Golden City
SRI RAGHAVENDRA INFRA DEVELOPERS · Mahabubnagar · RERA P01400005784
GOLDEN CITY is a plotted development in MAHABOOB NAGAR MUNCIPALITY, Mahabubnagar Urban mandal, Mahabubnagar district, developed by the registered promoter SRI RAGHAVENDRA INFRA DEVELOPERS. The RERA fields record a total land area of 24888.17 sqmts, and the layout approval extraction records 76 plots; plot configurations are not stated. The TG-RERA registration is P01400005784, with proposed completion on 17/03/2023.
01What we found
Read from TG-RERA filings, approvals, land and registration records and court records. A court case is counted only when the court record states this project's survey number with its village, or names the project.
02Check before you pay
10 items to check before you pay, 5 high - from the title chain, court records and approvals, each with what to ask the builder or your advocate. An item may not be a problem with the project: records can be incomplete.
1. Project at a glance
Project identity
| Item | Project record |
|---|---|
| Registered project name | GOLDEN CITY RERA record |
| Project type | Plotted development RERA record RERA filing |
| Phase / registered portion | Phase not separately identified in the supplied record; the registration is for the GOLDEN CITY plotted layout |
| TG-RERA registration | P01400005784 |
| Registration validity | 15/03/2023–17/03/2023; the certificate states “0 years.” No extension is recorded in the supplied evidence. This is the registration period, not a completion or occupancy certificate. |
| Registered promoter | SRI RAGHAVENDRA INFRA DEVELOPERS RERA record |
| RERA status | The supplied certificate records registration under section 5. It does not establish the project’s current registration status beyond its stated validity period. |
Land and geographic identity
| Item | Project record |
|---|---|
| Locality | MAHABOOB NAGAR MUNCIPALITY RERA record RERA filing |
| Revenue village | Mahaboob Nagar Muncipality as recorded in the project identity; the supplied records also use “Mahabubnagar Municipality” and “Mahaboobnagar.” RERA record Land records |
| Mandal | Mahabubnagar Urban RERA record |
| District | Mahabubnagar RERA record |
| PIN | 509001 RERA record |
| Project survey numbers / subdivisions | 786/P and 787/P RERA record Land records |
| Registered site extent | Ac. 6.15 Cents; 29766.00 Sq. Yds. in the layout approval extraction |
| RERA land area | Total Area: 24888.17 sqmts; Net Area: 24888.17 sqmts; affected area: 0 sqmts, as entered in the RERA project fields. RERA filing |
| Boundaries | East: EXISTING HOUSES; West: 40 ROAD; North: OPEN LAND; South: EXISTING HOUSES. RERA filing |
Development identity
| Item | Project record |
|---|---|
| Sanctioning authority | Director of Town and Country Planning, Government of Telangana; the layout record notes delegation to Mahabubnagar Municipality. Approvals record |
| Principal layout approval | TLP.No. 66/2021/H, Draft Technical Layout Pattern; approval date is extracted as /7-03-2021. Approvals record |
| Other approval references | File No. DTCP-HT3/0TH/7/2021-HYD Sec-DTCP; proceedings No. Lr.Roc.No.848/2021/H; layout proposal reference G/LP/e-945911/ MHBR/2021, dated 11.02.2021. Approvals record |
| Layout composition in approval extraction | 76 plots; layout area Ac. 6.15 Cents; 29766.00 Sq. Yds. The extraction gives open space as 10.00 % (Ac. 0.615 Cents; 2976.60 Sq. Yds.), road area as 37.38 % (Ac. 2.299 Cents; 11127.16 Sq. Yds.) and plotted area as 52.62 % (Ac. 3.236 Cents; 15662.24 Sq. Yds.). |
| Approved built-up area | Not disclosed for this plotted-development project. RERA filing |
| Buildings / floors | No building or floor configuration is established by the supplied project records. |
| Mortgage area | RERA fields record 2096.27 sqmts; the layout approval extraction separately describes mortgage-area information and reserved plots. RERA filing |
Offering and status
| Item | Project record |
|---|---|
| Offering | Plots; the layout approval extraction records 76 plots. Project-specific plot size bands, booked/available counts and RERA-filed saleable-area figures are not supplied. RERA unit table |
| RERA completion deadline | The registration record gives 17/03/2023 as proposed completion. RERA record |
| Promoter-declared completion deadline | Form B declarations filed for the project state completion by 07.03.2023. |
| Construction / development stage | No independently verified site-progress assessment is supplied. The RERA amenity checklist shows 0 progress for each listed item. RERA amenities |
| Occupancy / completion certificate | No occupancy or completion certificate is included in the supplied project records. The cited layout approval is a Draft Technical Layout Pattern, not an occupancy certificate. Document index |
2. The project story
GOLDEN CITY is recorded with TG-RERA as a plotted development in survey numbers 786/P and 787/P, at Mahabubnagar Municipality, Mahabubnagar district. Its layout approval extraction describes a proposed 76-plot layout, with land apportioned among plotted area, roads and open space. RERA record
The filed layout material describes required infrastructure works including road formation, drains, rainwater-harvesting pits, street lighting, electricity facilities, sewerage disposal and protected water supply. These are approval requirements or listed development works; the supplied evidence does not independently verify that they have been completed. The project’s RERA amenity checklist records 0 progress for its listed items, and no separate site-progress report or completion/occupancy certificate was supplied. RERA amenities Document index
The RERA certificate states registration validity through 17/03/2023. That date is distinct from the completion dates stated in the project fields and promoter declarations; the evidence provided does not establish a current extension or completed status. RERA record
3. Master plan, architecture & building design
The supplied approval material concerns a plotted layout, not a multi-storey building scheme. It records 76 plots within a layout area of Ac. 6.15 Cents; 29766.00 Sq. Yds. and identifies the following land-use components: 10.00 % open space, 37.38 % roads and 52.62 % plotted area. The RERA project fields separately state total and net land area of 24888.17 sqmts. RERA filing
The approval extraction lists development works such as curbstones and metalling of the carriage-way, side drains and nala channelization, avenue planting, rainwater-harvesting pits, fencing of open spaces, street lighting, electricity facilities, sewerage disposal and protected water supply. No detailed plot schedule, plot dimensions, layout drawing measurements, building footprints, building heights or residential/commercial building distribution are available in the supplied materials.
4. Homes, configurations & floor plans
This is a plotted development. The layout approval extraction records 76 plots, but the supplied project data does not provide a project-specific plot-size schedule, RERA-filed saleable-area range, or booked and available plot counts. RERA unit table
| Configuration | Units | Booked | Available | RERA saleable area | Measured carpet area | Loading (if supplied) |
|---|---|---|---|---|---|---|
| Plots | 76 plots recorded in the layout approval extraction | Not disclosed | Not disclosed | Not disclosed | Not applicable | Not disclosed |
The supplied drawing set has two floor-plan records, but both are scans pending measurement; no software-measured carpet or room dimensions are available. The vendor material contains a plot-area claim, but the supplied project evidence does not establish it as the RERA-filed plot schedule. Floor plans Promoter website
5. Parking & vehicle circulation
The supplied project records do not establish parking-space counts, visitor or accessible parking, parking allocation to individual plots, or a parking layout. The layout approval extraction identifies roads and road-development requirements, but does not provide a detailed vehicle-circulation plan or parking arrangement. Document index
6. Amenities, recreation & open spaces
The approval extraction lists planned layout works and facilities. The RERA checklist records the listed items with 0 progress; no independent completion verification is supplied. RERA amenities
| Facility | Description / size | Evidence source | Declared progress / verified status |
|---|---|---|---|
| Open space | 10.00 %; Ac. 0.615 Cents; 2976.60 Sq. Yds. | Approval material requires development and handover by registered gift deed; completion not verified. | |
| Roads | 37.38 %; Ac. 2.299 Cents; 11127.16 Sq. Yds. | Road development and handover are specified in the approval material; completion not verified. | |
| Greenery / avenue plantation | Avenue plantation and greenery in the layout are listed. | Completion not verified. | |
| Rainwater harvesting | Rainwater-harvesting pits are listed. | RERA amenities | RERA checklist progress: 0; completion not verified. |
| Community buildings | Listed in the RERA amenity checklist; no facility description or size supplied. | RERA amenities | RERA checklist progress: 0; completion not verified. |
7. Utilities, building services & safety
The approval extraction lists protected water supply, sewerage disposal, side drains and nala channelization, rainwater-harvesting pits, and street-lighting and electricity facilities as layout development works. The RERA checklist also lists water supply, storm-water drains, sewage and sullage treatment/disposal, solid-waste management, energy management, fire protection, and electrical meter/sub-station/receiving-station facilities. The checklist records 0 progress for these items; the evidence does not specify capacities or independently confirm installation or operation. RERA amenities
The supplied project records do not establish water sources or storage capacity, an STP capacity or reuse scheme, power-backup arrangements, EV charging, CCTV or access-control systems, fire-system specifications, or accessibility provisions. RERA amenities Document index
8. Location, access & connectivity
The registered project location is MAHABOOB NAGAR MUNCIPALITY, Mahabubnagar Urban mandal, Mahabubnagar district, PIN 509001. The RERA fields describe the west boundary as 40 ROAD; the other recorded boundaries are existing houses to the east and south, and open land to the north. RERA record RERA filing
A supplied location record lists Financial District (Nanakramguda), 1.2 km from a geocoded point described as the cadastral parcel centroid at 17.41528, 78.35459. The supplied evidence does not provide an approach-road description, public-transport details or other measured nearby landmarks. Location record
9. Developer & development status
The registered promoter is SRI RAGHAVENDRA INFRA DEVELOPERS. The RERA record identifies its organization type as “Others”, with the description “Sri Nagendra and Others”; a more specific legal-entity type, corporate identifiers and official contact or website details are not established in the supplied evidence. RERA record RERA filing Corporate record
Four Form B declarations filed for GOLDEN CITY—by Chandoji Rao, Maktumkari Raghavendhar, Maktumkari Seetharamji and Kamlekar Sreenivas—state a completion deadline of 07.03.2023 and include promoter-side declarations concerning title, encumbrances, project funds, accounts and pending approvals. These are filed declarations, not independent verification of the stated matters.
The supplied evidence does not establish current construction progress, completion, a revised completion date, or an occupancy/completion certificate. The RERA certificate’s registration validity is stated separately in the identity table. RERA amenities Document index
10. Approvals, official records & documents
| Record | Supplied evidence |
|---|---|
| TG-RERA registration | FORM “C” certificate for GOLDEN CITY, registration P01400005784, granted under section 5; validity stated as 15/03/2023–17/03/2023. |
| Layout approval | Draft Technical Layout Pattern TLP.No. 66/2021/H, recorded under the Director of Town and Country Planning, Government of Telangana; the extraction gives approval date /7-03-2021. Related file and proceedings references are listed in the identity table. |
| Layout plan document | A layout-plan item is listed in the RERA document register, but the supplied record marks it as not extracted. |
| Form B declarations | Four project declarations filed by Chandoji Rao, Maktumkari Raghavendhar, Maktumkari Seetharamji and Kamlekar Sreenivas. |
| Completion / occupancy record | No completion certificate or occupancy certificate is included in the supplied evidence. Document index |
| Other project records | The supplied document set includes a title report, title-related records and an encumbrance statement; their detailed title and encumbrance assessment is addressed in the relevant report sections. Document index |
1. Project at a glance
Project identity
Registered project name: GOLDEN CITY
Project type: Plotted development
Phase / registered portion: Phase not separately identified in the supplied record; the registration is for the GOLDEN CITY plotted layout
TG-RERA registration: P01400005784
Registration validity: 15/03/2023–17/03/2023; the certificate states “0 years.” No extension is recorded in the supplied evidence. This is the registration period, not a completion or occupancy certificate.
Registered promoter: SRI RAGHAVENDRA INFRA DEVELOPERS
RERA status: The supplied certificate records registration under section 5. It does not establish the project’s current registration status beyond its stated validity period.
Land and geographic identity
Locality: MAHABOOB NAGAR MUNCIPALITY
Revenue village: Mahaboob Nagar Muncipality as recorded in the project identity; the supplied records also use “Mahabubnagar Municipality” and “Mahaboobnagar.”
Mandal: Mahabubnagar Urban
District: Mahabubnagar
PIN: 509001
Project survey numbers / subdivisions: 786/P and 787/P
Registered site extent: Ac. 6.15 Cents; 29766.00 Sq. Yds. in the layout approval extraction
RERA land area: Total Area: 24888.17 sqmts; Net Area: 24888.17 sqmts; affected area: 0 sqmts, as entered in the RERA project fields.
Boundaries: East: EXISTING HOUSES; West: 40 ROAD; North: OPEN LAND; South: EXISTING HOUSES.
Development identity
Sanctioning authority: Director of Town and Country Planning, Government of Telangana; the layout record notes delegation to Mahabubnagar Municipality.
Principal layout approval: TLP.No. 66/2021/H, Draft Technical Layout Pattern; approval date is extracted as /7-03-2021.
Other approval references: File No. DTCP-HT3/0TH/7/2021-HYD Sec-DTCP; proceedings No. Lr.Roc.No.848/2021/H; layout proposal reference G/LP/e-945911/ MHBR/2021, dated 11.02.2021.
Layout composition in approval extraction: 76 plots; layout area Ac. 6.15 Cents; 29766.00 Sq. Yds. The extraction gives open space as 10.00 % (Ac. 0.615 Cents; 2976.60 Sq. Yds.), road area as 37.38 % (Ac. 2.299 Cents; 11127.16 Sq. Yds.) and plotted area as 52.62 % (Ac. 3.236 Cents; 15662.24 Sq. Yds.).
Approved built-up area: Not disclosed for this plotted-development project.
Buildings / floors: No building or floor configuration is established by the supplied project records.
Mortgage area: RERA fields record 2096.27 sqmts; the layout approval extraction separately describes mortgage-area information and reserved plots.
Offering and status
Offering: Plots; the layout approval extraction records 76 plots. Project-specific plot size bands, booked/available counts and RERA-filed saleable-area figures are not supplied.
RERA completion deadline: The registration record gives 17/03/2023 as proposed completion.
Promoter-declared completion deadline: Form B declarations filed for the project state completion by 07.03.2023.
Construction / development stage: No independently verified site-progress assessment is supplied. The RERA amenity checklist shows 0 progress for each listed item.
Occupancy / completion certificate: No occupancy or completion certificate is included in the supplied project records. The cited layout approval is a Draft Technical Layout Pattern, not an occupancy certificate.
2. The project story
GOLDEN CITY is recorded with TG-RERA as a plotted development in survey numbers 786/P and 787/P, at Mahabubnagar Municipality, Mahabubnagar district. Its layout approval extraction describes a proposed 76-plot layout, with land apportioned among plotted area, roads and open space.
The filed layout material describes required infrastructure works including road formation, drains, rainwater-harvesting pits, street lighting, electricity facilities, sewerage disposal and protected water supply. These are approval requirements or listed development works; the supplied evidence does not independently verify that they have been completed. The project’s RERA amenity checklist records 0 progress for its listed items, and no separate site-progress report or completion/occupancy certificate was supplied.
The RERA certificate states registration validity through 17/03/2023. That date is distinct from the completion dates stated in the project fields and promoter declarations; the evidence provided does not establish a current extension or completed status.
3. Master plan, architecture & building design
The supplied approval material concerns a plotted layout, not a multi-storey building scheme. It records 76 plots within a layout area of Ac. 6.15 Cents; 29766.00 Sq. Yds. and identifies the following land-use components: 10.00 % open space, 37.38 % roads and 52.62 % plotted area. The RERA project fields separately state total and net land area of 24888.17 sqmts.
The approval extraction lists development works such as curbstones and metalling of the carriage-way, side drains and nala channelization, avenue planting, rainwater-harvesting pits, fencing of open spaces, street lighting, electricity facilities, sewerage disposal and protected water supply. No detailed plot schedule, plot dimensions, layout drawing measurements, building footprints, building heights or residential/commercial building distribution are available in the supplied materials.
4. Homes, configurations & floor plans
This is a plotted development. The layout approval extraction records 76 plots, but the supplied project data does not provide a project-specific plot-size schedule, RERA-filed saleable-area range, or booked and available plot counts.
| Configuration | Units | Booked | Available | RERA saleable area | Measured carpet area | Loading (if supplied) |
|---|---|---|---|---|---|---|
| Plots | 76 plots recorded in the layout approval extraction | Not disclosed | Not disclosed | Not disclosed | Not applicable | Not disclosed |
The supplied drawing set has two floor-plan records, but both are scans pending measurement; no software-measured carpet or room dimensions are available. The vendor material contains a plot-area claim, but the supplied project evidence does not establish it as the RERA-filed plot schedule.
5. Parking & vehicle circulation
The supplied project records do not establish parking-space counts, visitor or accessible parking, parking allocation to individual plots, or a parking layout. The layout approval extraction identifies roads and road-development requirements, but does not provide a detailed vehicle-circulation plan or parking arrangement.
6. Amenities, recreation & open spaces
The approval extraction lists planned layout works and facilities. The RERA checklist records the listed items with 0 progress; no independent completion verification is supplied.
| Facility | Description / size | Evidence source | Declared progress / verified status |
|---|---|---|---|
| Open space | 10.00 %; Ac. 0.615 Cents; 2976.60 Sq. Yds. | Approval material requires development and handover by registered gift deed; completion not verified. | |
| Roads | 37.38 %; Ac. 2.299 Cents; 11127.16 Sq. Yds. | Road development and handover are specified in the approval material; completion not verified. | |
| Greenery / avenue plantation | Avenue plantation and greenery in the layout are listed. | Completion not verified. | |
| Rainwater harvesting | Rainwater-harvesting pits are listed. | RERA checklist progress: 0; completion not verified. | |
| Community buildings | Listed in the RERA amenity checklist; no facility description or size supplied. | RERA checklist progress: 0; completion not verified. |
7. Utilities, building services & safety
The approval extraction lists protected water supply, sewerage disposal, side drains and nala channelization, rainwater-harvesting pits, and street-lighting and electricity facilities as layout development works. The RERA checklist also lists water supply, storm-water drains, sewage and sullage treatment/disposal, solid-waste management, energy management, fire protection, and electrical meter/sub-station/receiving-station facilities. The checklist records 0 progress for these items; the evidence does not specify capacities or independently confirm installation or operation.
The supplied project records do not establish water sources or storage capacity, an STP capacity or reuse scheme, power-backup arrangements, EV charging, CCTV or access-control systems, fire-system specifications, or accessibility provisions.
8. Location, access & connectivity
The registered project location is MAHABOOB NAGAR MUNCIPALITY, Mahabubnagar Urban mandal, Mahabubnagar district, PIN 509001. The RERA fields describe the west boundary as 40 ROAD; the other recorded boundaries are existing houses to the east and south, and open land to the north.
A supplied location record lists Financial District (Nanakramguda), 1.2 km from a geocoded point described as the cadastral parcel centroid at 17.41528, 78.35459. The supplied evidence does not provide an approach-road description, public-transport details or other measured nearby landmarks.
9. Developer & development status
The registered promoter is SRI RAGHAVENDRA INFRA DEVELOPERS. The RERA record identifies its organization type as “Others”, with the description “Sri Nagendra and Others”; a more specific legal-entity type, corporate identifiers and official contact or website details are not established in the supplied evidence.
Four Form B declarations filed for GOLDEN CITY—by Chandoji Rao, Maktumkari Raghavendhar, Maktumkari Seetharamji and Kamlekar Sreenivas—state a completion deadline of 07.03.2023 and include promoter-side declarations concerning title, encumbrances, project funds, accounts and pending approvals. These are filed declarations, not independent verification of the stated matters.
The supplied evidence does not establish current construction progress, completion, a revised completion date, or an occupancy/completion certificate. The RERA certificate’s registration validity is stated separately in the identity table.
10. Approvals, official records & documents
TG-RERA registration: FORM “C” certificate for GOLDEN CITY, registration P01400005784, granted under section 5; validity stated as 15/03/2023–17/03/2023.
Layout approval: Draft Technical Layout Pattern TLP.No. 66/2021/H, recorded under the Director of Town and Country Planning, Government of Telangana; the extraction gives approval date /7-03-2021. Related file and proceedings references are listed in the identity table.
Layout plan document: A layout-plan item is listed in the RERA document register, but the supplied record marks it as not extracted.
Form B declarations: Four project declarations filed by Chandoji Rao, Maktumkari Raghavendhar, Maktumkari Seetharamji and Kamlekar Sreenivas.
Completion / occupancy record: No completion certificate or occupancy certificate is included in the supplied evidence.
Other project records: The supplied document set includes a title report, title-related records and an encumbrance statement; their detailed title and encumbrance assessment is addressed in the relevant report sections.
Frequently asked questions
Is GOLDEN CITY registered with Telangana RERA?
Yes. GOLDEN CITY is registered with the Telangana Real Estate Regulatory Authority as P01400005784; the registration status is New Project.
Who is the developer of GOLDEN CITY?
The promoter named in the RERA registration is SRI RAGHAVENDRA INFRA DEVELOPERS.
Where is GOLDEN CITY located?
GOLDEN CITY is in MAHABOOB NAGAR MUNCIPALITY, Mahabubnagar Urban, Mahabubnagar, Telangana (509001).
When will GOLDEN CITY be completed?
The promoter's proposed date of completion filed with RERA is 17/03/2023. This is the promoter's declaration, not a guarantee.
More projects in Mahabubnagar Urban