplied site inspection or current completion certificate confirms the present construction or occupancy status. RERA record Document index

10. Approvals, official records & documents

RecordSupplied evidence
TG-RERA registrationForm C certificate for TSR PRESTIGE, registration P01400001949, issued 6 July 2020; stated validity to 29 August 2024.
Building permitBuilding Permit Order No. 3063/W38/2018/3633, Mahaboobnagar Special Municipality, approved 29 August 2019; extracted as 1 stilt + 5 upper floors. Approvals record
Permit-related numberLayout / Sub Divn. No. G1/BA/4914/247/77 appears on the permit.
Title and development documentsRERA-filed title search report, title-report documents and development-agreement material are listed in the project file. Document index
Floor-plan drawingsTwo drawing scans are recorded; neither has been measured. Floor plans
Occupancy / completion certificateNot present in the supplied documents; status is not established. Document index

The permit records conditions including surrender of the road-affected portion, provision of a transformer space, use of approved stilt parking for vehicles, and obtaining an occupancy certificate before occupation. This overview identifies the recorded conditions without assessing compliance.

Frequently asked questions

Is TSR PRESTIGE registered with Telangana RERA?

Yes. TSR PRESTIGE is registered with the Telangana Real Estate Regulatory Authority as P01400001949; the registration status is On-Going Project.

Who is the developer of TSR PRESTIGE?

The promoter named in the RERA registration is TSR BUILDERS.

Where is TSR PRESTIGE located?

TSR PRESTIGE is in RAJENDRANAGAR, Mahabubnagar Urban, Mahabubnagar, Telangana (509001).

When will TSR PRESTIGE be completed?

The promoter's proposed date of completion filed with RERA is 29/08/2024. This is the promoter's declaration, not a guarantee.

More projects in Mahabubnagar Urban