Tapasya
SANCTUARY HABITAT PRIVATE LIMITED · Vikarabad · RERA P02100008345
TAPASYA is a plotted development in Kandlapally, Pudur Mandal, Vikarabad District. The registered promoter is SANCTUARY HABITAT PRIVATE LIMITED. The layout records land area of 47853.67 sqmts and 36 residential plots; tower, floor and building counts are not applicable in the supplied layout record, and plot configurations beyond residential plots are not stated. TG-RERA registration number P02100008345 records the original and revised proposed completion dates as 24/11/2025.
01What we found
Read from TG-RERA filings, approvals, land and registration records and court records. A court case is counted only when the court record states this project's survey number with its village, or names the project.
02Check before you pay
7 items to check before you pay, 4 high - from the title chain, court records and approvals, each with what to ask the builder or your advocate. An item may not be a problem with the project: records can be incomplete.
1. Project at a glance
Project identity
| Item | RERA-filed record |
|---|---|
| Registered project name | TAPASYA RERA record |
| Project type | Plotted development / open-plot layout RERA record RERA filing |
| Phase / registered portion | No separate phase name is disclosed; the registration identifies the plotted layout on the stated survey land. |
| TG-RERA registration number | P02100008345 RERA record |
| Registration validity | Certificate states it runs from 07/06/2024 to 24/11/2025, unless extended by the Authority. Registration validity is distinct from the project completion date. |
| Registered promoter | SANCTUARY HABITAT PRIVATE LIMITED RERA record |
| RERA status | Record labels the project “On-Going Project”; current registration status or extension after the stated validity end date is not supplied. RERA record |
Land and geographic identity
| Item | RERA-filed record |
|---|---|
| Locality / revenue village | Kandlapally (also rendered “Kandlapalle” in the approval records); revenue-village identity is not separately clarified beyond these records. RERA record |
| Mandal / district / PIN | Pudur Mandal, Vikarabad District, PIN 501501. RERA record |
| Project survey numbers | SY NOs 92/PART, 94/PART AND 95/PART; the draft layout document renders these as 92/PART, 94/PART & 95/PART and the approval letter as 92/P, 94/P, 95/P. RERA record |
| Registered site extent | Layout records state AC 11.825 CENTS. 57233.00 SQ.YDS. |
| RERA land area | Total and net area each recorded as 47853.67 sqmts; affected area recorded as 0. RERA filing |
| Boundaries | East: land in Sy. Nos. 94/PART and 95/PART; west: land in Sy. No. 92/PART; north: land in Sy. No. 93; south: existing Hyderabad to Vikarabad 200 feet road. RERA filing |
Development identity
| Item | Record |
|---|---|
| Sanctioning authority | Director of Town & Country Planning, Government of Telangana; the record describes the draft layout as delegated to Kandlapalle Gram Panchayat. Approvals record |
| Principal layout approval identifiers | T.L.P. No.2S)-/ 2023/ H (document 446896) and Draft-TLP.No.251/2023/H (document 446905); approval dates are recorded as 23\|11/ 2023 and 24-11-2023, respectively. Approvals record |
| Approved layout scale / plot count | Draft technical layout plan records scale 1"=100'-0" and 36 plots. |
| Built-up area / buildings / floors | Not disclosed for this plotted layout; tower, floor and building-count fields are not applicable in the supplied layout record. RERA filing |
| Approved built-up area field | 31338.59 sqmts is recorded as approved built-up area in the RERA fields; its meaning or application to individual plots/buildings is not further explained in the supplied material. RERA filing |
Offering and status
| Item | Record |
|---|---|
| Unit type | Residential plots; the draft approval specifies detached dwelling houses for single-family occupation. RERA filing |
| Plot count | 36 in the draft technical layout record. |
| Plot size range | Not stated in the supplied RERA layout data. |
| Booked / available plots | Counts not supplied. |
| Saleable size | The project’s unit-level RERA saleable-area schedule is not supplied. The filed allotment-letter template leaves plot particulars blank. |
| Construction / development stage | The RERA record labels the project “On-Going Project” and records overall completeness as 80%; the date, scope and independent verification basis for that percentage are not supplied. RERA record |
| Completion dates | Original and revised proposed completion dates are both 24/11/2025; the promoter’s Form B declaration undertakes completion on or before that date. RERA record |
| OC / completion certificate | No occupancy or completion certificate is supplied. The project is a plotted layout; the evidence does not establish an OC or completion-certificate status for any individual dwelling. RERA record Document index |
2. The project story
TAPASYA is registered as an open-plot residential layout in Kandlapally, Pudur Mandal, Vikarabad District. Its registered land identity covers portions of survey numbers 92, 94 and 95, with the filed land record listing 47853.67 sqmts and the draft layout records describing AC 11.825 CENTS. 57233.00 SQ.YDS. RERA record RERA filing
The draft technical layout shows 36 plots, with land allocated to plots, roads and open space. It also identifies Plot Nos. 30 and 36 as mortgage plots for the Gram Panchayat. The approval conditions describe roads and open space to be gifted to the Gram Panchayat before release of the final layout, and state that plots in the mortgaged area are not to be sold. These are conditions recorded in the filed layout-approval documents; the supplied evidence does not establish their subsequent completion or final-layout release.
The project is labelled ongoing and 80% complete in the RERA record, but no dated site inspection or independently verified construction-progress report is supplied. That percentage should therefore be read as a recorded project figure, not as an independent confirmation of present site condition. RERA record
3. Master plan, architecture & building design
The available plan evidence concerns a plotted layout, not an apartment or tower scheme. The draft technical layout records a total layout area of AC 11.825 CENTS. 57233.00 SQ.YDS., 36 plots, and the following land-use distribution: 65.50% plotted area (AC 7.744 CENTS. 37480.96 SQ.YDS.), 24.50% roads area (AC 2.898 CENTS. 14026.32 SQ.YDS.) and 10.43% open space (AC 1.183 CENTS. 5725.72 SQ.YDS.).
The approval letter describes roads of 33'-0" and 60'-0", and an adjoining existing 200'-0* WIDE ROAD. It records a 10.00 M BUILDING LINE. The approval conditions specify detached dwelling houses for single-family occupation and say plots are not to be altered or subdivided for occupation by more than one family.
The layout record identifies Plot Nos. 30 and 36 as mortgaged plots with a combined stated area of AC 1.213 cents or 5870.92 Sq. Yards. The supplied plan material does not provide individual plot dimensions, plot-by-plot orientation, building designs, building footprints, apartment configurations or a final released-layout plan.
4. Homes, configurations & floor plans
The registered offering is a plotted layout, not a schedule of apartment configurations. The supplied RERA material identifies 36 plots in the draft layout but does not give plot-size bands, plot-wise saleable areas, booking counts or available counts. The filed plot-allotment-letter template is incomplete, with plot and allottee particulars left blank.
Two drawing files are recorded, but neither has a completed software measurement; both are listed as scans pending. Accordingly, no measured carpet area or plot-level dimensions can be reported. Floor plans
| Configuration | Units | Booked | Available | RERA saleable area | Measured carpet area | Loading (if supplied) |
|---|---|---|---|---|---|---|
| Residential plots | 36 in draft layout | Not supplied | Not supplied | Plot-wise figures not supplied | Not applicable / not measured | Not supplied |
5. Parking & vehicle circulation
The supplied layout records roads and plot access but do not establish parking-space counts, visitor or accessible parking, parking allocation to individual plots, or a parking layout. The approval conditions require roads to be opened for access to neighbouring sites and prohibit a compound wall or fencing around the site.
6. Amenities, recreation & open spaces
The layout approval identifies a reserved open space / park and lists several infrastructure or amenity items in the RERA record. The percentages shown below are recorded progress figures; no independent inspection evidence is supplied. RERA amenities
| Description / size | AC 1.183 cents; 5725.72 Sq. Yds.; draft plan records 10.43%, while the approval letter states 10.00%. |
|---|---|
| Evidence source | Draft layout and approval letter |
| Declared progress / verified status | Approval-plan provision; amenities record shows aggregate recreational open space at 0%. Handover or completion not established. RERA amenities |
| Description / size | Road area: AC 2.898 cents; 14026.32 Sq. Yds.; road widths include 33'-0" and 60'-0". |
|---|---|
| Evidence source | Layout plan; RERA amenity record |
| Declared progress / verified status | RERA progress recorded at 70%; independent completion not verified. RERA amenities |
| Description / size | No source, capacity or storage details supplied. |
|---|---|
| Evidence source | RERA amenity record |
| Declared progress / verified status | Progress recorded at 70%; independent completion not verified. RERA amenities |
| Description / size | RERA amenity entry refers to chambers, lines, septic tank and STP; no capacity or treatment details supplied. |
|---|---|
| Evidence source | RERA amenity record; vendor list RERA amenities Promoter website |
| Declared progress / verified status | Sewerage entry progress recorded at 70%; treatment/disposal entry at 0%. Independent completion not verified. RERA amenities |
| Description / size | No additional dimensions supplied. |
|---|---|
| Evidence source | RERA amenity record |
| Declared progress / verified status | Progress recorded at 70%; independent completion not verified. RERA amenities |
| Description / size | No fixture or coverage details supplied. |
|---|---|
| Evidence source | RERA amenity record; vendor list RERA amenities Promoter website |
| Declared progress / verified status | Progress recorded at 70%; independent completion not verified. RERA amenities |
| Description / size | No system capacity or design details supplied. |
|---|---|
| Evidence source | RERA amenity record; vendor list RERA amenities Promoter website |
| Declared progress / verified status | Progress recorded at 70%; independent completion not verified. RERA amenities |
| Description / size | No capacity or equipment details supplied. |
|---|---|
| Evidence source | RERA amenity record |
| Declared progress / verified status | Progress recorded at 70%; independent completion not verified. RERA amenities |
| Description / size | No details supplied. |
|---|---|
| Evidence source | RERA amenity record |
| Declared progress / verified status | Progress recorded at 0%. RERA amenities |
| Description / size | No system details supplied. |
|---|---|
| Evidence source | RERA amenity record |
| Declared progress / verified status | Progress recorded at 0%. RERA amenities |
| Description / size | No system details supplied. |
|---|---|
| Evidence source | RERA amenity record |
| Declared progress / verified status | Progress recorded at 0%. RERA amenities |
The vendor list also mentions children’s play areas / sand pits and power backup, but these are vendor-supplied claims rather than established layout-plan provisions or independently verified completed facilities. Promoter website
7. Utilities, building services & safety
The RERA amenity record lists water supply, sewerage infrastructure, water conservation/rainwater harvesting and an electrical meter room/sub-station/receiving station, each with progress recorded at 70%. It does not provide source, capacity, design or commissioning information. Storm-water drains, sewage-treatment/disposal, solid-waste management, energy management and fire-protection/fire-safety entries show 0% progress in that record. These are recorded progress figures, not independent completion findings. RERA amenities
No project-specific details are supplied for water storage or treatment, recycled-water use, electrical backup capacity, EV charging, fire systems or clearances, security systems, accessibility provisions, or dwelling-level services. The vendor list mentions power backup and an STP, but does not supply technical particulars or verification of delivery. Promoter website
8. Location, access & connectivity
The RERA location is Kandlapally, Pudur, Vikarabad, 501501. The filed layout identifies the south boundary as the existing Hyderabad to Vikarabad 200 feet road, and the approval plan shows internal roads recorded as 33'-0" and 60'-0". RERA filing
The supplied location record gives an approximate distance of 35.3 km to the nearest sampled Outer Ring Road interchange. This is a location-data measurement, not a promoter travel-time claim. Location record
The parcel-centroid coordinates recorded in the cadastral data are 17.30927889056575, 78.02098883288612. Cadastral map
9. Developer & development status
The registered promoter is SANCTUARY HABITAT PRIVATE LIMITED, a company. The supplied corporate record lists GSTIN 36AAECN8603P1ZY; the PAN is masked as xxxxxx603P. RERA record Corporate record RERA filing
The RERA promoter address is recorded as SANCTUARY HABITAT PRIVATE LIMITED, SAI GANESH COLONY, KANDLAPALLE GRAMPANCHAYATH AND VILLAGE, PUDUR MANDAL, Pudur, Vikarabad, 501501. The registration certificate separately prints a promoter address in Hyderabad, PIN 500032. No official project contact details or promoter website are supplied for this overview. Parties record
The promoter’s Form B affidavit, dated 03/06/2024, declares title to the stated land, states that the land is free from encumbrances, and undertakes project completion on or before 24/11/2025. These are promoter declarations in the filed affidavit. The RERA record gives an 80% completeness figure, but no dated or independently verified site-progress evidence accompanies it.
10. Approvals, official records & documents
| Record | Supplied evidence and scope |
|---|---|
| TG-RERA registration | Form C certificate for TAPASYA, registration P02100008345, naming Sanctuary Habitat Private Limited and the project location/survey identity; stated validity 07/06/2024–24/11/2025, unless extended. |
| Draft layout approval | Director of Town & Country Planning approval record for the draft technical layout at Kandlapalle, covering Sy. Nos. 92/P, 94/P and 95/P, with 36 plots and stated layout conditions. Identifiers include Draft-TLP.No.251/2023/H, file Lr.Roc.No.3481/2350/2023/e-Panchayat, and application 3481/2350. |
| Draft technical layout plan | Layout record identifies T.L.P. No.2S)-/ 2023/ H, 36 plots and land-use allocations. |
| Layout-permission payment receipt | Receipt under Panchayat Raj & Rural Employment records reference 1652717 and payment of 2350; the supplied extraction says it does not establish that layout permission was sanctioned. |
| Other approval-number record | Document 446906 contains number strings and a portal reference but no legible heading or identifiable approval, land or terms in the supplied extraction. |
| Promoter declaration | Form B affidavit by Sanctuary Habitat Private Limited, signed through authorised signatory Phani Raja Kumari Meka, dated 03/06/2024. |
| Allotment-letter template | Plot allotment-letter template filed for the project; the extracted document leaves buyer, plot and booking particulars blank. |
The supplied file set does not include a final layout-release document, a project-specific occupancy/completion certificate, or an independently verified site-completion record. No apartment-building commencement or floor-plan evidence is supplied; the project record describes a plotted layout. Document index
1. Project at a glance
Project identity
Registered project name: TAPASYA
Project type: Plotted development / open-plot layout
Phase / registered portion: No separate phase name is disclosed; the registration identifies the plotted layout on the stated survey land.
TG-RERA registration number: P02100008345
Registration validity: Certificate states it runs from 07/06/2024 to 24/11/2025, unless extended by the Authority. Registration validity is distinct from the project completion date.
Registered promoter: SANCTUARY HABITAT PRIVATE LIMITED
RERA status: Record labels the project “On-Going Project”; current registration status or extension after the stated validity end date is not supplied.
Land and geographic identity
Locality / revenue village: Kandlapally (also rendered “Kandlapalle” in the approval records); revenue-village identity is not separately clarified beyond these records.
Mandal / district / PIN: Pudur Mandal, Vikarabad District, PIN 501501.
Project survey numbers: SY NOs 92/PART, 94/PART AND 95/PART; the draft layout document renders these as 92/PART, 94/PART & 95/PART and the approval letter as 92/P, 94/P, 95/P.
Registered site extent: Layout records state AC 11.825 CENTS. 57233.00 SQ.YDS.
RERA land area: Total and net area each recorded as 47853.67 sqmts; affected area recorded as 0.
Boundaries: East: land in Sy. Nos. 94/PART and 95/PART; west: land in Sy. No. 92/PART; north: land in Sy. No. 93; south: existing Hyderabad to Vikarabad 200 feet road.
Development identity
Sanctioning authority: Director of Town & Country Planning, Government of Telangana; the record describes the draft layout as delegated to Kandlapalle Gram Panchayat.
Principal layout approval identifiers: T.L.P. No.2S)-/ 2023/ H (document 446896) and Draft-TLP.No.251/2023/H (document 446905); approval dates are recorded as 23\|11/ 2023 and 24-11-2023, respectively.
Approved layout scale / plot count: Draft technical layout plan records scale 1"=100'-0" and 36 plots.
Built-up area / buildings / floors: Not disclosed for this plotted layout; tower, floor and building-count fields are not applicable in the supplied layout record.
Approved built-up area field: 31338.59 sqmts is recorded as approved built-up area in the RERA fields; its meaning or application to individual plots/buildings is not further explained in the supplied material.
Offering and status
Unit type: Residential plots; the draft approval specifies detached dwelling houses for single-family occupation.
Plot count: 36 in the draft technical layout record.
Plot size range: Not stated in the supplied RERA layout data.
Booked / available plots: Counts not supplied.
Saleable size: The project’s unit-level RERA saleable-area schedule is not supplied. The filed allotment-letter template leaves plot particulars blank.
Construction / development stage: The RERA record labels the project “On-Going Project” and records overall completeness as 80%; the date, scope and independent verification basis for that percentage are not supplied.
Completion dates: Original and revised proposed completion dates are both 24/11/2025; the promoter’s Form B declaration undertakes completion on or before that date.
OC / completion certificate: No occupancy or completion certificate is supplied. The project is a plotted layout; the evidence does not establish an OC or completion-certificate status for any individual dwelling.
2. The project story
TAPASYA is registered as an open-plot residential layout in Kandlapally, Pudur Mandal, Vikarabad District. Its registered land identity covers portions of survey numbers 92, 94 and 95, with the filed land record listing 47853.67 sqmts and the draft layout records describing AC 11.825 CENTS. 57233.00 SQ.YDS.
The draft technical layout shows 36 plots, with land allocated to plots, roads and open space. It also identifies Plot Nos. 30 and 36 as mortgage plots for the Gram Panchayat. The approval conditions describe roads and open space to be gifted to the Gram Panchayat before release of the final layout, and state that plots in the mortgaged area are not to be sold. These are conditions recorded in the filed layout-approval documents; the supplied evidence does not establish their subsequent completion or final-layout release.
The project is labelled ongoing and 80% complete in the RERA record, but no dated site inspection or independently verified construction-progress report is supplied. That percentage should therefore be read as a recorded project figure, not as an independent confirmation of present site condition.
3. Master plan, architecture & building design
The available plan evidence concerns a plotted layout, not an apartment or tower scheme. The draft technical layout records a total layout area of AC 11.825 CENTS. 57233.00 SQ.YDS., 36 plots, and the following land-use distribution: 65.50% plotted area (AC 7.744 CENTS. 37480.96 SQ.YDS.), 24.50% roads area (AC 2.898 CENTS. 14026.32 SQ.YDS.) and 10.43% open space (AC 1.183 CENTS. 5725.72 SQ.YDS.).
The approval letter describes roads of 33'-0" and 60'-0", and an adjoining existing 200'-0* WIDE ROAD. It records a 10.00 M BUILDING LINE. The approval conditions specify detached dwelling houses for single-family occupation and say plots are not to be altered or subdivided for occupation by more than one family.
The layout record identifies Plot Nos. 30 and 36 as mortgaged plots with a combined stated area of AC 1.213 cents or 5870.92 Sq. Yards. The supplied plan material does not provide individual plot dimensions, plot-by-plot orientation, building designs, building footprints, apartment configurations or a final released-layout plan.
4. Homes, configurations & floor plans
The registered offering is a plotted layout, not a schedule of apartment configurations. The supplied RERA material identifies 36 plots in the draft layout but does not give plot-size bands, plot-wise saleable areas, booking counts or available counts. The filed plot-allotment-letter template is incomplete, with plot and allottee particulars left blank.
Two drawing files are recorded, but neither has a completed software measurement; both are listed as scans pending. Accordingly, no measured carpet area or plot-level dimensions can be reported.
| Configuration | Units | Booked | Available | RERA saleable area | Measured carpet area | Loading (if supplied) |
|---|---|---|---|---|---|---|
| Residential plots | 36 in draft layout | Not supplied | Not supplied | Plot-wise figures not supplied | Not applicable / not measured | Not supplied |
5. Parking & vehicle circulation
The supplied layout records roads and plot access but do not establish parking-space counts, visitor or accessible parking, parking allocation to individual plots, or a parking layout. The approval conditions require roads to be opened for access to neighbouring sites and prohibit a compound wall or fencing around the site.
6. Amenities, recreation & open spaces
The layout approval identifies a reserved open space / park and lists several infrastructure or amenity items in the RERA record. The percentages shown below are recorded progress figures; no independent inspection evidence is supplied.
| Description / size | AC 1.183 cents; 5725.72 Sq. Yds.; draft plan records 10.43%, while the approval letter states 10.00%. |
|---|---|
| Evidence source | Draft layout and approval letter |
| Declared progress / verified status | Approval-plan provision; amenities record shows aggregate recreational open space at 0%. Handover or completion not established. |
| Description / size | Road area: AC 2.898 cents; 14026.32 Sq. Yds.; road widths include 33'-0" and 60'-0". |
|---|---|
| Evidence source | Layout plan; RERA amenity record |
| Declared progress / verified status | RERA progress recorded at 70%; independent completion not verified. |
| Description / size | No source, capacity or storage details supplied. |
|---|---|
| Evidence source | RERA amenity record |
| Declared progress / verified status | Progress recorded at 70%; independent completion not verified. |
| Description / size | RERA amenity entry refers to chambers, lines, septic tank and STP; no capacity or treatment details supplied. |
|---|---|
| Evidence source | RERA amenity record; vendor list |
| Declared progress / verified status | Sewerage entry progress recorded at 70%; treatment/disposal entry at 0%. Independent completion not verified. |
| Description / size | No additional dimensions supplied. |
|---|---|
| Evidence source | RERA amenity record |
| Declared progress / verified status | Progress recorded at 70%; independent completion not verified. |
| Description / size | No fixture or coverage details supplied. |
|---|---|
| Evidence source | RERA amenity record; vendor list |
| Declared progress / verified status | Progress recorded at 70%; independent completion not verified. |
| Description / size | No system capacity or design details supplied. |
|---|---|
| Evidence source | RERA amenity record; vendor list |
| Declared progress / verified status | Progress recorded at 70%; independent completion not verified. |
| Description / size | No capacity or equipment details supplied. |
|---|---|
| Evidence source | RERA amenity record |
| Declared progress / verified status | Progress recorded at 70%; independent completion not verified. |
| Description / size | No details supplied. |
|---|---|
| Evidence source | RERA amenity record |
| Declared progress / verified status | Progress recorded at 0%. |
| Description / size | No system details supplied. |
|---|---|
| Evidence source | RERA amenity record |
| Declared progress / verified status | Progress recorded at 0%. |
| Description / size | No system details supplied. |
|---|---|
| Evidence source | RERA amenity record |
| Declared progress / verified status | Progress recorded at 0%. |
The vendor list also mentions children’s play areas / sand pits and power backup, but these are vendor-supplied claims rather than established layout-plan provisions or independently verified completed facilities.
7. Utilities, building services & safety
The RERA amenity record lists water supply, sewerage infrastructure, water conservation/rainwater harvesting and an electrical meter room/sub-station/receiving station, each with progress recorded at 70%. It does not provide source, capacity, design or commissioning information. Storm-water drains, sewage-treatment/disposal, solid-waste management, energy management and fire-protection/fire-safety entries show 0% progress in that record. These are recorded progress figures, not independent completion findings.
No project-specific details are supplied for water storage or treatment, recycled-water use, electrical backup capacity, EV charging, fire systems or clearances, security systems, accessibility provisions, or dwelling-level services. The vendor list mentions power backup and an STP, but does not supply technical particulars or verification of delivery.
8. Location, access & connectivity
The RERA location is Kandlapally, Pudur, Vikarabad, 501501. The filed layout identifies the south boundary as the existing Hyderabad to Vikarabad 200 feet road, and the approval plan shows internal roads recorded as 33'-0" and 60'-0".
The supplied location record gives an approximate distance of 35.3 km to the nearest sampled Outer Ring Road interchange. This is a location-data measurement, not a promoter travel-time claim.
The parcel-centroid coordinates recorded in the cadastral data are 17.30927889056575, 78.02098883288612.
9. Developer & development status
The registered promoter is SANCTUARY HABITAT PRIVATE LIMITED, a company. The supplied corporate record lists GSTIN 36AAECN8603P1ZY; the PAN is masked as xxxxxx603P.
The RERA promoter address is recorded as SANCTUARY HABITAT PRIVATE LIMITED, SAI GANESH COLONY, KANDLAPALLE GRAMPANCHAYATH AND VILLAGE, PUDUR MANDAL, Pudur, Vikarabad, 501501. The registration certificate separately prints a promoter address in Hyderabad, PIN 500032. No official project contact details or promoter website are supplied for this overview.
The promoter’s Form B affidavit, dated 03/06/2024, declares title to the stated land, states that the land is free from encumbrances, and undertakes project completion on or before 24/11/2025. These are promoter declarations in the filed affidavit. The RERA record gives an 80% completeness figure, but no dated or independently verified site-progress evidence accompanies it.
10. Approvals, official records & documents
TG-RERA registration: Form C certificate for TAPASYA, registration P02100008345, naming Sanctuary Habitat Private Limited and the project location/survey identity; stated validity 07/06/2024–24/11/2025, unless extended.
Draft layout approval: Director of Town & Country Planning approval record for the draft technical layout at Kandlapalle, covering Sy. Nos. 92/P, 94/P and 95/P, with 36 plots and stated layout conditions. Identifiers include Draft-TLP.No.251/2023/H, file Lr.Roc.No.3481/2350/2023/e-Panchayat, and application 3481/2350.
Draft technical layout plan: Layout record identifies T.L.P. No.2S)-/ 2023/ H, 36 plots and land-use allocations.
Layout-permission payment receipt: Receipt under Panchayat Raj & Rural Employment records reference 1652717 and payment of 2350; the supplied extraction says it does not establish that layout permission was sanctioned.
Other approval-number record: Document 446906 contains number strings and a portal reference but no legible heading or identifiable approval, land or terms in the supplied extraction.
Promoter declaration: Form B affidavit by Sanctuary Habitat Private Limited, signed through authorised signatory Phani Raja Kumari Meka, dated 03/06/2024.
Allotment-letter template: Plot allotment-letter template filed for the project; the extracted document leaves buyer, plot and booking particulars blank.
The supplied file set does not include a final layout-release document, a project-specific occupancy/completion certificate, or an independently verified site-completion record. No apartment-building commencement or floor-plan evidence is supplied; the project record describes a plotted layout.
Frequently asked questions
Is TAPASYA registered with Telangana RERA?
Yes. TAPASYA is registered with the Telangana Real Estate Regulatory Authority as P02100008345; the registration status is On-Going Project.
Who is the developer of TAPASYA?
The promoter named in the RERA registration is SANCTUARY HABITAT PRIVATE LIMITED.
Where is TAPASYA located?
TAPASYA is in PUDUR MANDAL, Kandlapally, Pudur, Vikarabad, Telangana (501501).
When will TAPASYA be completed?
The promoter's proposed date of completion filed with RERA is 24/11/2025. This is the promoter's declaration, not a guarantee.