Titania

GHR INFRA · Rangareddy · RERA P02400001817

TITANIA is a residential apartment project in MASJID BANDA, Serilingampally Mandal, Ranga Reddy District, developed by the registered promoter GHR INFRA. The site covers 19,079.66 m² and comprises two residential towers, Tower A and Tower B, and a clubhouse; Tower A has 2 Cellar + 2 Stilt + 10 upper floors, Tower B has 2 Stilt + 10 upper floors, and the clubhouse has 1 Ground + 6 upper floors. The project has 447 apartments: 129 2BHK homes with a RERA-filed saleable area of 119.33 m² and 318 3BHK homes with a RERA-filed saleable area of 175.92 m². Its TG-RERA registration is P02400001817, and the proposed completion date is 19/12/2025.

01What we found

Period endedTG-RERA registration ran to 19 Dec 2025 - check its extension on TG-RERA
34documents on file - each fact links to its page
27court cases on this project's land (survey 218, Masjid Banda)
12items to check - 3 high

Read from TG-RERA filings, approvals, land and registration records and court records. A court case is counted only when the court record states this project's survey number with its village, or names the project.

02Check before you pay

12 items to check before you pay, 3 high - from the title chain, court records and approvals, each with what to ask the builder or your advocate. An item may not be a problem with the project: records can be incomplete.

Sign in to see each item and what to do

1. Project at a glance

Project identity

ItemRecord
Registered project nameTITANIA RERA record
Project typeResidential apartment project RERA record
Phase / registered portionRegistration is recorded for Survey No. 218/11. A separate phase designation is not disclosed.
TG-RERA registrationP02400001817; granted under section 5 on 20/03/2020; certificate states validity from 20/03/2020 to 19/12/2025, unless extended. No extension is recorded in the supplied registration-certificate data.
Registered promoterGHR INFRA (also written “M/s. GHR INFRA” in filed documents); partnership entity in the project record. RERA record RERA filing Corporate record
RERA statusThe registration validity ended on 19/12/2025 according to the certificate. The supplied record does not establish a later extension or current registration status.

Land and geographic identity

ItemRecord
LocalityMASJID BANDA RERA record RERA filing
Revenue villageMasjid Banda in the project identity record; project documents also identify the land as Kondapur Village. These names are retained as recorded. RERA record RERA filing
MandalSerilingampally RERA record RERA filing
DistrictRanga Reddy RERA record
PIN500084 RERA record
Project survey number(s)218/11 RERA record Land records
Site extent19,079.66 m²; road-affected area 0.00 m²; net area 19,079.66 m² in the filed approval/OC extracts.
Boundaries recorded in project filingNorth: 60 FEET WIDE ROAD; South: NEIGHBOURS LAND IN SY NO 218 BY II; East and West: NEIGHBOURS LAND IN SY NO 218 BY II PART. RERA filing

Development identity

ItemRecord
Sanctioning authorityGreater Hyderabad Municipal Corporation (GHMC)
Principal building permit1/C20/18425/2019, dated 19 December, 2019
Approved built-up areaThe project record gives 115,231.40 m² as approved built-up area. The building-permit extract separately lists residential and club floor areas; these are not treated here as interchangeable measures. RERA filing
Buildings and usesTwo residential towers (Tower A and Tower B) and a clubhouse building, described as commercial in the approval extracts.
Sanctioned floorsTower B: 2 Stilt + 10 upper floors. Tower A: 2 Cellar + 2 Stilt + 10 upper floors. Clubhouse: 1 Ground + 6 upper floors.
Parking provision in approval extractTower B: 8,995.65 m² parking area; Tower A: 21,200.78 m² cellar parking area and 7,111.83 m² stilt parking area. The OC extract also lists parking areas by building; see the approval documents for scope. Space counts and individual allocations are not supplied.
Units447 total units: 2BHK 129 and 3BHK 318, as recorded in the TG-RERA unit data. The building permit requires that sanctioned unit numbers not be increased without GHMC approval. RERA unit table RERA unit details

Offering and status

ItemRecord
RERA-filed configurations and saleable area2BHK: 119.33 m²; 3BHK: 175.92 m². RERA unit table RERA unit details
Booked / available2BHK: 84 booked / 45 available; 3BHK: 220 booked / 98 available. Portal counts have no as-of date in the supplied record and are indicative. RERA unit table RERA unit details
Construction stage / completionGHMC occupancy-certificate extracts record completed buildings and fitness for occupation. The certificate extract lists completion dates 31 July, 2024 and 31 January, 2025; it does not map those dates to individual towers in the supplied facts.
Occupancy certificatesThe supplied extract records proceedings 0097/GHMC/SLP/2025-OC, dated 11 February, 2025, and 0402/GHMC/SLP/2025-OC, dated 24 March, 2025. The extract identifies the CLUB, TOWER A and TOWER B as covered buildings; the specific building-to-proceeding allocation is not fully set out in the supplied facts.
Completion deadlineThe RERA header records proposed completion 19/12/2025. The Form B declaration states an undertaking to complete by 25-11-2025. RERA record

2. The project story

TITANIA is a residential apartment development registered with TG-RERA as P02400001817, on Survey No. 218/11, with the RERA identity record locating it at Masjid Banda, Serilingampally, Ranga Reddy. The project’s GHMC permit and occupancy-certificate extracts describe the site as Kondapur Village. RERA record

The filed development consists of two residential towers and a clubhouse. The RERA unit record lists 447 apartments in 2BHK and 3BHK configurations. GHMC occupancy-certificate extracts describe the clubhouse, Tower A and Tower B as completed and fit for occupation. This is documentary certification, not an independent site inspection for this report. RERA unit table

3. Master plan, architecture & building design

GHMC’s building-permit extract identifies a site area of 19,079.66 m², with net area also 19,079.66 m², and shows three buildings: Tower A, Tower B and a clubhouse. The permit extract lists Tower A at 30 m high, Tower B at 30 m, and the clubhouse at 21 m.

BuildingUse in approval extractSanctioned floor configurationArea figures in supplied approval extracts
Tower AResidential2 Cellar + 2 Stilt + 10 upper floorsResidential: 33,645.44 m²; cellar parking: 21,200.78 m²; stilt parking: 7,111.83 m²
Tower BResidential2 Stilt + 10 upper floorsResidential: 38,988.90 m²; stilt parking: 8,995.65 m²
ClubhouseCommercial in the permit extract1 Ground + 6 upper floorsPermit extract: 243.85 m² ground-floor figure and 1,936.30 m² upper-floor figure; OC extract lists clubhouse floor area 2,180.15 m².

The project record gives approved built-up area as 115,231.40 m²; the approval extracts also list building-specific area figures as above. No FSI-counted area, carpet area, floor-by-floor apartment arrangement, lift or stair count, building footprint, or detailed approved landscape plan is established by the supplied drawing data. The available floor-plan set contains eight drawings, but none has a software-measured apartment layout in the supplied records. RERA filing Floor plans

The permit extract records 950 Trees, a compound wall of 651.05 RM, a tot-lot area of 1,911.79 m², a transformer space, a garbage house and a rainwater-harvesting percolation-pit structure. These are approval-record items; the supplied evidence does not independently verify their present condition.

4. Homes, configurations & floor plans

TG-RERA unit data lists 447 apartments across two configurations. The portal’s booked and available counts are indicative because the supplied record has no count-as-of date. RERA unit table RERA unit details

ConfigurationUnitsBookedAvailableRERA saleable areaMeasured carpet areaLoading (if supplied)
2BHK1298445119.33 m²Not measured in supplied drawing recordNot supplied RERA unit details Floor plans
3BHK31822098175.92 m²Not measured in supplied drawing recordNot supplied RERA unit details Floor plans

The saleable areas above are RERA-filed figures. Carpet area and room dimensions are not available as measured values in the supplied records: the drawing set contains eight drawings, with zero software-measured plans and no apartment plans identified in the measurement summary. RERA unit details Floor plans

5. Parking & vehicle circulation

GHMC’s building-permit extract records parking in Tower A’s two cellar levels and two stilt levels, and Tower B’s two stilt levels. It lists 21,200.78 m² of cellar parking and 7,111.83 m² of stilt parking for Tower A, and 8,995.65 m² of stilt parking for Tower B. The permit states that cellar and stilt areas approved for parking are to be used exclusively for vehicle parking without partition walls or rolling shutters.

The supplied records provide parking area, not a count of spaces, visitor or accessible spaces, two-wheeler provision, EV charging provision in the sanctioned record, or unit-wise parking allocations. A parking bay shown or an area recorded in an approval does not establish an individual buyer’s exclusive parking right. RERA filing

6. Amenities, recreation & open spaces

FacilityDescription / sizeEvidence sourceDeclared progress / verified status
ClubhouseClubhouse building; 1 Ground + 6 upper floors in the permit extractGHMC occupancy-certificate extract identifies the CLUB as completed and fit for occupation; no independent site verification supplied.
Tot-lot1,911.79 m² listed in the permit extract; OC extract records tot-lot areas for Tower A and Tower BApproval/OC-recorded; current condition not independently verified.
Tree planting950 Trees listed in the permit extractApproval-record item; planting and survival not independently verified.
Green strip / tot lot / parkRERA amenity record marks “YES”RERA amenitiesRERA-listed; no independent completion verification supplied.
Community buildingsRERA amenity record marks “YES”RERA amenitiesRERA-listed; no separate facility details supplied beyond the clubhouse record.
Street lightingRERA amenity record marks “YES”RERA amenitiesRERA-listed; no independent completion verification supplied.

The promoter’s vendor record lists additional marketed features, including a swimming pool, gymnasium, yoga/meditation hall, amphitheatre, coworking space, smart homes and 24-hour security. The supplied TG-RERA and approval extracts do not establish these individual features’ sizes, sanctioned status or delivery; they are therefore not treated as confirmed facilities in this overview. Promoter website

7. Utilities, building services & safety

The TG-RERA amenity record marks water supply, sewerage (including chamber, lines, septic tank and STP), storm-water drains, sewage treatment/disposal, solid-waste management, water conservation/rainwater harvesting, energy management, fire protection, and an electrical meter room/substation/receiving station as provided or planned. These are filing-record declarations; the supplied evidence does not include capacities, system specifications, commissioning records or independent operational verification. RERA amenities

The GHMC permit extract specifically records a transformer space, a garbage house and a rainwater-harvesting percolation-pit structure. It also requires compliance with Fire Services Department and Airports Authority of India NOC conditions, and records a requirement to submit revised fire information for Tower 1 and Tower 2 at occupancy-certificate stage. The supplied extract does not provide the detailed NOC conditions or establish the status of each fire-safety component.

Water storage and source, STP capacity and treated-water reuse, electrical backup capacity, lift numbers/capacities, emergency access and escape-stair details, waste segregation arrangements, CCTV/access-control specifications and accessible circulation are not established in the supplied data. RERA amenities

8. Location, access & connectivity

The registered identity record places the project in Masjid Banda, Serilingampally Mandal, Ranga Reddy District, PIN 500084; GHMC project documents identify the site as Kondapur Village. The RERA boundary record identifies a 60 FEET WIDE ROAD to the north. The permit extract refers to 18 mt. road widths but does not, in the supplied details, identify a specific frontage or route. RERA record RERA filing

The supplied location record identifies the Financial District (Nanakramguda) at 1.2 km from the cadastral parcel centroid. This is a recorded distance, not a travel-time estimate. Location record

The promoter’s vendor record supplies travel-time claims for nearby destinations, but they are promotional claims and are not used here as verified connectivity measurements. The supplied data does not establish public-transport routes or additional measured approach distances. Promoter website

9. Developer & development status

The registered promoter is GHR INFRA, identified in the project record as a partnership. The registration certificate names “Ghr Infra”; the certificate gives the promoter office as Kondapur, Serilingampally, Ranga Reddy, PIN 500084. The project record lists Vangala Shyam Sunder Reddy and Kisari Srinivasa Reddy as authorized signatories. A company registration number or other corporate identifier is not established in the supplied overview data. RERA record RERA filing Corporate record

GHMC occupancy-certificate extracts record completed, occupation-fit buildings for the CLUB, Tower A and Tower B. The project record’s proposed completion date is 19/12/2025, while the Form B declaration states a completion undertaking of 25-11-2025. Registration validity is a separate matter: the certificate states it ended on 19/12/2025, and no extension is shown in the supplied certificate data. RERA record

10. Approvals, official records & documents

TG-RERA registration certificate
Identifier / dateP02400001817, issued 20/03/2020; stated validity to 19/12/2025
Scope and sourceTITANIA; Survey No. 218/11; certificate under section 5.
GHMC building permit
Identifier / date1/C20/18425/2019, 19 December, 2019; file 1/C20/11598/2019
Scope and sourceSanctions for Tower A, Tower B and clubhouse, with floor configurations, site area and permit conditions.
GHMC occupancy-certificate proceedings
Identifier / date0097/GHMC/SLP/2025-OC, 11 February, 2025; application 000204/GHMC/0106/SLP1/2025-OC
Scope and sourceOC extract identifies the CLUB, Tower A and Tower B; includes completion and fitness-for-occupation statements.
Further GHMC occupancy-certificate proceeding
Identifier / date0402/GHMC/SLP/2025-OC, 24 March, 2025; application 002495/GHMC/1078/SLP1/2025-OC
Scope and sourceRecorded in the supplied OC extract.
Promoter Form B declaration
Identifier / dateVerified at Hyderabad on 24 December 2019 (date appears as “24” day of December 2019” in the extraction)
Scope and sourcePromoter declaration includes completion undertaking and project-account undertakings.

The supplied approval records describe occupancy certification for the clubhouse and both residential towers. The building permit also states that an occupancy certificate is compulsory before occupation and that the sanctioned plan is to be followed. Detailed approval conditions and further approval review belong in the Approvals section.

Frequently asked questions

Is TITANIA registered with Telangana RERA?

Yes. TITANIA is registered with the Telangana Real Estate Regulatory Authority as P02400001817; the registration status is New Project.

Who is the developer of TITANIA?

The promoter named in the RERA registration is GHR INFRA.

Where is TITANIA located?

TITANIA is in MASJID BANDA, Serilingampally, Rangareddy, Telangana (500084).

When will TITANIA be completed?

The promoter's proposed date of completion filed with RERA is 19/12/2025. This is the promoter's declaration, not a guarantee.

More projects in Masjid Banda